Summary
This is a Specifications document for the City of Pittsburgh Department of Mobility & Infrastructure detailing construction requirements for the Beechwood/Linden/Wilkins and Brownsville/Maytide/Sankey traffic signal replacement project. The project encompasses multiple construction items including plain cement concrete base course (10" modified), cement concrete sidewalks (6" modified), trench and backfill with sawcutting, junction boxes, street name signs, traffic signal supports (ranging from 19' Type X to 45' mast arms with luminaire arms at 30' mounting height), Type 2070 controller assemblies, conduit installation (2-inch and 3-inch PVC Schedule 40), detectable warning surfaces for ADA compliance, electrical service reroute, vehicular signal heads (three and four 12" sections and three 8" sections), LED countdown pedestrian signal heads, video detection systems, accessible pedestrian signals, concrete deep curb with underdrain, ADA curb ramps, landscaping restoration, valve box grade adjustments, manhole adjustments, LED luminaires, video surveillance camera relocation, and light pole removal. The specifications reference PennDOT Publication 408, City of Pittsburgh Standards of Construction, and various ASTM standards for material and construction requirements.
The document establishes detailed material specifications, construction methodologies, and measurement and payment procedures for each line item. Key requirements include use of Class AAAP and Class S cement concrete, epoxy-coated welded wire fabric reinforcement, specific LED signal equipment from manufacturers including ITS Plus video detection systems and Polara or Campbell Company accessible pedestrian signal systems, Type 2070LC traffic signal controllers with Intelight MAXTIME 2.0 software, and compliance with ADA standards including PROWAG guidelines. Signal support materials and hardware are provided by the City, with contractors responsible for transportation from the City Zoo Yard and installation. The specifications include provisions for shop drawing submissions to the City of Pittsburgh Municipal Traffic Engineer, manufacturer representatives on-site for calibration and testing, hydro excavation for pole foundations when utilities conflict with designs, and a 30-day test period before final operational turnover to the City. Contingency items for utility investigation, test holes, and hydro excavation are included with predetermined funding allocations and force account provisions for non-contract work.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM 4301-0006 PLAIN CEMENT CONCRETE BASE COURSE, 10”
MODIFIED
In accordance with PennDOT Publication 408, Section 301 except as follows:
DESCRIPTION – This work is the construction of a normal or high early strength plain cement concrete base course. When placed on subgrade, it includes the preparation of subgrade, as specified in Section 210.
MATERIAL – In accordance with Section 301.2, except revise as follows:
• Class AAAP Cement Concrete – Section 704.
• Welded Wire Fabric Reinforcement – Section 709.3, Epoxy Coated and Section 709.4, Epoxy Coated.
• Water - Section 720
CONSTRUCTION – As specified in Section 301.3
MEASUREMENT AND PAYMENT – SQUARE YARD, in accordance with Section 301.4
ITEM 4676-0002 CEMENT CONCRETE SIDEWALK, 6” MODIFIED
In accordance with PennDOT Publication 408, Section 676 except as follows:
DESCRIPTION – This work is the construction of a reinforced cement concrete sidewalk and curb ramps on an aggregate bed.
MATERIAL – In accordance with Section 676.2, except revise as follows:
• Class AAAP Cement Concrete – Section 704.
• Welded Wire Fabric Reinforcement – Section 709.3 and Section 709.4.
CONSTRUCTION – As shown in SC-500 of the City of Pittsburgh Standards of Construction, Appendix B of the Right-of-Way Procedures Policy Manual (current edition), and in accordance with
PennDOT Publication 408, Section 676.3, except revise as follows:
• Preparation of Foundation:
o Sawcut and excavate as required, and form the foundation at a depth 10 inches parallel with the finished surface of the sidewalk.
• Placing Aggregate for Bed:
o Spread aggregate on the prepared foundation to form a thoroughly compacted bed 4 inches deep.
• Concrete:
o As specified in Section 1001.3.
o Place concrete 6 inches deep. Strike off, finish and test, as specified in Section
501.3(k) and (p), except the contractor may use manual operations and apply a light broom finish to the cement concrete surface , unless otherwise specified or directed to match existing conditions.
o Form control and expansion joints as specified in SC-500 of the City of Pittsburgh
Standards of Construction.
o Maximum allowable slump is 5 inches.
o Do not use vibratory screeds when concrete target slump is over 3 inches.
o Place welded wire fabric as specified in SC-500 of the City of Pittsburgh Standards of
Construction.
• Expansion Joints:
o Place 1/2 inch premolded, expansion joint material for the full depth of the sidewalk, opposite expansion joints in adjacent curb, between the sidewalk and curb, and between the sidewalk and rigid structures.
MEASUREMENT AND PAYMENT – SQUARE YARD
ITEM 4954-0151 TRENCH AND BACKFILL, TYPE I, WITH SAWCUTTING
DESCRIPTION - This work is the trenching through existing composite roadway consisting of asphalt and concrete and backfilling to the height of existing pavement prior to the placement of proposed sidewalk in the same location.
CONSTRUCTION - In accordance with Section 954.3 except as follows:
• Replace the second paragraph of 954.3.a.1 with the following:
o Backfill the trench to height of existing pavement with an aggregate material.
Compact backfill material for the full trench width as specified in Section 206.3(b) for the specific material placed. Do not restore pavement to the existing condition.
o Coordinate trench and backfill work with concrete sidewalk paving work so that the trench and backfill are completed before the proposed sidewalk is poured at the trench location. Proposed sidewalk is not included in this item.
MEASUREMENT AND PAYMENT - Linear Foot, including sawcutting.
ITEM 4910-0001 – JUNCTION BOXES, JB-1 CITY STANDARD
In accordance with Section 910 except as follows:
DESCRIPTION - This work is the furnishing, installation and backfilling of a standard City of
Pittsburgh concrete junction box (JB-1) with bottom as shown on City of Pittsburgh Signal Standard
Drawing No. CTY-3 and as directed.
MATERIAL -
• Concrete. Similar to PENNDOT Class AA Cement Concrete, 4000 psi, 28-day compressive strength, air entrained concrete.
• Curing. ACI Specification 318-56 as amended to date.
• Reinforcement Bars. Intermediate grade open-hearth steel in accordance with ASTM A15-
39.
