This is a set of 90% design submittal documents for the East Ramp Rehabilitation Phase 1 project at the Orlando Executive Airport, prepared by Mead & Hunt for the Greater Orlando Aviation Authority (GOAA). The project involves rehabilitating the east ramp area, with a base bid covering the area south of the Airport Administration and Customs and Border Protection building, and an optional additive alternate covering an additional area to the east. The project is divided into multiple phases, with a total construction duration of 165 calendar days, including a 45-day Phase 0 for submittals and mobilization, a 60-day Phase 1 for base bid work, and a potential 60-day Phase 2 for the additive alternate.
The project includes comprehensive pavement rehabilitation, involving removal of existing asphalt and base course, subgrade preparation, and installation of new limerock base and asphalt pavement. The base bid covers approximately 14,475 square yards of pavement, while the additive alternate covers about 10,030 square yards. The scope includes electrical work such as removing and replacing existing lighting, installing new high mast light poles, and relocating electrical infrastructure. The project also involves installing new aircraft tie-downs, markings, and improving drainage infrastructure. The work will be conducted in a live airport environment, with specific safety and security requirements, and must maintain access for U.S. Customs and Border Protection operations throughout the construction period.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Electrical
Professional Seals
PROJECT DESIGN TEAM:
Engineer of Record:
PROJECT SUB-CONSULTANTS:
Mead & Hunt 4010 W Boy Scout Blvd, Suite 1000 Tampa, FL 33607 (813)-210-8740 Dave.Schmidgall@meadhunt.com
Structural
BP - 048
EAST RAMP REHABILITATION
PHASE 1
TIM WEISHEYER
DR. JOHN L. EVANS, JR.
M. CARSON GOOD
JOE NUNZIATA
THE HONORABLE BUDDY DYER
THE HONORABLE JERRY DEMINGS
STEPHANIE KOPELOUSOS
KEVIN J. THIBAULT
GOAA ENGINEERING DEPARTMENT
GOAA FACILITIES DEPARTMENT
CHAIRPERSON:
VICE CHAIRPERSON:
IMMEDIATE PAST CHAIR:
TREASURER:
BOARD MEMBERS:
CHIEF EXECUTIVE OFFICER:
Civil Support:
Electrical:
Survey:
Geotechnical:
Engineer
FL PE #
Engineer FL Reg #
LOCATION MAP
U
PD
AT
ED
O N
: 2
Ja n
, 1 2:
pm
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
IS
-0
.0
C ov er S he et
.d w g
ORLANDO EXECUTIVE AIRPORT
365 RICKENBACKER DRIVE
ORLANDO, FLORIDA 32803
24 JANUARY, 2025
90% DESIGN SUBMITTAL
John B. Webb & Associates 925 S Denning Dr Winter Park, FL 32789 (407)-622-9322
CERM, Inc.
4767 New Broad St, Suite 255 Orlando, FL 32814 (407)-514-2717
NADIC Engineering Services 601 N Hart Blvd Orlando, FL 32818 (407)-521-4771
The Ohmega Group, Inc.
25 N Market St, Suite 300A Jacksonville, FL 32202 (904)-807-6512
Mead and Hunt, Inc.
Civil
Engineer
FL PE #
PROJECT LOCATION
EAST RAMP
LEGEND:
ANTENNA
BENCHMARK
BOLLARD
CONTROL POINT
CHISELED X
CLEANOUT, SANITARY OR STORM
DOWNSPOUT
ELECTRICAL METER
ELECTRICAL / COMMUNICATIONS
PEDESTAL
ELECTRICAL TRANSFORMER BOX
ELECTRICAL SERVICE PANEL
ELECTRICAL HANDHOLE/PULLBOX
FIRE HYDRANT
FLAGPOLE
GAS METER
GAS VALVE
GATE
GUY WIRE
HANDHOLE, GENERIC
INLET, CURB
INLET, ROUND
INLET, SQUARE
IRON PIN
LIGHT POLE (DOUBLE)
LIGHT POLE (SINGLE)
MAILBOX
MANHOLE, ELECTRIC
MANHOLE, FIBER OPTIC
MANHOLE, SANITARY SEWER
MANHOLE, STORM SEWER
MANHOLE, TELECOMMUNICATIONS
MANHOLE, VALVE
MARKER, CABLE
MARKER, DUCT
PK or MAG NAIL
POWER POLE
POWER POLE, DOUBLE
POWER POLE WITH LIGHT
PVC PIPE
REBAR
SANITARY VALVE
SIGN (SINGLE POST)
SIGN (DOUBLE POST)
SHRUB
STORM FLARED END SECTION
STUMP
CTV PEDESTAL BOX
WATER VALVE
WATER SHUT OFF
WATER METER
WATER SURFACE
WELL
GAS
ELECTRIC, OVERHEAD
ELECTRIC, UNDERGROUND
EXISTING CONTOUR LINES
FENCE
FIBER OPTIC CABLE
HANDRAIL
PROPERTY LINE
SANITARY SEWER
STORM PIPE
SWALE
TELEPHONE
TV CABLE
WATER
VEGETATION
PROPOSED ASPHALT PAVEMENT
B
DS
ESP
HH
MBX
E
FO
S
ST
T
MHV
C
D
PVC
SV
CTV
W V
OSW
WM
WELL
G
OHE
x
FOC
o
SS
SD
T
TV
W
ABBREVIATIONS:
ALCMS AIRFIELD LIGHTING CONTROL AND MONITORING
SYSTEM
AMSL ABOVE MEAN SEA LEVEL
AOA AIRCRAFT OPERATIONS AREA
APPROX APPROXIMATE
ARFF AIRCRAFT RESCUE AND FIRE FIGHTING
ATCT AIR TRAFFIC CONTROL TOWER
BLDG BUILDING
CA
TEAM CONSTRUCTION ADMINISTRATION TEAM
C-C CENTER TO CENTER
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CONC CONCRETE
CKT CIRCUIT
CSPP CONSTRUCTION SAFETY PHASING PLAN
DIA DIAMETER
EG EXISTING GRADE
ELEV ELEVATION
EOP EDGE OF PAVEMENT
FAA FEDERAL AVIATION ADMINISTRATION
FBO FIXED BASE OPERATOR
FG FINISHED GRADE
FOD FOREIGN OBJECT DEBRIS
FT FEET
GAL GALLON
GND GROUND
GPM GALLONS PER MINUTE
HDPE HIGH DENSITY POLYETHYLENE
HMA HOT MIX ASPHALT
IE INVERT ELEVATION
ILS INSTRUMENT LANDING SYSTEM
IN INCHES
LF LINEAL FEET
LOC LOCALIZER
MIN MINIMUM
MITL MEDIUM INTENSITY TAXIWAY LIGHT
MPH MILES PER HOUR
NIC NOT IN CONTRACT
NOTAM NOTICE TO AIRMAN
NTS NOT TO SCALE
OAR OWNERS AUTHORIZED REPRESENTATIVE
OFZ OBJECT FREE ZONE
PAPI PRECISION APPROACH PATH INDICATOR
PCC PORTLAND CEMENT CONCRETE
PVC POLYVINYL CHLORIDE
QTY QUANTITY
R RADIUS
RCP REINFORCED CONCRETE PIPE
ROFA RUNWAY OBJECT FREE AREA
ROW RIGHT OF WAY
RSA RUNWAY SAFETY AREA
RWY OR
RW RUNWAY
SIDA SECURITY IDENTIFICATION DISPLAY AREA
SF SQUARE FOOT
SPCD SAFETY PLAN COMPLIANCE DOCUMENT
STA STATION
TWY TAXIWAY
TOFA TAXIWAY OBJECT FREE AREA
TSA TAXIWAY SAFETY AREA
TYP TYPICAL
OFA OBJECT FREE AREA
132.75
131.53
PROPOSED ELEVATION
EXISTING ELEVATION
ASPHALT DEMOLITION
EXISTING JUNCTION CAN
EXISTING WIRE AND CONDUIT
TO REMAIN
E
UGE
CB
CB
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
90% SUBMITTAL
No. Date Description
U
PD
AT
ED
O N
: 0
Fe b
, 8 :5
8a m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C
-IS
-0 .0
.2 L
EG
EN
D
N O
TE
S.
dw g
4664455-212152.02
N.T.S.
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
LOCATION MAP
X
X
X
X X
X
X X
X
X X
X
X
X
X
X
X
X
X X
X
X
US CUSTOMS AND BORDER PROTECTION
RESTRICTED AREA
US CUSTOMS AND BORDER PROTECTION
RESTRICTED AREA
US
C
US
TO
MS
A
ND
B
OR
DE
R
PR
OT
EC
TI
ON
RE
ST
RI
CT
ED
A
RE
A
PROJECT LOCATION
EAST RAMP
GENERAL NOTES
1. CONTRACTOR SHALL NOTIFY THE OAR OR ENGINEER IMMEDIATELY OF
ANY DISCREPANCIES IN THE LAYOUT AND SHALL NOT PROCEED UNTIL
CLARIFICATION IS PROVIDED.
2. THE CONTRACTOR IS ADVISED TO USE CAUTION WHEN OPERATING
TRUCKS OR OTHER CONSTRUCTION EQUIPMENT ON EXISTING
PAVEMENTS. EXISTING PAVEMENTS MAY NOT SUPPORT CONSTRUCTION
TRAFFIC. ANY DAMAGE TO EXISTING PAVEMENTS SHALL BE REPAIRED
AT THE CONTRACTOR'S EXPENSE.
