This document provides details for a federal contract solicitation to replace roofs on four patient buildings. The solicitation number is 36C24523B0002 and seeks to replace roofs for buildings 19H, 22H, 23H and 24H through contract Z1DA--512A5-20-304. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 5 is the contracting agency. Offerors should respond with pricing and qualifications by the response date listed in the attached solicitation document. The award date and terms will also be specified in the attached solicitation. Services required include replacing roofs on the four buildings completely in accordance with specifications.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
ID
G
EL
IN
E
EL
EV
.4
ROOF ELEV.=64.1'
GRADE ELEV.=36.1'
ROOF ELEV.=64.1'
GRADE ELEV.=34.2'
R
ID
G
EL
IN
E
EL
EV
.5
R
ID
G
EL
IN
E
EL
EV
.5
R
ID
G
EL
IN
E
EL
EV
.5
R
ID
G
EL
IN
E
EL
EV
.4
R
ID
G
EL
IN
E
EL
EV
.5
RIDGELINE ELEV.=78.3'
RIDGELINE ELEV.=78.2'
FLAT ROOF ELEV.=
ROOF ELEV.=64.1'
GRADE ELEV.=36.0'
ROOF ELEV.=64.1'
GRADE ELEV.=35.6'
ROOF ELEV.=64.1'
LOWER ROOF ELEV.=43.2'
ROOF ELEV.=64.1'
GRADE ELEV.=35.6'
ROOF ELEV.=64.1'
GRADE ELEV.=35.7'
ROOF ELEV.=64.1'
GRADE ELEV.=34.6'
ROOF ELEV.=60.5'
GRADE ELEV.=34.5'
ROOF ELEV.=60.5'
GRADE ELEV.=34.5'
ROOF ELEV.=64.1'
GRADE ELEV.=34.5'
ROOF ELEV.=66.0'
LOWER ROOF ELEV.=64.1'
GRADE ELEV.=34.8'
ROOF ELEV.=66.0'
GRADE ELEV.=34.6'
ROOF ELEV.=66.0'
GRADE ELEV.=34.8'
ROOF ELEV.=66.0'
GRADE ELEV.=34.8'
ROOF ELEV.=66.0'
GRADE ELEV.=34.6'
ROOF ELEV.=66.0
LOWER ROOF ELEV.=64.1'
GRADE ELEV.=34.8'
ROOF ELEV.=66.0'
GRADE ELEV.=34.8'
ROOF ELEV.=66.0'
GRADE ELEV.=34.8'
ROOF ELEV.=66.0'
GRADE ELEV.=34.7'
ROOF ELEV.=64.1'
GRADE ELEV.=33.6'
ROOF ELEV.=60.8'
GRADE ELEV.=33.1'
FLAT ROOF ELEV.=60.8'
ROOF ELEV.=60.8'
GRADE ELEV.=32.9'
ROOF ELEV.=64.1'
GRADE ELEV.=32.9'
ROOF ELEV.=64.1'
GRADE ELEV.=33.8'
ROOF ELEV.=64.1'
GRADE ELEV.=33.8'
ROOF ELEV.=64.1'
GRADE ELEV.=32.4'
ROOF ELEV.=64.1'
GRADE ELEV.=33.3'
ROOF ELEV.=64.1'
GRADE ELEV.=34.1'
ROOF ELEV.=78.6'ROOF ELEV.=78.6'
ROOF ELEV.=53.2'
LOWER ROOF ELEV.=43.2'
ROOF ELEV.=64.1'
ROOF ELEV.=64.1'
ROOF ELEV.=40.5'
GRADE ELEV.=34.4'
ROOF ELEV.=40.5'
GRADE ELEV.=34.6'
ROOF ELEV.=40.5'
GRADE ELEV.=35.1'
ROOF ELEV.=64.1'
LOWER ROOF ELEV.=40.5'
ROOF ELEV.=64.1'
LOWER ROOF ELEV.=54.4'
ROOF ELEV.=64.1'
LOWER ROOF ELEV.=54.4'
(STAIRS BELOW)
ROOF ELEV.=54.4'
GRADE ELEV.=35.1'
ROOF ELEV.=54.4'
GRADE ELEV.=35.2'
ROOF ELEV.=64.1'
GRADE ELEV.=33.0'
ROOF ELEV.=64.1'
GRADE ELEV.=33.2'
ROOF ELEV.=60.8'
GRADE ELEV.=32.9'
ROOF ELEV.=60.8'
GRADE ELEV.=33.8'
ROOF ELEV.=60.5'
GRADE ELEV.=34.7'
ROOF ELEV.=60.5'
GRADE ELEV.=34.6'
EXISTING ASPHALT
SHINGLES TO
REMAIN, U.N.O. (TYP.)
EXISTING ASPHALT
SHINGLES TO REMAIN, U.N.O. (TYP,)
REMOVE GUTTER
AND DOWNSPOUTS (TYP.)
REMOVE FALL PROTECTION
APPARATUS FROM ROOF SURFACE
AND WITHIN ATTIC (TYPICAL)
REMOVE RFG.
TO GYP. DECK PRIME WITH
ASPHALT-BASED PRIMER
EXISTING CANOPY
TO REMAIN
REMOVE RFG.
TO DECK
REMOVE LOOSE,
FAILED COATING
ROOF AREA G
PER ROOFING DIAGRAM
ROOF AREA D
PER ROOFING
DIAGRAM
ROOF AREA F
PER ROOFING DIAGRAM
ROOF AREA B
PER ROOFING DIAGRAM
ROOF AREA D PER
ROOFING DIAGRAM ROOF AREA E
PER ROOFING
DIAGRAM
ROOF AREA H
PER ROOFING DIAGRAM
ROOF AREA I
EXISTING SNOW GUARD
TO BE REMOVED
STAGING AREA
EXACT LOCATION TBD
ROOF ELEV.=64.1'
LOWER ROOF ELEV.=53.2'
ROOF ELEV.=43.2'
GRADE ELEV.=35.3'
FLAT ROOF ELEV.=43.2
ROOF ELEV.=43.2'
GRADE ELEV.=34.7'
ROOF ELEV.=43.2'
GRADE ELEV.=34.6'
ROOF ELEV.=43.2'
GRADE ELEV.=33.9'
FL
AT
R O
O F
EL
EV
.5
ROOF ELEV.=64.1'
LOWER ROOF ELEV.=53.2'
REMOVE ROOFING SYSTEM
SEE ROOFING DETAIL
19H-AS-001
Building 19H
E4 ROOF PLAN-BUILDING 19H
SCALE: 3/32" = 1'-0"
N
E8 AERIAL IMAGE-BUILDING 19H
NOT TO SCALE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Stewart C. Cluck 717.850.2515
PATIENT BUILDING ROOF
REPLACEMENT
VAMC Perry Point, MD Project Director
GR/MC JS/MR/WMTRevisions: Date:
C
H
CORE CUT
HATCH
DRAIN
LADDER
CAPPED CURB
TIE-OFF POINT
SNOW GUARDS
X EXPANSION JOINT
EXIST DOWNSPOUT/LEADER/SCUPPER
SKYLIGHT
SYMBOL LEGEND
E EXHAUST FAN
SLOPE (POINT DOWN)
LIGHTNING PROTECTION
NOTE:
DIMENSIONS INDICATED WERE TAKEN AT TYPICAL LOCATIONS THROUGHOUT THE BUILDING.
VARIATIONS AND DISCREPANCIES ARE TO BE ANTICIPATED. THE CONTRACTOR SHALL
VERIFY ALL CRITICAL DIMENSIONS BEFORE SUBMITTING PROPOSAL, PROCUREMENT OR
FABRICATION OF MATERIALS AND EQUIPMENT, AND SHALL NOTIFY THE COR OF ANY
DISCREPANCIES NOTED. DUE DILIGENCE NEGLECT BY BIDDER WILL NOT BE A JUSTIFICATION
FOR FUTURE CONTRACT MODIFICATIONS.
CONSTRUCTION
DOCUMENTS
09.30.2021
512A5-20-304
600 North Hartley Street, Suite 152 York, PA 17404
I CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME AND THAT I AM DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NUMBER XXXXX, EXPIRATION DATE XX-XX-XXXX.