• Backfill. Placed to subgrade elevation. Crushed stone or gravel aggregate or air cooled blast furnace slag formed as a byproduct of the iron making process will be acceptable, conforming to select granular material (2RC).
• Stone Drain. Placed underneath junction box at least 12 inches deep. AASHTO Number 57
Coarse Aggregate, Type C, except no slag formed as a byproduct of the steel making process will be permitted. Air cooled blast furnace slag formed as a byproduct of the iron making process will be acceptable.
• Cement Mortar. Conforming to the City of Pittsburgh Specifications, Section 544, titled
"Portland Cement Mortar".
• Hatch Cover Frame and Hatch Cover Support. 6061-T6 aluminum.
• Junction Box Lid. Provide or construct junction box lids to match adjacent sidewalk material, finish, and color.
• Penetrating Concrete Sealer. For the concrete in the lid. In accordance with City of
Pittsburgh Signal Standard 506, non-staining, no yellowing.
CONSTRUCTION -
In accordance with City of Pittsburgh Street Lighting Standards M-164 and as follows:
• Install concrete junction boxes at or near the locations indicated. Obtain the Representative's written approval for a location greater than 3 feet in depth. Submit shop drawings for precast junction boxes prior to installation.
• Submit shop drawings/spec sheets electronically to the City of Pittsburgh Municipal Traffic
Engineer for review and approval.
• Sawcut if required, excavate for and compact at least 12 inches of course aggregate below the bottom of the junction box. Excavate for and install the concrete junction box at the location designated or as directed. Install conduits as required. Patch cut-outs and repair inside of junction box walls damaged by work. Backfill with compacted aggregate.
• Set the final elevation of the junction box lid at the future final grade and to be flush with adjacent ground. Install the lids so they do not project above the adjacent ground surface.
Set lids near or at sidewalks, curbs, ramps, etc. on grade so the adjacent edge of the lid is flush with the adjacent sidewalk, curb, ramp, etc. to prevent tripping hazards.
• Install temporary junction box lids (steel plates or concrete slabs) on the junction boxes until the lids are ready to have concrete placed. Plywood, pallets, wood, etc. are not acceptable temporary lids.
MEASUREMENT AND PAYMENT - EACH
ITEM 4936-0200 – STRUCTURE MOUNTED FLAT SHEET ALUMINUM
SIGNS, CITY STANDARD STREET NAME SIGNS
DESCRIPTION - This work is the furnishing and installing flat sheet aluminum street name signs and hardware for placement on overhead structures in accordance with the contract drawings and City of
Pittsburgh CBD Signal Standards and these specifications.
MATERIAL –
• Sizes, lettering and colors conforming to the City of Pittsburgh CBD Signal Standards.
• Flat sheet aluminum signs with Stiffeners and Miscellaneous Materials, Section 930.2(b), Publication 408, latest edition. Aluminum must be a minimum 0.080 inch thick (2.03 mm).
Use sheets free of buckles, warps, or dents. Remove burrs.
• Anti-theft nuts, bolts, and washers per Section 1103.11, Publication 408.
• Use pre-colored Type IV sheeting, conforming to PENNDOT's specification for
Retroreflective Sheeting Materials and Process Inks for Traffic Control, from a manufacturer listed in Bulletin 15.
• Prior to fabrication, submit to the City shop drawings for each street name sign for approval.
Shop drawings must show all dimensions, sign length and all legends (as indicated on the contract drawings) and must be per the City of Pittsburgh Standards. The street name signs shall include block and neighborhood information. Signs shall be fabricated at the minimum width required to include all text and symbols as specified.
• Signs shall be attached to mast arms in accordance with PENNDOT TC-8801.
• Apply the sheeting to the face and a 10 mm (3/8-inch) width along both edges of the channel sections, using a procedure specified by the sheeting material manufacturer. Apply free of bubbles or wrinkles greater than 75 mm (3 inches) in length and with total sheeting shrinkage of not more than 3.2 mm (1/8 inch). A maximum of one splice may be made in the sheeting for any channel section. Make the splice perpendicular to the longitudinal centerline of the channel, with the edges of adjacent pieces butted together throughout the entire seam length, without any overlap or separation. If covered sections are stacked before sign fabrication, then use microfoam between sign faces and store sections in a vertical position.
• Legend and Border. Use direct-applied cutout Type IV reflective sheeting material for letters, numerals, accessories, borders, and symbols.
• Install mast arms as directed. Fasten signs to posts with aluminum anti-theft nuts, bolts, and washers.
• Mount signs at a minimum of 7 feet above the sidewalk edge surface to the sign bottom.
Erect the signs in a level position, correctly aligned on the mast arm and firmly attached with the necessary mounting hardware. When mounting a sign below another sign, install the sign in the lowest set of holes provided on the support.
• All signs erected along City of Pittsburgh maintained streets or appearing on the signage plans must display a City of Pittsburgh DOMI sticker, supplied by the City of Pittsburgh. The
Contractor is responsible for obtaining the stickers from the City and applying them to the signs.
MEASUREMENT AND PAYMENT - Square Foot
• Measured on the front face surface of the actual sign only, using the two-dimensional method.
• Includes all signs, hardware, brackets, labor, material, equipment, and tools necessary to complete the work listed in the above Description, Material, and Construction sections and the removal and disposal of all excess materials.
ITEM 4951-7205 – TRAFFIC SIGNAL SUPPORT, 20’ AND 45' MAST ARMS
WITH LUMINAIRE ARM (30’ MOUNTING HEIGHT), POWDER COATED,
WITH OVERHEAD WIRING, INSTALL ONLY
DESCRIPTION - This work is the installation only of a traffic signal support with 30’ tall upright pole, dual mast arms and 10-foot bracket arm, and the excavation, construction and backfilling of a reinforced concrete foundation at the locations indicated in accordance with Section 951, the City of
Pittsburgh Policies and Standards and as follows:
MATERIAL - Supports, anchor bolts and hardware to be provided by the City.
• The City will pre-order and provide signal supports to the Contractor. The Contractor will transport the poles from the City Zoo Yard (7370 Baker St., Pittsburgh, PA 15206) to the job site. All traffic signal supports to be protected against injury and damage of all kinds during transport by wrapping and crating as recommended by the manufacturer. The hardware package will be available for pickup from the City Signal Shop. Coordinate pickup with Del
McElhany at 412-255-2873.
• Excavation and Removal. Foundations at-grade. Excavate to proposed foundation dimensions. Accurately position conduit and secure to prevent displacement during concrete placement.
• Construct foundations in accordance with TC-8801, except as follows:
o Excavate the foundation to the required depth. Finish the top 3 feet squared in accordance with City of Pittsburgh requirements. The remaining can be formed rounded or squared.
• Install anchor bolts, nuts and washers, as follows:
o Accurately position and secure anchor bolts in accordance with the approved shop drawings (to be provided by the Municipal Engineer) to prevent displacement during concrete placement. Use braced templates. Place anchor bolts truly vertical. Wrap exposed ends of anchor bolts to protect threads, as directed. Thoroughly clean exposed end and threads of anchor bolts prior to pole installation. Place nuts, washers and plate washers for anchor bolts. Place concrete in accordance with
Section 1001.3. Finish concrete flush with adjacent finished sidewalk or as indicated.
Backfill foundations with suitable compacted material. Protect the foundation anchor bolts and nuts at all times. Safely cover the foundation. Do not allow the protective covering to become a tripping hazard for pedestrian traffic.
• Provide and secure mesh covering around opening between pole base and top of foundation. Do not mortar/grout between pole base and top of foundation.
MEASUREMENT AND PAYMENT – Installation of Traffic Signal Support Foundation and Mast Arm
Support. Each.
ITEM 4951-2225 + ITEM 4951-2230 + ITEM 4951-2235 – TRAFFIC SIGNAL
SUPPORT, 25', 30' AND 35' MAST ARM WITH LUMINAIRE ARM (30’
MOUNTING HEIGHT), POWDER COATED, WITH OVERHEAD WIRING,
INSTALL ONLY
DESCRIPTION - This work is the installation only of traffic signal supports with 30’ tall upright pole and 10-foot bracket arm, and the excavation, construction and backfilling of a reinforced concrete foundation at the locations indicated in accordance with Section 951, the City of Pittsburgh Policies and Standards and as follows.
MATERIAL - Supports, anchor bolts and hardware to be provided by the City.
transport the poles from the City Zoo Yard (7370 Baker St., Pittsburgh, PA 15206) to the job site. All traffic signal supports to be protected against injury and damage of all kinds during transport by wrapping and crating as recommended by the manufacturer. The hardware package will be available for pickup from the City Signal Shop. Coordinate pickup with Del
McElhany at 412-255-2873.
• Excavation and Removal. Foundations at-grade. Excavate to proposed foundation dimensions. Accurately position conduit and secure to prevent displacement during concrete placement.
• Construct foundations in accordance with TC-8801, except as follows:
o Excavate the foundation to the required depth. Finish the top 3 feet squared in accordance with City of Pittsburgh requirements. The remaining can be formed rounded or squared
• Install anchor bolts, nuts and washers, as follows:
o Accurately position and secure anchor bolts in accordance with the approved shop drawings (to be provided by the Municipal Engineer) to prevent displacement during concrete placement. Use braced templates. Place anchor bolts truly vertical. Wrap exposed ends of anchor bolts to protect threads, as directed. Thoroughly clean exposed end and threads of anchor bolts prior to pole installation. Place nuts, washers and plate washers for anchor bolts. Place concrete in accordance with
Backfill foundations with suitable compacted material. Protect the foundation anchor bolts and nuts at all times. Safely cover the foundation. Do not allow the protective covering to become a tripping hazard for pedestrian traffic.
ITEM 4951-0235 – TRAFFIC SIGNAL SUPPORT, 35’ MAST ARM, POWDER
COATED, WITH OVERHEAD WIRING (INSTALL ONLY)
DESCRIPTION – This work is the installation only of a traffic signal support, and the excavation, construction and backfilling of a reinforced concrete foundation at the locations indicated in accordance with Section 951, the City of Pittsburgh Policies and Standards and as follows.
MATERIAL – Supports, anchor bolts and hardware to be provided by the City.
CONSTRUCTION –
transport the poles from the City Zoo Yard (7370 Baker St., Pittsburgh, PA 15206) to the job site. All traffic signal supports to be protected against injury and damage of all kinds during transport by wrapping and crating as recommended by the manufacturer. The hardware package will be available for pickup from the City Signal Shop. Coordinate pickup with Del
McElhany at 412-255-2873.
• Excavation and Removal. Foundations at-grade. Excavate to proposed foundation dimensions. Accurately position conduit and secure to prevent displacement during concrete placement.
• Construct foundations in accordance with TC-8801, except as follows:
o Excavate the foundation to the required depth. Finish the top 3 feet squared in accordance with City of Pittsburgh requirements. The remaining can be formed rounded or squared.
• Install anchor bolts, nuts and washers, as follows:
o Accurately position and secure anchor bolts in accordance with the approved shop drawings (to be provided by the Municipal Engineer) to prevent displacement during concrete placement. Use braced templates. Place anchor bolts truly vertical. Wrap exposed ends of anchor bolts to protect threads, as directed. Thoroughly clean exposed end and threads of anchor bolts prior to pole installation. Place nuts, washers, and plate washers for anchor bolts. Place concrete in accordance with
Backfill foundations with suitable compacted material. Protect the foundation anchor bolts and nuts at all times. Safely cover the foundation. Do not allow the protective covering to become a tripping hazard for pedestrian traffic.
ITEM 4952-1060 – TYPE 2070 CONTROLLER ASSEMBLY, TYPE 1
MOUNTING, CITY STANDARD
In accordance with Section 952 except as follows:
MATERIAL -
Submit software package for approval prior to acquisition. Provide four user manuals and any revisions to the software necessary to acquire the flashing operations indicated. No copyright privileges will be acquired as part of this item.
• Controller - Type 2070LC solid-state actuated volume density traffic signal controller. Furnish controller assemblies so that the controller returns to normal operation from time clock flash automatically.
• CPU Module - 2070-1C CPU module with Intelight MAXTIME 2.0 software package.
• Cabinet - Aluminum 332 Cabinet, with a double door, and 8 inch riser for Type I mounting.
o Provide an aluminum shelf with integral storage compartment in the rack below the controller. The storage compartment is to have telescoping drawer guides for full extension. The compartment top is to have a non-slip plastic laminate attached.
o Supply each cabinet with a cable approximately 4 feet long to connect a laptop computer with the controller. The cable is to have a DB-9 connector on one end, and a connector on the other end to mate with the C50 on the front of the controller. The cable is to allow a laptop computer to upload/download data to the controller.
o Each cabinet is to have two fluorescent lights installed at the top of the cabinet, one near each door. The lights are to be wired to the door switches such that opening either door will turn on both lights.
o Provide a manual cord and a method to switch the signal controller from "automatic" to "manual" control.
o DO NOT provide a twist lock receptacle and transfer switch for power provided by an emergency generator.
o Provide a sufficient quantity of load switches to obtain the color sequence as indicated. Provide two, 242 DC Isolators as required to provide operation indicated.
o Provide a filtering surge protector for the Type 2070 controller. Line to neutral clamping voltage is to be more than 250V at 10,000 amps. Filtering surge protector is not to exceed 3.5 inch x 6.0 inch x 2.5 inch, not including studs or mounting flange.
Spark gap arresters are not permitted.
o Controller to include a 2GB minimum flash drive that contains all the programming and timing information for each intersection.
• Power Strip - Conforming to NEMA environmental specifications.
Foundation:
o Class A Cement Concrete - Section 704 o Anchor Bolts, Nuts and Washers - 5/8 inch x (13 to 18 inches) x 3 inches, 100% H.D.
Galvanized Section 1101.04 o Conduit - Sections 1101.09(b) and 1101.09(c)2.
o Ground Rod - 10 feet. 5/8 inch diameter Ground Rod. Section 1101.11(j).
o Ground Wire - No. 6 AWG Stranded Copper Ground Wire.
o Non-shrink Grout - Section 1101.2(e).
o Backfill - Placed to sidewalk subgrade elevation. Crushed stone or gravel, except no slag formed as a by-product of the steel making process will be permitted. Air cooled blast furnace slag formed as a by-product of the iron making process will be acceptable aggregate conforming to Select Granular Material (AASHTO #57). (8)
Caulking Compound - Premium-grade, high- performance, moisture-cured, one-component, polyurethane-base, non-sag, elastomeric sealant, black.
• Provide software compatible with Intelight MAXTIME 2.0.
Section 950.3 as shown on the standard drawings, City of Pittsburgh Policies and Standards and as follows:
• Submit shop drawings/spec sheets electronically to the City of Pittsburgh Municipal Traffic
Engineer for review and approval.
• Excavate for and construct concrete foundation in accordance with the City of Pittsburgh standard drawing PF-1. Ensure anchor bolts are rigidly secured in the proper location for the controller housing.
• Monitor the absence of a red indication along with normal conflicts.
• Flash drive to be labeled and placed in controller cabinet.
• Provide for the automatic return to normal operation when lost electrical service has been restored.
• Controller ground rod is to be isolated from the traffic signal system grounding.
• Install coordination timings as provided on the Contract Drawings and as verified by the City of Pittsburgh Municipal Traffic Engineer.
• Hardwire the "Flash Sense" and "Stop Time" functions to operate without a DC isolator. The
City of Pittsburgh will inspect the new signal equipment prior to activation. All traffic signal maintenance and operation responsibilities will be turned over to the City of Pittsburgh after the following conditions are implemented to the City of Pittsburgh's satisfaction:
o All punch-list items are completed.
o Subsequent to satisfactorily completing a 30-day test period.
• Remove existing cabinet and return to the City of Pittsburgh Traffic Signal Shop.
• Return all existing controller equipment to the City of Pittsburgh Traffic Signal Shop.
ITEM 4954-0012 – 2 INCH CONDUIT, CITY STANDARD + ITEM 4954-0013
– 3 INCH CONDUIT, CITY STANDARD
In accordance with Section 954 and as follows:
MATERIAL -
• Conduit - Polyvinyl Chloride (PVC) Schedule 40; 90°C (194°F), UL-Listed conduit conforming to NEMA standard TC-2 (EPC-40-PVC), manufactured from compounds meeting the applicable requirements of ASTM D1784, listed in conformity with Article 347 of the National
Electrical Code. Furnish conduit fittings, elbows, cleaner, and solvent produced by the same manufacturer.
• Detectable Warning Tape - 5 mil overall thickness, with a solid aluminum foil core, double laminated tape. Red in color and have a repeating warning message "Caution Buried
Electrical Line Below" and laminated to foil core with a 3.75 mil clear film backing. Meet or exceed the American Public Works Association (APWA) AND OSHA standards. Detectable to a depth of 3 feet.
CONDUIT -
Provide positive drainage at the low point of each conduit run. Clean conduit runs after installation by pulling a stiff wire brush, the size of the conduit, through the conduit. Then test the conduit by pulling a ball mandrel, having a diameter of at least 85% of the inside diameter of the conduit, through each run. Where the mandrel fails to pass, either acceptably repair or replace conduit until mandrel passes. Place detectable warning tape 1 foot above the conduit.
MEASUREMENT AND PAYMENT - LINEAR FOOT
ITEM 4695-0004 – DETECTABLE WARNING SURFACE, MODIFIED
DESCRIPTION – This work is furnishing all material, equipment, tools, and labor required for the placement and installation of detectable warning surfaces on cement concrete sidewalk curb ramps and other designated surfaces in order to provide a tactile warning for pedestrians with visual impairments under the provisions of the Americans with Disabilities Act (ADA).
MATERIAL - In accordance with PennDOT Publication 408, Section 695.2(a), except delete third bullet and add the following:
• Color. Federal Standard 595 – Orange Yellow (33538).
Also, under PennDOT Publication 408, Section 695.2(b), delete first bullet and add the following:
• Class S Cement Concrete – In accordance with PennDOT Publication 408, Section 704.
CONSTRUCTION –
• As specified in Section 695.3
MEASUREMENT AND PAYMENT – Square Foot
• In accordance with Publication 408, Section 695.4.
ITEM 4954-0402 – ELECTRICAL SERVICE, TYPE B, REROUTE
In accordance with Section 954 except as follows:
Section 954.1 DESCRIPTION - As specified
Section 954.2 MATERIAL - As specified
Section 954.3 CONSTRUCTION - As specified and as follows:
• Install the new electrical service wire in a separate 2-inch conduit from the service disconnect to the new junction box and controller cabinet. Install the service disconnect on the signal support closest to the controller assembly, not on the controller assembly, at a height of 13 feet above the sidewalk. Coordinate electrical service installations with the City of Pittsburgh Department of Mobility and Infrastructure and Duquesne Light Company prior to installation. Do not place disconnect on a Type X support.
• Provide a separate 30 AMP circuit breaker for highway lighting luminaires at all signal installations with luminaires.
• Submit shop drawing/spec sheets electronically to the City of Pittsburgh Municipal Traffic
Engineer for review and approval.
Section 954.3 MEAASUREMENT AND PAYMENT - As specified and as follows:
Each. Includes conduit and fittings
ITEM 4955-3208 + ITEM 4955-3209 + ITEM 4955-1503 + ITEM 4955-2805 –
VEHICULAR SIGNAL HEAD, THREE AND FOUR 12” SECTIONS, CITY
STANDARD + OPTICALLY PROGRAMMED VEHICULAR SIGNAL HEAD,
THREE 12” SECTIONS, CITY STANDARD + VEHICULAR SIGNAL HEAD,
THREE 8” SECTIONS, CITY STANDARD
In accordance with Section 955 except as follows:
MATERIAL - In accordance with Section 955.2 except as follows:
• Housing - Delete the first bullet.
o Revise the second bullet by adding "Furnish black aluminum housings."
• Backplates- Revise the third bullet to read "Top, bottom and sides that measure 5 inches in width."
• Miscellaneous - Delete the first sentence. Replace with "Furnish tunnel visors."
• Revise Section 955.2(c) LED Vehicular Signal Head Modules by adding the following:
o Provide a clear lens for the green indications o Install Incandescent Look (IL) type LED Modules
• Revise Section 955.2(c)3 Warranties by adding the following:
o All LED vehicular signal head modules must have a written five-year warranty from the date of delivery.
• Revise Section 955.2(i) Mounting Assembly and Hardware by adding the following:
o Furnish a rigid mount signal bracket that uses aircraft cable banding for vehicular signal indications mounted on mast arms.
o Submit shop drawings/spec sheets electronically to the City of Pittsburgh Municipal
Traffic Engineer for review and approval.
MEASUREMENT AND PAYMENT - EACH. In accordance with Section 955.4 and add the following:
• Vehicular Signal Heads - The price includes tunnel visors.
ITEM 4955-3722 – LED COUNTDOWN PEDESTRIAN SIGNAL HEAD, TYPE
A CITY STANDARD
In accordance with Section 955 except as follows:
DESCRIPTION -
This work is furnishing and installing pedestrian countdown signals.
MATERIAL - In accordance with Section 955.2 and as follows:
• Equip the pedestrian countdown signal timer with a tunnel visor. Egg crate visors will not be accepted.
• Furnish pedestrian signal heads with black aluminum housing as indicated.
CONSTRUCTION - In accordance with Section 955.3 and as follows:
• Submit shop drawings/spec sheets electronically to the City of Pittsburgh Municipal Traffic
Engineer for review and approval
ITEM 4956-0709 – VIDEO DETECTION SYSTEM
As specified in Sections 956 except as follows:
Section 956.1 DESCRIPTION - Revise as follows:
This work is the furnishing and installation of an ITS Plus Lightning Series Analog/Digital Camera with OMT detection system to sense the presence of vehicles and bicycles.
Section 956.2 MATERIAL - As specified and as follows:
• Provide ITS Plus video detection system:
o Camera - Part # ITSP-PM120CR o Video Cards - ITSP-V100 (single), ITSP-V200E (dual)
• Provide surge protection at the pole where the camera is located and in the traffic signal cabinet.
• Provide a five-year manufacturer's warranty for all equipment.
Section 956.3 CONSTRUCTION - Revise by adding the following:
• Submit shop drawings/spec sheets electronically to the City of Pittsburgh Municipal Traffic
Engineer for review and approval.
• Install and mount as recommended by the manufacturer to provide area of detection as indicated. Have the manufacturer's representative on site during the traffic signal startup to calibrate the sensor to provide optimum performance. In the presence of the Department or their representative, have the manufacturer's representative establish and program the detection zones to achieve desired intersection detection. Make adjustments to the sensor calibration and/or the detection zones as directed during the 30-day test period.
Section 956.4 MEASUREMENT AND PAYMENT - As specified and as follows:
Includes all required cabinet hardware, surge protection, VIVDS cards, software, mounting brackets, cables, connections, and diagnostic work for a complete working system.
ITEM 4956-0790 – ACCESSIBLE PEDESTRIAN SIGNALS CITY STANDARD
DESCRIPTION - This work is the furnishing and installation of an Accessible Pedestrian Push button that provides audible, visual and tactile feedback of when to cross the street at a signalized intersection. The Accessible Push button is to consist of all electronic equipment, mounting hardware and sign faces as needed in order to provide a complete functioning system and is to conform to the specifications listed below.
MATERIAL -
The Accessible Pedestrian Signals shall be one of the following models, or approved equal, per City of Pittsburgh Standards:
• Campbell Company Guardian
• Polara Engineering, Inc. Navigator APS - EZ Communicator
Push Button:
• Operating Temperature Range: -40°C to +85°C (-40°F to +185°F)
• Face Plate: Aluminum, powder coated, ink marking.
• Pole Unit Push Button: ADA compliant, Cast aluminum, nickel plated, powder coated.
Control Unit:
• Operating Voltage: 120 VAC at the cabinet for the system. Push button station operates off of 17-19 VDC.
• Audio File Updates: Via secure USB Port.
• Ethernet Interface: 10/100BASE-T, Built-in Server-Host with Password Protection.
Wiring:
• Wiring between pedestrian signal head and accessible push button is included in this item.
CONSTRUCTION - Section 956.3 and as follows:
Submit shop drawings/spec sheets electronically to the City of Pittsburgh Municipal Traffic Engineer for review and approval.
