Other files
| File |
Type |
Posted |
| Base Admin Building_CNC LUC Area Construction Permit_Approved.pdf |
PDF |
|
| 70Z04725PCNI0007 Amendment 0005.pdf |
PDF |
|
| 70Z04725PCNI0007 Amendment 0004 PPI 22 Response.pdf |
PDF |
|
| 70Z04725PCNI0007 Amendment 0004.pdf |
PDF |
|
| TruckSearchCanopy.pdf |
PDF |
|
| Base Admin Geotechnical Report (2024).pdf |
PDF |
|
| 70Z04725PCNI0007 Amendment 0003.pdf |
PDF |
|
| LUC Area Construction Permit BLANK 2018-1003.pdf |
PDF |
|
| Site Visit Attendance Log.pdf |
PDF |
|
| Attachment A. Site Visit Meeting Location.pdf |
PDF |
|
| 70Z04725PCNI0007 Amendment 0002.pdf |
PDF |
|
| Attachment B. Base Charleston Topo Utilities.zip |
ZIP file |
|
| 70Z04725PCNI0007 Amendment 0001.pdf |
PDF |
|
| 70Z04725PCNI0007 SF1442.pdf |
PDF |
|
| General Decision Number SC20250023 01.03.2025.pdf |
PDF |
|
| Pre-Proposal Inquiry Form.xlsx |
XLSX spreadsheet |
|
| Attachment B - Geotechnical Report.zip |
ZIP file |
|
| Attachment H - BASE Charleston - Mechanical for UMCS system.pdf |
PDF |
|
| Attachment J - Sanitary Sewer As-Built Drawings.pdf |
PDF |
|
| Attachment G - SCPA N. Hobson Ave. Reconstruction.pdf |
PDF |
|
| Attachment K - USCG-FLETC Fence Line MOU.pdf |
PDF |
|
| General Decision Number SC20250041 01.03.2025.pdf |
PDF |
|
| CHARLESTON INFRA SPECS_COMBINED_24JUN25.pdf |
PDF |
|
| Attachment A - Hydrostatic Flow Test Report.pdf |
PDF |
|
| Attachment F - Base Charleston Admin Facility Rendering.pdf |
PDF |
|
| Attachment I - 2004 RDA SS As-Builts.pdf |
PDF |
|
| 70Z04725PCNI0007 Task Order Announcement (TOA).pdf |
PDF |
|
| CHAR INFRA DRAWINGS COMBINED 23JUNE25.pdf |
PDF |
|
| Attachment E - Referenced Design Standards and CSTOs.zip |
ZIP file |
|
| Attachment L - FLETC Final Grading and Drainage Plan.pdf |
PDF |
|
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated .