BNC-929CM003-BD-PLANSPart-6.pdf

PDF 17 MB Posted

Attached to
Bakersfield National Cemetery Gravesite Expansion
Solicitation number
36C78626B0029_1
Issued by

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RANCHO EL TEJONCIR.

WHITE WOLF DRIVE

EAST BEAR MOUNTAIN BLVD.

STATE HIGHWAY 223

RANCHO EL TEJON CIR.

TEHACHAPI WAY

COMMITTAL SHELTER

LOOP

MAINTENANCE ACCESS ROAD

MAINTENANCE ACCESS ROAD

EAST BEAR MOUNTAIN BLVD.

STATE HIGHWAY 223

X X

X

X

X X

X X

X X

X X

X X

X X

X

X X X X X X X X X X X X X X X X X X X X X

X

X

X

X X

X

SECTION 10 A

SECTION 10

SECTION 11

SECTION 12

SECTION 9

SECTION 8

SECTION 7

SECTION 18

SECTION 17

SECTION 16

SECTION 15

COLUMBARIUM COMPLEX A

ASSEMBLY AREA

X

XX

X

X

X

X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X X X X X X X X X X X X X X X X X X X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X X X X X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X X

X X

X

X X

X X

X X

X X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

W

W

W

W

W

W

W

WW

W

W

W

W W

W

W W

W

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W W

W

W

W

WWW

W

W

W

W

W

W

W

W

W

W

W

W

W W W

W

W

W

XX

XX

XX

XX

XX

XX

WILDFLOWER WAY

MAINTENANCE FACILITY

COLUMBARIUM B

PUBLIC INFORMATION CENTER

& ADMIN. BUILDING

MEMORIAL WALK

POW / MIA FLAGPOLE

OSSUARY

COMMITTAL SHELTER 1

U.S. FLAG

CORTEGE LANE

SS

SS

E

E

E

E

E

E

EE

E

E

EEEE

E

EE

E

E

E

E

E E

E E

E

E

E

E

E

E

E

E

E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E E E E E E E E E E E E E E E E E E E E E E E E E E E E

E E

E

E

E E

C

C

C C

C C

C C

C

E

E

E E

E

E

E

E

E E

E E

C

C

C

C

C

C C

C

C

C

C

C C

C

E E

E

E

E E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E

E

E

E

C

C

C

C

C

C

C

C

C

C

C

CC

C C

C

C

C C

C C C

C C C C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C C C C

C C C C

C

C

C

C

C

E E E

E

E

E

E

E

E

E

E

E E

E

E

E

E

E

E E

E

E

E

E

E

E

E

E

C

C

C

C

C

C

C

C

C

C

C

C

C

C

E

E

E

E

E E

E

E

E

E

E

E

E

E

E

EE

E

E

E

E

E E

E

E

E

E

E

E

E

X

XX

X

X

X

X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X X X X X X X X X X X X X X X X X X X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X X X X X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X X

X X

X

X X

X X

X X

X X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

W

W

W

W

W

W

W

WW

W

W

W

W W

W

W W

W

W

W

W

W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W W

W

W

W

WWW

W

W

W

W

W

W

W

W

W

W

W

W

W W W

W

W

W

XX

XX

XX

XX

XX

XX

WILDFLOWER WAY

MAINTENANCE FACILITY

COLUMBARIUM B

PUBLIC INFORMATION CENTER

& ADMIN. BUILDING

MEMORIAL WALK

POW / MIA FLAGPOLE

OSSUARY

COMMITTAL SHELTER 1

U.S. FLAG

CORTEGE LANE

SS

SS

REFER TO COLUMBARIUM

DRAWINGS FOR DETAILED

DESIGN INFORMATION WITHIN

COLUMBARIUM COMPLEX "D"

REFER TO COLUMBARIUM

DRAWINGS FOR DETAILED

DESIGN INFORMATION WITHIN

COLUMBARIUM COMPLEX "C"