3. WARNING: THERE ARE A NUMBER OF EXISTING UTILITIES, INCLUDING
DRAINAGE, ELECTRICAL, AND COMMUNICATIONS CABLES TRAVERSING
THE SITE. THE DESIGNER HAS ATTEMPTED TO DEPICT THE
APPROXIMATE LOCATIONS OF THESE ITEMS CURRENTLY IN PLACE. IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO HAVE EVERY
EXISTING ITEM LOCATED, FLAGGED, AND IDENTIFIED PRIOR TO START
UP OF CONSTRUCTION AND TO MAINTAIN VISIBLE LOCATION
THROUGHOUT THE CONSTRUCTION DURATION. THIS SHALL INCLUDE
COORDINATION WITH ALL NECESSARY AGENCIES INCLUDING THE
AIRPORT. ANY DAMAGE DONE SHALL BE THE RESPONSIBILITY OF THE
CONTRACTOR. THE CONTRACTOR SHALL REPAIR ANY UTILITY DAMAGED
DURING THE CONSTRUCTION BY THE CONTRACTOR'S OPERATIONS AT
NO COST TO THE AIRPORT.
INDEX OF DRAWINGS
SHEET NUMBER SHEET TITLE
IS-0.0.0 COVER SHEET
C-IS-0.0.1 SUMMARY OF QUANTITIES, INDEX OF DRAWINGS,
LEGEND & NOTES
C-2.1.1 OVERALL SITE PLAN
CD-3.1.1 EXISTING CONDITIONS AND DEMOLITION PLAN
C-1.1.1 SOIL BORING LOCATION PLAN
C-1.1.2 BORING LOGS - SHEET 1
C-1.1.3 BORING LOGS - SHEET 2
C-3.1.1 GEOMETRY & MARKING PLAN
C-9.1.1 TYPICAL SECTIONS
C-9.1.2 PAVING DETAILS
C-12.1.1 GRADING AND DRAINAGE PLAN - BASE BID
C-12.1.2 GRADING AND DRAINAGE PLAN - ADDITIVE ALTERNATE
C-15.1.1 DRAINAGE AND EROSION CONTROL DETAILS
C-40.1.1 MARKING DETAILS AND NOTES
C-60.0.1 CONTRACTOR LAYOUT AND OVERALL PHASING PLAN
C-60.0.2 PHASING PLAN - PHASE 1 - BASE BID
C-60.0.3 PHASING PLAN - PHASE 2 - ADDITIVE ALTERNATE
C-61.0.1 SAFETY AND SECURITY NOTES
C-61.0.2 SAFETY AND SECURITY DETAILS
S-1.1.1 LIGHT POLE FOUNDATION DETAILS
E0.01 ELECTRICAL LEGEND AND NOTES
E0.02 ELECTRICAL SPECIFICATIONS
E0.03 ELECTRICAL LIGHTING FIXTURE SCHEDULE
E1.01 APRON LIGHTING DEMOLITION PLAN
E1.02 APRON LIGHTING PLAN
E2.01 APRON LIGHTING PHOTOMETRIC PLAN
E5.01 ELECTRICAL DETAILS
E5.02 ELECTRICAL DETAILS
SUMMARY OF
QUANTITIES, INDEX
OF DRAWINGS,
LEGEND & NOTES
C-IS-0.0.1
RAD
ACC
DES
JANUARY 24, 2025
SUMMARY OF QUANTITIES - BASE BID
ITEM NO. ITEM DESCRIPTION UNIT QUANTITY
M-101.1 MOBILIZATION LS 1
M-102.2 SAFETY, SECURITY AND MAINTENANCE OF TRAFFIC LS 1
C-102.1 SILT FENCE INSTALLATION AND REMOVAL LF 750
C-102.2 INSTALL INLET PROTECTION (INLET SEDIMENT TRAP) EA 4
P-101.1 ASPHALT AND BASE REMOVAL, FULL DEPTH (VARIES, 6"-10") SY 14,475
P-101.2 TIEDOWN HOOK AND FOUNDATION REMOVAL EA 31
P-152.1 UNCLASSIFIED EXCAVATION (VARIES, 2"-4") CY 750
P-152.2 PREPARE SUBGRADE SY 14,475
P-152.3 UNSUITABLE EXCAVATION CY 500
P-211.1 LIMEROCK BASE COURSE (6" THICK) CY 2,413
P-401.1 4" ASPHALT PAVEMENT (2-2" LIFTS) TON 3,350
P-602.1 EMULSIFIED ASPHALT, PRIME COAT GAL 4,500
P-603.1 EMULSIFIED ASPHALT, TACK COAT GAL 1,050
P-620.2 PERMANENT PAVEMENT MARKINGS SF 1,500
P-620.3 TEMPORARY PAVEMENT MARKINGS SF 400
SUMMARY OF QUANTITIES - ADDITIVE ALTERNATE
ITEM NO. ITEM DESCRIPTION UNIT QUANTITY
M-101.1 MOBILIZATION LS 1
M-102.2 SAFETY, SECURITY AND MAINTENANCE OF TRAFFIC LS 1
C-102.1 SILT FENCE INSTALLATION AND REMOVAL LF 350
C-102.2
INSTALL INLET PROTECTION (INLET SEDIMENT
TRAP) EA 4
P-101.1
ASPHALT AND BASE REMOVAL, FULL DEPTH
(VARIES, 5.5"-10") SY 10,030
P-101.2 TIEDOWN HOOK AND FOUNDATION REMOVAL EA 75
P-152.1 UNCLASSIFIED EXCAVATION (VARIES, 3"-6") CY 1,500
P-152.2 PREPARE SUBGRADE SY 10,030
P-152.3 UNSUITABLE EXCAVATION CY 500
P-211.1 LIMEROCK BASE COURSE (6" THICK) CY 1,700
P-401.1 4" ASPHALT PAVEMENT (2-2" LIFTS) TON 2,300
P-602.1 EMULSIFIED ASPHALT, PRIME COAT GAL 3,200
P-603.1 EMULSIFIED ASPHALT, TACK COAT GAL 850
260502-1
ELECTRICAL DISTRIBUTION INCLUDING NEW
CONDUIT, CABLE, FROM EXISTING LIGHTPOLE
LOCATION TO NEW CONNECTION POINT INCLUDING
TRENCHING, JUNCTIONS CANS, CONNECTIONS AND
ALL ASSOCIATED WORK
LS 1
260502-2
NEW HIGH MAST LIGHT INSTALLED IN CONCRETE
FOUNDATION- INCLUDES DEMOLTION OF EXISTING
POLE, FOUNDATION, AND ALL ASSOCIATED
CONNECTIONS
LS 1
P-620.1 INSTALL NEW TIEDOWN HOOK AND FOUNDATION EA 45
U .S.
C U
STO
M
S AN
D
BO
R
D
ER
PR
O
TEC
TIO
N R
ESTR
IC
TED
AR
EA
U .S
C
U
ST
O M
S
AN
D B
O R
D
ER
P R
O
TE
C
TI
O N
R
ES
TR
IC
TE
D
A R
EA
U.S. CUSTOMS AND BORDER PROTECTION
RESTRICTED AREA
D
D
D
D
D
D
D
FAA FAA
FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA
DD
D
S
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X X X
X X X
X X
LAKE G
EO
RG
ETTE LN
RICKENBACKER DR FAIRGREEN ST
LAKE
GEORGETTE
RUNWAY 7-25
TAXIWAY A
ATLANTIC
AVIATION
EXISTING APRON
AIRPORT ADMIN.
AND CBP
MOOG FTS HANGAR
SAS T-HANGAR
SAS T-HANGAR
SAS T-HANGAR
SAS T-HANGAR
COLONIAL PROMENADE
SHOPPING CENTER
TAXIWAY A3
TAXIW
AY A4
TA
XI
W
AY
A
BASE BID
ADDITIVE
ALTERNATE
00 100 200
1. THE BASE BID IS THE
REHABILITATION OF
THE EAST RAMP
SOUTH OF THE
AIRPORT
ADMINISTRATION
AND CUSTOMS
BUILDING .
2. THE ADDITIVE
ALTERNATE IS THE
REHABILITATION OF
THE EAST RAMP TO
THE EAST OF THE
BASE BID.
3. THE OWNER MAY OR
MAY NOT ELECT TO
AWARD THE ADDITIVE
ALTERNATE BASED ON
PROJECT FUNDING.
ISSUED FOR
CONSTRUCTION
PLANS WILL BE
MODIFIED TO
REFLECT THE
AWARDED BID
SCHEDULE(S).
4. SEE SHEET C-61.0.1
FOR STAGING AREAS,
HAUL ROUTES, AND
PHASING
INFORMATION.
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
90% SUBMITTAL
No. Date Description
U
PD
AT
ED
O N
: 2
Ja n
, 1 :0
9p m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -2
.1 .1
O ve ra ll
Si te
P la n.
dw g
4664455-212152.02
N.T.S.
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
OVERALL SITE
PLAN
C-2.1.1
RAD
ACC
NOTES
LEGEND
BASE BID PROJECT
LIMITS
ADDITIVE
ALTERNATE
PROJECT LIMITS
D
D
D
D
D
D
FAA FAA FAA
FAA
FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
D
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
X
X
X
X
X
US CUSTOMS AND BORDER PROTECTION
RESTRICTED AREA
U S C
U S
TO
M S A
N D
B O
R D
ER
PR
O
TEC
TIO
N
R
ES
TR
IC
TED
A
R
EA
U S C
U S
TO
M S A
N D
B O
R D
ER
P
R O
TE
C
TI
O N
R
ES
TR
IC
TE
D
A R
EA
AIRPORT ADMIN.
AND CBP
EXISTING DRAINAGE
CATCH BASIN TO
REMAIN
TOP EL. = 111.39'
EXISTING
MANHOLE TO
REMAIN
RIM EL. = 111.52'
EXISTING SEWER MANHOLE
RIM EL. = 111.60'
EXISTING CATCH BASIN
TOP EL. = 107.25'
EXISTING CATCH BASIN
TOP EL. = 107.26'
EXISTING MANHOLE
TO REMAIN
RIM EL. = 111.52'
EXISTING
MANHOLE TO
REMAIN
TOP EL. = 111.84'
EXISTING MANHOLE
TO REMAIN
TOP EL. = 111.78'
110.5
111.5
109.5
108.5
107.5
7.5
108.5
107.5 107.5 108 108.5
108.5
109.5
112.5
111.5 111.5
111.5
110.5
111.5111
111 111.5
109.5
EXISTING DRAINAGE
CATCH BASIN TO
REMAIN
TOP EL. = 111.28'
PAVEMENT SAWCUT
INSTALL
INLET
PROTECTION
INSTALL
INLET
PROTECTION
EXISTING
REFLECTIVE
PAVEMENT MARKER
TO BE REMOVED
EXISTING
CONCRETE
FLUME TO
REMAIN
0.
5'
PAVEMENT REMOVAL
N: 1532427.02 E: 549834.94
PAVEMENT REMOVAL
N: 1532094.58 E: 549977.01
PAVEMENT REMOVAL
N: 1531952.58 E: 549644.16
N:1531977.58 E:549732.48
N:1532123.42 E:550070.72
EXISTING CATCH BASIN
TOP EL. = 109.76'
EXISTING CATCH BASIN
TOP EL. = 111.75'
EXISTING CATCH BASIN
TOP EL. = 112.74'
N:1531944.74 E:549726.83
N:1531934.27 E:549637.92
N:1532283.41 E:549488.86
PAVEMENT REMOVAL
N: 1531984.24 E: 549718.24
N:1531948.54 E:549636.95
PAVEMENT SAWCUT
PAVEMENT REMOVAL
N: 1532415.70
E: 549806.76
PAVEMENT REMOVAL
N: 1532401.02
E: 549774.20
INSTALL
SILT FENCE
TA
XI
W
AY
A
EXISTING AIRPLANE
TIE DOWN AND
FOUNDATION TO BE
REMOVED (TYP.)
PAVEMENT SAWCUT
EXISTING LIGHT POLE TO BE
REMOVED AND REPLACED -
SEE ELECTRICAL DRAWINGS
FOR ADDITIONAL
INFORMATION
PAVEMENT REMOVAL
N: 1532524.99 E: 550064.95
PAVEMENT REMOVAL
N: 1532193.53
E: 550206.60
N:1532214.69 E:550284.29
250'
361'
GRAVEL ACCESS TO
LAKE GEORGETTE LN
00 30 60
ASPHALT
PAVEMENT
REMOVAL
(BASE BID)
ASPHALT
PAVEMENT
REMOVAL
(ADDITIVE
ALTERNATE)
PAVEMENT
SAWCUT
DEMOLITION
/REMOVAL
INLET
PROTECTION
SILT FENCE
AIRPLANE
TIE DOWN
ANCHOR
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
90% SUBMITTAL
No. Date Description
U
PD
AT
ED
O N
: 2
Ja n
, 4 :3
8p m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C D
-3 .1
.1 E
XI
ST
IN
G
C O
N D
IT
IO
N S
AN
D
D
EM
O
LI
TI
O
N P
LA
N
.d w g
4664455-212152.02
N.T.S.
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
LEGEND
NOTES
1. ALL AIRPLANE TIE
DOWN LOCATIONS
SHOWN ARE
APPROXIMATE
LOCATIONS.
CONTRACTOR SHALL
FIELD VERIFY THAT
ALL TIE-DOWNS AND
FOUNDATIONS HAVE
BEEN REMOVED PRIOR
TO PAVEMENT
MILLING. TIE DOWNS
AND CONCRETE TO BE
DISPOSED OF
OFF-SITE.
2. CONTRACTOR SHALL
MAINTAIN AND
PROTECT ALL
EXISTING SIGNS,
LIGHTS, EXISTING
UTILITIES, AND
CIRCUITS UNLESS
OTHERWISE NOTED IN
THE DEMOLITION
PLANS.
EXISTING
CONDITIONS AND
DEMOLITION
PLAN
CD-3.1.1
RAD
ACC
EXISTING
CONDITIONS AND
DEMOLITION
PLAN
CD-3.1.1
RAD
ACC
D
D
D
D
D
FAA FAA FAA
FAA
FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
D
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
X
X
X
X
X
X
US CUSTOMS AND BORDER PROTECTION
RESTRICTED AREA
U S C
U S
TO
M S A
N D
B O
R D
ER
PR
O
TEC
TIO
N
R
ES
TR
IC
TED
A
R
EA
U S C
U S
TO
M S A
N D
B O
R D
ER
P
R O
TE
C
TI
O N
R
ES
TR
IC
TE
D
A R
EA
AIRPORT ADMIN.
AND CBP
B-1
B-4
B-2 B-3
B-5
B-8
B-10
B-7
B-9
B-6
TA
XI
W
AY
A
PHASE LIMIT BETWEEN
BASE BID AND
ADDITIVE ALTERNATE
HANGAR ACCESS
TAXILANE
00 30 60
NOTES
1. SEE GEOTECHNICAL
REPORT IN PROJECT
MANUAL FOR
ADDITIONAL
INFORMATION ON
PAVEMENT AND
BORING LOG DATA.
2. RESULTS SHOWN
REPRESENT ONLY
THE LOCATIONS
BORED.
CONTRACTOR MAY
ENCOUNTER
VARYING
CONDITIONS DURING
CONSTRUCTION.
BORING
LOCATION
PROJECT
LIMITS
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
90% SUBMITTAL
No. Date Description
U
PD
AT
ED
O N
: 0
Ja n
, 2 :4
7p m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -1
.1 .3
B O
R
IN
G L
O G
S
- S
H
EE
T 2.
dw g
4664455-212152.02
N.T.S.
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
SOIL BORING
LOCATION PLAN
C-1.1.1
RAD
ACC
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
90% SUBMITTAL
No. Date Description
U
PD
AT
ED
O N
: 0
Ja n
, 2 :4
7p m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -1
.1 .3
B O
R
IN
G L
O G
S
- S
H
EE
T 2.
dw g
4664455-212152.02
N.T.S.
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
BORING LOGS -
SHEET 1
C-1.1.2
RAD
ACC
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
90% SUBMITTAL
No. Date Description
U
PD
AT
ED
O N
: 0
Ja n
, 2 :4
7p m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -1
.1 .3
B O
R
IN
G L
O G
S
- S
H
EE
T 2.
dw g
4664455-212152.02
N.T.S.
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
BORING LOGS -
SHEET 2
C-1.1.3
RAD
ACC
C U
STO
M
S AN
D
BO
R
D
ER
PR
O
TEC
TIO
N R
ESTR
IC
TED
AR
EA
U .S
C
U
ST
O M
S
AN
D B
O R
D
ER
P R
O
TE
C
TI
O N
R
ES
TR
IC
TE
D
A R
EA
U.S. CUSTOMS AND BORDER PROTECTION
RESTRICTED AREA
D
D
D
D
FAA FAA FAA
FAA
FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
D
SD SD
SD
SD
SD
SD
S
X
X X
AIRPORT ADMIN.
AND CBP
361'
BASE BID
A-A
C-9.1.1
B-B
C-9.1.1
N:1532427.02 E:549834.94
N:1531952.88 E:549644.87
N:1532283.92 E:549503.39
0'
150'
0'
11'
80'
PROPOSED DOUBLE HEADED
AIRCRAFT PARKING POSITION
MARKING - SEE DETAIL 3
SHEET C-40.1.1
PROPOSED US
CUSTOMS
CONTAINMENT
MARKING - SEE DETAIL
5 SHEET C-40.1.1
PROPOSED AIRCRAFT
TIE DOWN - SEE
DETAIL 1 SHEET
C-40.1.1
PROPOSED
NON-MOVEMENT AREA
MARKING - SEE DETAIL
2 SHEET C-40.1.1
PROPOSED SURFACE
PAINTED INDICATOR
MARKING -SEE DETAIL 4
SHEET C-40.1.1
TA
XI
W
AY
A
N:1532419.93 E:549821.66
N:1532088.89 E:549963.13
N:1532309.25 E:549731.82
N:1532273.88 E:549649.06
N:1532183.99 E:549687.47
N:1532219.36 E:549770.23
100'
30'
30'
N:1532010.72 E:549667.28
25'
TYP.
TY
P.50'
TYP.
N:1532104.77 E:549986.25
N:1532118.27 E:549966.89
N:1532431.72 E:549849.25
N:1532524.99 E:550064.95
N:1532193.53 E:550206.60
N:1532094.58 E:549977.01
250'
ADDITIVE ALTERNATE
0'
N:1532427.02 E:549834.94
N:1532185.61 E:550188.23
N:1532517.03 E:550046.60
PROPOSED AIRCRAFT
TIE DOWN (TYP.) -
SEE DETAIL 1 SHEET
C-40.1.1
N:1532100.68 E:549990.72
90.00'
6.
PROPOSED HIGH MAST
LIGHT POLE - SEE
ELECTRICAL DRAWINGS
AND SHEET S-1.1.1 FOR
ADDITIONAL
INFORMATION
00 30 60
LEGEND
PROPOSED
AIRCRAFT
TIE
DOWN
NOTES
1. SEE TYPICAL
SECTION AND
PAVEMENT DETAIL
SHEETS C-9.1.1
AND C-9.1.2 FOR
PROPOSED
PAVEMENT
REHABILITATION.
2. LOCATION OF ALL
NEW TIE DOWNS
SHALL BE
CONFIRMED WITH
OAR AND/OR
ENGINEER PRIOR
TO INSTALLATION.
3. ALL MARKINGS ARE
LOCATED WITHIN
THE BASE BID
AREA. THERE ARE
NO MARKINGS
ASSOCIATED WITH
THE ADDITIVE
ALTERNATE.
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
90% SUBMITTAL
No. Date Description
U
PD
AT
ED
O N
: 2
Ja n
, 1 1:
am
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -3
.1 .1
G
EO
M
ET
R Y
M
AR
KI
N G
P
LA
N .d w g
4664455-212152.02
N.T.S.
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
GEOMETRY &
MARKING PLAN
C-3.1.1
RAD
ACC
BASE BID PROJECT
LIMITS
ADDITIVE
ALTERNATE
PROJECT LIMITS
VARIES
(0.7% TO 1.0%)
5%
EXISTING CONCRETE
CHANNEL TO REMAIN
ELEVATION VARIES:
112.6' TO 110.8'
ELEVATION
VARIES:
109.0' TO 108.0'
PROPOSED
APRON
PAVEMENT
SECTION-SEE
SHEET C-9.1.2
EXISTING
GRADE
PROPOSED
GRADE
BASE BID
PROJECT LIMITS
EXISTING
EAST RAMP
(TO REMAIN)
PROPOSED ELEVATION VARIES:
111.8' TO 108.2'
EXISTING
EDGE OF
PAVEMENT VARIES
(0.0% TO 0.7%)
PROPOSED ELEVATION
VARIES:
112.7' TO 108.5'
5%
PROPOSED APRON
PAVEMENT SECTION-SEE
SHEET C-9.1.2
TIE INTO EXISTING
PAVEMENT - SEE DETAIL
4 SHEET C-9.1.2
EXISTING
GRADE
PROPOSED
GRADE
ADDITIVE ALTERNATE
PROJECT LIMITS
SEE NOTE 1
TYPICAL SECTION A-A1 NOT TO SCALE
TYPICAL SECTION B-B2 NOT TO SCALE
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
90% SUBMITTAL
No. Date Description
U
PD
AT
ED
O N
: 2
Ja n
, 1 :5
1p m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -9
.1 .2
P
AV
IN
G
D
ET
AI
LS
.d w g
4664455-212152.02
N.T.S.
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
TYPICAL
SECTIONS
C-9.1.1
RAD
ACC
NOTES
1. PAVEMENT ELEVATIONS AT THIS BOUNDARY SHALL BE
DEPENDENT ON IF THE ADDITIVE ALTERNATE IS CHOSEN TO BE
AWARDED. GRADING PLANS HAVE BEEN PROVIDED FOR BOTH
SCENARIOS AND BASED UPON THE AWARDED BID SCHEDULES
ONE OF THE GRADING PLANS WILL BE INCLUDED IN THE ISSUED
FOR CONSTRUCTION PLANS.
2.5" - 4" ASPHALT
PAVEMENT
3" - 5" LIMEROCK
BASE COURSE
EXISTING SUBGRADE
2.5" - 4" EXISTING
ASPHALT TO BE REMOVED
(P-101.1) - SEE NOTE 1
3" - 4" LIMEROCK BASE
COURSE TO BE REMOVED
AND DISPOSED OFFSITE
(P-101.1)
EXISTING SUBGRADE
B
EL
O W
F
IN
IS
H
ED
G
R A D
E (S
EE
N
O
TE
VARIABLE DEPTH
SUBGRADE TO BE
REMOVED AND
DISPOSED OF
OFFSITE (P-152.1)
4" ASPHALT PAVEMENT
2 - 2" LIFTS (P-401.1)
6" LIMEROCK BASE
COURSE (P-211.1)
EXISTING SUBGRADE
TO BE COMPACTED
(P-152.2) - SEE
NOTES 2 AND 4
EXISTING PAVEMENT SECTION1 NOT TO SCALE
DEMOLITION SECTION2 NOT TO SCALE
PROPOSED PAVEMENT SECTION3 NOT TO SCALE
4" ASPHALT PAVEMENT (P-401)
6" LIMEROCK BASE COURSE (P-211)
COMPACTED SUBGRADE
EXISTING 2.5" - 4"
ASPHALT
EXISTING
3" - 4"
LIMEROCK
BASE
COURSE
EXISTING
SUBGRADE
2'
PAVEMENT
TIE-IN
EXISTING
RAMP
ASPHALT
PROPOSED
RAMP
ASPHALT
NOTES
1. THE EXISTING ASPHALT RAMP WAS PREVIOUSLY
SEAL COATED WITH A APPROXIMATELY 1/8" THICK
SEALANT PRODUCT. THE CONTRACTOR MAY
CHOOSE TO REMOVE THIS LAYER PRIOR TO FULL
DEPTH MILLING IN ORDER TO PRESERVE THE
QUALITY OF EXISTING MILLINGS. THIS SHALL BE
DONE AT THE CONTRACTORS DISCRETION AND NO
SEPARATE PAYMENT SHALL BE MADE FOR THIS
WORK.
2. TOP 12" OF EXISTING SUBGRADE TO BE
COMPACTED TO AT LEAST 98% OF MODIFIED
PROCTOR MAXIMUM DRY DENSITY (ASTM D-1557)
3. DEMOLITION SHALL CONSIST OF REMOVAL OF
EXISTING ASPHALT, BASE COURSE, AND SUBGRADE
(AS NECESSARY) TO A DEPTH OF 10" BELOW
PROPOSED GRADES SO THAT THE NEW PAVEMENT
SECTION CAN BE CONSTRUCTED. DEMOLITION
DEPTHS SHALL BE COORDINATED WITH GRADING
PLAN.
4. A PAY ITEM(P-152.3) HAS BEEN ESTABLISHED FOR
UNSUITABLE EXCAVATION IN THE EVENT THAT
UNSUITABLE / MUCK MATERIAL IS DISCOVERED
AFTER THE REMOVAL OF EXISTING SUBGRADE. IF
REQUIRED SUBGRADE COMPACTION CANNOT BE
ACHIEVED DUE TO THESE MATERIALS THIS PAY
ITEM SHALL BE UTILIZED FOR THE REMOVAL AND
REPLACEMENT OF THIS MATERIAL. PRIOR
APPROVAL FROM THE OAR OR ENGINEER IS
REQUIRED BEFORE ANY WORK RELATED TO THIS
WORK CAN COMMENCE.
PAVEMENT CONNECTION DETAIL4 NOT TO SCALE
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
90% SUBMITTAL
No. Date Description
U
PD
AT
ED
O N
: 2
Ja n
, 1 :5
1p m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -9
.1 .2
P
AV
IN
G
D
ET
AI
LS
.d w g
4664455-212152.02
N.T.S.
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
PAVING DETAILS
C-9.1.2
RAD
ACC
D
D
D
D
D
FAA FAA FAA
FAA
FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
D
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
X
X
X
X
X
AIRPORT ADMIN.
AND CBP
EXISTING SEWER MANHOLE
RIM EL. = 111.60'
EX. DRAINAGE CONTROL
BASIN
TOP EL. = 111.28'
MATCH EXISTING GRADE
SEE PAVEMENT CONNECTION
DETAIL SHEET C-9.1.2
EXISTING CATCH BASIN
TOP EL. = 109.76'
EXISTING CATCH BASIN
TOP EL. = 111.75'
EXISTING CATCH BASIN
TOP EL. = 112.74'
.2
3'
TY
P.
25'
TYP.
11.30'
108.16
108.49
108.66
108.84
109.01
109.19
109.36
109.54
109.71
109.89
110.06
110.24
110.41
110.59
110.76
108.50
108.65
108.83
109.00
109.18
109.35
109.53
109.70
109.88
110.05
110.22
110.40
110.57
110.75
110.92
108.56
108.69
108.87
109.07
109.25
109.44
109.62
109.81
109.99
110.18
110.36
110.54
110.73
110.91
111.10
108.40
108.63
108.85
109.05
109.26
109.46
109.66
109.86
110.06
110.27
110.47
110.67
110.87
111.08
111.27
108.33
108.61
108.82
109.04
109.26
109.48
109.70
109.92
110.14
110.36
110.57
110.79
111.01
111.23
111.45
108.31
108.55
108.79
109.02
109.26
109.50
109.73
109.97
110.21
110.44
110.68
110.92
111.15
111.39
111.63
108.31
108.54
108.78
109.02
109.26
109.50
109.74
109.98
110.22
110.45
110.69
110.93
111.17
111.41
111.65
108.31
108.54
108.78
109.02
109.26
109.50
109.74
109.98
110.22
110.45
110.69
110.93
111.17
111.41
111.65
108.31
108.54
108.78
109.02
109.26
109.50
109.74
109.98
110.22
110.45
110.69
110.93
111.17
111.41
111.65
108.31
108.54
108.78
109.02
109.26
109.50
109.74
109.98
110.22
110.45
110.69
110.93
111.17
111.41
111.65
108.34
108.58
108.82
109.05
109.29
109.52
109.76
110.00
110.23
110.47
110.70
110.94
111.18
111.41
111.65
108.38
108.61
108.85
109.08
109.31
109.55
109.78
110.02
110.25
110.48
110.72
110.95
111.18
111.42
111.65
108.42
108.65
108.88
109.11
109.34
109.57
109.80
110.03
110.27
110.50
110.73
110.96
111.19
111.42
111.65
108.46
108.68
108.91
109.14
109.37
109.60
109.83
110.05
110.28
110.51
110.74
110.97
111.20
111.42
111.65
8.
8.
8.
9.
9.
9.
9.
0.
0.
0.
0.
1.
1.
1.
1.
110.83 110.99
111.17 111.35
111.54 111.72
111.74 111.74
111.74 111.74
111.74 111.74
111.74 111.74
108.48
108.78
109.03
109.27
109.50
109.71
109.93
110.16
110.41
110.62
110.85
111.06
111.28
111.50
111.66 111.76
EXISTING
CONCRETE
FLUME TO
REMAIN
EXISTING CATCH BASIN
TOP EL. = 107.25'
10'
EXISTING
MANHOLE TO
REMAIN
RIM EL. = 111.52'
EXISTING DRAINAGE
CONTROL BASIN TO
REMAIN TOP EL. = 111.39'
110.5
111.5
109.5
108.5 109
109.5
110.5
111.5
112.5
TA
XI
W
AY
A
EXISTING MANHOLE
RIM EL. = 111.52'
MATCH EXISTING
GRADE
SEE PAVEMENT
CONNECTION DETAIL
SHEET C-9.1.2
EXISTING CATCH BASIN
TOP EL. = 107.26'
00 30 60
NOTES
1. NEW RAMP GRADES
HAVE BEEN
ESTABLISHED TO
PROVIDE A
CONSISTENT CROSS
SLOPE FOR THE NEW
PAVEMENT.
2. IF ADDITIVE
ALTERNATE IS
AWARDED THIS SHEET
WILL BE REMOVED
FROM THE CONTRACT
DOCUMENTS AND
SHEET C-12.1.2 SHALL
BE UTILIZED.
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
90% SUBMITTAL
No. Date Description
U
PD
AT
ED
O N
: 2
D ec
4, :3 3p m , B y:
D ra w in g Pa th : X
:\4
\2
2.
\T
EC
H
\C
AD
\D ra w in gs \S he et s\ C
-1 2.
1.
G R
AD
IN
G A
N D
D R
AI
N
AG
E
PL
AN
BA
SE
B
ID
.d w g
4664455-212152.02
N.T.S.
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
GRADING AND
DRAINAGE PLAN
- BASE BID
C-12.1.1
RAD
ACC
D
D
D
D
D
FAA FAA FAA FAA
FAA
FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA FAA
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
D
SD SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
X
X
X
X
X
X X
AIRPORT ADMIN.
AND CBP
111.5
110.5
109.5
112.5
MATCH EXISTING
GRADE SEE
PAVEMENT
CONNECTION
DETAIL 4 SHEET
C-9.1.2
108.73
108.96
109.18
109.41
109.63
109.86
110.08
110.31
110.53
110.76
110.98
111.20
111.43
111.65
108.59
108.81
109.04
109.27
109.49
109.72
109.94
110.17
110.40
110.62
110.85
111.07
111.30
111.52
111.75
108.67
108.89
109.12
109.35
109.57
109.80
110.02
110.25
110.48
110.70
110.93
111.16
111.38
111.61
111.84
108.97
109.20
109.43
109.66
109.88
110.11
110.34
110.56
110.79
111.02
111.25
111.47
111.70
111.93
109.05
109.28
109.51
109.74
109.97
110.20
110.42
110.65
110.88
111.11
111.34
111.56
111.79
112.02
109.13
109.36
109.59
109.82
110.05
110.28
110.51
110.74
110.97
111.19
111.42
111.65
111.88
112.11
109.21
109.44
109.67
109.90
110.13
110.36
110.59
110.82
111.05
111.28
111.51
111.74
111.97
112.20
109.29
109.52
109.75
109.98
110.22
110.45
110.68
110.91
111.14
111.37
111.60
111.83
112.06
112.29
109.37
109.60
109.83
110.07
110.30
110.53
110.76
110.99
111.22
111.46
111.69
111.92
112.15
112.38
109.45
109.68
109.91
110.15
110.38
110.61
110.84
111.08
111.31
111.54
111.77
112.01
112.24
112.47
109.65
109.86
110.09
110.36
110.60
110.83
111.03
111.26
111.45
111.70
111.89
112.09
112.31
112.58
108.75 108.83
108.91 108.99
109.06 109.14
109.22 109.3225
.2 3'
TY
P. 25'
TYP.
111.73 111.84
111.93 112.02
112.11 112.20
112.30 112.39
112.47 112.57
112.66
.3
10.00' 11.00'
EXISTING DRAINAGE
CONTROL BASIN TO
REMAIN
TOP EL. = 111.39'
EXISTING
MANHOLE TO
REMAIN
RIM EL. = 111.52'
EXISTING SEWER MANHOLE
RIM EL. = 111.60'
EXISTING CATCH BASIN
TOP EL. = 107.25'
EXISTING CATCH BASIN
TOP EL. = 107.26'
EXISTING
MANHOLE TO
REMAIN
RIM EL. = 111.52'
EXISTING DRAINAGE
CONTROL BASIN TO
REMAIN
TOP EL. = 111.28'
EXISTING CATCH BASIN
TOP EL. = 109.76'
EXISTING CATCH
BASIN
TOP EL. = 111.75'
EXISTING CATCH BASIN
TOP EL. = 112.74'
EXISTING
CONCRETE
FLUME TO
REMAIN
EXISTING
RAMP
TA
XI
W
AY
A
110.0
110.5 111.0
111.5
109.5
109.0
108.5
108.16
108.49
108.66
108.84
109.01
109.19
109.36
109.54
109.71
109.89
110.06
110.24
110.41
110.59
110.76
108.50
108.65
108.83
109.00
109.18
109.35
109.53
109.70
109.88
110.05
110.22
110.40
110.57
110.75
110.92
108.56
108.69
108.87
109.07
109.25
109.44
109.62
109.81
109.99
110.18
110.36
110.54
110.73
110.91
111.10
108.40
108.63
108.85
109.05
109.26
109.46
109.66
109.86
110.06
110.27
110.47
110.67
110.87
111.08
111.27
108.33
108.61
108.82
109.04
109.26
109.48
109.70
109.92
110.14
110.36
110.57
110.79
111.01
111.23
111.45
108.31
108.55
108.79
109.02
109.26
109.50
109.73
109.97
110.21
110.44
110.68
110.92
111.15
111.39
111.63
108.31
108.54
108.78
109.02
109.26
109.50
109.74
109.98
110.22
110.45
110.69
110.93
111.17
111.41
111.65
108.31
108.54
108.78
109.02
109.26
109.50
109.74
109.98
110.22
110.45
110.69
110.93
111.17
111.41
111.65
108.31
108.54
108.78
109.02
109.26
109.50
109.74
109.98
110.22
110.45
110.69
110.93
111.17
111.41
111.65
108.31
108.54
108.78
109.02
109.26
109.50
109.74
109.98
110.22
110.45
110.69
110.93
111.17
111.41
111.65
108.34
108.58
108.82
109.05
109.29
109.52
109.76
110.00
110.23
110.47
110.70
110.94
111.18
111.41
111.65
108.38
108.61
108.85
109.08
109.31
109.55
109.78
110.02
110.25
110.48
110.72
110.95
111.18
111.42
111.65
108.42
108.65
108.88
109.11
109.34
109.57
109.80
110.03
110.27
110.50
110.73
110.96
111.19
111.42
111.65
108.46
108.68
108.91
109.14
109.37
109.60
109.83
110.05
110.28
110.51
110.74
110.97
111.20
111.42
111.65
8.4
8.7
8.9
9.1
9.4
9.6
9.8
0.0
0.3
0.5
0.7
0.9
1.2
1.4
1.6
110.83 110.99
111.17 111.35
111.54 111.72
111.74 111.74
111.74 111.74
111.74 111.74
111.74 111.74
108.51
108.73
108.96
109.18
109.41
109.63
109.86
110.08
110.31
110.53
110.76
110.98
111.20
111.43
111.65 111.73
00 30 60
NOTES
1. NEW RAMP GRADES HAVE BEEN ESTABLISHED TO
PROVIDE A CONSISTENT CROSS SLOPE FOR THE NEW
PAVEMENT.
2. THIS SHEET SHALL BE UTILIZED ONLY IF ADDITIVE
ALTERNATE IS AWARDED. IF ONLY BASE BID AWARDED,
THIS SHEET SHALL BE REMOVED FROM THE CONTRACT
DOCUMENTS AND SHEET C-12.1.1 SHALL BE UTILIZED
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
90% SUBMITTAL
No. Date Description
U
PD
AT
ED
O N
: 1
Ja n
, 1 1:
am
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -1
2.
1.
G
R
AD
IN
G
A N
D D
R
AI
N
AG
E
PL
AN
AD
D
IT
IV
E
AL
TE
R
N
AT
E.
dw g
4664455-212152.02
N.T.S.
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
GRADING AND
DRAINAGE PLAN
- ADDITIVE
ALTERNATE
C-12.1.2
RAD
ACC
BASE BID
PROJECT
LIMITS
ADDITIVE
ALTERNATE
PROJECT
LIMITS
GRATE
FILTER FABRICFILTER FABRIC
DRAINAGE FRAME
DRAINAGE FRAME
GRATE
ATTACH THE FILTER FABRIC TO THE POSTS
AND EXTEND IT INTO THE TRENCH.
4. EXTENSION OF FABRIC AND
WIRE INTO THE TRENCH.
2.1. SET POSTS AND EXCAVATE A 4"x4" TRENCH
UPSLOPE ALONG THE LINE OF POSTS.
BACKFILL AND COMPACT THE EXCAVATED SOIL.
4" 4"
FILTER FABRIC
3.
GENERAL EROSION CONTROL NOTES
1. THE PURPOSE OF EROSION CONTROL IS TO PREVENT POLLUTION OF BODIES OF WATER ON OR ADJACENT TO THE PROJECT SITE. IN ADDITION, EROSION CONTROL SHALL PREVENT DAMAGE TO ADJACENT PROPERTY, AIRPORT PROPERTY AND WORK IN PROGRESS.
2. ALL EROSION AND SILTATION MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN GRADING. CARE AND MAINTENANCE OF EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH DRAWINGS, TECHNICAL SPECIFICATIONS, APPROVED STORMWATER POLLUTION PREVENTION PLAN (SWPPP) OR AS DIRECTED BY THE
CONSTRUCTION MANAGER.
3. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO INSPECT ALL EROSION CONTROL DEVICES PERIODICALLY AND AFTER EVERY RAINFALL. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY.
4. CONTRACTOR IS RESPONSIBLE FOR DEVELOPING, SUBMITTING FOR APPROVAL, IMPLEMENTING AND MAINTAINING A STORM WATER POLLUTION PREVENTION PLAN
(SWPPP).
5. ALL STREAM CROSSINGS AND STREAM DIVERSIONS REQUIRE ENVIRONMENTAL APPROVAL PRIOR TO ANY INSTREAM CONSTRUCTION.
6. CONTRACTOR SHALL SUBMIT AND RECEIVE APPROVAL ON THROUGH THE SHOP DRAWING SUBMITTAL PROCESS AN EROSION CONTROL AND DUST CONTROL PLAN PRIOR TO ANY LAND DISTURBING ACTIVITY. EROSION CONTROL PLAN SHALL INCLUDE PROPOSED LOCATION OF SILT FENCE, INLET/OUTLET PROTECTION, AND OTHER EROSION
CONTROL MEASURES AS NECESSARY.
SODDING NOTES
1. ANY SODDED/SEEDED AREAS DISTURBED DURING CONSTRUCTION SHALL BE RESTORED TO THE CONDITION THEY WERE PRIOR TO CONSTRUCTION BY THE CONTRACTOR. THIS INCLUDES APRON SHOULDER AREAS, STAGING AREAS, HAUL ROUTES, AND ANY OTHER AREAS DISTURBED DURING CONSTRUCTION. THIS SHALL BE
CONSIDERED INCIDENTAL TO THE PROJECT AND NO SEPARATE PAYMENT SHALL BE MADE.
INLET PROTECTION NOTES
1. INLET PROTECTION SHALL BE INSTALLED AT ALL INLETS WITHIN THE PROJECT WORK AREA.
2. INLET PROTECTION METHOD SHALL BE PER THE DETAIL SHOWN ON THIS SHEET. ALTERNATIVE METHODS MAY BE APPROVED THROUGH THE SHOP DRAWING SUBMITTAL
PROCESS.
3. CONTRACTOR SHALL CLEAR DEBRIS AND SILT AS REQUIRED FROM FABRIC TO MAINTAIN DRAINAGE THROUGH THE STRUCTURE.
4. FABRIC SHALL REMAIN IN PLACE UNTIL CONSTRUCTION IS COMPLETE.
5. PAYMENT FOR INLET PROTECTION SHALL BE INCLUSIVE OF THE C-102.2 INSTALL INLET PROTECTION PAY ITEM.
SILT FENCE NOTES
1. SILT FENCE SHALL BE INSTALLED AT THE PERIMETER OF ALL DISTURBED LAND AREAS AS SHOWN ON SHEET G012.
2. SILT FENCE SEDIMENT BARRIER SHALL BE IN PLACE PRIOR TO GRADING.
3. SILT FENCE AND FILTER FABRIC MUST BE ENTRENCHED, 4 INCHES DEEP BY 4 INCHES WIDE, ON THE UPSLOPE SIDE OF THE SILT FENCE.
4. WHEN JOINTS ARE NECESSARY, THE FABRIC SHALL BE SPLICED AT A SUPPORT POST WITH A MINIMUM 12 INCH OVERLAP AND SECURELY SEALED
5. POST FOR SILT FENCES SHALL BE 2.5 X 2 INCH DIAMETER WOOD WITH A MINIMUM LENGTH OF 5 FEET.
6. POSTS SHALL BE SPACED A MAXIMUM OF 10 FEET APART ON CENTER AND DRIVEN SECURELY INTO THE GROUND (MIN. OF 12 INCHES).
7. SEDIMENT MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER.
8. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE OR FILTER BARRIER IS NO LONGER REQUIRED SHALL BE DRESSED TO CONFORM WITH THE
PROPOSED AND EXISTING GRADES, PREPARED AND SEEDED.
9. UNDER NO CIRCUMSTANCES SHOULD SILT FENCE BE CONSTRUCTED IN LIVE STREAMS.
10. SILT FENCE SHALL BE REMOVED UPON COMPLETION OF THE PROJECT OR WHEN NECESSARY PER THE APPROVED SWPPP.
11. PAYMENT FOR SILT FENCE SHALL BE INCLUSIVE OF THE C-102.1 SILT FENCE INSTALLATION AND REMOVAL PAY ITEM.
GRATE INLET PROTECTION2 NOT TO SCALE
SILT FENCE CONSTRUCTION DETAIL1 NOT TO SCALE
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
90% SUBMITTAL
No. Date Description
U
PD
AT
ED
O N
: 0
Ja n
, 2 :5
9p m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -1
5.
1.
D ra in ag e an d
Er os io n
C on tro l D et ai ls .d w g
4664455-212152.02
N.T.S.
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
DRAINAGE AND
EROSION
CONTROL
DETAILS
C-15.1.1
RAD
ACC
TIE DOWN ANCHOR DETAIL1 NOT TO SCALE
NON - MOVEMENT AREA MARKING2 NOT TO SCALE
3' 3'3' 3' 3'
6"
6" 6"
D
IS
TA
N
C E
A S
S H
O W
N O
N
PL
A N
S
6" SOLID YELLOW LINE
DOUBLE HEADED AIRCRAFT LEAD IN MARKING3 NOT TO SCALE
90' (TYP.)
6'
TY
P.
ASPHALT
PAVEMENT
6" DIA.
HOLE
CORED
2" DIA. EYE
3"
90° BEND
10"±
4"
BAR
FLARED BASE.
3/4" GALVANIZED
P-610 CONCRETE
SHAVE CORE HOLE
WALL TO PROVIDE
SOLID YELLOW LINE
ON NON-MOVEMENT
SIDE
DASHED YELLOW LINE
ON MOVEMENT SIDE
SURFACE PAINTED INDICATOR MARKING4 NOT TO SCALE
11'
2'
2'
1' 1'
6" SOLID YELLOW LINE
US CUSTOMS CONTAINMENT MARKING 5 NOT TO SCALE
TWO 6" SOLID LINES
(ONE WHITE / ONE RED)
WITH 6" SPACING
BETWEEN
US CUSTOMS AND BORDER PROTECTION
RESTRICTED AREA
CBP AREA INSCRIPTION. 2'
STANDARD WHITE LETTERING.
INSTALL ON CENTER OF EACH
SIDE OF CONTAINMENT AREA.
MARKING SHALL BE INSTALLED 1
FT INSIDE OF CONTAINMENT
MARKING. SEE SHEET C-3.1.1
FOR LOCATION
STANDARD FAA YELLOW CHARACTERS:
4' WIDE
12' HIGH
6" SOLID YELLOW LINE
PROPOSED
NOTES:
1. SEE SHEET C-3.1.1 FOR TIE DOWN LOCATIONS. EXACT LOCATIONS
OF TIE DOWNS SHALL BE COORDINATED WITH OAR AND/OR
ENGINEER PRIOR TO INSTALLATION.
2. COST OF CORING AND CONCRETE SHALL BE INCLUDED IN THE
COST OF THE TIE DOWN.
NOTE:
1. NO BLACK OUTLINE IS REQUIRED AS ALL MARKINGS
ARE ON NEW PAVEMENT
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
90% SUBMITTAL
No. Date Description
U
PD
AT
ED
O N
: 2
Ja n
, 2 :0
9p m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -4
0.
1.
M ar ki ng D et ai ls a nd N ot es
.d w g
4664455-212152.02
N.T.S.
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
MARKING
DETAILS AND
NOTES
C-40.1.1
RAD
ACC
REFERENCE LOCATION
SEE SHEET C-3.1.1 FOR
COORDINATES
1'
6" SOLID WHITE LINE
6" SOLID RED LINE
C U
STO
M
S AN
D
BO
R
D
ER
PR
O
TEC
TIO
N R
ESTR
IC
TED
AR
EA
U .S
C
U
ST
O M
S
AN
D B
O R
D
ER
P R
O
TE
C
TI
O N
R
ES
TR
IC
TE
D
A R
EA
U.S. CUSTOMS AND BORDER PROTECTION
RESTRICTED AREA
D D
D
D
D
D
D
FAA FAA FAA FAA FAA
DD
D
S
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X
X
X
X X X
X
X
X
X
X
X
X
X
X
X
X
X
X X
XX X
X
X
X
X
X
X
X
X
X
X
TAXIWAY A
E COLONIAL DR
RUN
W
AY 13-31
TAXIW
AY E
TAXIWAY B
LAKE
GEORGETTE
FAIRGREEN ST
PHASE 1
CONTRACTOR
STAGING
AREA
SITE ACCESS FROM
RICKENBACKER DR
RICKEN
BACKER D
R
SAS T-HANGAR
SAS T-HANGAR
SAS T-HANGAR
SAS T-HANGAR
COLONIAL PROMENADE
SHOPPING CENTER
ATLANTIC
AVIATION
CONTRACTOR
ACCESS GATE
(PHASE 1)
N:1532134.76 E:549409.84
100'
0'
PHASE 1
HAUL ROUTE
EXISTING EAST RAMP
TA
XI
W
AY
A
CONTRACTOR
ACCESS GATE
(PHASE 2)
PHASE 1
HAUL ROUTE
AIRPORT
ADMINISTRATION
AND CUSTOMS
BUILDING
N:1532517.21 E:549962.83
100'
0'
PHASE 1
CONTRACTOR STAGING
AREA
PHASE 2-
ADDITIVE
ALTERNATE
PHASE 1-BASE
BID
TAXIW
AY A3
TAXIW
AY A4
NO APRON ACCESS
FROM TAXIWAY A5
DURING PHASE 1
AIRCRAFT ACCESS
APRON FROM TAXIWAY
A3 DURING PHASE 1
ADVENT HEALTH
HANGAR
SEE NOTE 8
00 200 400
LEGEND
CONTRACTOR
STAGING AREA
HAUL
ROUTE
BASE BID
PROJECT
LIMITS
ADDITIVE
ALTERNATE
PROJECT LIMITS
NOTES
1. CONTRACTOR SHALL
ACCESS SITE AS
SHOWN THROUGH THE
DESIGNATED GATES.
THEY SHALL INSTALL
THEIR OWN LOCK ON
THE GATE. GATE
SHALL BE SECURED OR
MANNED AT ALL
TIMES.
2. CONTRACTOR SHALL
PROVIDE SILT FENCE
AROUND CONTRACTOR
STAGING AREA AND BE
RESPONSIBLE FOR
RESTORING STAGING
ARE TO
PRE-CONSTRUCTION
CONDITIONS AT THE
CONCLUSION OF THE
PROJECT. THERE
SHALL BE NO
SEPARATE PAYMENT
FOR THIS WORK.
3. CONSTRUCTION
STAGING AND
EQUIPMENT PARKING
SHALL BE IN THE
DESIGNATED AREAS
ONLY OR AS
OTHERWISE APPROVED
BY THE OAR AND OR
ENGINEER.
4. CONTRACTOR TO
ACCESS WORK AREA
IN ACCORDANCE WITH
HAUL ROUTES SHOWN.
5. ACCESS TO RUNWAYS
AND TAXIWAYS IS
PROHIBITED WITHOUT
PRIOR COORDINATION
WITH THE ENGINEER
AND THE AIRPORT.
6. IN THE INSTANCE OF
ANY SCHEDULED
NIGHT WORK,
CONTRACTOR TO
PLACE AND AIM WORK
LIGHTS SO THAT THEY
FACE AWAY FROM AIR
TRAFFIC CONTROL
TOWER AND THE
AIRFIELD.
7. PRIOR TO THE
OPENING OF THE
WORK AREA, THE AREA
SHALL BE SWEPT
CLEAN OF ALL FOD
(FOREIGN OBJECT
DEBRIS - ROCKS,
DEBRIS, EQUIPMENT,
ETC.). THE AIRPORT
SHALL PERFORM AN
INSPECTION AND
APPROVE THE SITE
BEFORE BARRICADES
HAVE BEEN REMOVED.
8. NEW HANGARS MAY BE
UNDER
CONSTRUCTION AT
THE TIME OF THIS
PROJECT TAKING
PLACE.CONTRACTOR
SHALL BE AWARE OF
OTHER ONGOING
ACTIVITIES NEAR THE
WORK AREA
PHASE 0
45 DAYS
TOTAL CONSTRUCTION TIME=
165 CALENDAR DAYS
CONSTRUCTION PHASING DIAGRAM
NOT TO SCALE
15 30 45 60 75 90 1050
S U
B S
TA
N
TI
A L
C O
M
PL
ET
IO
N
PHASE 1-BASE BID
60 DAYS
N O
TI
C E
TO
P
R O
C
EE
D
PHASING NOTES:
PHASE 0
PHASE 0 SHALL CONSIST BUT NOT BE LIMITED TO SUBMITTAL AND APPROVAL OF SHOP DRAWINGS / MATERIAL CERTIFICATIONS/MIX DESIGNS/QUALITY CONTROL PROGRAM, COORDINATION MEETINGS, PROCUREMENT OF MATERIALS, MOBILIZATION OF EQUIPMENT TO THE PROJECT SITE, ESTABLISHING CONTRACTOR'S STAGING AREA
AND SITE ACCESS, SURVEY AND LAYOUT, PROCUREMENT OF MOT ITEMS, AND RELATED WORK.
PHASE 1
PHASE 1 SHALL CONSIST OF ALL THE PAVEMENT RECONSTRUCTION WORK WITHIN THE BASE BID LIMITS AS SHOWN ON THE PLANS. THE PHASE 1 WORK AREA MUST BE CONSIDERED SUBSTANTIALLY COMPLETE AND READY
TO REOPEN FOR AIRPORT USE PRIOR TO MOVING TO PHASE 2.
PHASE 2
PHASE 2 SHALL CONSIST OF ALL WORK WITHIN THE ADDITIVE ALTERNATE LIMITS AS SHOWN ON THE PLANS. THE PROJECT SHALL BE CONSIDERED SUBSTANTIALLY COMPLETE AT THE CONCLUSION OF THIS PHASE. IF THE ADDITIVE ALTERNATE IS NOT AWARDED, THE TOTAL CONTRACT DURATION SHALL BE REDUCED BY THE DURATION
OF THIS PHASE.
FINAL COMPLETION
THE CONTRACTOR HAS 45 CALENDAR DAYS TO COMPLETE DEFICIENT PUNCH LIST ITEMS NOTED IN THE FINAL
INSPECTION AND TO DEMOBILIZE FROM THE JOBSITE.
PHASE 2-ADDITIVE
ALTERNATE
60 DAYS
120 135 150 165
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
90% SUBMITTAL
No. Date Description
U
PD
AT
ED
O N
: 2
Ja n
, 3 :5
5p m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -6
0.
0.
C on tra ct or
L ay ou t a nd O ve ra ll Ph as in g Pl an .d w g
4664455-212152.02
N.T.S.
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
CONTRACTOR
LAYOUT AND
OVERALL
PHASING PLAN
C-60.0.1
RAD
ACC
C U
STO
M
S AN
D
BO
R
D
ER
PR
O
TEC
TIO
N R
ESTR
IC
TED
AR
EA
U .S
C
U
ST
O M
S
AN
D B
O R
D
ER
P R
O
TE
C
TI
O N
R
ES
TR
IC
TE
D
A R
EA
U.S. CUSTOMS AND BORDER PROTECTION
RESTRICTED AREA
D
D
D
D
D
D
D
FAA FAA FAA FAA
FAA
SD
SD
SD
SD
SD
SD
SD
DD
D
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X
X
X
X
X
X
X
X
X
X X
X
X
X X
X X
X
LAKE G
EO
RG
ETTE LN
LAKE
GEORGETTE
x x x x x x xxxxxx
EXISTING APRON
AIRPORT ADMIN.
AND CBP
CONSTRUCTION BARRICADE
FENCE - SEE DETAIL SHEET
C-61.0.2
CONTRACTOR
STAGING
AREA
HAUL ROUTE
A TEMPORARY CUSTOMS
CONTAINMENT BOX WILL BE
REMARKED ADJACENT TO
THE PROJECT SITE SO U.S.
