This solicitation package from the Department of Veterans Affairs includes requirements for roof replacement services at multiple patient buildings. The solicitation seeks replacement of existing roofing systems with new fully reinforced liquid applied membranes, standing seam metal roofing, or new fluid applied roofing over insulation. Bidders must include removal and disposal of existing roof materials, installation of new insulation and cover boards, flashing, gutters, downspouts and accessories to match existing. The solicitation number is 36C24523B0002 and responses are due by the date specified on FedBizOpps. The work will be performed at the Veterans Affairs Medical Center in Perry Point, Maryland.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR WET INSUL. WITH
IN KIND MATERIALS
RESTORE ROOF SURFACE WITH
WHITE AGGREGATE AND ADHESIVE
REPAIR WET INSUL. WITH
IN KIND MATERIALS
REMOVE AREAS OF SILICONE
BY CUTTING OUT AND REPLACING
1-PLY THEN FLUID APPLIED RFG.
REPAIR WET INSUL. WITH
IN KIND MATERIALS
REPAIR WET INSUL. WITH
IN KIND MATERIALS
RESTORE ROOF SURFACE WITH
FULLY REINF. LIQUID APPLIED MEMBRANE
REMOVE AREAS OF SILICONE
BY CUTTING OUT AND REPLACING
1-PLY THEN FLUID APPLIED RFG.
RESTORE ROOF SURFACE WITH
FULLY REINF. LIQUID APPLIED MEMBRANE
RESTORE ROOF SURFACE WITH
FULLY REINF. LIQUID APPLIED MEMBRANE
REMOVE AREAS OF SILICONE
BY CUTTING OUT AND REPLACING
1-PLY THEN FLUID APPLIED RFG.
D4
AS304
D4
AS304
D5
AS303
D3
AS301
D10
AS304
D9
AS304
SPORADIC WET
THROUGHOUT REPLACE
D5
AS304
D4
AS305
D15
AS305
D16
AS305
D15
AS305
D4
AS305
D4
AS305
D5
AS304
D7
AS304
D7
AS304
D7
AS305
D12
AS301
D5
AS304
D15
AS305
D9
AS304
D915
AS304
D4
AS304
D12
AS305
D7
AS304
SPORADIC WET
THROUGHOUT REPLACE
REPLACE WITH NBN.
FLUID APPLIED
CRICKETS
STAGING AREA
EXACT LOCATION TBD
DS
DS
DS
DSDS DS DS
DS DS
DSDSDSDS
DS
DS
DS
DS
EXISTING MECHANICAL
SYSTEM TO REMAIN
EXISTING ROOF TO REMAIN
D10
AS301
REPAIR WET INSUL. WITH
IN KIND MATERIALS
NEW STANDING SEAM
METAL ROOFING SYSTEM
NEW FLUID APPLIED
ROOFING SYSTEM OVER
EXISTING ROOF
NEW FLUID APPLIED
ROOFING SYSTEM OVERTOP
NEW INSULATION AND
PROTECTION BOARD
EXISTING ROOF TO
REMAIN.
REPAIR WET INSUL. WITH
IN KIND MATERIALS
23H-AS-004
Building 23H
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Stewart C. Cluck 717.850.2515
PATIENT BUILDING ROOF
REPLACEMENT
VAMC Perry Point, MD Project Director
GR/MC JS/MR/WMTRevisions: Date:
C
H
CORE CUT
HATCH
DRAIN
LADDER
CAPPED CURB
TIE-OFF POINT
SNOW GUARDS
X EXPANSION JOINT
EXIST DOWNSPOUT/LEADER/SCUPPER
SKYLIGHT
SYMBOL LEGEND
E EXHAUST FAN
SLOPE (POINT DOWN)
LIGHTNING PROTECTION
NOTE:
DIMENSIONS INDICATED WERE TAKEN AT TYPICAL LOCATIONS THROUGHOUT THE BUILDING.
VARIATIONS AND DISCREPANCIES ARE TO BE ANTICIPATED. THE CONTRACTOR SHALL
VERIFY ALL CRITICAL DIMENSIONS BEFORE SUBMITTING PROPOSAL, PROCUREMENT OR
FABRICATION OF MATERIALS AND EQUIPMENT, AND SHALL NOTIFY THE COR OF ANY
DISCREPANCIES NOTED. DUE DILIGENCE NEGLECT BY BIDDER WILL NOT BE A JUSTIFICATION
FOR FUTURE CONTRACT MODIFICATIONS.