LEGEND
ROOF PLAN - DEMOLITION
AutoCAD SHX Text
VA FORM 08 - 6231
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F8
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text R1. GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFICATION AND RECORDING OF ALL EXISTING BUILDING DIMENSIONS AND GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFICATION AND RECORDING OF ALL EXISTING BUILDING DIMENSIONS AND CONDITIONS RELATED TO THE WORK, INCLUDING BUT NOT LIMITED TO FINISHES, MATERIALS, AND SYSTEMS SHOWN AND DESIGNATED AS EXISTING IN THE CONTRACT DOCUMENTS. ANY DISCREPANCIES FROM THE INFORMATION INDICATED ON THE CONTRACT DOCUMENTS SHALL BE DIRECTED TO THE ATTENTION OF THE COR. VERIFICATION OF CLEARANCES REQUIRED FOR ALL NEW EQUIPMENT, PIPING, DUCTWORK AND RELATED COMPONENTS SHALL BE THE CONTRACTOR'S RESPONSIBILITY. R2. CONTRACTOR IS RESPONSIBLE FOR REVIEWING WITH THE THE COR ALL ITEMS REQUIRING REMOVAL BEFORE THE START OF CONTRACTOR IS RESPONSIBLE FOR REVIEWING WITH THE THE COR ALL ITEMS REQUIRING REMOVAL BEFORE THE START OF REMOVAL BEFORE THE START OF WORK. OWNER RESERVES THE RIGHT TO SALVAGE ANY ITEM. ALL REMAINING ITEMS AND MATERIALS DEEMED TO BE TRASH SHALL BE DISPOSED PROPERLY BY LAW, OFF SITE BY THE CONTRACTOR. R3. WHERE EXISTING WALL OPENINGS ARE INDICATED TO BE CLOSED, USE MATERIALS AND FINISHES TO MATCH EXISTING ADJACENT WHERE EXISTING WALL OPENINGS ARE INDICATED TO BE CLOSED, USE MATERIALS AND FINISHES TO MATCH EXISTING ADJACENT MATERIALS AND FINISHES. R4. ALL EXISTING MATERIALS AND FINISHES DISTURBED OR INTERRUPTED BY THE WORK SHALL BE REPLACED OR IN-FILLED TO ALL EXISTING MATERIALS AND FINISHES DISTURBED OR INTERRUPTED BY THE WORK SHALL BE REPLACED OR IN-FILLED TO ACHIEVE UNIFORM COLOR, TEXTURE, PATTERN AND APPEARANCE TO MATCHING ADJACENT MATERIALS AND FINISHES. TRANSITIONS BETWEEN EXISTING-TO-EXISTING AND NEW-TO-EXISTING MATERIALS AND FINISHES HALL BE SEAMLESS IN APPEARANCE. R5. PATCH AND REPAIR OR REPLACE ALL EXISTING FINISHES AND MATERIALS THAT ARE DAMAGED DURING CONSTRUCTION OR AS A PATCH AND REPAIR OR REPLACE ALL EXISTING FINISHES AND MATERIALS THAT ARE DAMAGED DURING CONSTRUCTION OR AS A CONSTRUCTION OR AS A RESULT OF DEMOLITION OR REMOVAL OF AN ITEM. ALL REPAIR OR REPLACEMENT SHALL MATCH EXISTING ADJACENT FINISHES OR NEW WORK/FINISHES AS SCHEDULED. R6. PREPARE EXISTING WORK SUBSTRATES TO RECEIVE NEW WORK PREPARATION SHALL BE IN CONFORMANCE WITH THE MANU- PREPARE EXISTING WORK SUBSTRATES TO RECEIVE NEW WORK PREPARATION SHALL BE IN CONFORMANCE WITH THE MANU- FACTURER'S STANDARDS AND WRITTEN REQUIREMENTS FOR INSTALLATION OF EACH NEW MATERIALS. R7. AT THE DEMOLITION OF AN EXISTING ITEM, REMOVE ALL TRACES OF THE ITEM TO BE DEMOLISHED AND ITS COMPONENTS FROM AT THE DEMOLITION OF AN EXISTING ITEM, REMOVE ALL TRACES OF THE ITEM TO BE DEMOLISHED AND ITS COMPONENTS FROM THE SURFACE OF THE ROOF. STRUCTURE, ABOVE CEILING AND/OR ATTICS. AT REMOVED FASTENERS, PATCH & REPAIR ALL HOLES IN DECKS, WALLS AND/OR CEILINGS FLUSH WITH EXISTING ADJACENT SURFACES. R8. PATCH & REPAIR WORK AT EXISTING DECKS SHALL BE FLUSH WITH EXISTING ADJACENT ELEVATIONS. AREAS OF PATCH AND PATCH & REPAIR WORK AT EXISTING DECKS SHALL BE FLUSH WITH EXISTING ADJACENT ELEVATIONS. AREAS OF PATCH AND REPAIR WORK SHALL NOT TELEGRAPH THROUGH NEW FINISHES.
AutoCAD SHX Text
GENERAL RENOVATION NOTES
AutoCAD SHX Text D1. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING CONDITIONS RELATING TO THE DEMOLITION. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING CONDITIONS RELATING TO THE DEMOLITION. D2. SEE HAZARDOUS MATERIAL, FIRE PROTECTION, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR OTHER DEMOLITION SEE HAZARDOUS MATERIAL, FIRE PROTECTION, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR OTHER DEMOLITION WORK REQUIRED. ANY DEMOLITION OF FIRE PROTECTION, MECHANICAL, ELECTRICAL OR PLUMBING EQUIPMENT SHOWN ON ARCHITECTURAL DRAWINGS IS FOR COORDINATION ONLY. COORDINATE ALL WORK INCLUDING CAPPING AND DISCONNECTING BUILDING SERVICES SUCH AS WATER, WASTE, ELECTRIC, DUCTWORK, ETC. D3. BEFORE DEMOLITION AND THROUGHOUT CONSTRUCTION, CONTRACTOR SHALL BE RESPONSIBLE TO REVIEW WITH COR ALL ITEMS BEFORE DEMOLITION AND THROUGHOUT CONSTRUCTION, CONTRACTOR SHALL BE RESPONSIBLE TO REVIEW WITH COR ALL ITEMS BEING REMOVED BY THEIR TRADES. ALL ITEMS DESIGNATED DURING THIS REVIEW SHALL REMAIN VA PROPERTY, SHALL BE REMAIN VA PROPERTY, SHALL BE MAINTAINED IN GOOD CONDITION AND TURNED OVER TO THE VA. ALL ITEMS DESIGNATED TO BE REUSED AS PART OF NEW IN GOOD CONDITION AND TURNED OVER TO THE VA. ALL ITEMS DESIGNATED TO BE REUSED AS PART OF NEW CONSTRUCTION SHALL BE MAINTAINED IN USABLE CONDITION AND STORED ON SITE BY THE CONTRACTOR IN A CLEAN, DRY LOCATION UNTIL INSTALLATION. ALL TRASH SHALL BE DISPOSED PROPERLY BY LAW, OFF SITE BY THE CONTRACTOR. D4. EXISTING CONDITIONS SHOWN ON CONTRACT DOCUMENTS MAY VARY FROM ACTUAL CONDITIONS BECAUSE OF WORK PERFORMED EXISTING CONDITIONS SHOWN ON CONTRACT DOCUMENTS MAY VARY FROM ACTUAL CONDITIONS BECAUSE OF WORK PERFORMED WORK PERFORMED PRIOR TO THE CONTRACT. CONTRACTOR SHALL VERIFY ACTUAL SCOPE OF DEMOLITION PRIOR TO SUBMITTING BID. D5. PRIOR TO STARTING DEMOLITION AND CONSTRUCTION, CONTRACTOR SHALL VERIFY EXISTING BUILDING DIMENSIONS AND PRIOR TO STARTING DEMOLITION AND CONSTRUCTION, CONTRACTOR SHALL VERIFY EXISTING BUILDING DIMENSIONS AND CONDITIONS, INCLUDING FINISHES, MATERIALS, AND SYSTEMS SHOWN AND DESIGNATED AS EXISTING ON CONTRACT DRAWINGS. ANY DISCREPANCIES IN INFORMATION INDICATED ON CONTRACT DRAWINGS SHALL BE DIRECTED IN WRITING TO THE ATTENTION OF THE COR PRIOR TO STARTING DEMOLITION AND CONSTRUCTION. VERIFICATION OF CLEARANCES REQUIRED FOR ALL NEW EQUIPMENT, PIPING, DUCTWORK AND RELATED COMPONENTS SHALL BE THE CONTRACTOR'S RESPONSIBILITY. D6. DEMOLITION WORK SHOWN ON THE DEMOLITION CONTRACT DRAWINGS SHALL BE FOR THE AREA OF THE BUILDING RECEIVING DEMOLITION WORK SHOWN ON THE DEMOLITION CONTRACT DRAWINGS SHALL BE FOR THE AREA OF THE BUILDING RECEIVING MAJOR DEMOLITION WORK AND DOES NOT REPRESENT THE ENTIRETY OF DEMOLITION FOR THE PROJECT. REFER TO OTHER CONTRACT DRAWINGS AND DETAILS FOR ADDITIONAL DEMOLITION WORK, IF ANY, FOR EACH BUILDING OR BUILDING COMPONENT. D7. VA RESERVES THE RIGHT TO SALVAGE AND REMOVE ANY EXISTING ITEMS BEFORE THE START OF DEMOLITION WORK.VA RESERVES THE RIGHT TO SALVAGE AND REMOVE ANY EXISTING ITEMS BEFORE THE START OF DEMOLITION WORK.
AutoCAD SHX Text
GENERAL DEMOLITION NOTES
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text A1. ALL ELEVATIONS ARE REFERENCED FROM BENCHMARK- ALL ELEVATIONS ARE REFERENCED FROM BENCHMARK- SEE 512A5-GI-102 A2. REMOVE ALL WALL FLASHING AND COUNTER FLASHING REMOVE ALL WALL FLASHING AND COUNTER FLASHING WHERE ROOFING MATERIAL IS REMOVED-PATCH AND PREPARE WALL TO RECEIVE NEW WORK. A3. REMOVE ALL COPING CAPS AND/OR GRAVEL REMOVE ALL COPING CAPS AND/OR GRAVEL STOPS-PREPARE PARAPET WALL TO RECEIVE NEW WORK.
AutoCAD SHX Text
1. REMOVE ALL SURFACE MOUNTED GUTTERS AND REMOVE ALL SURFACE MOUNTED GUTTERS AND DOWNSPOUTS. ALL COPPER GUTTERS AND DOWNSPOUTS SHALL BE TURNED OVER TO THE COR.
AutoCAD SHX Text
NOTES
19H-AS-002
Building 19H
E8 AERIAL IMAGE-BUILDING 19H
NOT TO SCALE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Stewart C. Cluck 717.850.2515
PATIENT BUILDING ROOF
REPLACEMENT
VAMC Perry Point, MD Project Director
GR/MC JS/MR/WMTRevisions: Date:
C
H
CORE CUT
HATCH
DRAIN
LADDER
CAPPED CURB
TIE-OFF POINT
SNOW GUARDS
X EXPANSION JOINT
EXIST DOWNSPOUT/LEADER/SCUPPER
SKYLIGHT
SYMBOL LEGEND
E EXHAUST FAN
SLOPE (POINT DOWN)
LIGHTNING PROTECTION
NOTE:
DIMENSIONS INDICATED WERE TAKEN AT TYPICAL LOCATIONS THROUGHOUT THE BUILDING.
VARIATIONS AND DISCREPANCIES ARE TO BE ANTICIPATED. THE CONTRACTOR SHALL
VERIFY ALL CRITICAL DIMENSIONS BEFORE SUBMITTING PROPOSAL, PROCUREMENT OR
FABRICATION OF MATERIALS AND EQUIPMENT, AND SHALL NOTIFY THE COR OF ANY
DISCREPANCIES NOTED. DUE DILIGENCE NEGLECT BY BIDDER WILL NOT BE A JUSTIFICATION
FOR FUTURE CONTRACT MODIFICATIONS.
CONSTRUCTION
DOCUMENTS
09.30.2021
512A5-20-304
600 North Hartley Street, Suite 152 York, PA 17404
I CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME AND THAT I AM DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NUMBER XXXXX, EXPIRATION DATE XX-XX-XXXX.
AREA B
AREA D
AREA E
AREA F
AREA G & H
AREA I
ROOF PLAN - INFORMATION
AutoCAD SHX Text
VA FORM 08 - 6231
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F8
AutoCAD SHX Text
KEY PLAN
NOT TO SCALE
NEW STANDING SEAM
METAL ROOFING SYSTEM
NEW FLUID APPLIED
ROOFING SYSTEM OVERTOP
NEW INSULATION AND
PROTECTION BOARD
NEW FULLY-REINF.
LIQUID APPLIED
MEMBRANE
EXISTING
METAL CANOPY
ROOF AREA G
PER ROOFING DIAGRAM
NEW 2-PLY MOD.
BITUMEN OR LIQUID
APPLIED MEMBRANE
OVER SECUREROCK
COVER BD. OVER
R-30 TAPERED INSUL.
ROOF AREA D
PER ROOFING
DIAGRAM
NEW 2-PLY MOD.
BITUMEN OR LIQUID
APPLIED MEMBRANE
OVER SECUREROCK
COVER BD. OVER R-30
TAPERED INSUL.
ROOF AREA F
PER ROOFING DIAGRAM
ROOF AREA B
PER ROOFING DIAGRAM
ROOF AREA D PER
ROOFING DIAGRAM
NEW ST.SM.
GUTTERS
(TYP.)
NEW ST.SM.
GUTTERS
(TYP.)
ROOF AREA E
PER ROOFING
DIAGRAM
ROOF AREA H
PER ROOFING DIAGRAMNEW FULLY-REINF.
LIQUID APPLIED
MEMBRANE
NEW FULLY-REINF.
LIQUID APPLIED
MEMBRANE
ROOF AREA I
D1
AS302
D1
AS303
D4
AS305
D1
AS302
D1
AS303
D4
AS305
D12
AS305
D12
AS305
D11
AS301
D7
AS301
D11
AS301
D3
AS301
D1
AS302
D12
AS304
D13
AS301
D1
AS302
D7
AS301
D6
AS301
D7
AS306
D12
AS306
D16
AS306
D12
AS301
D5
AS303
(TYP.)
STAGING AREA
EXACT LOCATION TBD
DS
DSDS
DSDS DS
DS
DS DS
DS DS
DS
DS
DS
DS
DS DS
DS
DS
DS DS
DS
DS
DSDSDS
DS
19H-AS-003
Building 19H
E4 ROOF PLAN-BUILDING 19H
SCALE: 3/32" = 1'-0"
N
E8 AERIAL IMAGE-BUILDING 19H
NOT TO SCALE
Fi le
P at h 6/
/2
:3
9:
P M
NOTE:
DIMENSIONS INDICATED WERE TAKEN AT TYPICAL LOCATIONS THROUGHOUT THE BUILDING.
VARIATIONS AND DISCREPANCIES ARE TO BE ANTICIPATED. THE CONTRACTOR SHALL
VERIFY ALL CRITICAL DIMENSIONS BEFORE SUBMITTING PROPOSAL, PROCUREMENT OR
FABRICATION OF MATERIALS AND EQUIPMENT, AND SHALL NOTIFY THE COR OF ANY
DISCREPANCIES NOTED. DUE DILIGENCE NEGLECT BY BIDDER WILL NOT BE A JUSTIFICATION
FOR FUTURE CONTRACT MODIFICATIONS.
EXISTING DRAIN
EXISTING LADDER
EXISTING CAPPED CURB
DOWNSPOUT (DS)
EXISTING SKYLIGHT
SYMBOL LEGEND
EXISTING MECHANICAL UNIT
EXISTING MECHANICAL UNIT
EXISTING VENT PIPING
NEW FALL PROTECTION
EXISTING ROOF HATCH
NEW SNOW GUARD
LIGHTNING PROTECTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Stewart C. Cluck 717.850.2515
PATIENT BUILDING ROOF
REPLACEMENT
VAMC Perry Point, MD Project Director
GR/MC JS/MR/WMTRevisions: Date:
CONSTRUCTION
DOCUMENTS
09.30.2021
512A5-20-304
600 North Hartley Street, Suite 152 York, PA 17404
I CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME AND THAT I AM DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NUMBER XXXXX, EXPIRATION DATE XX-XX-XXXX.
LEGEND
ROOF PLAN - NEW WORK
AutoCAD SHX Text
VA FORM 08 - 6231
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F8
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text A1. CONTRACTOR SHALL PROTECT EXPOSED AREAS OF THE BUILDING TO PREVENT DAMAGE TO ANY/ALL EXISTING CONSTRUCTION TO REMAIN. CONTRACTOR SHALL PROTECT EXPOSED AREAS OF THE BUILDING TO PREVENT DAMAGE TO ANY/ALL EXISTING CONSTRUCTION TO REMAIN. PREVENT DAMAGE TO ANY/ALL EXISTING CONSTRUCTION TO REMAIN. TO REMAIN. A2. THIS DRAWING DOES NOT SHOW ALL ROOF PENETRATIONS OR EQUIPMENT. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE QUANTITY AND LOCATION OF ALL THIS DRAWING DOES NOT SHOW ALL ROOF PENETRATIONS OR EQUIPMENT. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE QUANTITY AND LOCATION OF ALL ROOF-MOUNTED EQUIPMENT, EQUIPMENT SUPPORTS AND PENETRATIONS. SEE ARCHITECTURAL DETAILS AND MEP DRAWINGS FOR ADDITIONAL INFO. INSTALLATION OF EQUIPMENT, EQUIPMENT SUPPORTS AND PENETRATIONS SHALL BE IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS. A3. CONTRACTOR SHALL INSTALL ALL FLASHING FOR EQUIPMENT, EQUIPMENT SUPPORTS AND PENETRATIONS PER MANUFACTURER'S STANDARD DETAILS AND WRITTEN CONTRACTOR SHALL INSTALL ALL FLASHING FOR EQUIPMENT, EQUIPMENT SUPPORTS AND PENETRATIONS PER MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY. MANUFACTURER'S STANDARD INSTALLATION REQUIREMENTS SHALL TAKE PRECEDENCE IF THERE ARE ANY DISCREPANCIES IN CONTRACT DOCUMENTS. A4. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE HIGH POINT AND THE LOW POINT OF ALL ROOF SLOPES PRIOR TO INSTALLATION OF ANY ROOF INSULATION. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE HIGH POINT AND THE LOW POINT OF ALL ROOF SLOPES PRIOR TO INSTALLATION OF ANY ROOF INSULATION. INSTALLATION OF ANY ROOF INSULATION. THIS VERIFICATION SHALL BE INDICATED ON THE ROOF INSULATION SUBMITTAL DRAWING. A5. CONTRACTOR SHALL INSTALL NON-TAPERED ROOF INSULATION OVER LOW SLOPED ROOF DECKS THAT HAVE A SLOPE GREATER THAN OR EQUAL TO 1/4" PER FOOT. CONTRACTOR SHALL INSTALL NON-TAPERED ROOF INSULATION OVER LOW SLOPED ROOF DECKS THAT HAVE A SLOPE GREATER THAN OR EQUAL TO 1/4" PER FOOT. PONDING SHALL NOT OCCUR. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY LOW SLOPING ROOF DECK LOCATIONS. A6. CONTRACTOR SHALL INSTALL TAPERED ROOF INSULATION OVER FLAT ROOF DECKS AND OVER LOW SLOPED ROOF DECKS THAT HAVE A SLOPE LESS THAN 1/4" PER FOOT. CONTRACTOR SHALL INSTALL TAPERED ROOF INSULATION OVER FLAT ROOF DECKS AND OVER LOW SLOPED ROOF DECKS THAT HAVE A SLOPE LESS THAN 1/4" PER FOOT. PONDING SHALL NOT OCCUR. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY FLAT ROOF DECK LOCATIONS AND LOW SLOPING ROOF DECK LOCATIONS. RESPONSIBLE TO VERIFY FLAT ROOF DECK LOCATIONS AND LOW SLOPING ROOF DECK LOCATIONS. FLAT ROOF DECK LOCATIONS AND LOW SLOPING ROOF DECK LOCATIONS. A7. CRICKETS AND SADDLES SHALL HAVE A MINIMUM SLOPE OF 2 TIMES THAT OF THE PRIMARY TAPERED SYSTEM OR STRUCTURAL SLOPE. CRICKET WIDTH-TO-LENGTH RATIO CRICKETS AND SADDLES SHALL HAVE A MINIMUM SLOPE OF 2 TIMES THAT OF THE PRIMARY TAPERED SYSTEM OR STRUCTURAL SLOPE. CRICKET WIDTH-TO-LENGTH RATIO STRUCTURAL SLOPE. CRICKET WIDTH-TO-LENGTH RATIO SHALL BE NO LESS THAN 1:3. PONDING SHALL NOT OCCUR. A8. CONTRACTOR SHALL FURNISH AND INSTALL FIRE-RETARDANT LUMBER FOR ALL WOOD BLOCKING. CONTRACTOR SHALL FURNISH AND INSTALL FIRE-RETARDANT LUMBER FOR ALL WOOD BLOCKING. A9. CONTRACTOR SHALL FURNISH AND INSTALL ALL ROOFING SYSTEMS IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN CONTRACTOR SHALL FURNISH AND INSTALL ALL ROOFING SYSTEMS IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY. A10. CONTRACTOR SHALL REMOVE EXISTING EQUIPMENT AS REQUIRED TO ALLOW ROOF FLASHING TO OCCUR IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND CONTRACTOR SHALL REMOVE EXISTING EQUIPMENT AS REQUIRED TO ALLOW ROOF FLASHING TO OCCUR IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY. A11. EXTEND CURBS AS REQUIRED TO PROVIDE CLEARANCE IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY. EXTEND CURBS AS REQUIRED TO PROVIDE CLEARANCE IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY. A12. CONTRACTOR SHALL VERIFY IF BUILDING STRUCTURE OR ROOF DECK HAS FIRE PROOFING. IF FOUND, NOTIFY C.O.R. DISTRIBUTED CONTRACTOR SHALL REPLACE IN LIKE CONTRACTOR SHALL VERIFY IF BUILDING STRUCTURE OR ROOF DECK HAS FIRE PROOFING. IF FOUND, NOTIFY C.O.R. DISTRIBUTED CONTRACTOR SHALL REPLACE IN LIKE KIND.
AutoCAD SHX Text
GENERAL ROOF PLAN NOTES
AutoCAD SHX Text
1. GENERAL CONTRACTOR SHALL INCLUDE 214 SF OF GYPSUM REPLACEMENT. GENERAL CONTRACTOR SHALL INCLUDE 214 SF OF GYPSUM REPLACEMENT. 2. SEE ROOF DATA INFORMATION FOR REQUIRED WORK. SEE ROOF DATA INFORMATION FOR REQUIRED WORK. 3. FURNISH AND INSTALL NEW PRE-FINISHED METAL GUTTERS AND DOWNSPOUTS. MATCH EXISTING FURNISH AND INSTALL NEW PRE-FINISHED METAL GUTTERS AND DOWNSPOUTS. MATCH EXISTING GUTTERS AND DOWNSPOUTS. REFER TO SPECIFICATIONS FOR MATERIAL DETAILS. 4. FURNISH AND INSTALL PREFINISHED METAL COPING CAP AND GRAVEL STOPS - MATCH EXISTING FURNISH AND INSTALL PREFINISHED METAL COPING CAP AND GRAVEL STOPS - MATCH EXISTING SIZE.
NOTE
DS
DS
2-PLY MODIFIED BITUMEN
OR NEW LIQUID APPLIED
MEMBRANE RFG. SYS.
OVER SECUREROCK
COVER BD. OVER
R-30 TAPERED INSUL.
NEW PRE-FINISHED
GUTTER AND
DOWNSPOUTS
D10
AS304
NEW WOOD NAILER AND METAL EDGE
NEW METAL NAILER
AND METAL EDGE
NEW WOOD NAILER
AND GUTTER EDGE
D16
AS304
DS
DS
ROOF ELEV.=39.9'
GRADE ELEV.=33.7'
ROOF ELEV.=39.9'
GRADE ELEV.=33.6'
ROOF ELEV.=51.0'
LOWER ROOF ELEV.=39.9'
GRADE ELEV.=28.9'
ROOF ELEV.=51.0'
LOWER ROOF ELEV.=39.9'
GRADE ELEV.=35.0'
FL
AT
R O
O F
EL
EV
.9
REMOVE GUTTER
AND DOWNSPOUTS
REMOVE ROOFING
AND INSUL TO DECK
AND PRIME WITH
ASPHALT-BASED PRIMER
EXISTING DRAIN
EXISTING LADDER
EXISTING CAPPED CURB
DOWNSPOUT (DS)
EXISTING SKYLIGHT
SYMBOL LEGEND
EXISTING MECHANICAL UNIT
EXISTING MECHANICAL UNIT
EXISTING VENT PIPING
NEW FALL PROTECTION
EXISTING ROOF HATCH
NEW SNOW GUARD
LIGHTNING PROTECTION
NEW FLUID APPLIED
ROOFING SYSTEM
REMOVE ROOFING SYSTEM
SEE ROOFING DETAIL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Stewart C. Cluck 717.850.2515
PATIENT BUILDING ROOF
REPLACEMENT
VAMC Perry Point, MD Project Director
GR/MC JS/MR/WMTRevisions: Date:
C
H
CORE CUT
HATCH
DRAIN
LADDER
CAPPED CURB
TIE-OFF POINT
SNOW GUARDS
X EXPANSION JOINT
EXIST DOWNSPOUT/LEADER/SCUPPER
SKYLIGHT
SYMBOL LEGEND
E EXHAUST FAN
SLOPE (POINT DOWN)
LIGHTNING PROTECTION
NOTE:
DIMENSIONS INDICATED WERE TAKEN AT TYPICAL LOCATIONS THROUGHOUT THE BUILDING.
VARIATIONS AND DISCREPANCIES ARE TO BE ANTICIPATED. THE CONTRACTOR SHALL
VERIFY ALL CRITICAL DIMENSIONS BEFORE SUBMITTING PROPOSAL, PROCUREMENT OR
FABRICATION OF MATERIALS AND EQUIPMENT, AND SHALL NOTIFY THE COR OF ANY
DISCREPANCIES NOTED. DUE DILIGENCE NEGLECT BY BIDDER WILL NOT BE A JUSTIFICATION
FOR FUTURE CONTRACT MODIFICATIONS.
CONSTRUCTION
DOCUMENTS
09.30.2021
512A5-20-304
600 North Hartley Street, Suite 152 York, PA 17404
I CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME AND THAT I AM DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NUMBER XXXXX, EXPIRATION DATE XX-XX-XXXX.