CUSTOMS AND BORDER
PROTECTION CAN OPERATE
DURING CONSTRUCTION.
THIS MARKING SHALL BE
REMOVED AT THE
CONCLUSION OF THE
PROJECT. ALL WORK
ASSOCIATED WITH THIS
SHALL BE INCLUDED IN THE
TEMPORARY MARKINGS PAY
ITEM.
BASE BID WORK AREA
CLOSURE OF THIS HANGAR
TAXILANE SHALL BE
COORDINATED PRIOR TO
BEGINNING CONSTRUCTION -
NO SEPARATE PHASE SHALL
BE DESIGNATED FOR WORK
AFFECTING THIS CLOSURE. IN
THE EVENT THAT A PLANE IS
REQUIRED TO ACCESS THIS
TAXILANE THE CONTRACTOR
MAY BE REQUIRED TO
TEMPORARILY REMOVE THE
BARRICADE FENCE SO THAT
THE PLANE CAN ENTER OR
EXIT THE HANGAR TAXILANE.
CONTRACTORS ACCESS
GATE. ACCESS THROUGH
AUTOMATED GATE TO BE
COORDINATED WITH
AIRPORT - CONTRACTOR
SHALL NOT LEAVE GATE
UNATTENDED IN OPEN
POSITION
CUSTOMER ACCESS TO
CUSTOMS FACILITY
(SEE NOTE 1)
TAXIWAY A5 CONNECTOR TO
EAST RAMP TO BE CLOSED
DURING CONSTRUCTION:
LOW PROFILE BARRICADE -
SEE SHEET C-61.0.2
T/ W
A
SEE NOTE 2
00 50 100
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
90% SUBMITTAL
No. Date Description
U
PD
AT
ED
O N
: 2
Ja n
, 4 :3
8p m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -6
0.
0.
PH
AS
IN
G P
LA
N
PH
AS
E
- B
AS
E
BI
D
.d w g
4664455-212152.02
N.T.S.
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
PHASING PLAN -
PHASE 1 - BASE
BID
C-60.0.2
RAD
ACC
LOW PROFILE
BARRICADE
CONSTRUCTION
BARRICADE FENCE
x
NOTES
1. CUSTOMERS USING
THE CBP FACILITY
WILL NEED TO HAVE
EGRESS FROM THE
TEMPORARY CUSTOMS
CONTAINMENT
MARKING TO THE
FACILITY AS SHOWN.
THE CONTRACTOR
SHALL PROVIDE A
SAFE PATH OF EGRESS
BETWEEN THESE TWO
LOCATIONS AT ALL
TIMES DURING
CONSTRUCTION.
2. THE CONSTRUCTION
BARRICADE FENCE
SHALL BE INSTALLED
ACROSS THE
NORTHERN LIMITS OF
THE PHASE 1
CONSTRUCTION LIMITS
TO SEPARATE THE
WORK AREA FROM
CUSTOMS OPERATIONS
3. NO WORK SHALL
BEGIN IN WORK AREA
UNTIL MOBILIZATION
IS COMPLETED AND
THE CONTRACTOR HAS
BEEN AUTHORIZED BY
THE OAR TO PROCEED
WITH WORK.
D
D
D
D
D
FAA FAA FAA FAA
FAA
SD
SD
SD
SD
SD
SD
SD
DD
D
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
SD
S
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X
X
X
X
X
X
X
X
X
X X
X
X
X X
X X
X
US CUSTOMS AND BORDER PROTECTION
RESTRICTED AREA
U S C
U S
TO
M S A
N D
B O
R D
ER
PR
O
TEC
TIO
N
R
ES
TR
IC
TED
A
R
EA
U S C
U S
TO
M S A
N D
B O
R D
ER
P
R O
TE
C
TI
O N
R
ES
TR
IC
TE
D
A R
EA
AIRPORT ADMIN.
AND CBP
EXISTING EAST RAMP
CONTRACTOR'S
STAGING
AREA
HAUL ROUTE
x x x x x x
CONSTRUCTION BARRICADE
FENCE - SEE DETAIL SHEET
C-61.0.2
LOW PROFILE BARRICADE
- SEE SHEET C-61.0.2
T/ W
A
SEE
NOTE 1
00 50 100
NOTES
1. THE EXACT LOCATION OF
THE CONSTRUCTION
BARRICADE FENCE WILL BE
COORDINATED WITH THE
OAR AND/OR ENGINEER SO
THAT THERE IS ADEQUATE
ROOM FOR PAVING
OPERATIONS WHOLE
PROVIDING TENANT ACCESS
TO THE HANGAR TAXILANE
NORTH OF THE APRON.
2. US CUSTOMS RAMP
OPERATIONS WILL OPERATE
WITHOUT INTERRUPTION IN
THEIR CURRENT LOCATION
DURING THIS PHASE.
3. NO WORK SHALL BEGIN IN
WORK AREA UNTIL PHASE 1
IS COMPLETED AND THE
CONTRACTOR HAS BEEN
AUTHORIZED BY THE OAR TO
PROCEED WITH WORK.
Drawing No.
Drawing Title:
Project No.:
Designed By:
Drawn By:
Checked By:
Issue Date:
Drawing Scale:
Key Plan
Revisions
A
B
C
D
E
F
123456
ORLANDO EXECUTIVE AIRPORT
State of Florida Seal
Name:
License/Registration #:
This item has been electronically signed and sealed by the individual named below, using a dated Digital Signature in the space below, per F.A.C.Rule 61G15-23.004. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
BP-048 - EAST RAMP
REHABILITATION -
PHASE 1
90% SUBMITTAL
No. Date Description
U
PD
AT
ED
O N
: 2
Ja n
, 2 :4
0p m
, B y:
D ra w in g
Pa th
: X :\4
\2
2.
\T
EC
H \C
AD
\D ra w in gs
\S he et s\
C -6
0.
0.
PH
AS
IN
G P
LA
N
PH
AS
E
- A
D D
IT
IV
E
AL
TE
R
N
AT
E.
dw g
4664455-212152.02
N.T.S.
AIRSIDE
4010 W Boy Scout Blvd, Suite 1000
Tampa, FL 33607 phone: 813-210-8740 meadhunt.com
Mead and Hunt, Inc.
PHASING PLAN -
PHASE 2 -
ADDITIVE
ALTERNATE
C-60.0.3
RAD
ACC
LOW PROFILE
BARRICADE
CONSTRUCTION
BARRICADE FENCE
x
SAFETY NOTES:
1. AIRPORT OPERATIONS - THE CONTRACTOR SHALL ACQUAINT ALL SUPERVISORS AND
EMPLOYEES WITH THE AIRPORT ACTIVITIES AND OPERATIONS THAT ARE INHERENT AT THE
AIRPORT AND SHALL CONDUCT ALL CONSTRUCTION ACTIVITIES TO CONFORM TO ALL ROUTINE
AND EMERGENCY AIR TRAFFIC REQUIREMENTS AND GUIDELINES ON SAFETY SPECIFIED IN
NOTE 12 BELOW.
2. VEHICLE IDENTIFICATION -
2.1. ALL CONSTRUCTION VEHICLES WHICH ARE NOT ESCORTED BY A VEHICLE IN CONSTANT
TWO-WAY RADIO COMMUNICATION WITH ATC AND PROPERLY EQUIPPED AND AUTHORIZED
TO OPERATE IN THE AOA, MUST BE PROVIDED WITH A FLAG ON A STAFF ATTACHED TO THE
VEHICLE SO THAT THE FLAG WILL BE READILY VISIBLE.
2.2 THE FLAG MUST BE AT LEAST A 3 FT. BY 3 FT. SQUARE HAVING A CHECKERED PATTERN OF
INTERNATIONAL ORANGE AND WHITE SQUARES AT LEAST 1 FT ON EACH SIDE. COMPANY
LOGOS SHALL BE PLACED ON EACH SIDE OF THE VEHICLE.
2.3 ALL VEHICLES OPERATING IN THE ACTIVE AOA DURING THE HOURS OF DARKNESS NOT
ESCORTED BY A PROPERLY LIGHTED VEHICLE MUST BE IDENTIFIED. VEHICLES SHALL BE
EQUIPPED WITH A YELLOW FLASHING LIGHT MOUNTED ON THE UPPERMOST PART OF THE
VEHICLE STRUCTURE. A STEADY YELLOW LIGHT DESIGNATES VEHICLES LIMITED TO
NON-MOVEMENT AREAS. THE LIGHT MUST BE VISIBLE FROM ANY DIRECTION, DAY AND
NIGHT, INCLUDING FROM THE AIR.
2.4 FURTHER INFORMATION ON THE VEHICLE IDENTIFICATION REQUIREMENTS CAN BE FOUND
IN FAA ADVISORY CIRCULAR 150/5210-5D INCLUDING LIGHTING AND COLOR
SPECIFICATIONS.
3. PAVEMENT CLOSURES - NO RUNWAY, TAXIWAY, APRON OR AIRPORT ROADWAY SHALL BE
CLOSED WITHOUT PRIOR APPROVAL OF THE AIRFIELD OPERATIONS, TO ENABLE NECESSARY
NOTICES TO AIRMEN (NOTAMS) OR ADVISORIES TO AIRPORT SERVICES OR TENANTS. A
MINIMUM OF 72 HOURS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .