C250236_SOW_Verification.pdf
PDF 311 KB Posted
- Solicitation number
- 250236
- Issued by
- Orange County, California
About this file
This is a Scope of Work Verification form submitted by the Orange County Transportation Authority (OCTA) in California for a procurement of two hydrogen mobile fuelers designed for 40-foot hydrogen fuel cell buses. The form certifies that the scope of work was independently prepared to invite fair competition and does not contain brand name preferences, unreasonable restrictions, or vendor favoritism. The verification was completed by the Transit Technical Services Department on January 29, 2026, and signed by both the Project Manager and Department Manager/Director as required by procurement regulations.
The project has an allocated budget of $6,779,429 for an initial one-year term. The scope of work verification confirms compliance with Federal Transit Administration requirements and general procurement principles, including clear specification of performance characteristics, identification of optional items where applicable, and use of industry and government standards where suitable. The form documents that no consultants involved in writing the scope of work will be permitted to bid on this procurement, ensuring competitive integrity and adherence to procurement regulations.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK VERIFICATION
This Form Must Be Submitted with Scope of Work (SOW)
FA-CAMM-071.docm (03/16/18) Page 1 of 1
The following general rules shall apply when preparing scopes of work and specifications:
a) Provide a clear and concise Scope of Work (SOW) and not impose unreasonable requirements.
b) Specifications and Scopes of Work shall identify all characteristics and specific tasks and functions of the items or services to be procured, and meet the Authority’s requirements.
c) Whenever possible, the expected quality of services to be provided or the performance characteristics of the item shall be specified.
d) The requestor shall identify all optional items, and the solicitation documents shall set forth the expected needs and the manner in which the related bid prices will be considered.
e) Brand name specifications must be accompanied by an explanation that clearly indicates that the specification is not intended to be restrictive.
f) The salient characteristics represented by the brand names shall be identified to allow for evaluation of possible “or equal” material.
g) Because standard specifications and requirements allow for more efficient operations and result in lower prices, they shall be used wherever suitable.
h) Industry, federal, state and local government specifications and requirements can be used.
Consultants are prohibited from writing the Scope of Work or assisting in the development or writing the Scope of Work in which they may bid.
INSTRUCTIONS
Project Managers (PM) must select one of the following certifications and submit this form with the scope of work/specifications. This form must be signed by the Project Manager and one of the following: the PM’s Department Manager or Director or Executive Director.
☒ I certify that the attached SOW/specifications was independently prepared to invite competition;
does not include reference to a brand name, or include unreasonable restrictions or an intent to favor any specific vendor or brand product.
OR
☐ The SOW/specifications prepared includes a “brand name or equal” description because it was determined to be “impractical or uneconomical” (as referenced in FTA Circular 4220.1F -revised March 18, 2013) to write a clear and accurate description of the technical requirements of the goods or services to be acquired. However, the specific features or salient characteristics of the named brand which must be met by offerors of “an equal” proposal have been clearly stated, as required by Federal Transit Administration regulations. (FTA Circular 4220.1F – revised March 18, 2013)
R001397 Requisition Number Dept. Manager/Director/Executive Director Signature
Project Manager Signature
Transit Technical Services 01/29/2026 Department Date
File details come from the government source that posted it. Updated .