19H-C-AS-001
Building 19H-C
E6 ROOF PLAN-NEW WORK-BLDG 19H-C
SCALE: 1/4" = 1'-0"N
E8 AERIAL IMAGE-BUILDING 19H-C
NOT TO SCALE
E6 ROOF PLAN-DEMOLITION-BLDG 19H-C
SCALE: 1/4" = 1'-0"N
LEGENDLEGEND
NEW WORK
DEMOLITION
ROOF PLAN - DEMOLITION
AND NEW WORK
AutoCAD SHX Text
VA FORM 08 - 6231
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F8
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text R1. GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFICATION AND RECORDING OF ALL EXISTING BUILDING DIMENSIONS AND GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFICATION AND RECORDING OF ALL EXISTING BUILDING DIMENSIONS AND CONDITIONS RELATED TO THE WORK, INCLUDING BUT NOT LIMITED TO FINISHES, MATERIALS, AND SYSTEMS SHOWN AND DESIGNATED AS EXISTING IN THE CONTRACT DOCUMENTS. ANY DISCREPANCIES FROM THE INFORMATION INDICATED ON THE CONTRACT DOCUMENTS SHALL BE DIRECTED TO THE ATTENTION OF THE COR. VERIFICATION OF CLEARANCES REQUIRED FOR ALL NEW EQUIPMENT, PIPING, DUCTWORK AND RELATED COMPONENTS SHALL BE THE CONTRACTOR'S RESPONSIBILITY. R2. CONTRACTOR IS RESPONSIBLE FOR REVIEWING WITH THE THE COR ALL ITEMS REQUIRING REMOVAL BEFORE THE START OF CONTRACTOR IS RESPONSIBLE FOR REVIEWING WITH THE THE COR ALL ITEMS REQUIRING REMOVAL BEFORE THE START OF REMOVAL BEFORE THE START OF WORK. OWNER RESERVES THE RIGHT TO SALVAGE ANY ITEM. ALL REMAINING ITEMS AND MATERIALS DEEMED TO BE TRASH SHALL BE DISPOSED PROPERLY BY LAW, OFF SITE BY THE CONTRACTOR. R3. WHERE EXISTING WALL OPENINGS ARE INDICATED TO BE CLOSED, USE MATERIALS AND FINISHES TO MATCH EXISTING ADJACENT WHERE EXISTING WALL OPENINGS ARE INDICATED TO BE CLOSED, USE MATERIALS AND FINISHES TO MATCH EXISTING ADJACENT MATERIALS AND FINISHES. R4. ALL EXISTING MATERIALS AND FINISHES DISTURBED OR INTERRUPTED BY THE WORK SHALL BE REPLACED OR IN-FILLED TO ALL EXISTING MATERIALS AND FINISHES DISTURBED OR INTERRUPTED BY THE WORK SHALL BE REPLACED OR IN-FILLED TO ACHIEVE UNIFORM COLOR, TEXTURE, PATTERN AND APPEARANCE TO MATCHING ADJACENT MATERIALS AND FINISHES. TRANSITIONS BETWEEN EXISTING-TO-EXISTING AND NEW-TO-EXISTING MATERIALS AND FINISHES HALL BE SEAMLESS IN APPEARANCE. R5. PATCH AND REPAIR OR REPLACE ALL EXISTING FINISHES AND MATERIALS THAT ARE DAMAGED DURING CONSTRUCTION OR AS A PATCH AND REPAIR OR REPLACE ALL EXISTING FINISHES AND MATERIALS THAT ARE DAMAGED DURING CONSTRUCTION OR AS A CONSTRUCTION OR AS A RESULT OF DEMOLITION OR REMOVAL OF AN ITEM. ALL REPAIR OR REPLACEMENT SHALL MATCH EXISTING ADJACENT FINISHES OR NEW WORK/FINISHES AS SCHEDULED. R6. PREPARE EXISTING WORK SUBSTRATES TO RECEIVE NEW WORK PREPARATION SHALL BE IN CONFORMANCE WITH THE MANU- PREPARE EXISTING WORK SUBSTRATES TO RECEIVE NEW WORK PREPARATION SHALL BE IN CONFORMANCE WITH THE MANU- FACTURER'S STANDARDS AND WRITTEN REQUIREMENTS FOR INSTALLATION OF EACH NEW MATERIALS. R7. AT THE DEMOLITION OF AN EXISTING ITEM, REMOVE ALL TRACES OF THE ITEM TO BE DEMOLISHED AND ITS COMPONENTS FROM AT THE DEMOLITION OF AN EXISTING ITEM, REMOVE ALL TRACES OF THE ITEM TO BE DEMOLISHED AND ITS COMPONENTS FROM THE SURFACE OF THE ROOF. STRUCTURE, ABOVE CEILING AND/OR ATTICS. AT REMOVED FASTENERS, PATCH & REPAIR ALL HOLES IN DECKS, WALLS AND/OR CEILINGS FLUSH WITH EXISTING ADJACENT SURFACES. R8. PATCH & REPAIR WORK AT EXISTING DECKS SHALL BE FLUSH WITH EXISTING ADJACENT ELEVATIONS. AREAS OF PATCH AND PATCH & REPAIR WORK AT EXISTING DECKS SHALL BE FLUSH WITH EXISTING ADJACENT ELEVATIONS. AREAS OF PATCH AND REPAIR WORK SHALL NOT TELEGRAPH THROUGH NEW FINISHES.
AutoCAD SHX Text
GENERAL RENOVATION NOTES
AutoCAD SHX Text D1. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING CONDITIONS RELATING TO THE DEMOLITION. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL EXISTING CONDITIONS RELATING TO THE DEMOLITION. D2. SEE HAZARDOUS MATERIAL, FIRE PROTECTION, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR OTHER DEMOLITION SEE HAZARDOUS MATERIAL, FIRE PROTECTION, MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR OTHER DEMOLITION WORK REQUIRED. ANY DEMOLITION OF FIRE PROTECTION, MECHANICAL, ELECTRICAL OR PLUMBING EQUIPMENT SHOWN ON ARCHITECTURAL DRAWINGS IS FOR COORDINATION ONLY. COORDINATE ALL WORK INCLUDING CAPPING AND DISCONNECTING BUILDING SERVICES SUCH AS WATER, WASTE, ELECTRIC, DUCTWORK, ETC. D3. BEFORE DEMOLITION AND THROUGHOUT CONSTRUCTION, CONTRACTOR SHALL BE RESPONSIBLE TO REVIEW WITH COR ALL ITEMS BEFORE DEMOLITION AND THROUGHOUT CONSTRUCTION, CONTRACTOR SHALL BE RESPONSIBLE TO REVIEW WITH COR ALL ITEMS BEING REMOVED BY THEIR TRADES. ALL ITEMS DESIGNATED DURING THIS REVIEW SHALL REMAIN VA PROPERTY, SHALL BE REMAIN VA PROPERTY, SHALL BE MAINTAINED IN GOOD CONDITION AND TURNED OVER TO THE VA. ALL ITEMS DESIGNATED TO BE REUSED AS PART OF NEW IN GOOD CONDITION AND TURNED OVER TO THE VA. ALL ITEMS DESIGNATED TO BE REUSED AS PART OF NEW CONSTRUCTION SHALL BE MAINTAINED IN USABLE CONDITION AND STORED ON SITE BY THE CONTRACTOR IN A CLEAN, DRY LOCATION UNTIL INSTALLATION. ALL TRASH SHALL BE DISPOSED PROPERLY BY LAW, OFF SITE BY THE CONTRACTOR. D4. EXISTING CONDITIONS SHOWN ON CONTRACT DOCUMENTS MAY VARY FROM ACTUAL CONDITIONS BECAUSE OF WORK PERFORMED EXISTING CONDITIONS SHOWN ON CONTRACT DOCUMENTS MAY VARY FROM ACTUAL CONDITIONS BECAUSE OF WORK PERFORMED WORK PERFORMED PRIOR TO THE CONTRACT. CONTRACTOR SHALL VERIFY ACTUAL SCOPE OF DEMOLITION PRIOR TO SUBMITTING BID. D5. PRIOR TO STARTING DEMOLITION AND CONSTRUCTION, CONTRACTOR SHALL VERIFY EXISTING BUILDING DIMENSIONS AND PRIOR TO STARTING DEMOLITION AND CONSTRUCTION, CONTRACTOR SHALL VERIFY EXISTING BUILDING DIMENSIONS AND CONDITIONS, INCLUDING FINISHES, MATERIALS, AND SYSTEMS SHOWN AND DESIGNATED AS EXISTING ON CONTRACT DRAWINGS. ANY DISCREPANCIES IN INFORMATION INDICATED ON CONTRACT DRAWINGS SHALL BE DIRECTED IN WRITING TO THE ATTENTION OF THE COR PRIOR TO STARTING DEMOLITION AND CONSTRUCTION. VERIFICATION OF CLEARANCES REQUIRED FOR ALL NEW EQUIPMENT, PIPING, DUCTWORK AND RELATED COMPONENTS SHALL BE THE CONTRACTOR'S RESPONSIBILITY. D6. DEMOLITION WORK SHOWN ON THE DEMOLITION CONTRACT DRAWINGS SHALL BE FOR THE AREA OF THE BUILDING RECEIVING DEMOLITION WORK SHOWN ON THE DEMOLITION CONTRACT DRAWINGS SHALL BE FOR THE AREA OF THE BUILDING RECEIVING MAJOR DEMOLITION WORK AND DOES NOT REPRESENT THE ENTIRETY OF DEMOLITION FOR THE PROJECT. REFER TO OTHER CONTRACT DRAWINGS AND DETAILS FOR ADDITIONAL DEMOLITION WORK, IF ANY, FOR EACH BUILDING OR BUILDING COMPONENT. D7. VA RESERVES THE RIGHT TO SALVAGE AND REMOVE ANY EXISTING ITEMS BEFORE THE START OF DEMOLITION WORK.VA RESERVES THE RIGHT TO SALVAGE AND REMOVE ANY EXISTING ITEMS BEFORE THE START OF DEMOLITION WORK.
AutoCAD SHX Text
GENERAL DEMOLITION NOTES
AutoCAD SHX Text A1. CONTRACTOR SHALL PROTECT EXPOSED AREAS OF THE BUILDING TO PREVENT DAMAGE TO ANY/ALL EXISTING CONSTRUCTION CONTRACTOR SHALL PROTECT EXPOSED AREAS OF THE BUILDING TO PREVENT DAMAGE TO ANY/ALL EXISTING CONSTRUCTION PREVENT DAMAGE TO ANY/ALL EXISTING CONSTRUCTION TO REMAIN. A2. THIS DRAWING DOES NOT SHOW ALL ROOF PENETRATIONS OR EQUIPMENT. CONTRACTOR SHALL BE RESPONSIBLE TO THIS DRAWING DOES NOT SHOW ALL ROOF PENETRATIONS OR EQUIPMENT. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE QUANTITY AND LOCATION OF ALL ROOF-MOUNTED EQUIPMENT, EQUIPMENT SUPPORTS AND PENETRATIONS. SEE ARCHITECTURAL DETAILS AND MEP DRAWINGS FOR ADDITIONAL INFO. INSTALLATION OF EQUIPMENT, EQUIPMENT SUPPORTS AND PENETRATIONS SHALL BE IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS. A3. CONTRACTOR SHALL INSTALL ALL FLASHING FOR EQUIPMENT, EQUIPMENT SUPPORTS AND PENETRATIONS PER CONTRACTOR SHALL INSTALL ALL FLASHING FOR EQUIPMENT, EQUIPMENT SUPPORTS AND PENETRATIONS PER MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY. MANUFACTURER'S STANDARD INSTALLATION REQUIREMENTS SHALL TAKE PRECEDENCE IF THERE ARE ANY DISCREPANCIES IN CONTRACT DOCUMENTS. A4. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE HIGH POINT AND THE LOW POINT OF ALL ROOF SLOPES PRIOR TO CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE HIGH POINT AND THE LOW POINT OF ALL ROOF SLOPES PRIOR TO INSTALLATION OF ANY ROOF INSULATION. THIS VERIFICATION SHALL BE INDICATED ON THE ROOF INSULATION SUBMITTAL DRAWING. A5. CONTRACTOR SHALL INSTALL NON-TAPERED ROOF INSULATION OVER LOW SLOPED ROOF DECKS THAT HAVE A SLOPE CONTRACTOR SHALL INSTALL NON-TAPERED ROOF INSULATION OVER LOW SLOPED ROOF DECKS THAT HAVE A SLOPE GREATER THAN OR EQUAL TO 1/4" PER FOOT. PONDING SHALL NOT OCCUR. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY LOW SLOPING ROOF DECK LOCATIONS. A6. CONTRACTOR SHALL INSTALL TAPERED ROOF INSULATION OVER FLAT ROOF DECKS AND OVER LOW SLOPED ROOF DECKS THAT CONTRACTOR SHALL INSTALL TAPERED ROOF INSULATION OVER FLAT ROOF DECKS AND OVER LOW SLOPED ROOF DECKS THAT HAVE A SLOPE LESS THAN 1/4" PER FOOT. PONDING SHALL NOT OCCUR. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY RESPONSIBLE TO VERIFY FLAT ROOF DECK LOCATIONS AND LOW SLOPING ROOF DECK LOCATIONS. A7. CRICKETS AND SADDLES SHALL HAVE A MINIMUM SLOPE OF 2 TIMES THAT OF THE PRIMARY TAPERED SYSTEM OR STRUCTURAL CRICKETS AND SADDLES SHALL HAVE A MINIMUM SLOPE OF 2 TIMES THAT OF THE PRIMARY TAPERED SYSTEM OR STRUCTURAL STRUCTURAL SLOPE. CRICKET WIDTH-TO-LENGTH RATIO SHALL BE NO LESS THAN 1:3. PONDING SHALL NOT OCCUR. A8. CONTRACTOR SHALL FURNISH AND INSTALL FIRE-RETARDANT LUMBER FOR ALL WOOD BLOCKING. CONTRACTOR SHALL FURNISH AND INSTALL FIRE-RETARDANT LUMBER FOR ALL WOOD BLOCKING. A9. CONTRACTOR SHALL FURNISH AND INSTALL ALL ROOFING SYSTEMS IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS CONTRACTOR SHALL FURNISH AND INSTALL ALL ROOFING SYSTEMS IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY. A10. ALL ELEVATIONS ARE REFERENCED FROM BENCHMARK- ALL ELEVATIONS ARE REFERENCED FROM BENCHMARK- SEE 512A5-GI-102 A11. CONTRACTOR SHALL REMOVE EXISTING EQUIPMENT AS REQUIRED TO ALLOW ROOF FLASHING TO OCCUR IN ACCORDANCE WITH CONTRACTOR SHALL REMOVE EXISTING EQUIPMENT AS REQUIRED TO ALLOW ROOF FLASHING TO OCCUR IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY. A12. EXTEND CURBS AS REQUIRED TO PROVIDE CLEARANCE IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND EXTEND CURBS AS REQUIRED TO PROVIDE CLEARANCE IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY. A13. CONTRACTOR SHALL VERIFY IF BUILDING STRUCTURE OR ROOF DECK HAS FIRE PROOFING. IF FOUND, NOTIFY C.O.R. CONTRACTOR SHALL VERIFY IF BUILDING STRUCTURE OR ROOF DECK HAS FIRE PROOFING. IF FOUND, NOTIFY C.O.R. DISTRIBUTED CONTRACTOR SHALL REPLACE IN LIKE KIND.
AutoCAD SHX Text
GENERAL ROOF PLAN NOTES
AutoCAD SHX Text
1. SEE ROOF DATA INFORMATION FOR REQUIRED WORK. SEE ROOF DATA INFORMATION FOR REQUIRED WORK. 2. REMOVE ALL SURFACE MOUNTED GUTTERS AND DOWNSPOUTS. ALL COPPER GUTTERS AND REMOVE ALL SURFACE MOUNTED GUTTERS AND DOWNSPOUTS. ALL COPPER GUTTERS AND DOWNSPOUTS SHALL BE TURNED OVER TO THE COR. 3. FURNISH AND INSTALL NEW PRE-FINISHED METAL GUTTERS AND DOWNSPOUTS. MATCH EXISTING FURNISH AND INSTALL NEW PRE-FINISHED METAL GUTTERS AND DOWNSPOUTS. MATCH EXISTING GUTTERS AND DOWNSPOUTS SIZE. REFER TO SPECIFICATIONS FOR MATERIAL DETAILS. 4. FURNISH AND INSTALL PREFINISHED METAL COPING CAP AND GRAVEL STOPS - MATCH EXISTING FURNISH AND INSTALL PREFINISHED METAL COPING CAP AND GRAVEL STOPS - MATCH EXISTING SIZE.
NOTE
H
MAIN CONDUCTOR (TYP.) 3
LIGHTNING PROTECTION SYSTEM1
AIR TERMINAL (TYP.)2
GROUND ROD (TYP.) 5
DOWN CONDUCTOR (TYP.) 4
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
600 North Hartley Street, Suite 152 York, PA 17404 Stewart C. Cluck 717.850.2515
PATIENT BUILDING ROOF
REPLACEMENT
VAMC Perry Point, MD
512A5-20-304
Project Director
09.30.2021Revisions: Date:
F8 KEY PLAN
NOT TO SCALE
936 Ridgebrook Road, Sparks, MD 21152 Phone: 410-316-7800 | Fax: 410-316-7817
WWW.KCI.COM
SCALE: 3/32" = 1'-0"
8 4 0 8 16 24
19H-C-E-001
ELECTRICAL LIGHTNING
PROTECTION PLAN Building 19H-C
E6 ROOF PLAN-BUILDING 19H-C
SCALE: 1/4" = 1'-0"N
E8 AERIAL IMAGE-BUILDING 19H-C
NOT TO SCALE
DMTBRM
KEYED NOTES
INSTALL NEW COMPONENTS FOR AN ENTIRELY NEW LIGHTNING PROTECTION SYSTEM AS SHOWN.
INSTALL NEW AIR TERMINALS (STRIKE TERMINATION DEVICES) WHERE SHOWN. AIR TERMINALS SHALL BE GENTLY TAPERED SOLID, 3/8" DIA., COPPER, 24" HEIGHT, PROVIDED WITH SUPPORTS AS SHOWN IN
THE DETAILS AND PER NFPA 780.
INSTALL NEW MAIN CONDUCTORS AND CROSS-RUN CONDUCTORS TO INTERCONNECT ALL STRIKE
TERMINATION DEVICES AS SHOWN. CONDUCTORS SHALL BE NO. 29 CLASS I COPPER LIGHTNING CONDUCTOR (29 STRANDS OF 17 AWG WIRES), 95% CONDUCTIVITY WHEN ANNEALED, CORROSION
RESISTANT, PROVIDED WITH CONNECTORS AND FITTINGS AS REQUIRED IN NFPA 780.
INSTALL NEW DOWN CONDUCTORS FROM STRIKE TERMINATION DEVICES TO GROUND RODS AS
SHOWN. CONDUCTORS SHALL BE NO. 29 CLASS I COPPER LIGHTNING CONDUCTOR (29 STRANDS OF 17 AWG WIRES), 95% CONDUCTIVITY WHEN ANNEALED, CORROSION RESISTANT, PROVIDED WITH CONNECTORS AND FITTINGS AS REQUIRED IN NFPA 780. DOWN CONDUCTORS SHALL BE PROTECTED
A MINIMUM OF 6FT ABOVE GRADE LEVEL WHERE EXPOSED TO PHYSICAL DAMAGE.
INSTALL NEW GROUND ROD FOR TERMINATION OF THE DOWN CONDUCTORS AS SHOWN. GROUND
ROD SHALL BE SIZED AND INSTALLED PER THE LIGHTNING PROTECTION DETAILS. PROVIDE ONE
GROUND TEST WELL PER THE DETAILS AT ONE LOCATION FOR EACH LIGHTNING PROTECTION
SYSTEM.
THE LIGHTNING PROTECTION SYSTEM SHALL INTERCONNECT WITH ALL GROUNDED MEDIA AND
BURIED METALLIC CONDUCTORS PER NFPA 780 ARTICLE 4.14. THE CONTRACTOR SHALL LOCATE THE MAIN ELECTRICAL SERVICE GROUNDING ELECTRODE SYSTEM AND INTERCONNECT THE LIGHTNING
PROTECTION SYSTEM PER NFPA 780 REQUIREMENTS.
