BusStopImprovementProject_Exhibit9_Final.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- Bus Stop Improvement Project
- Solicitation number
- S-KS2410-00015080
- Issued by
- Marion County, Oregon
About this file
This document is an Excel-based Invitation to Bid (ITB # 25-032) for a Bus Stop Improvement Project, likely for a municipal transit authority or public works department. The project involves improvements at 12 different bus stop locations across various streets in what appears to be Salem, Oregon, with each location requiring similar construction activities such as temporary traffic control, demolition, excavation, concrete sidewalk installation, and permanent signage restoration. Each bus stop location involves 1-4 specific work elements, with sidewalk square footage ranging from 122 to 386 square feet, totaling approximately 2,498 square feet of concrete sidewalk work across all sites.
The bid document details a comprehensive set of standardized improvements for urban bus stop infrastructure, with work items priced on a lump sum (LS) basis for each location. While specific cost details are not provided in the exhibit, the document suggests a systematic approach to bus stop accessibility and infrastructure enhancement, covering multiple neighborhoods and intersections. The project appears to be a capital improvement initiative focused on creating more accessible and functional public transit infrastructure, with each location receiving similar but site-specific improvements to support pedestrian mobility and transit system functionality.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB 25_032 EXHIBIT 9.xlsx | XLSX spreadsheet | |
| ITB 25_032 SCORING EXHIBIT 9-Final~1.xlsx | XLSX spreadsheet | |
| Addendum 1 RFP 10.6.25.1 Office Paper.pdf | ||
| Addendum2_25_032.pdf | ||
| ITB 25_032 SCORING EXHIBIT 9-Finalv2.xlsx | XLSX spreadsheet | |
| ITB 25_032 SCORING EXHIBIT 9-Final~2.xlsx | XLSX spreadsheet | |
| 25_032BusStopIMP_Final_Posted.pdf | ||
| Notice Of Intent To Award~1.docx | DOCX document | |
| BSIP_Drawings.pdf | ||
| Addendum 1_25-032BusStop.pdf | ||
| ITB 25_032 SCORING EXHIBIT 9-Final.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ITB # 25-032 BUS STOP IMPROVEMENT PROJECT | ||||
| Item | Description | Quantity | Unit | Cost |
| 1 | Manzanita St NE/14th Ave NE (Bus Stop ID 1117) |
| 1.1 | Temporary Traffic Control and Erosion Control Measures | 1 | LS | Cost |
| 1.2 | Demo, Removals, Excavation & Prep | 1 | LS | Cost |
| 1.3 | Form & Place Concrete Sidewalk | 217 | SF | Cost |
| 1.4 | Permanent Signs and Restoration | 1 | LS | Cost |
2 Manzanita St NE/Trail Ave NE (Bus Stop ID 1560)
| 2.1 | Temporary Traffic Control and Erosion Control Measures | 1 | LS | Cost |
| 2.2 | Demo, Removals, Excavation & Prep | 1 | LS | Cost |
| 2.3 | Form & Place Concrete Sidewalk | 219 | SF | Cost |
| 2.4 | Permanent Signs and Restoration | 1 | LS | Cost |
3 Portland Rd NE/Hayesville Dr NE (Bus Stop ID 375)
| 3.1 | Temporary Traffic Control and Erosion Control Measures | 1 | LS | Cost |
| 3.2 | Demo, Removals, Excavation & Prep | 1 | LS | Cost |
| 3.3 | Form & Place Concrete Sidewalk | 134 | SF | Cost |
| 3.4 | Permanent Signs and Restoration | 1 | LS | Cost |
4 Summer St NE/Madison St NE (Bus Stop ID 443)
| 4.1 | Temporary Traffic Control and Erosion Control Measures | 1 | LS | Cost |
| 4.2 | Demo, Removals, Excavation & Prep | 1 | LS | Cost |
| 4.3 | Form & Place Concrete Sidewalk | 305 | SF | Cost |
| 4.4 | Permanent Signs and Restoration | 1 | LS | Cost |
5 Market St NE/Capitol St NE (Bus Stop ID 981)
| 5.1 | Temporary Traffic Control and Erosion Control Measures | 1 | LS | Cost |
| 5.2 | Demo, Removals, Excavation & Prep | 1 | LS | Cost |
| 5.3 | Form & Place Concrete Sidewalk | 127 | SF | Cost |
| 5.4 | Roadworks - Curb & Gutter, Asphalt Paving incl /Granular | 1 | LS | Cost |
| 5.5 | Permanent Signs and Restoration | 1 | LS | Cost |
6 State St /12th St SE (Bus Stop ID 708)
| 6.1 | Temporary Traffic Control and Erosion Control Measures | 1 | LS | Cost |
| 6.2 | Demo, Removals, Excavation & Prep | 1 | LS | Cost |
| 6.3 | Form & Place Concrete Sidewalk | 335 | SF | Cost |
| 6.4 | Permanent Signs and Restoration | 1 | LS | Cost |
7 Liberty St SE/Kearney ST SE (Bus Stop ID 11)
| 7.1 | Temporary Traffic Control and Erosion Control Measures | 1 | LS | Cost |
| 7.2 | Demo, Removals, Excavation & Prep | 1 | LS | Cost |
| 7.3 | Form & Place Concrete Sidewalk | 386 | SF | Cost |
| 7.4 | Permanent Signs and Restoration | 1 | LS | Cost |
8 Commercial St SE/Owens St SE (Bus Stop ID 1765)
| 8.1 | Temporary Traffic Control and Erosion Control Measures | 1 | LS | Cost |
| 8.2 | Demo, Removals, Excavation & Prep | 1 | LS | Cost |
| 8.3 | Form & Place Concrete Sidewalk | 152 | SF | Cost |
| 8.4 | Permanent Signs and Restoration | 1 | LS | Cost |
9 13th St SE/McGilchrist St SE (Bus Stop ID 659)
| 9.1 | Temporary Traffic Control and Erosion Control Measures | 1 | LS | Cost |
| 9.2 | Demo, Removals, Excavation & Prep | 1 | LS | Cost |
| 9.3 | Form & Place Concrete Sidewalk | 173 | SF | Cost |
| 9.4 | Permanent Signs and Restoration | 1 | LS | Cost |
10 Commercial St SE/Barnes St SE (Bus Stop ID 540)
| 10.1 | Temporary Traffic Control and Erosion Control Measures | 1 | LS | Cost |
| 10.2 | Demo, Removals, Excavation & Prep | 1 | LS | Cost |
| 10.3 | Form & Place Concrete Sidewalk | 122 | SF | Cost |
| 10.4 | Permanent Signs and Restoration | 1 | LS | Cost |
11 Fairway Ave/Lexington Cir SE (Bus Stop ID 545)
| 11.1 | Temporary Traffic Control and Erosion Control Measures | 1 | LS | Cost |
| 11.2 | Demo, Removals, Excavation & Prep | 1 | LS | Cost |
| 11.3 | Form & Place Concrete Sidewalk | 221 | SF | Cost |
| 11.4 | Permanent Signs and Restoration | 1 | LS | Cost |
12 Pennsylvania Ave SE/47th Pl SE (Bus Stop ID 869)
| 12.1 | Temporary Traffic Control and Erosion Control Measures | 1 | LS | Cost |
| 12.2 | Demo, Removals, Excavation & Prep | 1 | LS | Cost |
| 12.3 | Form & Place Concrete Sidewalk | 334 | SF | Cost |
| 12.4 | Permanent Signs and Restoration | 1 | LS | Cost |
Project Total
File details come from the government source that posted it. Updated .