23H-AS-004-4-20-23.pdf

PDF 5 MB Posted

Attached to
Z1DA--512A5-20-304 - Replace Roof - Patient Buildings
Solicitation number
36C24523B0002
Issued by

About this file

This solicitation package from the Department of Veterans Affairs includes requirements for roof replacement services at multiple patient buildings. The solicitation seeks replacement of existing roofing systems with new fully reinforced liquid applied membranes, standing seam metal roofing, or new fluid applied roofing over insulation. Bidders must include removal and disposal of existing roof materials, installation of new insulation and cover boards, flashing, gutters, downspouts and accessories to match existing. The solicitation number is 36C24523B0002 and responses are due by the date specified on FedBizOpps. The work will be performed at the Veterans Affairs Medical Center in Perry Point, Maryland.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPAIR WET INSUL. WITH

IN KIND MATERIALS

RESTORE ROOF SURFACE WITH

WHITE AGGREGATE AND ADHESIVE

REPAIR WET INSUL. WITH

IN KIND MATERIALS

REMOVE AREAS OF SILICONE

BY CUTTING OUT AND REPLACING

1-PLY THEN FLUID APPLIED RFG.

REPAIR WET INSUL. WITH

IN KIND MATERIALS

REPAIR WET INSUL. WITH

IN KIND MATERIALS

RESTORE ROOF SURFACE WITH

FULLY REINF. LIQUID APPLIED MEMBRANE

REMOVE AREAS OF SILICONE

BY CUTTING OUT AND REPLACING

1-PLY THEN FLUID APPLIED RFG.

RESTORE ROOF SURFACE WITH

FULLY REINF. LIQUID APPLIED MEMBRANE

RESTORE ROOF SURFACE WITH

FULLY REINF. LIQUID APPLIED MEMBRANE

REMOVE AREAS OF SILICONE

BY CUTTING OUT AND REPLACING

1-PLY THEN FLUID APPLIED RFG.

D4

AS304

D4

AS304

D5

AS303

D3

AS301

D10

AS304

D9

AS304

SPORADIC WET

THROUGHOUT REPLACE

D5

AS304

D4

AS305

D15

AS305

D16

AS305

D15

AS305

D4

AS305

D4

AS305

D5

AS304

D7

AS304

D7

AS304

D7

AS305

D12

AS301

D5

AS304

D15

AS305

D9

AS304

D915

AS304

D4

AS304

D12

AS305

D7

AS304

SPORADIC WET

THROUGHOUT REPLACE

REPLACE WITH NBN.

FLUID APPLIED

CRICKETS

STAGING AREA

EXACT LOCATION TBD

DS

DS

DS

DSDS DS DS

DS DS

DSDSDSDS

DS

DS

DS

DS

EXISTING MECHANICAL

SYSTEM TO REMAIN

EXISTING ROOF TO REMAIN

D10

AS301

REPAIR WET INSUL. WITH

IN KIND MATERIALS

NEW STANDING SEAM

METAL ROOFING SYSTEM

NEW FLUID APPLIED

ROOFING SYSTEM OVER

EXISTING ROOF

NEW FLUID APPLIED

ROOFING SYSTEM OVERTOP

NEW INSULATION AND

PROTECTION BOARD

EXISTING ROOF TO

REMAIN.

REPAIR WET INSUL. WITH

IN KIND MATERIALS

23H-AS-004

Building 23H

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Stewart C. Cluck 717.850.2515

PATIENT BUILDING ROOF

REPLACEMENT

VAMC Perry Point, MD Project Director

GR/MC JS/MR/WMTRevisions: Date:

C

H

CORE CUT

HATCH

DRAIN

LADDER

CAPPED CURB

TIE-OFF POINT

SNOW GUARDS

X EXPANSION JOINT

EXIST DOWNSPOUT/LEADER/SCUPPER

SKYLIGHT

SYMBOL LEGEND

E EXHAUST FAN

SLOPE (POINT DOWN)

LIGHTNING PROTECTION

NOTE:

DIMENSIONS INDICATED WERE TAKEN AT TYPICAL LOCATIONS THROUGHOUT THE BUILDING.