REFER TO ROSTRUM DRAWINGS

FOR DETAILED DESIGN

INFORMATION WITHIN THE

ROSTRUM COMPLEX

SECTION 19

1,560 DOUBLE-DEPTH

PRE-PLACED CRYPTS

(WITHIN 3'x8' PLOTS)

SECTION 6

2,152 IN-GROUND CREMAIN

SITES (WITHIN 4'x4' PLOTS)

SECTION 20

1,444 DOUBLE-DEPTH

PRE-PLACED CRYPTS

(WITHIN 3'x8' PLOTS)

EX. SWM FACILITY TO

BE UPGRADED

PROPOSED SWM

FACILITY

4:1 4:14:1

4:1 5:1 4:1

4:1

4:1

5:1

4:1

4:1

5:1

4:1

4:1

4:1

4:1

4:1

4:1

4:1

4:1

196519651965

52 27

GS

1965 1965

19701975

.8%

2.0

2.0

2.0 % 2.0

2.0

6.3%

2.8%

5.9%

6.4%

1.9%

1.8%

1.8%

6.6

6.6%

16.0%

LOG

LOG

LO

G

LOG

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

KERN COUNTY, CALIFORNIA

929CM003

JULY 30, 2026 RPP RJP

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

BAKERSFIELD NATIONAL CEMETERY

EXPANSION CONSTRUCTION

DOCUMENTS

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

B

AK

ER

SF

IE

LD

E

XP

AN

SI

ON

\E

NG

IN

\P

LA

NS

\C

G1

.D W

G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Walter P Moore

(310) 254-1900

AES Group, Inc.

(303) 841-3922

Davy Architecture

(619) 238-3811

Aqua Engineering

(970) 229-9668

Above Group

(321) 345-9026 CG100

OVERALL SITE GRADING AND

DRAINAGE PLAN

NORTHGRAPHICAL SCALE: 1"=100'

100 50 0 100 200 300

CG101 CG102

CG103

CG104 CG105

CG106

Dirt Rd.

Dirt Rd.

Dirt Rd.

Dirt Rd.

MAINTENANCE ACCESS ROAD

X X X X X X X X X X X

WOOD POST

FIBERGLASS

MARKER

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X X X X X X X X X X X

X

X

X

X

X

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

WWWW

W

W W

W

W

W

W

W

W

W

W

W

W

W

W W W

W

W W

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E E E E E E E E E E E E

C C

C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C C

C C

C C C C C C C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

E

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X X X X X X X X X X X X

X

X

X

X

X

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

WWWW

W

W W

W

W

W

W

W

W

W

W

W

W

W

W W W

W

W W

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LO

C

LO

C

LOC

LOC

LOC

LOC

LOC

LOC

LO

C LOC LOC LOC LOC

LO

C

LO

C

LOC LIMITS OF CONSTRUCTION

STORM SEWER PIPE

TC TOP OF CURB

GS GROUND SPOT

EP EDGE OF PAVEMENT

TOP TOP OF STRUCTURE

INV. INVERT OF STRUCTURE

EXISTING STORM PIPE

STORM STRUCTURE

EXISTING STORM STRUCTURE

1. CONTRACTOR SHALL PERFORM UTILITY LOCATION FOR ALL UNDERGROUND

UTILITIES AND NOTIFY THE VA IN THE EVENT ADJUSTMENTS ARE REQUIRED TO

ENSURE THE IMPROVEMENTS ARE CONSTRUCTED IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES.

2. HORIZONTAL DATUM IS REFERENCED TO THE CALIFORNIA STATE PLANES, ZONE V

(NAD 83) COORDINATE SYSTEM. VERTICAL DATUM IS REFERENCED TO NAVD 88.

3. STORM SEWER TOP ELEVATIONS SHOWN FOR CURB INLET STRUCTURES REFER TO

THE ELEVATION AT THE CENTER OF THE STRUCTURE.

4. SEE SHEETS CG151-CG153 FOR DETAILED BURIAL SECTION GRADING AND

DRAINAGE INFORMATION.

VERTICAL DRAIN

HP HIGH POINT

LP LOW POINT

4" DRAIN LINE

LEGEND:

GRADING NOTES:

CO

DRAINAGE FLOW ARROW

VERTICAL DRAIN (TYP.)

TYPE A STORM STRUCTURE (TYP.)

END SECTION (TYP.)

KEYNOTE LEGEND:

DESCRIPTION

VERTICAL DRAIN CLEAN OUT (TYP.)

VERTICAL DRAIN TO 4" DRAIN

LINE TRANSITION (TYP.)

VELOCITY DISSIPATION DEVICES

ADS NYLOPLAST DOME TOP INLET (TYP.)

TYPE C MANHOLE STRUCTURE (TYP.)

REMOVE SECTION OF EXISTING STORM SEWER

PIPE AND INSTALL TYPE C MANHOLE. CONNECT

EXISTING PIPES INTO NEW MANHOLE

EXISTING INDEX CONTOUR

EXISTING INTERMEDIATE CONTOUR

PROPOSED INDEX CONTOUR

PROPOSED INTERMEDIATE CONTOUR

45 0

XX PROPOSED SPOT ELEVATIONS

DRY WELL10

4" DRAIN LINE CLEAN OUT (TYP.)11

CRYPT PERIMETER UNDER DRAIN (TYP.)12

CRYPT UNDER DRAIN CLEAN OUT (TYP.)13

DRY WELL CLEAN OUT14

FLOWER WATERING STATION DRAIN LINE (SEE

SHEETS CG151-CG153 FOR DESIGN INFORMATION15

4" CRYPT PERIMETER UNDERDRAIN (PERFORATED)

CONTRACTOR TO VERIFY LOCATION OF EXISTING

INFILTRATION SWALE AND REESTABLISH IF

DISTURBED BY GRADING ACTIVITIES.

(SHADED AREA)

JUTE MATTING CHANNEL/SWALE PROTECTION17

ADS NYLOPLAST 24" X 4" WYE W/ GASKETED SWR BELL18

GRADED BERM19

TP TP TREE PROTECTION

RIP-RAP CHANNEL/SWALE PROTECTION20

LOG

LIMITS OF GRADING NEAR PROTECTED

TREE. (FILL ONLY, NO CUT WITHIN TP)

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

KERN COUNTY, CALIFORNIA

929CM003

JULY 30, 2026 RPP RJP

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

BAKERSFIELD NATIONAL CEMETERY

EXPANSION CONSTRUCTION

DOCUMENTS

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

B

AK

ER

SF

IE

LD

E

XP

AN

SI

ON

\E

NG

IN

\P

LA

NS

\C

G1

.D W

G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Walter P Moore

(310) 254-1900

AES Group, Inc.

(303) 841-3922

Davy Architecture

(619) 238-3811

Aqua Engineering

(970) 229-9668

Above Group

(321) 345-9026

KEY MAP

(NOT TO SCALE)

1 2 3

CG101

SITE GRADING AND DRAINAGE

PLAN

NORTHGRAPHICAL SCALE: 1"=30'

30 15 0 30 60 90

Dirt Rd.

Dirt Rd.

EAST BEAR MOUNTAIN BLVD.

STATE HIGHWAY 223

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

OAK TREE

PLANTER

FOG LINE

FOG LINE

YELLOW STRIPES

FOG LINE

FOG LINE

YELLOW STRIPES

POST MILE

SIGN

UTILITY

VAULT

POST

POST

X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X

E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E

E

X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X X X X X X X X X X X X X X X X X X

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOCLOC

LO

C

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOOP ROAD

LOOP CONNECTOR ROAD

25+00

26+00

27+00 28+0028+61

+0

+0

+5

+0

+0

+5

25+00

26+00

27+00 28+0028+61

R743.5'

R770.1'

R30'R30'

R213.3'

R186.7'

R263.3'

R236.7'

R236.7'

R15'

R15'

R62 'R50'

R15'

R15'

R106'

R94'

R94'

R106' R206'R194'

.3'

.3'

13.3' 13.3'

12'

12'

4:1

5:1

74 12

TC

74 12

TC

74 66

TC

74 66

TC

74 68

TC74 62

TC

74 62

TC

76 32

TC

79 99

TC

79 99

TC

80 69

TC

80 69

TC

71 61

TOP

71 71

TOP

74 64

TOP

76 38

TOP

76 40

TOP

79 27

TOP

79 19

TOP

81 57

GS

81 57

GS

85 00

GS

84 97

GS

87 02

GS

GS

63 75

GS

63 99

GS

66 67

GS

66 91

GS

67 33

GS

67 57

GS

76 55

GS

76 79

GS

79 31

GS

78 60

GS

80 66

TC

80 21

TC

74 28

TOP

80 68

HP

74 92

TC-HP

1976 1977 1978

741974

1976197719781979 198119821983

74 85

GS

63 11

GS

68 39

GS

69 44

GS

70 40

GS

74 02

GS

.8%

5.9%

6.4%

" H

DP

E

15" HDPE

15" HDPE

15" HDPE

" H

DP

E

15" HDPE

15" HDPE

28A

27A

26A

LOC LIMITS OF CONSTRUCTION

STORM SEWER PIPE

TC TOP OF CURB

GS GROUND SPOT

EP EDGE OF PAVEMENT

TOP TOP OF STRUCTURE

INV. INVERT OF STRUCTURE

EXISTING STORM PIPE

STORM STRUCTURE

EXISTING STORM STRUCTURE

1. CONTRACTOR SHALL PERFORM UTILITY LOCATION FOR ALL UNDERGROUND

UTILITIES AND NOTIFY THE VA IN THE EVENT ADJUSTMENTS ARE REQUIRED TO

ENSURE THE IMPROVEMENTS ARE CONSTRUCTED IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES.

2. HORIZONTAL DATUM IS REFERENCED TO THE CALIFORNIA STATE PLANES, ZONE V

(NAD 83) COORDINATE SYSTEM. VERTICAL DATUM IS REFERENCED TO NAVD 88.

3. STORM SEWER TOP ELEVATIONS SHOWN FOR CURB INLET STRUCTURES REFER TO

THE ELEVATION AT THE CENTER OF THE STRUCTURE.

4. SEE SHEETS CG151-CG153 FOR DETAILED BURIAL SECTION GRADING AND

DRAINAGE INFORMATION.

VERTICAL DRAIN

HP HIGH POINT

LP LOW POINT

4" DRAIN LINE

LEGEND:

GRADING NOTES:

CO

DRAINAGE FLOW ARROW

VERTICAL DRAIN (TYP.)

TYPE A STORM STRUCTURE (TYP.)

END SECTION (TYP.)

KEYNOTE LEGEND:

DESCRIPTION

VERTICAL DRAIN CLEAN OUT (TYP.)

VERTICAL DRAIN TO 4" DRAIN

LINE TRANSITION (TYP.)

VELOCITY DISSIPATION DEVICES

ADS NYLOPLAST DOME TOP INLET (TYP.)

TYPE C MANHOLE STRUCTURE (TYP.)

REMOVE SECTION OF EXISTING STORM SEWER

PIPE AND INSTALL TYPE C MANHOLE. CONNECT

EXISTING PIPES INTO NEW MANHOLE

EXISTING INDEX CONTOUR

EXISTING INTERMEDIATE CONTOUR

PROPOSED INDEX CONTOUR

PROPOSED INTERMEDIATE CONTOUR

45 0

XX PROPOSED SPOT ELEVATIONS

DRY WELL10

4" DRAIN LINE CLEAN OUT (TYP.)11

CRYPT PERIMETER UNDER DRAIN (TYP.)12

CRYPT UNDER DRAIN CLEAN OUT (TYP.)13

DRY WELL CLEAN OUT14

FLOWER WATERING STATION DRAIN LINE (SEE

SHEETS CG151-CG153 FOR DESIGN INFORMATION15

4" CRYPT PERIMETER UNDERDRAIN (PERFORATED)

CONTRACTOR TO VERIFY LOCATION OF EXISTING

INFILTRATION SWALE AND REESTABLISH IF

DISTURBED BY GRADING ACTIVITIES.

