Site Visit Attendance Log.pdf

PDF 37 MB Posted

Attached to
DESIGN BUILD CONSTRUCTION FOR UTILITY INFRASTRUCTURE, ROADS & CLINIC AT USCG BASE CHARLESTON, SOUTH CAROLINA
Solicitation number
70Z04725RPCNI0007
Issued by

About this file

The Site Visit Attendance Log.pdf appears to be a document recording participants who attended an on-site visit for the USCG Base Charleston construction project. While the specific details of the log are not provided in the excerpt, the related federal contract opportunity involves a comprehensive design-build construction project for the US Coast Guard in Charleston, South Carolina.

The project scope includes constructing a new Entry Control Point/Main Gate with a Guard House and Visitor's Check-In Center, installing site utilities, and building a Medical/Dental Facility. The medical facility is designed with specific sustainable building requirements, emphasizing energy efficiency, environmental performance, and resilience. The building must comply with the Guiding Principles for Sustainable Federal Buildings (2020), incorporating features like storm surge adaptability, integrated design principles, optimized energy performance, and enhanced indoor environmental protections. The project is solicited under Solicitation Number 70Z04725RPCNI0007 by the Department of Homeland Security US Coast Guard, with the contractor expected to complete work according to government-accepted specifications and drawings.

View the file

Other files

File Type Posted
Base Admin Building_CNC LUC Area Construction Permit_Approved.pdf PDF
70Z04725PCNI0007 Amendment 0005.pdf PDF
70Z04725PCNI0007 Amendment 0004 PPI 22 Response.pdf PDF
70Z04725PCNI0007 Amendment 0004.pdf PDF
TruckSearchCanopy.pdf PDF
Base Admin Geotechnical Report (2024).pdf PDF
70Z04725PCNI0007 Amendment 0003.pdf PDF
LUC Area Construction Permit BLANK 2018-1003.pdf PDF
Attachment A. Site Visit Meeting Location.pdf PDF
70Z04725PCNI0007 Amendment 0002.pdf PDF
Attachment B. Base Charleston Topo Utilities.zip ZIP file
70Z04725PCNI0007 Amendment 0001.pdf PDF
70Z04725PCNI0007 SF1442.pdf PDF
General Decision Number SC20250023 01.03.2025.pdf PDF
Pre-Proposal Inquiry Form.xlsx XLSX spreadsheet
Attachment B - Geotechnical Report.zip ZIP file
Attachment D - Electrical Service Documents.zip ZIP file
Attachment H - BASE Charleston - Mechanical for UMCS system.pdf PDF
Attachment J - Sanitary Sewer As-Built Drawings.pdf PDF
General Decision Number SC20250041 01.03.2025.pdf PDF
CHARLESTON INFRA SPECS_COMBINED_24JUN25.pdf PDF
Attachment A - Hydrostatic Flow Test Report.pdf PDF
Attachment F - Base Charleston Admin Facility Rendering.pdf PDF
Attachment I - 2004 RDA SS As-Builts.pdf PDF
Attachment G - SCPA N. Hobson Ave. Reconstruction.pdf PDF
Attachment K - USCG-FLETC Fence Line MOU.pdf PDF
70Z04725PCNI0007 Task Order Announcement (TOA).pdf PDF
CHAR INFRA DRAWINGS COMBINED 23JUNE25.pdf PDF
Attachment E - Referenced Design Standards and CSTOs.zip ZIP file
Attachment L - FLETC Final Grading and Drainage Plan.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .