Revised Bid Detailed Breakout.docx

DOCX document 18 KB Posted

Attached to
Z1DA--512A5-20-304 - Replace Roof - Patient Buildings
Solicitation number
36C24523B0002
Issued by

About this file

This document contains a proposal detail breakout sheet and related federal contract solicitation for roof replacement projects at multiple patient buildings on the Perry Point VA Medical Center campus. The proposal breakout sheet requests itemized pricing for 27 individual buildings and connecting corridors for labor, materials, equipment and other costs associated with standing seam metal roofing, fluid applied roofing, wood and metal deck replacement, gutters, downspouts, insulation, asbestos remediation, testing and safety measures. It provides a summary of total proposed costs by priority level for the base bid and four alternate additive bid packages. The related solicitation provides additional details for the roof replacement work and identifies the Department of Veterans Affairs VISN 5 as the contracting agency. Responses were due in accordance with the solicitation instructions and terms.

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROPOSAL DETAIL BREAKOUT FOR EACH BUILDING/LOCATION AS DEFINED IN THE SUMMARY PROPOSAL SHEET: THE TOTAL SHALL ADD TO 27 INDIVIDUAL SHEETS.

*To be provided with bid at the time submission. Failure by bidder to provide as required shall be consider non-responsive and maybe rejected by the Contracting Officer .Each item may not be applicable for every building.

Project: Perry Point Replace Patients Roofs

Ref: Itemized proposal cost

Building/Location:

Date:

Item
Labor$
Materials$
Equipment$
Other$

General conditions

Mobilization

Demobilization

Demo

Demo disposal

Lightning protection

Fall restraints

New standing seam metal roofing

New Fluid Applied Roofing

New Wood deck replacement

New Metal deck replacement

New Gutters Leader downspouts

New insulation, protective board

Asbestos / Lead remediation

Testing and inspections

Safety railing

Flashing, Equipment raising, penetrations

Other

Total:$

Grand total:$

SUMMARY PROPOSAL SHEETS:

Building(s)
Priority Level
Alternate Additive No.
Total($)
Period of Performance
361
1
366
1
19H
1
23H
1
314A
1
314B
1
314C
1
1H Connecting Corridor
1
2H Connecting Corridor
1
3H Connecting Corridor(27H)
1
19H Connecting Corridors
1
314C Connecting Corridors
1
361 Connecting Corridors
1

Total Base Bid

ALTERNATE BID ADDITIVES:

Building(s)
Priority Level
Alternate Additive No.
Total($)
Period of Performance
15H Connecting Corridors
2
8
14H Area A
2
7
17H
2
6
15H
2
5
14H Connecting Corridor
3
4
14H Areas B, C, D, E, F, Shingles
3
3
82H
4
2
22H
4
1
TOTAL BID WITH ALTERNATES:
-

File details come from the government source that posted it. Updated .