This document is an Amendment (No. 0003) to a federal solicitation for a design-build contract for utility infrastructure, roads, and a clinic at the United States Coast Guard (USCG) Base in Charleston, South Carolina. The amendment extends the proposal due date from August 20, 2025, to September 3, 2025, at 4:30 pm Eastern Daylight Time and makes numerous modifications to the original Request for Proposal (RFP) specifications.
Key changes include removing references to net-zero energy and emissions requirements, updating ASHRAE standards from 2019 to 2022, modifying building design and construction specifications, adjusting lightning protection system requirements, revising geotechnical and environmental compliance guidelines, and clarifying various technical details for the medical/dental clinic, visitor center, and access control point facilities. The amendment also addresses multiple pre-proposal inquiries and provides attachments such as a Base Admin Geotechnical Report and site visit attendance log. The project involves constructing new facilities on a brownfield site with complex environmental and design considerations.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
2. AMENDMENT/MODIFICATION NUMBER
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Design-build the Utility Infrastructure, Roads & Clinic at United States Coast Guard (USCG) Base Charleston; Charleston, SC.
See continuation page(s).
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
6. ISSUED BY
U. S. Coast Guard Facilities Design & Construction Center 5505 Robin Hood Rd, Suite K Norfolk, VA, 23513
70Z04725PCNI0007
08/08/2025
9B. DATED (SEE ITEM 11)
07/11/2025
1 3044444
X
This amendment is issued to incorporate the following:
I. General Submission Instructions
Proposal due date is hereby extended from August 20, 2025, to September 3, 2025, 2025 at 4:30 pm Eastern Daylight Time (EDT).
II. Specifications
1. PPI #21, RFP Specification Section 01800, para. 1.4.2.5 and 1.4.2.5.2
Paragraph1.4.2.5: Delete the following verbiage:
“The project shall achieve as near to a net zero energy building as possible, with emphasis on an integrated building approach, specifically intelligent design of the building envelope paired with electrical and mechanical systems and the use of on-site renewable energy to make up the difference. See Section 1.4.2.5.2 for additional details regarding using renewable energy to meet the net zero energy goal.”
Paragraph1.4.2.5.2: Delete paragraph 1.4.2.5.2 in its entirety:
2. PPI #23, RFP Specification Section 01800, para. 1.3.1
Delete: Reference I
3. PPI #24, Table of Contents, Item 1.3
Delete: “AND LEED-NC CERTIFICATION”
Edited: Changed heading to 1.3.3, then renumbered remaining paragraphs sequentially.
4. PPI #36, RFP Specification Section 01800, para. 1.7.5.2
Delete: All interior walls shall be full height from floor to underside of floor structure or roof above.
Add: All interior spaces that require enhanced security, privacy noise reduction or acoustical control shall have full height from floor to underside of floor structure or roof above.
5. PPI #254, RFP Specification 01900, Attachment A-Geotechnical
Add: Base Admin Geotechnical Report (2024)
6. PPI #41, RFP Specification Section 01800, para. 1.7.10.2
Delete: 1.7.8.2
7. PPI #43, RFP Specification Section 01800, para. 1.7.9.4.2
Delete: At the exterior wall of the Central Kitchen and Dining, RFP space 205, a fixed glass window is shown. Base cabinets and countertop located on interior at the window location would prevent the longer double or single type of window being installed.
8. PPI #69, RFP Specification Section 01800, para. 1.4
Delete: paragraph 1.4. in its entirety.
9. PPI #45, RFP Specification Section 01800, para. 1.7.10.4
Delete: paragraph 1.7.10.4. in its entirety.
10. PPI #46, RFP Specification Section 01800, para. 1.7.10.6
Delete: “Wash-Down Drying/Gear Storage” from title.
11. PPI #88, RFP Specification Section 01800, para. 1.7.10.5
Delete: paragraph 1.7.10.5. in its entirety.
Replace with: 1.7.10.5 Wall and Door Protection Provide wall corner protection as applicable for the function of the space.
12. PPI #47, RFP Specification Section 01800, para. 1.7.10.6.6 & 1.7.10.6.7
Delete: paragraph 1.7.10.6.6 and 1.7.10.6.7 in their entirety.
13. PPI #48, RFP Specification Section 01800, para. 1.7.10.6.9
Delete: paragraph 1.7.10.6.9 in its entirety.
14. PPI #49, RFP Specification Section 01800, para. 1.7.11.2.2
Delete: paragraph 1.7.11.2.2 in its entirety.
15. PPI #54, RFP Specification Section 01800, para. 1.9.3.2
Delete: Reuse of existing materials on-site would only be acceptable if approved as part of LEED certification and if approved by the Contracting Officer. Any materials commonly recycled locally shall be disposed of by the Contractor in an approved recycle site for that type of material.
All demolished debris and construction waste materials shall be diverted from landfills in accordance with the principles of integrated sustainable design contained in the latest LEED-NC rating system. Construction waste management is to be prepared in accordance with LEED principles and practices, but LEED submittal and accreditation is not required.
The Contractor shall provide an analysis of the LEED-NC criteria as it applies to the design of this project and include that analysis with each design submittal.
16. PPI #65, RFP Specification Section 01800, para. 1.13.11.18
Delete: paragraph 1.13.11.18
17. PPI #66, RFP Specification Section 01800, para. 1.13.15.1
Delete: paragraph 1.13.15.1 Replace: Provide a lightning protection system for The Medical/Denal Clinic building, Paheand the access control point. The system shall be master labeled by a testing laboratory or by a testing laboratory certified installer. Provide a perimeter ground ring around the Consolidated Sector Base Facility building with minimum size #1/0 bare stranded copper cable, 10-foot x ¾ inch copper clad steel ground rods at maximum 10-foot intervals and with a minimum of two test wells for ground rod access. All connections to the ground ring shall be exothermically welded.
18. PPI #96, RFP Specification Section 01800, para. 1.12.4.2
Delete: paragraph 1.12.4.2 Replace: Provide permanent elevated platforms for all exterior mounted mechanical equipment on grade. Platform elevation shall be at the Finished Floor Elevation per ASCE-24 for the 100-year flood. Equipment includes but is not limited to condensing units, air-cooled chillers, etc. Platform materials shall be stainless steel or concrete.
19. PPI #52, RFP Specification Section 01800, para. 1.9.1.4
Delete: Remove all existing underground utility lines and aboveground features, underground electrical duct bank and cables and aboveground electrical equipment, and surface utility features not used within the limits of the CG Enclave.
Replace: Remove all the aboveground features, electrical equipment, and surface utility features within the limits of the CG Enclave. Existing underground utilities to be abandoned in place.
20. PPI #173, RFP Specification Section 01800, para. 1.8.3.1
Delete: The structural loads and design, including deflection limitations, shall be in accordance with the latest edition of the South Carolina Building Code and ASCE Standard 7 entitled "Minimum Design Loads for Buildings and Other Structures".
Structural loads include all dead, live, snow, wind, seismic, earth, vehicular and hydrodynamic forces as applicable. In the event of a conflict between the requirements the criteria given in ASCE 7 shall govern.
Replace: The building’s design loads shall be determined in accordance with the latest edition of the Unified Facilities Criteria 1-200-01 DoD Building Code and the latest edition of the South Carolina Building Code. While UFC 1-200-01 is the overarching document for buildings and facilities owned by DoD it shall be used for this USCG project. UFC 1-200-01 directs the use of the International Building Code® (IBC), the International Existing Building Code® (IEBC), and other UFC as applicable to the building, facility, structure, or system.
As stated in UFC 1-200-01, Para 2-16, structural design shall follow the IBC Chapter 16, except as modified within 1-200-01 and UFC 3-301-01 ‘Structural Engineering with Change 3’ (03 Feb 2025). UFC 3-301-01 provides requirements for structures designed and constructed for the Department of Defense (DoD). The technical requirements therein are based on the 2024 IBC, as modified by UFC 1-200-01 and the structural standard referenced by the 2024 IBC: ASCE/SEI 7-22 Minimum Design Loads and Associated Criteria for Buildings and Other Structures. The criteria further provides limited technical guidance for seismic evaluation and strengthening of existing buildings, and references ICSSC RP 10, Standards of Seismic Safety for Existing Federally Owned and Leased Buildings (RP 10) as well as ASCE/SEI 41-17, Seismic Evaluation and Retrofit of Existing Buildings.
Additionally, for non-seismic retrofit of existing buildings, the criteria references the 2024 edition of the International Existing Building Code (2024 IEBC). This information is for use by structural engineers to develop design calculations, specifications, plans, and design-build Requests for Proposal (RFPs), and it is meant to serve as the minimum design requirement for DoD buildings.
The 2024 IBC provisions are directed toward public health, safety, and general welfare, presenting minimum standards that must be met by the private sector construction industry. The use of industry standards for DoD projects promotes communication in the marketplace, improves competition, and results in cost savings. However, the military sometimes requires higher standards to achieve unique building performance, or to construct types of facilities that are not used in the private sector. In addition, the construction of military facilities outside the United States can introduce requirements that are not addressed in national model building codes. Modifications to the 2024 IBC and ASCE 7-22 provisions contained herein are intended to fulfill those unique military requirements. Where conflicts between the 2024 IBC or ASCE 7-22 and this UFC arise, this UFC prevails.
21. PPI #255, RFP Specification Section 01800, para. 1.5.1
Delete: Remove the last paragraph that reads, These factors present a significant challenge to site development and foundation design and construction. The Contractor needs to account for these variables and risks.'
22. PPI #120, RFP Specification Section 01800, para. 1.7.14.1
Delete: 3,500 Lbs.
Add: 4,000 Lbs.
23. PPI #304, RFP Specification Section 01800, para. 1.13.15.1
Delete: Provide a lightning protection system for Consolidated Sector Base Facility building. The system shall be master labeled by a testing laboratory or by a testing laboratory certified installer. Provide a perimeter ground ring around the Consolidated Sector Base Facility building with minimum size #1/0 bare stranded copper cable, 10-foot x ¾ inch copper clad steel ground rods at maximum 10-foot intervals and with a minimum of two test wells for ground rod access. All connections to the ground ring shall be exothermically welded.
Add: Provide a lightning protection system for Medical-Dental building. The system shall be master labeled by a testing laboratory or by a testing laboratory certified installer.
Provide a perimeter ground ring around the Consolidated Sector Base Facility building with minimum size #1/0 bare stranded copper cable, 10-foot x ¾ inch copper clad steel ground rods at maximum 10-foot intervals and with a minimum of two test wells for ground rod access. All connections to the ground ring shall be exothermically welded.
24. PPI #304, RFP Specification Section 01800, para. 1.13.15.2
Delete: Provide a single point ground system with a buried perimeter ground ring around the Consolidated Sector Base Facility building. The ground ring shall have minimum size #1/0 bare stranded copper cable, 10-foot by ¾ inch copper clad steel ground rods at maximum 3-foot intervals, and a minimum of two test wells for ground rod access. All connections to the ground ring shall be exothermically welded.
Add: Provide a single point ground system with a buried perimeter ground ring around the Medical-Dental building. The ground ring shall have minimum size #1/0 bare stranded copper cable, 10-foot by ¾ inch copper clad steel ground rods at maximum 3-foot intervals, and a minimum of two test wells for ground rod access. All connections to the ground ring shall be exothermically welded.
25. PPI #207, RFP Specification Section 01800, para. 1.7.4.1
Delete: 1.7.4.1 Building Insulation Provide rigid or closed-cell spray foam depending on building envelope design. As mentioned above, the exterior perimeter wall system of the BMWB structure may feature insulation factory applied within a precast architectural concrete wall panel. MWB structure or it may be site applied within the inner perimeter metal stud wall at the multi-story structure and possibly the BMWB structure. Site applied perimeter wall insulation in the stud cavities shall be either closed-cell spray foam or a combination of closed-cell spray foam and open-cell spray foam where an outer (exterior side) layer of closed-cell sprayed foam is applied first and then an inner (interior side) of open-cell sprayed-in foam is applied to complete the exterior wall insulation system.
Add: 1.7.4.1 Building Insulation Provide rigid or closed-cell spray foam depending on building envelope design. As mentioned above, the exterior perimeter wall system may feature an insulation factory applied within a precast architectural concrete wall panel. The site applied perimeter wall insulation in the stud cavities shall be either closed-cell spray foam or a combination of closed-cell spray foam and open-cell spray foam where an outer (exterior side) layer of closed-cell sprayed foam is applied first and then an inner (interior side) of open-cell sprayed-in foam is applied to complete the exterior wall insulation system.
PPI #207, RFP Specification Section 01800, para. 1.7.9.1.1
Delete: Two overhead Insulated doors with electrical operation are required for the building exterior. Both are located at the BMWB and will have standard inside controls.
PPI #207, RFP Specification Section 01800, para. 1.7.9.5.4
Delete: “the two”
Delete: “to the Station/ANT Boat Maintenance Work and the entry door to the Boat Storage Bay in the Boat Storage Building.”
26. PPI #154, RFP Specification Section 01800, 1800-1.1.3.1 References
Delete: (o) ASHRAE 90.1-2019
Add: (o) ASHRAE 90.1-2022
27. PPI #154, RFP Specification Section 01800, 1800-1.11 Plumbing, 1.11.1.1
Delete: ASHRAE 90.1-2019
Add: ASHRAE 90.1-2022
28. PPI #154, RFP Specification Section 01800, 1800-1.11 Mechanical, 1.12.1.1
Delete: ASHRAE 90.1-2019
Add: ASHRAE 90.1-2022
29. PPI #154, RFP Specification Section 01800, 1800-1.4.1 Submittals under (d) Energy Compliance Analysis (S)
Delete: Submittal shall demonstrate compliance with all energy-related requirements.
Provide Energy Model Summary demonstrating 30% reduction below ASHRAE 90.1 2019 requirements. If not in compliance, provide LCCA per the above.
Add: Submittal shall demonstrate compliance with all energy related requirements.
Provide Energy Model Summary demonstrating 30% reduction below ASHRAE 90.1 2022 requirements. If not in compliance, provide LCCA per the above.
30. PPI #212, RFP Specification Section 01800, 1800-1.7.10 .8
Delete: Provide a Wet Chemical K Class fire extinguisher in the Galley. The extinguisher is shown on the RFP A101 floor plan located near the cooking area along the plan, west wall. The nominal capacity of the extinguisher shall be 2 ½ gallons. A Larsen Series WC 2 ½ with the optional B1 wall bracket/hanger is referenced as a basis of design selection.
31. PPI #154, RFP Specification Section 01800, 1800-1.11.13.2
Delete: Submittal shall demonstrate compliance with all energy-related requirements.
Provide Energy Model Summary demonstrating 30% reduction below ASHRAE 90.1 2019 requirements. If not in compliance, provide LCCA per the above.
Add: Submittal shall demonstrate compliance with all energy related requirements.
Provide Energy Model Summary demonstrating 30% reduction below ASHRAE 90.1 2022 requirements. If not in compliance, provide LCCA per the above.
32. PPI #316, RFP Specification Section 01800, 1800-1.12.2.2.2
Delete: Thermal Zoning By Space – At a minimum, each of the rooms should be on separate zone.
Add: Provide separate thermal zones for each of the rooms/spaces listed in 1.12.2.2.2.1,
1.12.2.2.2.2 and 1.12.2.2.2.3. Offices spaces with similar thermal qualities may be combined in the same thermal zone & served by the same VAV box per the DOR’s final layout.
33. PPI #180, RFP Specification Section 01800, 1800-1.12.2.2.2.2
Delete: Pharmacy Spaces
AMENDMENT ATTACHMENTS:
A. Pre-Proposal Inquires B. RFP CAD Files (DOD Safe) C. Base Admin Geotechnical Report (2024) D. LUC Area Construction Permit BLANK 2018-1003 E. Site Visit Attendance Log
RESPONSES TO QUESTIONS: Due to the Government answering the questions out of order received, henceforth, all questions will be provided in the amendments as an attachment. All questions received by the date of the amendment will be listed either with the answer provided and the associated amendment number or questions not yet answered will be marked “To be answered in future amendment.”
END OF AMENDMENT
PPI #
SUBMITTED
DATE
PG SECTION PARAGRAPH QUESTION GOVERNMENT RESPONSE
POSTED ON
AMEND NO.
7/16/202
The RFP includes concept drawings. To assist and expedite the RFP phase can the government please provide the .dwg or CAD files for these drawings? If possible please provide them as soon as possible to maximize the benefit of expediting the procurement process.
See Amendment 0001 001
2 7/16/2025 28 Factor 1 Factor 1 requires a minimum of 3 and a maximum of 5 project described completed by the prime contractors. Please confirm the government is only looking for projects by the Prime and not also by the Designer of Record.
See Amendment 0001 001
3 7/16/2025 28 Factor 1 Factor 1 notes the narrative shall not exceed 6 pages. Please confirm the 3-5 projects experience on brownfield redevelopment is not included in the 6 pages.
Please bid per RFP; the 3-5 projects experience on brownfield redevelopment is included in the six (6) pages.
4 7/16/2025 28 Factor 1 Factor 1 notes technical complexities for the 3-5 project demonstration. The 2nd to last bullet point has a typo for the minimum price; $1,00,000.00. Please confirm if this is to be $1,000,000 or a different number.
Please bid per RFP; the minimum price is $1,000,000.00 (inadvertent typo) 001
5 7/16/2025 29 Factor 2 Factor 2 notes, "The narrative should address" Prior experience on Medical Facilities constructed to DHA standard and Access Control Points. Please confirm if this experience is to be only from the Prime Contractor or the Prime Contractor and Designer of Record.
See Amendment 0001 001
6 7/16/2025 29 Factor 2
Factor 2, notes the narrative shall not exceed 5 pages, not including drawings. Please confirm the project experience referenced is not included in the 5 page narrative. It will be hard to identify all aspects of design including the conceptual site and building design in 5 pages as well as our experience.
Please bid per RFP, project experience for the narrative is included in the five page limitation. 001
7 7/16/2025 29 Factor 2 Factor 2, notes the narrative shall not exceed 5 pages, not including drawings. Please confirm this is no page limit on drawings.
Please bid per RFP, there is no page limit on drawings. 001
8 7/17/2025 28 Factor 1
Factor 1 – Environmental Compliance Solution states that the plan shall address “a minimum of three (3), maximum of five (5) projects described completed by the prime contractor.” Most Prime Contractors do not self-perform the Environmental Compliance scopes of work described.
Therefore, may the Prime Contractor present experience from an Environmental Specialist (team member, subcontractor, and/or subconsultant) within this Factor? Please clarify whether this experience will be evaluated equally to experience of the Prime Contractor.
See Amendment 0001 001
9 7/17/2025 3 Insurance/Bonds
On page 3, section Insurance/Bonds, the RFP states "Please review Section H.2 of the contract for insurance requirements and FAR 52.228-15 Performance and Payment Bonds-Construction (JUN 2020) (DEVIATION MAY 2023) for bonding requirements. A bid guarantee is not required."
Please confirm a Bid Bond is not required for submission in Offeror's Price proposals.
Please bid per RFP, a bid guarantee is not required 001
10 7/17/2025 27
Instructions for Submitting Questions
Regarding TO Announcement
Bidder inquiries are due Wednesday, August 13th. This leaves 4 business days until the proposal due date, Wednesday, August 20th, for the Government to review and respond to inquiries, and for Offerors to coordinate with both the designers and subcontracting community to make the required adjustments, for both technical and price proposals, based on the inquiry responses. Would the Government please consider a proposal due date extension of 3 weeks? This extension will result in an increase of accuracy and competitiveness of Offerors proposed pricing and will allow for a more detailed technical response which will increase project efficiency post award.
Please bid per RFP, proposal due date remains unchanged. 001
11 7/18/2025 28 V In an effort to increase competition for qualified contractors, will the government consider revising the requirements for the projects with brownfield redevelopment scope from 3 to 1 project?
Please bid per RFP 001
12 7/18/2025 28 V In an effort to increase competition for qualified contractors, will the government consider revising the requirements for the projects with brownfield redevelopment scope from within the past 5 years to 10?
See Amendment 0001 001
13 7/18/2025 28 V Will subcontractor experience be allowed for evaluation purposes as it relates to brownfield redevelopment?
See Amendment 0001 001
14 7/18/2025 28 Task Order
Announcement Section V, Factor 1
Reference Task Order Announcement page 28, Section V, Factor 1 – Environmental Compliance Solution. Under technical complexities, the second bullet states, “All projects described in the narrative shall be completed within the past five (5) years.” To increase competition and to better demonstrate relevant experience, we respectfully request that the reach back period for relevant project completion be increased from five to seven years.
See Amendment 0001 001
15 7/18/2025 28 Task Order
Announcement Section V, Factor 1
Reference Task Order Announcement page 28, Section V, Factor 1 – Environmental Compliance Solution. Under technical complexities, the last bullet states, “All projects described in the narrative shall have a minimum price of $1,00,000.00.” Please confirm the correct project price is $10,000,000.00.
See Amendment 0001 001
16 7/23/2025 TOA Reps and Certs Please confirm the Reps and Certs to be submitted in the proposal are the ones included in the
TOA?
Please bid per RFP 003
17 7/23/2025 TOA Reps and Certs Please confirm the Reps and Certs are to be included in the Pricing section of the proposal? Yes, please bid per RFP 003
18 7/23/2025 TOA Factor 1 TOA, Factor 1 bullet for is missing "0" in minimum price. Please confirm the minimum price is $1 million?
See Amendment 0001 revisions 003
19 7/23/2025 TOA Factor 1 TOA, Factor 1 is requesting a lot of information to provided with only a 6 page limit. Please increase the page limit to 10 pages in order to provide all the requested information?
Please bid per RFP 003
20 7/23/2025 TOA Factor 2
TOA, Factor 2 is requesting a lot of information including design approach, complexities, construction strategy, prior clinic experience, prior access control point experience, and our conceptual design that is comprised of design narratives. The current page limit of 5 pages is not nearly enough to capture all this information including the design narratives. Please increase the page limit to 12 pages in order to provide all the requested information?
