9000-0008_Removal_of_Existing_Signal_Pole.pdf
PDF 52 KB Posted
- Solicitation number
- 2026-IFB-105
- Issued by
- Allegheny County, Philadelphia City, Pennsylvania
About this file
This is a scope of work document for the City of Pittsburgh Department of Mobility & Infrastructure detailing Item 9000-0008, the removal of existing signal poles as part of the broader Beechwood/Linden/Wilkins and Brownsville/Maytide/Sankey traffic signal replacements project. The work encompasses the removal of existing steel pole supports along with excavation and backfill of pole foundations. Contractors must await City of Pittsburgh direction before removing any poles or foundations, carefully execute removal to prevent damage to surrounding areas, excavate foundations to a minimum of 2 feet below subgrade elevation, backfill with flowable concrete material Type D, and finish by placing sidewalk material matching the surrounding surface in material and color. All pole materials become the contractor's responsibility for disposal. Bids for the overall traffic signal replacement project are due July 15, 2026, with work conducted at four intersections across two locations in Allegheny County, Pennsylvania.
The project is subject to prevailing wage requirements under Davis-Bacon wage determination PA20260002, effective May 18, 2026, with electricians earning $49.11 per hour plus $36.79 fringe and linemen earning up to $68.06 per hour plus $31.43 fringe in Allegheny County. Executive Order 13706 paid sick leave requirements (one hour per 30 hours worked, up to 56 hours annually) and Executive Order 13658 minimum wage of $13.65 per hour through December 31, 2026, apply where not superseded by prevailing rates. Performance and payment bonds are required, and contractors must submit shop drawings to the City Municipal Traffic Engineer with manufacturer representatives present on-site for calibration and testing. A 30-day operational test period is mandated prior to project completion. Signal support materials and hardware are provided by the City, with contractors responsible for transportation from the City Zoo Yard and installation.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM 9000-0008 – REMOVAL OF EXISTING SIGNAL POLE
DESCRIPTION - This work is the removal of existing steel pole support along with the excavation and backfill of existing pole foundations as indicated and as directed.
MATERIAL - Flowable Backfill Type D - As specified in Section 220.
CONSTRUCTION –
a. Do not remove any pole(s) or foundation(s) until directed by City of Pittsburgh. Pole(s) are to be disposed of by the contractor.
b. Carefully remove the pole as directed. Repair any damage to the surrounding area incurred during removal to the satisfaction of Property Owner.
c. Remove foundations for steel poles a minimum of 2 feet below subgrade elevation.
d. Backfill with flowable concrete material or equal with no additional payment.
e. Finish by placing sidewalk material to match material and color of surrounding sidewalk.
MEASUREMENT AND PAYMENT – Each