Bid Detailed Breakout.docx

DOCX document 18 KB Posted

Attached to
Z1DA--512A5-20-304 - Replace Roof - Patient Buildings
Solicitation number
36C24523B0002
Issued by

About this file

This document contains a bid proposal breakdown template and related federal contract solicitation. The template requires itemized pricing for 27 individual buildings or locations for a roof replacement project at the Perry Point VA Medical Center. Pricing must include costs for labor, materials, equipment, general conditions, mobilization, demolition, disposal, lighting protection, fall restraints, new standing seam metal roofing, new fluid applied roofing, new wood and metal deck replacement, gutters, downspouts, insulation, testing, safety railings, flashing, and equipment raising. The solicitation is for roof replacements at various patient buildings at the Perry Point VA Medical Center. The base bid is for 7 buildings, with 15 additional buildings listed as alternates to be awarded at the agency's discretion. The period of performance for the base bid is 350 calendar days.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSAL DETAIL BREAKOUT FOR EACH BUILDING/LOCATION AS DEFINED IN THE SUMMARY PROPOSAL SHEET: THE TOTAL SHALL ADD TO 27 INDIVIDUAL SHEETS.

*To be provided with bid at the time submission. Failure by bidder to provide as required shall be consider non-responsive and maybe rejected by the Contracting Officer .Each item may not be applicable for every building.

Project: Perry Point Replace Patients Roofs

Ref: Itemized proposal cost

Building/Location:

Date:

Item
Labor$
Materials$
Equipment$
Other$

General conditions

Mobilization

Demobilization

Demo

Demo disposal

Lightning protection

Fall restraints

New standing seam metal roofing

New Fluid Applied Roofing

New Wood deck replacement

New Metal deck replacement

New Gutters Leader downspouts

New insulation, protective board

Asbestos / Lead remediation

Testing and inspections

Safety railing

Flashing, Equipment raising, penetrations

Other

Total:$

Grand total:$

SUMMARY PROPOSAL SHEETS:

Building(s)
Priority Level
Alternate Additive No.
Total($)
Period of Performance
361
1
366
1
19H
1
25H
1
23H
1
314A
1
314B
1
314C
1
1H Connecting Corridor
1
2H Connecting Corridor
1
3H Connecting Corridor
1
19H Connecting Corridors
1
314C Connecting Corridors
1
361 Connecting Corridors
1

Total Base Bid

ALTERNATE BID ADDITIVES:

Building(s)
Priority Level
Alternate Additive No.
Total($)
Period of Performance
15H Connecting Corridors
2
13
14H Area A
2
12
17H
2
11
15H
2
10
1H
2
9
2H
2
8
14H Connecting Corridor
3
7
24H Connecting Corridor
3
6
25H Connecting Corridor
3
5
24H
3
4
14H Areas B, C, D, E, F, Shingles
3
3
82H
4
2
22H
4
1
TOTAL BID WITH ALTERNATES:
-

File details come from the government source that posted it. Updated .