Please bid per RFP 003
21 7/23/2025 1800
1.3 Sustainable
Design and 1.4
Guiding Principles for Sustainability
Specification section 1800, 1.3.1 References include EO 14008. The current administration EO 14148 has rescinded EO 14008 as well as EO 14057. There is scope within the TOA including net zero energy and net zero emissions that has been rescinded by EO 14148. Please revise the proposal requirements deleting EO 14008 and the net zero energy and net zero emissions requirements referenced in 1800, 1.4.2.5 and 1.4.2.5.2 since this has been rescinded by EO 14148?
Confirmed, reference deleted see Amendment 0003, Item #1. 003
22 7/23/2025 1800
1.4 Guiding
Principles for Sustainability
Specification section 1800, 1.4.2 states where requirements are more stringent than HPSB requirements, the requirements here take precedence. EO 14148 has rescinded many of the more stringent requirements listed in section 1.4 such as net zero energy and net zero emissions. Please delete these more stringent requirements and confirm we are to meet the HPSB Guiding Principles.
"To be answered in future amendment"
23 7/23/2025 1800
1.3 Sustainable
Design Specification section 1800, 1.3.1 references USGBC. Please confirm LEED certifications are not required since we are to follow the HPSB checklist?
Confirmed, reference deleted see Amendment 0003, Item #2. 003
24 7/23/2025 TOA Document
TOC 1800 1.3,
1.4 Specification TOC 1800 1.3 does not match title in specification. Is LEED-NC Certification required? TOC is missing 1800 1.4 Guiding Principles for Sustainability. Please clarify?
Concur, see Amendment 0003, item #3. 003
25 7/23/2025 1800 1.4 Civil Specification section 1800, 1.4.1.2 Hydrographic Survey. Please confirm this section is not required for this project?
"To be answered in future amendment"
26 7/23/2025 1800
1.4 Civil - Cap
Integrity Specification section 1800, 1.4.3 NOTE: at end of section reference the site cap. Please confirm that the contaminate concealment cap is to be restored if removed?
"To be answered in future amendment"
27 7/23/2025 1800
1.4 Civil -
Metering
Specification section 1800, 1.4. Please confirm that advanced metering is required as noted in the
RFP?
"To be answered in future amendment"
28 7/23/2025 1800
1.4 Civil - Water
Service Specification section 1800, 1.4.8 Water System. For bidding purposes, please confirm we should use the water pressure provided in Attachment A for the water service?
"To be answered in future amendment"
29 7/23/2025 1800
1.4 Civil - Water
Service
Specification section 1800, 1.4.8 Water System. For bidding purposes, please confirm we should assume the existing water service is in good working condition and has the capacity to meet the project demands?
"To be answered in future amendment"
30 7/23/2025 1800
1.4 Civil -
Sanitary Sewer Service
Specification section 1800, 1.4.9 Sanitary. For bidding purposes, please confirm we should assume the existing sanitary sewer service is in good working condition and has the capacity to meet the project demands?
"To be answered in future amendment"
31 7/23/2025 1800 1.5 Geotechnical Specification section 1800, 1.5.2 Preliminary Geotechnical Site Investigation. For bidding purposes, please confirm we are to base our proposal off these provided reports / borings since it is the only information available until post award?
"To be answered in future amendment"
32 7/23/2025 1800 1.5 Geotechnical Specification section 1800, 1.5 Geotechnical. For bidding purposes, please confirm we are to assume the existing soil conditions to be that of the boring closest to that specific construction scope found in the RFP Geotechnical Report?
Use your professional judgement based on the soil information presented in the geotechnical report attached to the RFP.
33 7/23/2025 1800 1.7 Architectural Specification section 1800, 1.7 states Security Building. Please confirm this is the Guard House / Visitor Center?
"To be answered in future amendment"
34 7/23/2025
AT/FP,
Progressive Collapse
Since the clinic structure is 3 stories, is progressive collapse required in structural design? "To be answered in future amendment"
35 7/23/2025 1800 1.7 Architectural Specification section 1800, 1.7.2 Sample wall mockup. This process adds time to the procurement process. Confirm wall sample mockup is required? Workmanship can be established and monitored upon the initial construction and quality assurance process.
Confirmed, purpose of mock-up is to establish a quality baseline prior to initial construction. 003
36 7/23/2025 1800 1.7 Architectural Specification section 1800, 1.7.5.2. Please confirm that all interior partitions are required to be full height, slab to deck?
Spaces that require enhanced security, privacy noise reduction or acoustical control shall have full height wall partitions. See Amendment 0003, Item #4
37 7/23/2025 1800 1.7 Architectural Specification section 1800, 1.7.6.2.3 Exterior Coating System. Confirm this is also required for façade masonry veneer if selected?
Masonry veneer should not be painted as it can trap moisture and require on-going maintenance.
38 7/23/2025 1800 1.7 Architectural Specification section 1800, 1.7.9.2.2 seems like this section is for another project. Please clarify?
There are two watchstander berths located in the Medical/Dental Facility. The intent is to provide maximum acoustical control for the watchstander on duty.
39 7/23/2025 1800 1.7 Architectural Specification section 1800, 1.7.9.6.1 Glass Block. Please clarify if required and where? Glass block may be provided at Designer of Record (DOR) discretion. 003
40 7/23/2025 1800 1.7 Architectural Specification section 1800, 1.7.10.1.2 seems like this section for another project. Please clarify?
This is additional signage intended to provide occupants directional cues as they move within the building.
41 7/23/2025 1800 1.7 Architectural Specification section 1800, 1.7.10.2 includes 1.7.8.2. Please correct and seems like another project?
Specification section 1800, 1.7.10.2 pertains to this project. (see Amendment 0003, Item #6. 003
42 7/23/2025 1800 1.7 Architectural Specification section 1800, 1.7.9.4.1 please confirm this project does not require operable windows? They will negatively effect building performance.