1. At a minimum, the system is to provide the following as recommended by the Federally-adopted
PROWAG (Public Right of Way Accessibility Guidelines) .
a. Location Tone. All buttons should make a sound so they can be located for activation. This sound is to occur once every 3 seconds.
b. Voice On Location. The system is to provide, upon the press of the button, a location message stating the name of the street being crossed, the name of the side street; example
"Wait to Cross Fifth at Penn ".
c. Walk Message. The system is to provide a verbal message during the walk signal;
example "Penn. Walk sign is on to cross Penn ". For "rest in green" conditions the
Accessible Push button is to play for the duration of the WALK signal, minimum 7 seconds.
Play the walk message one, two or three times. The Walk message is to play on all push button stations for that crossing. For exclusive pedestrian phases the system is to say
“WALK SIGN IS ON FOR ALL CROSSINGS”.
d. Directional Arrow. Incorporate a raised/vibrating directional arrow as part of the push button which vibrates for the duration of the Walk message. The arrow is to be oriented parallel to the crosswalk.
e. Push button feedback. Each time the push button is pressed the user is to receive an acknowledgement in the form of a single audible "tick" as well as single momentary vibrating pulse. In addition, an LED is to turn on and latch until the walk signal is displayed. The LED is to latch for all push button stations on that crossing.
f. Fail Safe Feature. In the event the push button station loses power, the system is to automatically place a constant call to the traffic controller.
g. The button is to be a non-mechanical, vandal-resistant type rated using a piezo switch and be designed so that it cannot be made to "stick on".
h. System is to be able to self-test the push button stations and report any faults to the traffic controller.
i. Each audio feature is to be "user" selected and turned on or off accordingly at the intersection.
j. All audible messages and locator tone will be at integral part of the push button assembly.
k. Changes to the operating characteristics to be completed using a web-browser capable device (e.g. laptop, tablet) via either wireless access or an Ethernet port.
l. Mounting height is to be between 40and 44 inches, measured to the top of the push button
(part that is physically pressed).
m. No audible overhead speakers permitted
2. Polara operational settings are to match the following in addition to all previous settings:
a. Extended Push Time = 0s. The message is to play whenever the button is pressed, regardless of duration of press.
b. Locator Tone: Min = 20% / Max = 100%. Volume over ambient = 5 dB
c. All Messages: Min = 45% / Max = 100%. Volume over ambient = 10 dB
d. Quiet Time setting is to be enabled from 9pm to 6am with volume reduction set at
40%.
e. Internal time is to match correct global time with DST enabled.
3. Guardian operational settings are to match the following in addition to all previous settings:
a. Acknowledgement and Extended Press audio files are to be the same. The message is to play whenever the button is pressed, regardless of duration of press.
b. Day Locator Tone: Min = 50 / Max = 95. Left bubble = 49 / Right bubble = 94
c. Day Non-locator Tone: Min = 42 / Max = 95. Left bubble = 41 / Right bubble = 94
d. Night Locator Tone: Min = 40 / Max = 80. Left bubble = 39 / Right bubble = 70
e. Night Non-locator Tone: Min = 40 / Max = 80. Left bubble = 39 / Right bubble = 70
f. Night Time setting is to be enabled from 9pm to 6am.
g. Internal time is to match correct global time with DST enabled.
MEASUREMENT AND PAYMENT - Each.
• Includes all electronic equipment, mounting hardware, and R10-3E (L), (R) or (C) signs for each push button as needed in order to provide a complete functioning system. Intersections placed on “ped recall” will omit the “Press Button to Cross” message and arrow sticker at the bottom of the R10-3E sign. The control unit for each traffic signal controller assembly will be incidental to the accessible pedestrian push buttons.
ITEM 9000-0001 – CONCRETE DEEP CURB
In accordance with Section 630 and as follows:
DESCRIPTION - This work is the construction of a concrete deep curb and underdrain with pipe, variable height deep curb, concrete depressed deep curb and underdrain for curb ramps and driveways as indicated.
MATERIAL - In accordance with Section 630.2 and as follows:
Revise the first and second bullets as follows:
• Class S Cement Concrete – Section 704
• Class S Cement Concrete (Slip-Forming) – Section 704, except with a maximum slump of 1
1/2 inches
Add the following:
• Geotextiles, Class 1 – Section 212
• Geotextiles, Class 4, Type A – Section 212
• Pipe Underdrain – Section 610
• No. 57 Coarse Aggregate – Section 703
• Preformed Cellular Polystyrene – As specified in ASTM C 578, sheets with a thickness between 3/16 inch to 1/2 inch
CONSTRUCTION - As shown in SC-100 and SC-502a through SC-502i of the City of Pittsburgh
Standards of Construction (dated 2023)
MEASUREMENT AND PAYMENT –
• Concrete Deep Curb, 4” Pipe Underdrain. Linear Foot
• Variable height and depressed curb will be measured and paid for as full depth curb of the type indicated.
• Extra depth excavation and aggregate required to connect underdrain to the subgrade drains are incidental to this item.
ITEM 9000-0002 CEMENT CONCRETE CURB RAMP
DESCRIPTION – This work is the construction of ADA Curb Cut Ramps as indicated in SC-502a through SC-502-i in the City of Pittsburgh Standards of Construction, Appendix B of the Right-of-
Way Procedures Policy Manual (current edition).
MATERIAL – In accordance with PennDOT Publication 408, Section 676.2, except add the following:
• Class S Cement Concrete – Publication 408, Section 704
• Welded Wire Fabric, 6 x 6 x W4.0 x W4.0 – in accordance with PennDOT Publication 408, Section 709.
CONSTRUCTION – As shown in SC-502a through SC-502i of the City of Pittsburgh Standards of
Construction (dated 2023).
• Construct expansion joints as indicated in SC-502a through SC-502i of the City of Pittsburgh
Standards of Construction (dated 2023). Joints are incidental to the ADA Curb Cut Ramp.
MEASUREMENT AND PAYMENT – Square Yard.
• Boiled Linseed Oil is incidental. If depressed curb is placed monolithically with curb ramps, side-flairs, or both, the depressed curb will be measured and paid separately from curb ramps and side flairs.
• Cubic Yard. Class 1 Excavation.
ITEM 9000-0003 RESTORATION OF LANDSCAPING
DESCRIPTION - This work involves the removal, storage, resetting, regrading, and restoration of the existing landscaping plantings, signs, stones, and other appurtenances where indicated.
MATERIAL –
• Mulch, to match color of existing mulch
• Existing shrubs and plantings
• Existing stones and appurtenances
CONSTRUCTION –
• Remove the existing plantings, signs, stones, and appurtenances as needed and coordinated with the City of Pittsburgh representative, and store them on site. Once final sidewalk and curb ramp construction is complete and graded, reset the landscaping stones and signs as indicated or directed. Replace, remove, and properly dispose of any existing plantings or components that are damaged during removal, storage, or replacement. If plantings are damaged during removal, replace them with similar plantings at no additional cost. After plantings are reset, place mulch at a depth of 4 inches around the plantings.
MEASUREMENT AND PAYMENT – Lump Sum.
• Includes the replacement of existing plantings or components that are damaged during the removal or restoration.
ITEM 9000-0004 GRADE ADJUSTMENT OF MUNICIPALITY'S EXISTING
VALVE BOX, ADJUSTMENT ONLY
In accordance with Section 606 except as follows:
Section 606.2 MATERIAL - Revise by adding the following:
• (d) Supplied Material. New valve boxes, risers or adapters may be provided by the local municipality, water or sanitary authority, or utility company. Three weeks before performing any adjustments, contact the facility owner to make arrangements for the delivery of the materials and notify the Representative that arrangements were made.
Section 606.3 CONSTRUCTION - Revise by adding the following:
• (c) For PGH2O owned water valves and boxes, construct as indicated and shown on the attachment entitled, PGH2O Water Utility Distribution Valves, and as directed.
Section 606.4 MEASUREMENT AND PAYMENT - Revise to read:
• Each. For replacement and/or adjustment only. Install either the material supplied by the facility owner or if the facility owner cannot supply the material, then the material will be paid for separately under Item 9000-0005.
• Due to the contingent or unpredictable nature of the work being performed, the provisions of
Section 110.02(d) are not applicable to this item.
ITEM 9000-0005 GRADE ADJUSTMENT OF MUNICIPALITY'S EXISTING
VALVE BOX, MATERIAL ONLY
• Valve box risers or adapters may be provided by the local municipality, water or sanitary authority, or utility company. Contact the facility owner as specified under Item
9000-0104 prior to ordering the material. Purchase all required material not provided by the facility owner, as directed.
• For PGH2O owned water valves and boxes, purchase all required material, as indicated and shown on the attachment entitled, PGH2O Water Utility Distribution Valves, and as directed. Any existing "square" style PGH2O water valve box that needs to be grade adjusted to be replaced with the current "Medium Extension Gate (MEG)" style valve box.
Section 606.4 MEASUREMENT AND PAYMENT - Revise to read:
• Set. For material only. Installation will be paid for separately under Item 9000-0004.
Section 110.02(d) are not applicable to this item.
ITEM 9000-0006 GRADE ADJUSTMENT OF MUNICIPALITY'S EXISTING
MAHOLES, ADJUSTMENT ONLY
• (d) Supplied Material. Manhole extension materials may be provided by the local municipality, water or sanitary authority, or utility company. Three weeks before performing any adjustments, contact the facility owner to make arrangements for the delivery of the materials and notify the Representative that arrangements were made. For PGH2O owned public manholes and structures, purchase all required material as indicated under Item 9000-
0107.
Section 606.4 MEASUREMENT AND PAYMENT - Revise to read:
• Each. For adjustment only. Install either the provided material supplied by the facility owner or if the facility owner cannot supply the material, then the material will be paid for separately under Item 9000-0007.
Section 110.02(d) are not applicable to this item
ITEM 9000-0007 GRADE ADJUSTMENT OF MUNICIPALITY'S EXISTING
MAHOLES, MATERIAL ONLY
• Manhole extension materials may be provided by the local municipality, water or sanitary authority, or utility company. Contact the facility owner as specified under Item 9000-0106 prior to ordering the material. Purchase all required material not provided by the facility owner, as directed.
• For PGH2O owned public manholes and structures, purchase all required material, as indicated and shown on the attachment entitled, PGH2O Public Manholes and Structures, and as directed.
Section 606.4 MEASUREMENT AND PAYMENT - Revise to read:
• Set. For material only. Installation will be paid for separately under Item 9000-0006.
• Due to the contingent or unpredictable nature of the work being performed, the provisions of
Section
110.02(d) are not applicable to this item.
ITEM 9000-1001 TRAFFIC SIGNAL SUPPORT, 19' TYPE X, CITY
STANDARD, INSTALL ONLY
DESCRIPTION - This work is the installation only of traffic signal supports for the mounting of traffic control devices that is capable of supporting overhead cable. The overhead traffic signal cable will connect to the proposed traffic signal supports. The work also includes the excavation for construction and backfilling of a reinforced concrete foundation at the locations indicated in accordance with Section 951, the City of Pittsburgh Policies and Standards and as follows.
MATERIAL - Section 951.2 and as follows:
• Foundation - In accordance with City of Pittsburgh policies and as follows:
o Reinforcement Steel. Section 709, Grade 6.
o Conduit. Sections 1101.09(b)1 and 1101.09(c)2.
o Cement Concrete. Section 704, Change PennDOT Class A to City Class PP.
o Ground Rod Section 1101.11(j) and Ground Rod Clamp Section 910.3(q) o Ground Wire. No. 6 AWG Stranded Copper Ground Wire.
o Pre-molded Expansion Joint Filler. Section 705.1.
o Caulking Compound. Section 705.8, Elastomeric Sealant.
o Anchor Bolts, Nuts and Washers. Section 1101.04.
• Supports, anchor bolts and hardware to be provided by the City.
• Painting -o Check each pole for flaws, pinholes, and discontinuities. Repair minor defects that include galvanizing in accordance with Section 910.3(r). Repair paint damage with a liquid touch-up air-dry acrylic paint that is compatible with and matches the finish top coat color.
• Handholes - Provide handhole at the pole base. Furnish a galvanized keeper chain and a cover plate as shown on the Standard Drawings.
• Provide welded couplings for mounting of traffic signals onto the pole for the purpose of supporting pedestrian signals. Couplings to be galvanized and painted in as specified above.
Stainless steel banding is not allowed.
• Signal supports will not have base plate covers.
CONSTRUCTION - Section 951.3 and as follows:
• The City will pre-order and provide the Type X supports to the Contractor. The Contractor will transport the poles from the City Zoo Yard (7370 Baker St., Pittsburgh, PA 15206) to the job site. All traffic signal supports to be protected against injury and damage of all kinds during transport by wrapping and crating as recommended by the manufacturer. The hardware package will be available for pickup from the City Signal Shop. Coordinate pickup with Del
McElhany at 412-255-2873.
• The traffic signal support strain pole foundation is to conform to the City of Pittsburgh standard drawing for pedestal support Type X foundation.
• Excavation and Removal. Foundations at-grade. Excavate to proposed foundation dimensions. Accurately position conduit and secure to prevent displacement during concrete placement.
• Install anchor bolts, nuts, and washers, as follows:
o Accurately position and secure anchor bolts to prevent displacement during concrete placement. Use braced templates. Place anchor bolts truly vertical. Wrap exposed ends of anchor bolts to protect threads, as directed. Thoroughly clean exposed end and threads of anchor bolts prior to pole installation. Provide nuts, washers and plate washers for anchor bolts. Place concrete in accordance with Section 1001.3. Finish concrete flush with adjacent finished sidewalk or as indicated. Backfill foundations with suitable compacted material. Protect the foundation anchor bolts and nuts at all times. Safely cover the foundation. Do not allow the protective covering to become a tripping hazard for pedestrian traffic.
o Provide and secure mesh covering around opening between pole base and top of foundation. Do not mortar/grout between pole base and top of foundation.
o Drill the foundation to the required depth. Finish the top 3 feet squared in accordance with City of Pittsburgh requirements. The remaining can be formed rounded or squared.
MEASUREMENT AND PAYMENT – Each. In accordance with Section 951.4 and as follows:
• Includes span wire, span wire attachments, and lashing.
• Hydroexcavation paid for separately under item 9000-1028 HYDRO EXCAVATION FOR
TRAFFIC SIGNAL POLE FOUNDATIONS
ITEM 9000-1002 TRAFFIC SIGNAL SUPPORT, 30' TYPE X-L WITH
LUMINAIRE ARM, CITY STANDARD, INSTALL ONLY
DESCRIPTION - This work is the installation only of traffic signal supports for the mounting of traffic control devices that is capable of supporting overhead cable. The overhead traffic signal cable will connect to the proposed traffic signal supports. The work also includes the excavation for construction and backfilling of a reinforced concrete foundation at the locations indicated in accordance with Section 951, the City of Pittsburgh Policies and Standards and as follows.
MATERIAL - Section 951.2 and as follows:
• Foundation - In accordance with City of Pittsburgh policies and as follows:
o Reinforcement Steel. Section 709, Grade 6.
o Conduit. Sections 1101.09(b)1 and 1101.09(c)2.
o Cement Concrete. Section 704, Change PennDOT Class A to City Class PP.
o Ground Rod Section 1101.11(j) and Ground Rod Clamp Section 910.3(q) o Ground Wire. No. 6 AWG Stranded Copper Ground Wire.
o Pre-molded Expansion Joint Filler. Section 705.1.
o Caulking Compound. Section 705.8, Elastomeric Sealant.
o Anchor Bolts, Nuts and Washers. Section 1101.04.
• Supports, anchor bolts and hardware to be provided by the City.
• Painting -o Check each pole for flaws, pinholes, and discontinuities. Repair minor defects that include galvanizing in accordance with Section 910.3(r). Repair paint damage with a liquid touch-up air-dry acrylic paint that is compatible with and matches the finish top coat color.
• Handholes - Provide handhole at the pole base. Furnish a galvanized keeper chain and a cover plate as shown on the Standard Drawings.
• Provide welded couplings for mounting of traffic signals onto the pole for the purpose of supporting pedestrian signals. Couplings to be galvanized and painted in as specified above.
Stainless steel banding is not allowed.
• Signal supports will not have base plate covers.
CONSTRUCTION - Section 951.3 and as follows:
• The City will pre-order and provide the Type X-L supports to the Contractor. The Contractor will transport the poles from the City Zoo Yard (7370 Baker St., Pittsburgh, PA 15206) to the job site. All traffic signal supports to be protected against injury and damage of all kinds during transport by wrapping and crating as recommended by the manufacturer. The hardware package will be available for pickup from the City Signal Shop. Coordinate pickup with Del McElhany at 412-255-2873.
• The traffic signal support strain pole foundation is to conform to the City of Pittsburgh standard drawing for pedestal support Type X-L foundation.
• Excavation and Removal. Foundations at-grade. Excavate to proposed foundation dimensions. Accurately position conduit and secure to prevent displacement during concrete placement.
• Install anchor bolts, nuts, and washers, as follows:
o Accurately position and secure anchor bolts to prevent displacement during concrete placement. Use braced templates. Place anchor bolts truly vertical. Wrap exposed ends of anchor bolts to protect threads, as directed. Thoroughly clean exposed end and threads of anchor bolts prior to pole installation. Provide nuts, washers and plate washers for anchor bolts. Place concrete in accordance with Section 1001.3. Finish concrete flush with adjacent finished sidewalk or as indicated. Backfill foundations with suitable compacted material. Protect the foundation anchor bolts and nuts at all times. Safely cover the foundation. Do not allow the protective covering to become a tripping hazard for pedestrian traffic.
o Provide and secure mesh covering around opening between pole base and top of foundation. Do not mortar/grout between pole base and top of foundation.
o Drill the foundation to the required depth. Finish the top 3 feet squared in accordance with City of Pittsburgh requirements. The remaining can be formed rounded or squared.
MEASUREMENT AND PAYMENT – Each. In accordance with Section 951.4 and as follows:
• Includes span wire, span wire attachments, and lashing.
• Hydroexcavation paid for separately under item 9000-1028 HYDRO EXCAVATION FOR
TRAFFIC SIGNAL POLE FOUNDATIONS
ITEM 9000-1003 RELOCATE AND RECONNECT VIDEO SURVEILLANCE
CAMERA SYSTEM
DESCRIPTION – This work is to remove, store, and reinstall existing video surveillance cameras.
MATERIAL – Provide cable and mounting hardware in accordance with manufacturer’s recommendations.
CONSTRUCTION – Carefully remove and store surveillance camera equipment and cabling.