CONSTRUCTION
DOCUMENTS
09.30.2021
512A5-20-304
600 North Hartley Street, Suite 152 York, PA 17404
I CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME AND THAT I AM DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NUMBER XXXXX, EXPIRATION DATE XX-XX-XXXX.
F4 ROOF PLAN-BUILDING 23H
SCALE: 3/32" = 1'-0"
N
LEGEND
E8 AERIAL IMAGE-BUILDING 23H
NOT TO SCALE
'-1
1 3 /8"
55'-11"
'-0
26'-1" 18'-0" 20'-9 3/4"
'-1
1 3 /8"
56'-0"
100'-0"82'-3 5/8"100'-0"
4'- 5 7
/8"
ROOF PLAN - NEW WORK
AMENDMENT NO. 1 - ROOF CLARIFICATIONS (ADJUSTED WET ROOF LOCATIONS) 04/13/2023
AutoCAD SHX Text F8
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
1. GENERAL CONTRACTOR SHALL INCLUDE 655 SF OF METAL REPLACEMENT.GENERAL CONTRACTOR SHALL INCLUDE 655 SF OF METAL REPLACEMENT.2. SEE ROOF DATA INFORMATION FOR REQUIRED WORK.SEE ROOF DATA INFORMATION FOR REQUIRED WORK.3. FURNISH AND INSTALL NEW PRE-FINISHED METAL GUTTERS AND DOWNSPOUTS. MATCH EXISTING GUTTERS AND DOWNSPOUTS SIZE. FURNISH AND INSTALL NEW PRE-FINISHED METAL GUTTERS AND DOWNSPOUTS. MATCH EXISTING GUTTERS AND DOWNSPOUTS SIZE. REFER TO SPECIFICATIONS FOR MATERIAL DETAILS.4. FURNISH AND INSTALL PRE-FINISHED METAL COPING CAP AND GRAVEL STOPS - MATCH EXISTING SIZE.FURNISH AND INSTALL PRE-FINISHED METAL COPING CAP AND GRAVEL STOPS - MATCH EXISTING SIZE.5. RAISE ALL ROOF PENETRATION TO PROVIDE A MIN. 8" FLASHING. RAISE ALL ROOF PENETRATION TO PROVIDE A MIN. 8" FLASHING. 6. FURNISH AND INSTALL NEW WOOD BLOCKING TO ACCOMMODATE FOR NEW ROOFING INSULATION AND COVER BOARD THICKNESSFURNISH AND INSTALL NEW WOOD BLOCKING TO ACCOMMODATE FOR NEW ROOFING INSULATION AND COVER BOARD THICKNESS
AutoCAD SHX Text
NOTE
AutoCAD SHX Text A1. CONTRACTOR SHALL PROTECT EXPOSED AREAS OF THE BUILDING TO PREVENT DAMAGE TO ANY/ALL EXISTING CONSTRUCTION CONTRACTOR SHALL PROTECT EXPOSED AREAS OF THE BUILDING TO PREVENT DAMAGE TO ANY/ALL EXISTING CONSTRUCTION PREVENT DAMAGE TO ANY/ALL EXISTING CONSTRUCTION TO REMAIN.A2. THIS DRAWING DOES NOT SHOW ALL ROOF PENETRATIONS OR EQUIPMENT. CONTRACTOR SHALL BE RESPONSIBLE TO THIS DRAWING DOES NOT SHOW ALL ROOF PENETRATIONS OR EQUIPMENT. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE QUANTITY AND LOCATION OF ALL ROOF-MOUNTED EQUIPMENT, EQUIPMENT SUPPORTS AND PENETRATIONS. SEE ARCHITECTURAL DETAILS AND MEP DRAWINGS FOR ADDITIONAL INFO. INSTALLATION OF EQUIPMENT, EQUIPMENT SUPPORTS AND PENETRATIONS SHALL BE IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS.A3. CONTRACTOR SHALL INSTALL ALL FLASHING FOR EQUIPMENT, EQUIPMENT SUPPORTS AND PENETRATIONS PER MANUFACTURER'S CONTRACTOR SHALL INSTALL ALL FLASHING FOR EQUIPMENT, EQUIPMENT SUPPORTS AND PENETRATIONS PER MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY. MANUFACTURER'S STANDARD INSTALLATION REQUIREMENTS SHALL TAKE PRECEDENCE IF THERE ARE ANY DISCREPANCIES IN CONTRACT DOCUMENTS.A4. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE HIGH POINT AND THE LOW POINT OF ALL ROOF SLOPES PRIOR TO CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE HIGH POINT AND THE LOW POINT OF ALL ROOF SLOPES PRIOR TO INSTALLATION OF ANY ROOF INSULATION. THIS VERIFICATION SHALL BE INDICATED ON THE ROOF INSULATION SUBMITTAL DRAWING.A5. CONTRACTOR SHALL INSTALL NON-TAPERED ROOF INSULATION OVER LOW SLOPED ROOF DECKS THAT HAVE A SLOPE CONTRACTOR SHALL INSTALL NON-TAPERED ROOF INSULATION OVER LOW SLOPED ROOF DECKS THAT HAVE A SLOPE GREATER THAN OR EQUAL TO 1/4" PER FOOT. PONDING SHALL NOT OCCUR. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY LOW SLOPING ROOF DECK LOCATIONS.A6. CONTRACTOR SHALL INSTALL TAPERED ROOF INSULATION OVER FLAT ROOF DECKS AND OVER LOW SLOPED ROOF DECKS THAT CONTRACTOR SHALL INSTALL TAPERED ROOF INSULATION OVER FLAT ROOF DECKS AND OVER LOW SLOPED ROOF DECKS THAT HAVE A SLOPE LESS THAN 1/4" PER FOOT. PONDING SHALL NOT OCCUR. CONTRACTOR SHALL BE RESPONSIBLE TO RESPONSIBLE TO VERIFY FLAT ROOF DECK LOCATIONS AND LOW SLOPING ROOF DECK LOCATIONS.FLAT ROOF DECK LOCATIONS AND LOW SLOPING ROOF DECK LOCATIONS.A7. CRICKETS AND SADDLES SHALL HAVE A MINIMUM SLOPE OF 2 TIMES THAT OF THE PRIMARY TAPERED SYSTEM OR CRICKETS AND SADDLES SHALL HAVE A MINIMUM SLOPE OF 2 TIMES THAT OF THE PRIMARY TAPERED SYSTEM OR STRUCTURAL SLOPE. CRICKET WIDTH-TO-LENGTH RATIO SHALL BE NO LESS THAN 1:3. PONDING SHALL NOT OCCUR.SLOPE. CRICKET WIDTH-TO-LENGTH RATIO SHALL BE NO LESS THAN 1:3. PONDING SHALL NOT OCCUR.A8. CONTRACTOR SHALL FURNISH AND INSTALL FIRE-RETARDANT LUMBER FOR ALL WOOD BLOCKING.CONTRACTOR SHALL FURNISH AND INSTALL FIRE-RETARDANT LUMBER FOR ALL WOOD BLOCKING.A9. CONTRACTOR SHALL FURNISH AND INSTALL ALL ROOFING SYSTEMS IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS CONTRACTOR SHALL FURNISH AND INSTALL ALL ROOFING SYSTEMS IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY.A10. CONTRACTOR SHALL REMOVE EXISTING EQUIPMENT AS REQUIRED TO ALLOW ROOF FLASHING TO OCCUR IN ACCORDANCE WITH CONTRACTOR SHALL REMOVE EXISTING EQUIPMENT AS REQUIRED TO ALLOW ROOF FLASHING TO OCCUR IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY.A11. EXTEND CURBS AS REQUIRED TO PROVIDE CLEARANCE IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND EXTEND CURBS AS REQUIRED TO PROVIDE CLEARANCE IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY.A12. CONTRACTOR SHALL VERIFY IF BUILDING STRUCTURE OR ROOF DECK HAS FIRE PROOFING. IF FOUND, NOTIFY C.O.R. CONTRACTOR SHALL VERIFY IF BUILDING STRUCTURE OR ROOF DECK HAS FIRE PROOFING. IF FOUND, NOTIFY C.O.R. DISTRIBUTED CONTRACTOR SHALL REPLACE IN LIKE KIND.
AutoCAD SHX Text
GENERAL ROOF PLAN NOTES
| Sheets and Views |
| A004 |
File details come from the government source that posted it. Updated .