GENERAL NOTES
1. NO EXISTING ELECTRICAL SYSTEMS ARE KNOWN TO PENETRATE THE
ROOF. ADDITIONAL SURVEY REQUIRED TO CONFIRM.
2. THE CONTRACTOR SHALL SELECTIVELY REMOVE CIRCUITS WITHIN THE
LIMITS OF THE PROJECT SCOPE ONLY, AND EXTEND EXISTING TO REMAIN
CIRCUITS AS NECESSARY TO MAINTAIN CIRCUIT CONTINUITY.
3. NEW FALL PROTECTION ANCHORS SHALL BE CONSIDERED UNGROUNDED
METAL BODIES PER NFPA 780, AND ARE NOT REQUIRED TO BE BONDED
TO THE LIGHTNING PROTECTION SYSTEM.
4. REFER TO SPECIFICATION SECTION 264100 FOR UL CERTIFICATION AND
TESTING REQUIREMENTS.
5. CONTRACTOR SHALL INSTALL NEW TYPE 2 SURGE PROTECTIVE DEVICE
(SPD) AT EXISTING ELECTRICAL SERVICE DISCONNECT. REFER TO
SPECIFICATIONS FOR REQUIREMENTS. REFER TO DETAIL ON SHEET E-501
FOR INSTALLATION DETAILS.
6. PRIOR TO PERFORMING ANY UNDERGROUND WORK, THE CONTRACTOR
SHALL CALL MISS UTILITY TO TRACE OUT ALL UTILITIES IN THE AREA. THE
CONTRACTOR SHALL CONTRACT WITH A THIRD PARTY UTILITY LOCATOR
TO CONFIRM ALL UTILITIES AND STRUCTURES IN THE AREA OF WORK.
CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY DAMAGE AND ALL
COSTS ASSOCIATED WITH AND AS A RESULT OF THE CONTRACTOR'S
INSTALLATION.
9/30/21
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
600 North Hartley Street, Suite 152 York, PA 17404 Stewart C. Cluck 717.850.2515
PATIENT BUILDING ROOF
REPLACEMENT
VAMC Perry Point, MD
512A5-20-304
Project Director
09.30.2021Revisions: Date:
F8 KEY PLAN
NOT TO SCALE
936 Ridgebrook Road, Sparks, MD 21152 Phone: 410-316-7800 | Fax: 410-316-7817
WWW.KCI.COM
SCALE: 3/32" = 1'-0"
8 4 0 8 16 24
19H-C-M-001
MECHANICAL EQUIPMENT
AND PIPING ROOF PLAN Building 19H-C
E6 ROOF PLAN-BUILDING 19H-C
SCALE: 1/4" = 1'-0"
N
E8 AERIAL IMAGE-BUILDING 19H-C
NOT TO SCALE
DCLELS
GENERAL NOTES
1. REFER TO ARCHITECTURAL DRAWINGS FOR REQUIRED REPAIRS TO
ROOFING SYSTEM(S).
2. EXISTING HVAC AND PLUMBING SYSTEMS INDICATED ARE BASED ON
AERIAL IMAGES AND GROUND BASED VISUAL INSPECTION. NO EXISTING
HVAC OR PLUMBING SYSTEMS ARE KNOWN TO PENETRATE THE ROOF.
ROOFING CONTRACTOR TO CONFIRM PRIOR TO START OF WORK.
3. ALL BUILDINGS ARE TO BE CONSIDERED OCCUPIED. ALL WORK ON
BUILDING SYSTEMS SHALL BE COMPLETED ON OFF SHIFTS AND/OR
WEEKENDS/HOLIDAYS. SCHEDULE ALL WORK WITH THE COR OR CO IN
ADVANCE.
9/21/2021
EF 1
EF1
2EF 2
2 2
LIGHTNING PROTECTION SYSTEMS2
DOWN CONDUCTOR (TYP.) 5
GROUND ROD (TYP.) 7
MAIN CONDUCTOR (TYP.) 4
AIR TERMINAL (TYP.) 3
BONDING CONDUCTOR (TYP.) 6
CROSS-RUN CONDUCTOR (TYP.)
MAIN CONDUCTOR (TYP.) 4
MAIN CONDUCTOR (TYP.) 4
MAIN CONDUCTOR (TYP.) 4 MAIN CONDUCTOR (TYP.) 4
CROSS-RUN CONDUCTOR (TYP.)
19H-E-001
ELECTRICAL LIGHTNING
PROTECTION PLAN Building 19H
E4 ROOF PLAN-BUILDING 19H
SCALE: 3/32" = 1'-0"N
E8 AERIAL IMAGE-BUILDING 19H
NOT TO SCALE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
600 North Hartley Street, Suite 152 York, PA 17404 Stewart C. Cluck 717.850.2515
PATIENT BUILDING ROOF
REPLACEMENT
VAMC Perry Point, MD
512A5-20-304
Project Director
09.30.2021Revisions: Date:
F8 KEY PLAN
NOT TO SCALE
936 Ridgebrook Road, Sparks, MD 21152 Phone: 410-316-7800 | Fax: 410-316-7817
WWW.KCI.COM
SCALE: 3/32" = 1'-0"
8 4 0 8 16 24
DMTBRM
KEYED NOTES
EXISTING MECHANICAL EQUIPMENT ON FLAT ROOF TO REMAIN. PROVIDE FLASHING AS REQUIRED FOR APPLICATION OF ROOFING MATERIAL AROUND ALL CONDUITS AND
ELECTRICAL DEVICES ASSOCIATED WITH THE EQUIPMENT.
EXISTING MECHANICAL EQUIPMENT ON GABLED ROOF. EXTEND ELECTRICAL CONDUIT AND WIRING AS REQUIRED WHERE EQUIPMENT IS RAISED FROM EXISTING POSITION.
CONDUIT AND WIRING TO MATCH EXISTING SIZE AND QUANTITY.
EXISTING LIGHTNING PROTECTION SYSTEMS ON BUILDINGS 19H TO BE REPLACED ENTIRELY. REMOVE ALL ASSOCIATED AIR TERMINALS, MAIN CONDUCTORS, DOWN CONDUCTORS, GROUND RODS AND ALL ASSOCIATED BONDING MATERIALS. INSTALL NEW COMPONENTS FOR AN
ENTIRELY NEW LIGHTNING PROTECTION SYSTEM AS SHOWN.
INSTALL NEW AIR TERMINALS (STRIKE TERMINATION DEVICES) WHERE SHOWN. AIR TERMINALS SHALL BE GENTLY TAPERED SOLID, 3/8" DIA., COPPER, 24" HEIGHT, PROVIDED WITH
SUPPORTS AS SHOWN IN THE DETAILS AND PER NFPA 780.
INSTALL NEW MAIN CONDUCTORS AND CROSS-RUN CONDUCTORS TO INTERCONNECT ALL STRIKE TERMINATION DEVICES AS SHOWN. CONDUCTORS SHALL BE NO. 29 CLASS I COPPER LIGHTNING CONDUCTOR (29 STRANDS OF 17 AWG WIRES), 95% CONDUCTIVITY WHEN ANNEALED, CORROSION RESISTANT, PROVIDED WITH CONNECTORS AND FITTINGS
AS REQUIRED IN NFPA 780.
INSTALL NEW DOWN CONDUCTORS FROM STRIKE TERMINATION DEVICES TO GROUND RODS AS SHOWN. CONDUCTORS SHALL BE NO. 29 CLASS I COPPER LIGHTNING CONDUCTOR (29 STRANDS OF 17 AWG WIRES), 95% CONDUCTIVITY WHEN ANNEALED, CORROSION RESISTANT, PROVIDED WITH CONNECTORS AND FITTINGS AS REQUIRED IN NFPA 780. DOWN CONDUCTORS SHALL BE PROTECTED A MINIMUM OF 6FT ABOVE GRADE LEVEL WHERE EXPOSED TO PHYSICAL DAMAGE.
INSTALL NEW BONDING CONDUCTORS TO INTERCONNECT METALLIC BODIES ON THE ROOF TO THE LIGHTNING PROTECTION SYSTEM. BONDING CONDUCTORS SHALL BE #6 AWG BARE COPPER CLASS I LIGHTNING CONDUCTOR, 95% CONDUCTIVITY WHEN ANNEALED, CORROSION RESISTANT, PROVIDED WITH CONNECTORS AND FITTINGS AS REQUIRED IN NFPA 780. PROVIDE FASTENERS AND SUPPORTS REQUIRED TO BOND TO THE EQUIPMENT SHOWN.
INSTALL NEW GROUND ROD FOR TERMINATION OF THE DOWN CONDUCTORS AS SHOWN. GROUND ROD SHALL BE SIZED AND INSTALLED PER THE LIGHTNING PROTECTION DETAILS. PROVIDE ONE GROUND TEST WELL PER THE DETAILS AT ONE LOCATION FOR EACH LIGHTNING PROTECTION SYSTEM.
THE LIGHTNING PROTECTION SYSTEM SHALL INTERCONNECT WITH ALL GROUNDED MEDIA AND BURIED METALLIC CONDUCTORS PER NFPA 780 ARTICLE 4.14. THE CONTRACTOR SHALL LOCATE THE MAIN ELECTRICAL SERVICE GROUNDING ELECTRODE SYSTEM AND INTERCONNECT THE LIGHTNING PROTECTION SYSTEM PER NFPA 780 REQUIREMENTS.
GENERAL NOTES
1. EXISTING ELECTRICAL SYSTEMS INDICATED ARE BASED ON AERIAL
IMAGES. ADDITIONAL SURVEY REQUIRED TO CONFIRM.
2. THE CONTRACTOR SHALL SELECTIVELY REMOVE CIRCUITS WITHIN THE
LIMITS OF THE PROJECT SCOPE ONLY, AND EXTEND EXISTING TO REMAIN
CIRCUITS AS NECESSARY TO MAINTAIN CIRCUIT CONTINUITY.
3. NEW FALL PROTECTION ANCHORS SHALL BE CONSIDERED UNGROUNDED
METAL BODIES PER NFPA 780, AND ARE NOT REQUIRED TO BE BONDED
TO THE LIGHTNING PROTECTION SYSTEM.
4. REFER TO SPECIFICATION SECTION 264100 FOR UL CERTIFICATION AND
TESTING REQUIREMENTS.
5. REFER TO DETAIL FOR TYPE 2 SPD INSTALLATION.
6. PRIOR TO PERFORMING ANY UNDERGROUND WORK, THE CONTRACTOR
SHALL CALL MISS UTILITY TO TRACE OUT ALL UTILITIES IN THE AREA. THE
CONTRACTOR SHALL CONTRACT WITH A THIRD PARTY UTILITY LOCATOR
TO CONFIRM ALL UTILITIES AND STRUCTURES IN THE AREA OF WORK.
CONTRACTOR IS SOLELY RESPONSIBLE FOR ANY DAMAGE AND ALL
COSTS ASSOCIATED WITH AND AS A RESULT OF THE CONTRACTOR'S
EF 1
EF1
2EF 2
2 2
2 33
19H-M-001
MECHANICAL EQUIPMENT
AND PIPING ROOF PLAN Building 19H
E4 ROOF PLAN-BUILDING 19H
SCALE: 3/32" = 1'-0"
N
E8 AERIAL IMAGE-BUILDING 19H
NOT TO SCALE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
600 North Hartley Street, Suite 152 York, PA 17404 Stewart C. Cluck 717.850.2515
PATIENT BUILDING ROOF
REPLACEMENT
VAMC Perry Point, MD
512A5-20-304
Project Director
09.30.2021Revisions: Date:
F8 KEY PLAN
NOT TO SCALE
936 Ridgebrook Road, Sparks, MD 21152 Phone: 410-316-7800 | Fax: 410-316-7817
WWW.KCI.COM
SCALE: 3/32" = 1'-0"
8 4 0 8 16 24
DCLELS
KEYED NOTES
EXISTING ROOFTOP EQUIPMENT ON FLAT ROOF TO REMAIN. PROVIDE
FLASHING AS REQUIRED FOR APPLICATION OF ROOFING MATERIAL.
EXISTING ROOFTOP HVAC EQUIPMENT ON GABLED ROOF. EXTEND
CURB AS AS REQUIRED TO RAISE EQUIPMENT A MINIMUM OF 12
INCHES ABOVE NEW METAL ROOF. REFER TO DETAIL ON SHEET M-501
FOR TYPICAL CURB INSTALLATION; CONTRACTOR TO MODIFY AS
REQUIRED FOR EACH LOCATION. CONTRACTOR SHALL SUBMIT CURB
DETAIL FOR APPROVAL BY THE VA COR OR CO PRIOR TO
MODIFICATIONS.
EXISTING PIPING THROUGH GABLED ROOF. EXTEND AS REQUIRED TO
RAISE RAISE PIPE OUTLET A MINIMUM OF 12 INCHES ABOVE NEW
METAL ROOF. REFER TO DETAIL ON SHEET M-501 FOR TYPICAL
INSTALLATION; CONTRACTOR TO MODIFY AS REQUIRED FOR EACH
LOCATION. CONTRACTOR SHALL SUBMIT DETAIL FOR APPROVAL BY
THE VA COR OR CO PRIOR TO MODIFICATIONS.
GENERAL NOTES
1. REFER TO ARCHITECTURAL DRAWINGS FOR REQUIRED REPAIRS TO
ROOFING SYSTEM(S).
2. EXISTING HVAC AND PLUMBING SYSTEMS INDICATED ARE BASED ON
AERIAL IMAGES AND GROUND BASED VISUAL INSPECTION. ROOFING
CONTRACTOR TO CONFIRM PRIOR TO START OF WORK.
3. ALL BUILDINGS ARE TO BE CONSIDERED OCCUPIED. ALL WORK ON
BUILDING SYSTEMS SHALL BE COMPLETED ON OFF SHIFTS AND/OR
WEEKENDS/HOLIDAYS. SCHEDULE ALL WORK WITH THE COR OR CO IN
36'-8" 35'-4" 36'-8" 35'-4" 36'-8"
'-0
'-8
'-0
36'-8"27'-4"8'-0"36'-8"8'-0"27'-4"36'-8"
'-0
'-8
'-0
6'- 0"
3'- 6"
'-2
7'-8"
7'-8"7'-8"
7'-8"
24"
(TYP.)
SAFETY RAILING
SAFETY RAILING
MECHANICAL ROOF ROOF:
CONCRETE RIB DECK
G U
A R
D R
A
IL
2'- 6"
M
IN
TY
P.
19H-SF-001
Building 19H
E4 ROOF PLAN-BUILDING 19H
SCALE: 3/32" = 1'-0"N
E8 AERIAL IMAGE-BUILDING 19H
NOT TO SCALE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
CONSTRUCTION
DOCUMENTS
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
600 North Hartley Street, Suite 152 York, PA 17404 Stewart C. Cluck 717.850.2515
PATIENT BUILDING ROOF
REPLACEMENT
VAMC Perry Point, MD
512A5-20-304
Project Director
09.30.2021 JK CKRevisions: Date:
NOTE:
QPROQ ENGINEERING, INC.
187 NORTH MAIN STREET, WILKES-BARRE, PENNSYLVANIA 18702-4425 (570) 823-9935
A VETERAN-OWNED SMALL BUSINESS WWW.QPROQ.COM
ROOF ANCHORS/FRAMING
RAFTERS: 2X10@16"O.C., U.N.O.
RIDGES: 2X12, U.NO.
HIPS & VALLEYS: (2) - 2X12, U.N.O.
FALL RESTRAINT ANCHOR
REFER TO DWG. SJ-001 FOR ANCHOR AND SAFETY RAILING DETAILS.
REFER TO ARCH. DWGS. FOR ROOF FINISH.
9/27/2021 12:53:12 PM, ARCH full bleed E1 (30.00 x 42.00 Inches), 1:1
ROOF AREA A
PER ROOFING
DIAGRAM
EXISTING ASPHALT
SHINGLES TO REMAIN,
U.N.O. (TYP.)
EXISTING ASPHALT
SHINGLES TO REMAIN, U.N.O. (TYP.)
REMOVE GUTTER
AND DOWNSPOUTS (TYP.)
REMOVE FALL
PROTECTION
APPARATUS FROM
ROOF SURFACE
AND WITHIN ATTIC
(TYPICAL)
ROOF AREA B PER
ROOFING DIAGRAM
REMOVE RFG.
AND INSUL.
TO DECK
EXISTING CANOPY
TO REMAIN
REMOVE RFG. AND
INSUL. TO DECK
EXISTING CANOPY
TO REMAIN
ROOF AREA C PER
ROOFING DIAGRAMS
ROOF AREA D
PER ROOFING DIAGRAM
ROOF AREA E
PER ROOFING DIAGRAM REMOVE RFG. AND
INSUL. TO DECK
ROOF AREA F
PER ROOFING
DIAGRAM
ROOF AREA G
RF AREA H RF AREA I
RF AREA J
RF AREA K
REMOVE RFG. AND
INSUL. TO DECK
PRIME DECK WITH
ASPHALT BASED PRIMER
R
ID
G
EL
IN
E
EL
EV
.6
ROOF ELEV.=37.5'
GRADE ELEV.=18.7'
ROOF ELEV.=37.5'
GRADE ELEV.=18.8'
R
ID
G
EL
IN
E
EL
EV
.6
R
ID
G
EL
IN
E
EL
EV
.6
R
ID
G
EL
IN
E
EL
EV
.6
R
ID
G
EL
IN
E
EL
EV
.6
FLAT ROOF ELEV.=62.3'
PARAFET ELEV.=64.3'
RIDGELINE ELEV.=58.8' RIDGELINE ELEV.=58.7'
ROOF ELEV.=49.7'
GRADE ELEV.=19.8'
ROOF ELEV.=49.7'
GRADE ELEV.=19.9'
ROOF ELEV.=49.7'
GRADE ELEV.=19.7'
ROOF ELEV.=49.7'
GRADE ELEV.=20.3'
ROOF ELEV.=47.6'
GRADE ELEV.=19.9'
ROOF ELEV.=47.6'
GRADE ELEV.=19.8'
ROOF ELEV.=49.7'
GRADE ELEV.=20.1'
ROOF ELEV.=49.7'
GRADE ELEV.=19.9'
ROOF ELEV.=47.6'
GRADE ELEV.=20.3'
ROOF ELEV.=47.6'
GRADE ELEV.=19.0'
ROOF ELEV.=47.6'
GRADE ELEV.=19.6'
ROOF ELEV.=47.6'
GRADE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .