This document package includes a solicitation for roof replacement services at a Veteran's hospital and the related project plans. The solicitation requests bids to replace roofs on several patient buildings according to project specifications. Key details include the following. The solicitation was issued by the Department of Veterans Affairs VHA VISN 5 for project number 512A5-20-304 located at the Perry Point VAMC. The project involves replacing roofs on multiple areas of Building 14H per the attached roof plans. Bidders must follow manufacturer specifications and install tapered insulation as required over flat or low-sloped areas to prevent ponding. The contractor will be responsible for verifying structural details prior to installation and coordinating all penetrations and equipment attachments according to plans. The closing date for bids is not provided.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
'-0
'-8
'-0
15'-2" 37'-8" 25'-4" 6'-0" 47'-8" 6'-0" 25'-4" 37'-8" 7'-8"
7'-8" 37'-8" 36'-4" 37'-8" 36'-4" 37'-8" 7'-8"
'-2
'-0
'-8
'-0
ROOF AREA C
PER ROOFING DIAGRAM
ROOF AREA D
PER ROOFING DIAGRAM
ROOF AREA E
PER ROOFING DIAGRAM
ROOF AREA F
PER ROOFING DIAGRAM
ROOF AREA B
PER ROOFING DIAGRAM
ROOF AREA A
NEW FLUID APPLIED
ROOFING SYSTEM OVER
5.25" (R30) TAPERED POLYISO
ROOFING INSULATION
NEW FLUID APPLIED
ROOFING SYSTEM OVER
5.25" (R30) POLYISO ROOFING
INSULATION
CAPPED CURB
STAGING AREA
EXACT LOCATION TBD
D16
AS304
D7
AS304
D14
AS304
D7
AS301
D10
AS301
D4
AS303
D3
AS301
D5
AS303
D12
AS301
D11
AS301
D4
AS303
D16
AS304
D4
AS309
D5
AS309
DSDS
DSDSDSDSDS
DSDS
DS
DS
DS
DS
DS
DS
DSDS
DSDS
DS
DS
DSDS
DS
DS
DS
NEW STANDING SEAM
METAL ROOFING SYSTEM
NEW FLUID APPLIED
ROOFING SYSTEM OVERTOP
NEW INSULATION AND
PROTECTION BOARD
RESTORE ROOFING WITH
WHITE AGGREGATE AND
ADHESIVE - BUILT UP RFG.
NEW FLUID APPLIED
ROOFING SYSTEM OVER
EXISTING ROOF
14H-AS-003
Building 14H
E3 ROOF PLAN-BUILDING 14H
SCALE: 3/32" = 1'-0"N
E8 AERIAL IMAGE-BUILDING 14H
NOT TO SCALE
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
NOTE:
DIMENSIONS INDICATED WERE TAKEN AT TYPICAL LOCATIONS THROUGHOUT THE BUILDING.
VARIATIONS AND DISCREPANCIES ARE TO BE ANTICIPATED. THE CONTRACTOR SHALL
VERIFY ALL CRITICAL DIMENSIONS BEFORE SUBMITTING PROPOSAL, PROCUREMENT OR
FABRICATION OF MATERIALS AND EQUIPMENT, AND SHALL NOTIFY THE COR OF ANY
DISCREPANCIES NOTED. DUE DILIGENCE NEGLECT BY BIDDER WILL NOT BE A JUSTIFICATION
FOR FUTURE CONTRACT MODIFICATIONS.
EXISTING DRAIN
EXISTING LADDER
EXISTING CAPPED CURB
DOWNSPOUT (DS)
EXISTING SKYLIGHT
SYMBOL LEGEND
EXISTING MECHANICAL UNIT
EXISTING MECHANICAL UNIT
EXISTING VENT PIPING
NEW FALL PROTECTION
EXISTING ROOF HATCH
NEW SNOW GUARD
LIGHTNING PROTECTION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Stewart C. Cluck 717.850.2515
PATIENT BUILDING ROOF
REPLACEMENT
VAMC Perry Point, MD Project Director
GR/MC JS/MR/WMTRevisions: Date:
CONSTRUCTION
DOCUMENTS
09.30.2021
512A5-20-304
600 North Hartley Street, Suite 152 York, PA 17404
I CERTIFY THAT THESE DOCUMENTS WERE PREPARED OR APPROVED BY ME AND THAT I AM DULY LICENSED ARCHITECT UNDER THE LAWS OF THE STATE OF MARYLAND, LICENSE NUMBER XXXXX, EXPIRATION DATE XX-XX-XXXX.
LEGEND
ROOF PLAN - NEW WORK
AMENDMENT NO. 1 - ROOF CLARIFICATIONS 04/13/2023
AutoCAD SHX Text F8
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text A1. CONTRACTOR SHALL PROTECT EXPOSED AREAS OF THE BUILDING TO PREVENT DAMAGE TO ANY/ALL EXISTING CONSTRUCTION CONTRACTOR SHALL PROTECT EXPOSED AREAS OF THE BUILDING TO PREVENT DAMAGE TO ANY/ALL EXISTING CONSTRUCTION PREVENT DAMAGE TO ANY/ALL EXISTING CONSTRUCTION TO REMAIN. A2. THIS DRAWING DOES NOT SHOW ALL ROOF PENETRATIONS OR EQUIPMENT. CONTRACTOR SHALL BE RESPONSIBLE TO THIS DRAWING DOES NOT SHOW ALL ROOF PENETRATIONS OR EQUIPMENT. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE QUANTITY AND LOCATION OF ALL ROOF-MOUNTED EQUIPMENT, EQUIPMENT SUPPORTS AND PENETRATIONS. SEE ARCHITECTURAL DETAILS AND MEP DRAWINGS FOR ADDITIONAL INFO. INSTALLATION OF EQUIPMENT, EQUIPMENT SUPPORTS AND PENETRATIONS SHALL BE IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS. A3. CONTRACTOR SHALL INSTALL ALL FLASHING FOR EQUIPMENT, EQUIPMENT SUPPORTS AND PENETRATIONS PER CONTRACTOR SHALL INSTALL ALL FLASHING FOR EQUIPMENT, EQUIPMENT SUPPORTS AND PENETRATIONS PER MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY. MANUFACTURER'S STANDARD INSTALLATION REQUIREMENTS SHALL TAKE PRECEDENCE IF THERE ARE ANY DISCREPANCIES IN CONTRACT DOCUMENTS. A4. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE HIGH POINT AND THE LOW POINT OF ALL ROOF SLOPES PRIOR TO CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY THE HIGH POINT AND THE LOW POINT OF ALL ROOF SLOPES PRIOR TO INSTALLATION OF ANY ROOF INSULATION. THIS VERIFICATION SHALL BE INDICATED ON THE ROOF INSULATION SUBMITTAL DRAWING. A5. CONTRACTOR SHALL INSTALL NON-TAPERED ROOF INSULATION OVER LOW SLOPED ROOF DECKS THAT HAVE A SLOPE CONTRACTOR SHALL INSTALL NON-TAPERED ROOF INSULATION OVER LOW SLOPED ROOF DECKS THAT HAVE A SLOPE GREATER THAN OR EQUAL TO 1/4" PER FOOT. PONDING SHALL NOT OCCUR. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY LOW SLOPING ROOF DECK LOCATIONS. A6. CONTRACTOR SHALL INSTALL TAPERED ROOF INSULATION OVER FLAT ROOF DECKS AND OVER LOW SLOPED ROOF DECKS THAT CONTRACTOR SHALL INSTALL TAPERED ROOF INSULATION OVER FLAT ROOF DECKS AND OVER LOW SLOPED ROOF DECKS THAT HAVE A SLOPE LESS THAN 1/4" PER FOOT. PONDING SHALL NOT OCCUR. CONTRACTOR SHALL BE RESPONSIBLE TO VERIFY RESPONSIBLE TO VERIFY FLAT ROOF DECK LOCATIONS AND LOW SLOPING ROOF DECK LOCATIONS. A7. CRICKETS AND SADDLES SHALL HAVE A MINIMUM SLOPE OF 2 TIMES THAT OF THE PRIMARY TAPERED SYSTEM OR STRUCTURAL CRICKETS AND SADDLES SHALL HAVE A MINIMUM SLOPE OF 2 TIMES THAT OF THE PRIMARY TAPERED SYSTEM OR STRUCTURAL STRUCTURAL SLOPE. CRICKET WIDTH-TO-LENGTH RATIO SHALL BE NO LESS THAN 1:3. PONDING SHALL NOT OCCUR. A8. CONTRACTOR SHALL FURNISH AND INSTALL FIRE-RETARDANT LUMBER FOR ALL WOOD BLOCKING. CONTRACTOR SHALL FURNISH AND INSTALL FIRE-RETARDANT LUMBER FOR ALL WOOD BLOCKING. A9. CONTRACTOR SHALL FURNISH AND INSTALL ALL ROOFING SYSTEMS IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS CONTRACTOR SHALL FURNISH AND INSTALL ALL ROOFING SYSTEMS IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY. A10. CONTRACTOR SHALL REMOVE EXISTING EQUIPMENT AS REQUIRED TO ALLOW ROOF FLASHING TO OCCUR IN ACCORDANCE WITH CONTRACTOR SHALL REMOVE EXISTING EQUIPMENT AS REQUIRED TO ALLOW ROOF FLASHING TO OCCUR IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY. A11. EXTEND CURBS AS REQUIRED TO PROVIDE CLEARANCE IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND EXTEND CURBS AS REQUIRED TO PROVIDE CLEARANCE IN ACCORDANCE WITH MANUFACTURER'S STANDARD DETAILS AND WRITTEN INSTRUCTIONS TO MAINTAIN WARRANTY. A12. CONTRACTOR SHALL VERIFY IF BUILDING STRUCTURE OR ROOF DECK HAS FIRE PROOFING. IF FOUND, NOTIFY C.O.R. CONTRACTOR SHALL VERIFY IF BUILDING STRUCTURE OR ROOF DECK HAS FIRE PROOFING. IF FOUND, NOTIFY C.O.R. DISTRIBUTED CONTRACTOR SHALL REPLACE IN LIKE KIND.
AutoCAD SHX Text
GENERAL ROOF PLAN NOTES
AutoCAD SHX Text
1. SEE ROOF DATA INFORMATION FOR REQUIRED WORK. SEE ROOF DATA INFORMATION FOR REQUIRED WORK. 2. FURNISH AND INSTALL NEW PRE-FINISHED METAL GUTTERS AND DOWNSPOUTS. MATCH EXISTING GUTTERS AND DOWNSPOUTS SIZE. REFER FURNISH AND INSTALL NEW PRE-FINISHED METAL GUTTERS AND DOWNSPOUTS. MATCH EXISTING GUTTERS AND DOWNSPOUTS SIZE. REFER TO SPECIFICATIONS FOR MATERIAL DETAILS. 3. FURNISH AND INSTALL PREFINISHED MENTAL COPING CAP AND GRAVEL STOPS - MATCH EXISTING SIZE. FURNISH AND INSTALL PREFINISHED MENTAL COPING CAP AND GRAVEL STOPS - MATCH EXISTING SIZE. 4. REMOVE AND REPLACE DAMAGED CANOPY FASCIA BOARDS WITH NEW PRE-FINISHED BREAK METAL REFER TO SPECIFICATIONS FOR REMOVE AND REPLACE DAMAGED CANOPY FASCIA BOARDS WITH NEW PRE-FINISHED BREAK METAL REFER TO SPECIFICATIONS FOR MATERIAL DETAILS.
AutoCAD SHX Text
NOTES
| Sheets and Views |
| A003 |
File details come from the government source that posted it. Updated .