VARIATIONS AND DISCREPANCIES ARE TO BE ANTICIPATED. THE CONTRACTOR SHALL

VERIFY ALL CRITICAL DIMENSIONS BEFORE SUBMITTING PROPOSAL, PROCUREMENT OR

FABRICATION OF MATERIALS AND EQUIPMENT, AND SHALL NOTIFY THE COR OF ANY

DISCREPANCIES NOTED. DUE DILIGENCE NEGLECT BY BIDDER WILL NOT BE A JUSTIFICATION

FOR FUTURE CONTRACT MODIFICATIONS.

CONSTRUCTION

DOCUMENTS

09.30.2021

512A5-20-304

600 North Hartley Street, Suite 152 York, PA 17404

I CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME AND THAT I AM DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NUMBER XXXXX, EXPIRATION DATE XX-XX-XXXX.

F4 ROOF PLAN-BUILDING 23H

SCALE: 3/32" = 1'-0"

N

LEGEND

E8 AERIAL IMAGE-BUILDING 23H

NOT TO SCALE

'-1

1 3 /8"

55'-11"

'-0

26'-1" 18'-0" 20'-9 3/4"

'-1

1 3 /8"

56'-0"

100'-0"82'-3 5/8"100'-0"

4'- 5 7

/8"

ROOF PLAN - NEW WORK

AMENDMENT NO. 1 - ROOF CLARIFICATIONS (ADJUSTED WET ROOF LOCATIONS) 04/13/2023

AutoCAD SHX Text F8

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

1. GENERAL CONTRACTOR SHALL INCLUDE 655 SF OF METAL REPLACEMENT.GENERAL CONTRACTOR SHALL INCLUDE 655 SF OF METAL REPLACEMENT.2. SEE ROOF DATA INFORMATION FOR REQUIRED WORK.SEE ROOF DATA INFORMATION FOR REQUIRED WORK.3. FURNISH AND INSTALL NEW PRE-FINISHED METAL GUTTERS AND DOWNSPOUTS. MATCH EXISTING GUTTERS AND DOWNSPOUTS SIZE. FURNISH AND INSTALL NEW PRE-FINISHED METAL GUTTERS AND DOWNSPOUTS. MATCH EXISTING GUTTERS AND DOWNSPOUTS SIZE. REFER TO SPECIFICATIONS FOR MATERIAL DETAILS.4. FURNISH AND INSTALL PRE-FINISHED METAL COPING CAP AND GRAVEL STOPS - MATCH EXISTING SIZE.FURNISH AND INSTALL PRE-FINISHED METAL COPING CAP AND GRAVEL STOPS - MATCH EXISTING SIZE.5. RAISE ALL ROOF PENETRATION TO PROVIDE A MIN. 8" FLASHING. RAISE ALL ROOF PENETRATION TO PROVIDE A MIN. 8" FLASHING. 6. FURNISH AND INSTALL NEW WOOD BLOCKING TO ACCOMMODATE FOR NEW ROOFING INSULATION AND COVER BOARD THICKNESSFURNISH AND INSTALL NEW WOOD BLOCKING TO ACCOMMODATE FOR NEW ROOFING INSULATION AND COVER BOARD THICKNESS

AutoCAD SHX Text

NOTE

AutoCAD SHX Text A1. CONTRACTOR SHALL PROTECT EXPOSED AREAS OF THE BUILDING TO PREVENT DAMAGE TO ANY/ALL EXISTING CONSTRUCTION CONTRACTOR SHALL PROTECT EXPOSED AREAS OF THE BUILDING TO PREVENT DAMAGE TO ANY/ALL EXISTING CONSTRUCTION PREVENT DAMAGE TO ANY/ALL EXISTING CONSTRUCTION TO REMAIN.A2. THIS DRAWING DOES NOT SHOW ALL ROOF PENETRATIONS OR EQUIPMENT. CONTRACTOR SHALL BE RESPONSIBLE TO THIS DRAWING DOES NOT SHOW ALL ROOF PENETRATIONS OR EQUIPMENT. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE QUANTITY AND LOCATION OF ALL ROOF-MOUNTED EQUIPMENT, EQUIPMENT SUPPORTS AND PENETRATIONS. SEE ARCHITECTURAL DETAILS AND MEP DRAWINGS FOR ADDITIONAL INFO. INSTALLATION OF EQUIPMENT, EQUIPMENT SUPPORTS AND PENETRATIONS SHALL BE IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS.A3. CONTRACTOR SHALL INSTALL ALL FLASHING FOR EQUIPMENT, EQUIPMENT SUPPORTS AND PENETRATIONS PER MANUFACTURER'S CONTRACTOR SHALL INSTALL ALL FLASHING FOR EQUIPMENT, EQUIPMENT SUPPORTS AND PENETRATIONS PER MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY. MANUFACTURER'S STANDARD INSTALLATION REQUIREMENTS SHALL TAKE PRECEDENCE IF THERE ARE ANY DISCREPANCIES IN CONTRACT DOCUMENTS.A4. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE HIGH POINT AND THE LOW POINT OF ALL ROOF SLOPES PRIOR TO CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE HIGH POINT AND THE LOW POINT OF ALL ROOF SLOPES PRIOR TO INSTALLATION OF ANY ROOF INSULATION. THIS VERIFICATION SHALL BE INDICATED ON THE ROOF INSULATION SUBMITTAL DRAWING.A5. CONTRACTOR SHALL INSTALL NON-TAPERED ROOF INSULATION OVER LOW SLOPED ROOF DECKS THAT HAVE A SLOPE CONTRACTOR SHALL INSTALL NON-TAPERED ROOF INSULATION OVER LOW SLOPED ROOF DECKS THAT HAVE A SLOPE GREATER THAN OR EQUAL TO 1/4" PER FOOT. PONDING SHALL NOT OCCUR. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY LOW SLOPING ROOF DECK LOCATIONS.A6. CONTRACTOR SHALL INSTALL TAPERED ROOF INSULATION OVER FLAT ROOF DECKS AND OVER LOW SLOPED ROOF DECKS THAT CONTRACTOR SHALL INSTALL TAPERED ROOF INSULATION OVER FLAT ROOF DECKS AND OVER LOW SLOPED ROOF DECKS THAT HAVE A SLOPE LESS THAN 1/4" PER FOOT. PONDING SHALL NOT OCCUR. CONTRACTOR SHALL BE RESPONSIBLE TO RESPONSIBLE TO VERIFY FLAT ROOF DECK LOCATIONS AND LOW SLOPING ROOF DECK LOCATIONS.FLAT ROOF DECK LOCATIONS AND LOW SLOPING ROOF DECK LOCATIONS.A7. CRICKETS AND SADDLES SHALL HAVE A MINIMUM SLOPE OF 2 TIMES THAT OF THE PRIMARY TAPERED SYSTEM OR CRICKETS AND SADDLES SHALL HAVE A MINIMUM SLOPE OF 2 TIMES THAT OF THE PRIMARY TAPERED SYSTEM OR STRUCTURAL SLOPE. CRICKET WIDTH-TO-LENGTH RATIO SHALL BE NO LESS THAN 1:3. PONDING SHALL NOT OCCUR.SLOPE. CRICKET WIDTH-TO-LENGTH RATIO SHALL BE NO LESS THAN 1:3. PONDING SHALL NOT OCCUR.A8. CONTRACTOR SHALL FURNISH AND INSTALL FIRE-RETARDANT LUMBER FOR ALL WOOD BLOCKING.CONTRACTOR SHALL FURNISH AND INSTALL FIRE-RETARDANT LUMBER FOR ALL WOOD BLOCKING.A9. CONTRACTOR SHALL FURNISH AND INSTALL ALL ROOFING SYSTEMS IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS CONTRACTOR SHALL FURNISH AND INSTALL ALL ROOFING SYSTEMS IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY.A10. CONTRACTOR SHALL REMOVE EXISTING EQUIPMENT AS REQUIRED TO ALLOW ROOF FLASHING TO OCCUR IN ACCORDANCE WITH CONTRACTOR SHALL REMOVE EXISTING EQUIPMENT AS REQUIRED TO ALLOW ROOF FLASHING TO OCCUR IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY.A11. EXTEND CURBS AS REQUIRED TO PROVIDE CLEARANCE IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND EXTEND CURBS AS REQUIRED TO PROVIDE CLEARANCE IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY.A12. CONTRACTOR SHALL VERIFY IF BUILDING STRUCTURE OR ROOF DECK HAS FIRE PROOFING. IF FOUND, NOTIFY C.O.R. CONTRACTOR SHALL VERIFY IF BUILDING STRUCTURE OR ROOF DECK HAS FIRE PROOFING. IF FOUND, NOTIFY C.O.R. DISTRIBUTED CONTRACTOR SHALL REPLACE IN LIKE KIND.

AutoCAD SHX Text

GENERAL ROOF PLAN NOTES

Sheets and Views
A004

File details come from the government source that posted it. Updated .