As stated in 1.7.9.4.1 "The Designer of Record (DOR) is free to select different sizes and configuration types of windows that are most suitable or applicable to the final design."
43 7/23/2025 1800 1.7 Architectural Specification section 1800, 1.7.9.4.2 mentions space 205….believe this is another project. Please clarify.
Concur, see Amendment 0003, Item #7. 003
44 7/23/2025 1800 1.7 Architectural Specification section 1800, 1.7.10.4 mentions spaces 111 and 112 for wire mesh partitions. Seems like another project. Please clarify this and if there are wire mesh partitions?
Concur, delete Section 1800, 1.7.10.4 in its entirety. (See Amendment 0003, Item #9) 003
45 7/23/2025 1800 1.7 Architectural Specification section 1800, 1.7.10.6 seems like this section is for another project. Please clarify? Concur, Section title has been edited. See Amendment 0003, Item #9. 003
46 7/23/2025 1800 1.7 Architectural Specification section 1800, 1.7.10.6.4 seems like this section is for another project. Please clarify?
Do not concur. Section pertains to watchstander berthing rooms on 2nd floor of Med/Dent.
Clinic. See Amendment 0003, Item #10.
47 7/23/2025 1800 1.7 Architectural Specification section 1800, 1.7.10.6.6 and 6.7 seems to be for another project. Please clarify?
Concur, delete Section 1800, 1.7.10.6.6 and 1.7.10.6.7 in their entirety. (See Amendment
0003, Item #12)
48 7/23/2025 1800 1.7 Architectural Specification section 1800, 1.7.10.6.9 lists space 243… seems like for another project. Please clarify?
Concur, delete Section 1800, 1.7.10.6.9 in its entirety. (See Amendment 0003, Item #13) 003
49 7/23/2025 1800 1.7 Architectural Specification section 1800, 1.7.11.2.2 seems like this section is for another project. Please clarify? Concur, delete Section 1800, 1.7.11.2.2 in its entirety. (See Amendment 0003, Item #14) 003
50 7/23/2025 1800 1.7 Architectural Specification section 1800, 1.7.11.2.2 includes LE-02 Laundry but cannot find. Please confirm not part of this project?
Please refer to FFE schedules on drawings. 003
51 7/23/2025 1800 1.7 Architectural Specification section 1800, 1.7.1.1 does not provide a finish for masonry veneer façade such as split face, ground face, painted (exterior coating system). Please clarify the façade exterior masonry veneer finish if used?
"To be answered in future amendment"
52 7/23/2025 1800 1.9 Demolition
Specification section 1800. 1.9.1 states that items stated to be demolished may still have some portion remaining including utilities 6 feet outside building footprint. Please provide an allowance for this work since it cannot be quantified for pricing, or quantify for us to price? Or instruct this will be handled as a changed site condition if discovered and has to be removed?
See Amendment 0003, Item #19 for revised language. 003
53 7/23/2025 1800 1.9 Demolition
Specification section 1800. 1.9.1.2 states to obtain all permits. Please confirm the U.S. Navy Dig Permit will be required to be created and procured by the Contractor prior to commencing with any sitework clearing activities? The Navy Dig permit process can be lengthy with several required revisions and approval by SCDHEC. Please confirm the USCG has not started the Navy Dig Permit process for this project?
"To be answered in future amendment"
54 7/23/2025 1800 1.9 Demolition Specification section 1800. 1.9.3.2 states LEED certification. Please confirm this project does not require a formal LEED certification since HPSB is to be followed?
Concur, See Amendment 0003, Item #15 003
55 7/23/2025 1800 1.9 Demolition
Specification section 1800. 1.9.5 states items considered hazardous materials, but ground water is not included. Please confirm that groundwater dewatering below the concealment cap is also part of this? Please clarify that groundwater below the site concealment cap will need to be collected, sampled, tested for proper disposal?
"To be answered in future amendment"
56 7/23/2025 1800 1.9 Demolition
Specification section 1800. 1.9.5 states items considered hazardous materials, but then states unidentified or unexpected hazardous materials encountered should be informed to the KO for this unexpected condition. We assume hazardous materials are handled as a changed site condition and non-hazardous contaminated materials is included in the bid price. Please confirm correct?
"To be answered in future amendment"
57 7/23/2025 1800 1.9 Demolition
Specification section 1800. 1.9.5 states contaminated soils and materials are hazardous materials which is not completely accurate. Soils / materials can be contaminated, but not hazardous. For pricing, should we assume hazardous materials will be handled as a changed site condition? This seems to be consistent with section 1.9.5.6 Contaminated Soils.
"To be answered in future amendment"
58 7/23/2025 MEP Elevated
Platforms Please confirm all outside MEP equipment will need to be on raised platforms above the required flood elevation? These could be substantial and require deep foundations.
"To be answered in future amendment"
59 7/23/2025
1.12.4.2 Specification section 1800, 1.12.4.2 states to provide elevated concrete platforms for all outside MEP equipment on grade, and then states steel requirements. These confirm we have the design freedom for these elevated platforms?
"To be answered in future amendment"
60 7/23/2025
1.12.5.12.2
Controls Specification section 1800, 1.12.5.12.2 states to provide UMCS capability for future buildings as listed. Anyway to provide sizes of the future buildings listed for bidding purposes?
For bidding purposes, assume future buildings would be approximately the same size as Dental / Medical Clinic.
61 7/23/2025
1.12.7 Specification section 1800, 1.12.7 states all HVAC piping run under slab shall be supported from the slab. Does this include HVAC piping under slab-on-grade?
"To be answered in future amendment"
62 7/23/2025 1800 1.13.3 Specification section 1800, 1.13.3 states all wiring in conduits. Please confirm this or if we can follow minimum requirements of code?
Confirm, please follow the RFP. 003
63 7/23/2025 1800 1.13.2
Specification section 1800, 1.13.2 We cannot obtain any cost information from the local utility provider, Dominion, until design developed and application completed post award. Please provide an allowance for all Contractors to carry for the work performed by Dominion, the electrical utility provider? Or direct that these costs are by the Government?
"To be answered in future amendment"
64 7/23/2025 1800 1.13.11.18 Specification section 1800, 1.13.11.18 refers to a Communication Center. Please confirm this is in the existing Administrative building. If so, why not have these power requirements provided by that Contractor since they understand the panels, etc.. If not, please provide details for bidding.
This paragraph may be deleted. The telecom portion of the RFP handles the powering of any racks for the buildings of this project. See amendment 0003, Item 16.
65 7/23/2025 1800 1.13.12.2 Specification section 1800, 1.13.12.2 mentions LEED. Please confirm LEED certification is not required?
"To be answered in future amendment"
66 7/23/2025 1800 1.13.15.1 Specification section 1800, 1.13.15.1 Lightning protection for Consolidated Sector Base Facility building. Please clarify?
See amendment 003, Item #17 003
67 7/23/2025 1800 1.15.1 Specification section 1800, 1.15.1 required CATV. Please provide locations for bidding purposes? See RFP drawings for locations 003
68 7/23/2025 1800 1.16.3.1 Specification section 1800, 1.16.3.1 states base wide telecom hub is located in the Base Building.
Please confirm this is the Admin Building under construction? Please provide details of this room for bidding purposes?
"To be answered in future amendment"
69 7/23/2025 1900 1.4 Specification section 1900, 1.4 states Individual Space Criteria Sheets are included in the RFP. We can not find. Please clarify?
Delete Section 1900, 1.4 in its entirety. (See Amendment 0003, Item #8) 003
70 7/23/2025 RFP Drawings Please confirm the existing monitoring wells in way of new construction can be abandoned or need to be relocated?
"To be answered in future amendment"
71 7/23/2025 RFP Drawings Is the PT exercise room governed by the Fitness specification in 1800, 1.7? Yes 003
72 7/23/2025 RFP Drawings Clinic female locker room shows locker configuration but male locker room does not. Please provide for bidding.
Please refer to drawing I-103B. 003
73 7/23/2025 RFP Drawings Guard house / visitor center locker rooms do not show locker configuration. Please provide details for bidding?
Please refer to drawing I-104. 003
74 7/23/2025 RFP Drawings Guard house / visitor center Open Office space seems to show an operable partition to divide the room. Please confirm this is the case?
"To be answered in future amendment"
75 7/23/2025 1800
1.18 Environmental - Navy Dig Permit
/ SCDHEC
Specification section 1800, 1.18 General states the project site is to be considered a Brownfield property and that Contractor will need to obtain a U.S. Navy Dig Permit prior to commencing any work on site. Our understanding is that this Navy Dig Permit can take an extensive time to procure typically with several revisions as well as obtaining SCDHEC approval. Please confirm this permit is directly handled with the Navy and if the USCG has started the procurement process, or does the Contractor own the full creation and procurement of the permit and approvals by the Navy and
SCDHEC?
"To be answered in future amendment"
76 7/23/2025 1800
1.18 Environmental - Navy Dig Permit
/ SCDHEC
Specification section 1800, 1.18 states we are to create and procure a U.S. Navy Dig Permit prior to working on the project site. Our understanding is that we need to create a plan for Navy approval and SCDHEC approval on how we our to manage and mitigate risk on this Brownfield site addressing items such as handling hazardous soils and groundwater, the existing site concealment cap integrity, monitoring wells, etc. Please confirm this permit is to include the scope guidance provided in Attachment C - Environmental, Process to Conduct Construction Activities in Areas under Land Use Controls at the Charleston Naval Complex?
"To be answered in future amendment"
77 7/23/2025 1800 1.18
Environmental Manager
Specification section 1800, 1.18.3 states that a certified or licensed qualified environmental manager to lead and manage all environmental aspects of this project. Please clarify it is the duties listed (1-5) in this section?
"To be answered in future amendment"
78 7/23/2025 1800
1.18 Environmental -
Hazardous Waste
Specification section 1800, 1.18.5.2.1 and 1.18.5.3.3. If hazardous waste is identified and generated, this section outlines the procedures to handle such waste. Please confirm this process is just for hazardous waste only and not for non-hazardous contaminated materials, and that the Contractor owns the proper handling and disposal of non-hazardous contaminated soils and groundwater?
"To be answered in future amendment"
79 7/23/2025 1800
1.18 Environmental -
Hazardous Waste
Specification section 1800, 1.18.5.2.1 and 1.18.5.3.3. If hazardous waste is identified and generated, this section outlines the procedures to handle such waste. Please confirm the process outlined in this section is to be handled as a changed site condition since there is no way to identify and quantify hazardous waste?
"To be answered in future amendment"
80 7/23/2025 1800
1.18 Environmental -
Hazardous Waste
Specification section 1800, 1.18.5.2.1. If hazardous waste is identified and generated, this section outlines the procedures to handle such waste. The process outlined in this section does not address sampling / testing the identified suspect hazardous waste. Please confirm that if suspect hazardous materials are discovered that the sampling, testing, handling and proper disposal will be handled as a changed site condition since there is no way to identify and quantify hazardous waste?
"To be answered in future amendment"
81 7/23/2025 1800
1.18 Environmental -
Soil and Groundwater
Specification section 1800, 1.18.5.2.2 Please confirm that the necessary soil and groundwater sampling and testing required per the Navy Dig Permit and per the Subtitle D Landfill facility is by the Contractor?
"To be answered in future amendment"
82 7/23/2025 1800
1.18 Environmental -
Hazardous Waste
Specification section 1800, 1.18.5.3.3. The site can have hazardous waste and non-hazardous contaminated waste. Please confirm we do not own sampling, testing, handling, disposal of hazardous waste since this in an unknown quantity that can significantly vary in cost depending on the type and concentration of the hazardous waste? Also confirm we do own non-hazardous contaminated waste that will be accepted by the local EPA RCRA Subtitle D Municipal Solid Waste Landfill facility?
"To be answered in future amendment"
83 7/23/2025 1800
1.18 Environmental -
Hazardous Waste
Specification section 1800, 1.18.5.3.4 states in the event that a suspected previous environmental release is discovered during construction, the Contractor shall immediately notify the COR of this changed site condition. Since this is a Brownfield site with potential hazardous wastes, wouldn't the identification of any hazardous (not non-hazardous, contaminated) materials be a changed site condition? We cannot quantify or categorize hazardous wastes for bidding?
"To be answered in future amendment"
84 7/23/2025 1800 1.18
Environmental - Groundwater
Specification section 1800, 1.18. Please confirm groundwater sampling, testing, and proper disposal will need to be finalized and approved in the Navy Dig Permit and with SCDHEC, and this is part of the Contractor scope of work?
"To be answered in future amendment"
85 7/23/2025 1800 1.18.4.4 Please confirm that the required NPDES / SWPPP / NOI permits are to be created and procured by the Contractor?
"To be answered in future amendment"
86 7/23/2025 RFP Drawings RFP Drawing A-603 and A-606 lists Gypsum Board for all ceilings in the Clinic and Security Building. Please confirm this is not prescriptive and we have design freedom to provide ceiling types as we feel is appropriate?
Confirmed. 003
87 7/23/2025 Concrete Platform
Structure - Clinic
The 1800 specs and as well as RFP Drawing A-201 calls out for the Clinic to have a cast-place concrete structure for the 1st floor. Please confirm that a steel structure for the first floor is not allowed due to the high corrosive elements it would be subjected to?
Confirmed. 003
88 7/23/2025 1800
1.7 Corner
Guards Specification section 1800, 1.7.10.5 states corner guards as shown on RFP drawings but we cannot find. Please clarify.
Concur, Section title has been edited. See Amendment 0003, Item #11. 003
89 7/23/2025 1800
1.8 Finish Floor
Elevation
Per section 1.8.3.2 of the 01800 specifications the Guardhouse / Visitor Center building is to be designed to a Flood Design Class 4. Please confirm this is correct so we can accurately determine the finish floor elevation?
"To be answered in future amendment"
90 7/23/2025 1800
1.8 Finish Floor
Elevation
Per section 1.8.3.2 of the 01800 specifications the Medical / Dental building is to be designed to a Flood Design Class 3. Please confirm this is correct so we can accurately determine the finish floor elevation?
"To be answered in future amendment"
91 7/23/2025 500 year flood elevation - FFE
ASCE-24 requires bottom of structure of Flood Design Class 4 / Risk Category IV buildings (Guardhouse/Visitor Center) be designed at DFE+2ft or the 500 year flood plain level, whichever is greater. FEMA does not have a 500 year flood plain elevation available in this location. Please provide the 500 year flood plain elevation to be used?
92 7/23/2025 Sea Level Rise -
FFE
The RFP requires an additional finish floor elevation over the ASCE-24 requirement to accommodate for sea level rise. The link provided in the RFP is not working. Please provide the amount of sea level rise that should be added to the ASCE-24 elevation requirement?
"To be answered in future amendment"
93 7/23/2025 Guardhouse /
Visitor Center -
FFE
Without knowing the FEMA 500 year flood plain elevation or the sea level rise elevation, we would like the Government to confirm the following finish floor elevation. Assuming a 500-year flood plain elevation of 15 ft plus 3 ft for sea level rise, plus 2.5 ft for structural depth, we calculate the Guardhouse / Visitor Building finish floor elevation to be 20.5 ft. The existing grade in the area is approximately 4 ft. Please confirm our assumptions are correct or provide the 500 year flood plain elevation and the sea level rise required?
"To be answered in future amendment"
94 7/23/2025 100 year flood elevation - FFE
Without knowing the sea level rise elevation, we would like the Government to confirm our assumptions that follow regarding the finish floor elevation for the Medical / Dental Clinic.
Assuming a BFE (100 year flood elevation) of 12 ft, plus 2 ft per ASCE-24 (For a design flood class 3), plus 3 ft for seal level rise and plus 2.5 ft for structural depth, we calculate the Medical / Dental Clinic finish floor elevation to be at elevation 19.5 ft. The existing grade in this area is at approximately elevation 4’. Please confirm our assumptions are correct or provide the sea level rise elevation required?
"To be answered in future amendment"
95 7/23/2025 1800 1.4 Civil - FFE
Specification section 1800, 1.4.6. states the finished floor elevation shall be based upon "the closest FEMA 100 year floodplain elevation to the site established by FEMA, the International Building Code, and ASCE 24-14" PLUS the sea- level change for 50 year projection per ASCE 24.
Please note the Guardhouse / Visitor Building is a flood design class 4, per the RFP. According to ASCE 24, the finished floor elevation must also account for the 500 year flood plain "if greater".
Please confirm.
"To be answered in future amendment"
96 7/23/2025
1.12.4.2
Specification section 1800, 1.12.4.2 states to provide elevated concrete platforms for all outside MEP equipment on grade.