(SHADED AREA)

JUTE MATTING CHANNEL/SWALE PROTECTION17

ADS NYLOPLAST 24" X 4" WYE W/ GASKETED SWR BELL18

GRADED BERM19

TP TP TREE PROTECTION

RIP-RAP CHANNEL/SWALE PROTECTION20

LOG

LIMITS OF GRADING NEAR PROTECTED

TREE. (FILL ONLY, NO CUT WITHIN TP)

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

KERN COUNTY, CALIFORNIA

929CM003

JULY 30, 2026 RPP RJP

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

BAKERSFIELD NATIONAL CEMETERY

EXPANSION CONSTRUCTION

DOCUMENTS

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

B

AK

ER

SF

IE

LD

E

XP

AN

SI

ON

\E

NG

IN

\P

LA

NS

\C

G1

.D W

G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Walter P Moore

(310) 254-1900

AES Group, Inc.

(303) 841-3922

Davy Architecture

(619) 238-3811

Aqua Engineering

(970) 229-9668

Above Group

(321) 345-9026

KEY MAP

(NOT TO SCALE)

1 2 3

CG102

SITE GRADING AND DRAINAGE

PLAN

NORTHGRAPHICAL SCALE: 1"=30'

Dirt Rd.

Dir t R d.

W

HITE W

OLF DRIVE

3.5" ALUMINUM CAP 3.5" ALUMINUM CAP

3.5" ALUMINUM CAP 1" REBAR

X X

X X

X X

X X

X X

X

X

XXXX

X X X X X X X X X X X X X X X X X X X X X

X

X X

X X

X X

X X

X X

X X

X

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTERPLANTER

WHITE STRIPE

FOG LINE

FOG LINEDOUBLE YELLOW STRIPES

WHITE STRIPE

FOG LINE

FOG LINE

DOUBLE YELLOW STRIPES

RAMP

ADA

RAMPADA

RAMP

MEDIAN

ISLAND SIGN

MEDIAN

ISLAND SIGN

BAKERSFIELD NATIONAL

CEMETERY MONUMENT SIGN

WHITE WOLF

DRIVE SIGN

STREET SIGN

STOP SIGN

BENCHMARK #3 SET:

CHISELED "+" ON TOP OF CURB.

ELEV. = 1971.83' (NAVD88)

N = 2279930.124 E = 6362583.43

SECTION 7

SECTION 16

SECTION 15

SECTION 8SECTION 12SECTION 17

CULVERT

V-GUTTER

4" PVC

6" PVC

POST

SLIDING GATE

SLIDING GATE

WALL

WALL

WALL

WROUGHT

IRON FENCE

WROUGHT

IRON FENCE

WALL

WALL

W

OOD CHIPS

WOOD CHIPS

GRAVEL

GRAVEL

POST

POST

POST

TRASH

BINS

BENCH

BURIED

UTILITY LINE

UTILITY BOX

BENCH

IRR. BOXES IRR. BOXES

IRR.

BOXES

IRR. BOX

IRR. BOX

IRR. BOX

IRR. BOX

I.C.V.

I.C.V.

I.C.V.

I.C.V.

I.C.V.

IRR. BOX.

IRR. BOX.

IRR. BOX.

IRR. BOX.

IRR. BOX.

IRR. BOX. IRR. BOX. IRR. BOX.

IRR. BOX.

IRR. BOX.

WATER

BOXES

5-I.C.V.

IRR. BOXES

POST

POST

POST

POST

POST

POST POST

POST

POST

I.C.V.

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X

X

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

E

E

E

E

E

E

E

E

E

E

E E

E

E

E E E E E E E E E E E E E E E E E E E E E E E E E E E E

E E

E E

E E

E E

E E

E E E

E E

E

E E

E E

E E

E E

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E E

E E

E E

E E

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C C C C

C C C C

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

E

E

E

E

E E

E

X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X

X X

X

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

LOC

LOC

LOC

LO

C

LO

C

LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOC

LOC

LOC

LOC

LOCLOC

LOC

LOC

LOC

LOC LOC LOC

LOC

LOC

LOC

LOC

LO

C

LOC LOC LOC LOC LOC LOC LOC LOC LOC

LOC

LOC

LOC

LOC

LOCLOCLOCLOCLOCLOCLOCLOCLOCLOC

LOC

LOC

LOC

LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LO

C

LOC

LOC

LO

C

LO

C

LO

C LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LO

C

LO

C

LO

C

LO

C

LO

C

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOCLOCLOCLOC

LOC

LOC

LOC

13.32' 10'

M6A M6BBM6

SM6A

SM6B

LOOP ROAD

LOOP ROAD

+0

17+00

18+00

19+00

20+

21+00

22+00

23+00

24+00

25+00

+0

17+00

18+00

19+00

20+

21+00

22+00

23+00

24+00

25+00

R3 0'

R30'

R3 0'

R30'

R413.3'

R386.7'

R186.7'

R213.3'

R241.7'

R268.3'

R30'

R2

.3'

R15'

R15'

R62

R15'

R15'

R106'

R94'

R2

.3'

13.3' 13.3'

4' 4'

48'

72'

12'

12'

13.32' 13.32'

13.32'

SECTION 6

2,152 IN-GROUND CREMAIN SITES

(WITHIN 4'x4' PLOTS)

4:1

4:1

4:1

4:1

4:1

4:1

67 64

TC

67 64

TC

66 70

TC

67 03

TC-LP

68 13

TC

63 95

TC

63 57

TC

62 71

TC

57 59

TC

57 59

TC

47 90

TC

47 31

TC

47 11

TC

46 69

TC

67 07

TOP

66 77

TOP

56 83

TOP

56 42

TOP

48 02

TOP

48 34

TOP

46 12

TOP

45 68

TOP

81 57

GS

81 57

GS

84 97

GS

87 02

GS

76 55

GS

76 79

GS

79 31

GS

78 60

GS

80 66

TC

80 21

TC

4:1

45 87

GS

46 80

GS46 84

GS

47 50

GS

46 75

GS

REFER TO COLUMBARIUM

DRAWINGS FOR DETAILED

GRADING AND DRAINAGE

INFORMATION WITHIN

COLUMBARIUM COMPLEX "C"

68 85

TC

64 56

TC

4:1

1964 1964

197119721973

19611962

46 44

GS

65 13

TOP

1966 19

74 85

GS 6.4%

1.9%

1.8%

1.8%

15" HDPE

15" HDPE

" H

DP

E

15" HDPE

15" HDPE

15" HDPE

15" HDPE

15" HDPE

7A

7B

LOC LIMITS OF CONSTRUCTION

STORM SEWER PIPE

TC TOP OF CURB

GS GROUND SPOT

EP EDGE OF PAVEMENT

TOP TOP OF STRUCTURE

INV. INVERT OF STRUCTURE

EXISTING STORM PIPE

STORM STRUCTURE

EXISTING STORM STRUCTURE

1. CONTRACTOR SHALL PERFORM UTILITY LOCATION FOR ALL UNDERGROUND

UTILITIES AND NOTIFY THE VA IN THE EVENT ADJUSTMENTS ARE REQUIRED TO

ENSURE THE IMPROVEMENTS ARE CONSTRUCTED IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES.

2. HORIZONTAL DATUM IS REFERENCED TO THE CALIFORNIA STATE PLANES, ZONE V

(NAD 83) COORDINATE SYSTEM. VERTICAL DATUM IS REFERENCED TO NAVD 88.

3. STORM SEWER TOP ELEVATIONS SHOWN FOR CURB INLET STRUCTURES REFER TO

THE ELEVATION AT THE CENTER OF THE STRUCTURE.

4. SEE SHEETS CG151-CG153 FOR DETAILED BURIAL SECTION GRADING AND

DRAINAGE INFORMATION.

VERTICAL DRAIN

HP HIGH POINT

LP LOW POINT

4" DRAIN LINE

LEGEND:

GRADING NOTES:

CO

DRAINAGE FLOW ARROW

VERTICAL DRAIN (TYP.)

TYPE A STORM STRUCTURE (TYP.)

END SECTION (TYP.)

KEYNOTE LEGEND:

DESCRIPTION

VERTICAL DRAIN CLEAN OUT (TYP.)

VERTICAL DRAIN TO 4" DRAIN

LINE TRANSITION (TYP.)

VELOCITY DISSIPATION DEVICES

ADS NYLOPLAST DOME TOP INLET (TYP.)

TYPE C MANHOLE STRUCTURE (TYP.)

REMOVE SECTION OF EXISTING STORM SEWER

PIPE AND INSTALL TYPE C MANHOLE. CONNECT

EXISTING PIPES INTO NEW MANHOLE

EXISTING INDEX CONTOUR

EXISTING INTERMEDIATE CONTOUR

PROPOSED INDEX CONTOUR

PROPOSED INTERMEDIATE CONTOUR

45 0

XX PROPOSED SPOT ELEVATIONS

DRY WELL10

4" DRAIN LINE CLEAN OUT (TYP.)11

CRYPT PERIMETER UNDER DRAIN (TYP.)12

CRYPT UNDER DRAIN CLEAN OUT (TYP.)13

DRY WELL CLEAN OUT14

FLOWER WATERING STATION DRAIN LINE (SEE

SHEETS CG151-CG153 FOR DESIGN INFORMATION15

4" CRYPT PERIMETER UNDERDRAIN (PERFORATED)

CONTRACTOR TO VERIFY LOCATION OF EXISTING

INFILTRATION SWALE AND REESTABLISH IF

DISTURBED BY GRADING ACTIVITIES.

(SHADED AREA)

JUTE MATTING CHANNEL/SWALE PROTECTION17

ADS NYLOPLAST 24" X 4" WYE W/ GASKETED SWR BELL18

GRADED BERM19

TP TP TREE PROTECTION

RIP-RAP CHANNEL/SWALE PROTECTION20

LOG

LIMITS OF GRADING NEAR PROTECTED

TREE. (FILL ONLY, NO CUT WITHIN TP)

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

KERN COUNTY, CALIFORNIA

929CM003

JULY 30, 2026 RPP RJP

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

BAKERSFIELD NATIONAL CEMETERY

EXPANSION CONSTRUCTION

DOCUMENTS

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

B

AK

ER

SF

IE

LD

E

XP

AN

SI

ON

\E

NG

IN

\P

LA

NS

\C

G1

.D W

G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Walter P Moore

(310) 254-1900

AES Group, Inc.

(303) 841-3922

Davy Architecture

(619) 238-3811

Aqua Engineering

(970) 229-9668

Above Group

(321) 345-9026

KEY MAP

(NOT TO SCALE)

1 2 3

CG103

SITE GRADING AND DRAINAGE

PLAN

NORTHGRAPHICAL SCALE: 1"=30'

Dirt R d.

RANCHO EL TEJON CIR.

MAINTENANCE ACCESS ROAD

X

Ground Not Visible

Dense Trees

GUARDRAIL

CULVERT

FLAG

POLE

FLAG

POLE

FLAG

POLE

VAULT

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

XXXXX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X WWWW

W

W W

W W W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E E

E

E

E E

E

C

C C

C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

E

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

XXXXX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X WWWW

W

W W

W W W

W

W

W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

LO

C LOC LOC LOC LOC

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LOC

LOC

LOC

LOC

LO

C

LO

C

LOC

LOC

LOC LIMITS OF CONSTRUCTION

STORM SEWER PIPE

TC TOP OF CURB

GS GROUND SPOT

EP EDGE OF PAVEMENT

TOP TOP OF STRUCTURE

INV. INVERT OF STRUCTURE

EXISTING STORM PIPE

STORM STRUCTURE

EXISTING STORM STRUCTURE

1. CONTRACTOR SHALL PERFORM UTILITY LOCATION FOR ALL UNDERGROUND

UTILITIES AND NOTIFY THE VA IN THE EVENT ADJUSTMENTS ARE REQUIRED TO

ENSURE THE IMPROVEMENTS ARE CONSTRUCTED IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES.

2. HORIZONTAL DATUM IS REFERENCED TO THE CALIFORNIA STATE PLANES, ZONE V

(NAD 83) COORDINATE SYSTEM. VERTICAL DATUM IS REFERENCED TO NAVD 88.

3. STORM SEWER TOP ELEVATIONS SHOWN FOR CURB INLET STRUCTURES REFER TO

THE ELEVATION AT THE CENTER OF THE STRUCTURE.

4. SEE SHEETS CG151-CG153 FOR DETAILED BURIAL SECTION GRADING AND

DRAINAGE INFORMATION.

VERTICAL DRAIN

HP HIGH POINT

LP LOW POINT

4" DRAIN LINE

LEGEND:

GRADING NOTES:

CO

DRAINAGE FLOW ARROW

VERTICAL DRAIN (TYP.)

TYPE A STORM STRUCTURE (TYP.)

END SECTION (TYP.)

KEYNOTE LEGEND:

DESCRIPTION

VERTICAL DRAIN CLEAN OUT (TYP.)

VERTICAL DRAIN TO 4" DRAIN

LINE TRANSITION (TYP.)

VELOCITY DISSIPATION DEVICES

ADS NYLOPLAST DOME TOP INLET (TYP.)

TYPE C MANHOLE STRUCTURE (TYP.)

REMOVE SECTION OF EXISTING STORM SEWER

PIPE AND INSTALL TYPE C MANHOLE. CONNECT

EXISTING PIPES INTO NEW MANHOLE

EXISTING INDEX CONTOUR

EXISTING INTERMEDIATE CONTOUR

PROPOSED INDEX CONTOUR

PROPOSED INTERMEDIATE CONTOUR

45 0

XX PROPOSED SPOT ELEVATIONS

DRY WELL10

4" DRAIN LINE CLEAN OUT (TYP.)11

CRYPT PERIMETER UNDER DRAIN (TYP.)12

CRYPT UNDER DRAIN CLEAN OUT (TYP.)13

DRY WELL CLEAN OUT14

FLOWER WATERING STATION DRAIN LINE (SEE

SHEETS CG151-CG153 FOR DESIGN INFORMATION15

4" CRYPT PERIMETER UNDERDRAIN (PERFORATED)

CONTRACTOR TO VERIFY LOCATION OF EXISTING

INFILTRATION SWALE AND REESTABLISH IF

DISTURBED BY GRADING ACTIVITIES.

(SHADED AREA)

JUTE MATTING CHANNEL/SWALE PROTECTION17

ADS NYLOPLAST 24" X 4" WYE W/ GASKETED SWR BELL18

GRADED BERM19

TP TP TREE PROTECTION

RIP-RAP CHANNEL/SWALE PROTECTION20

LOG

LIMITS OF GRADING NEAR PROTECTED

TREE. (FILL ONLY, NO CUT WITHIN TP)

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

KERN COUNTY, CALIFORNIA

929CM003

JULY 30, 2026 RPP RJP

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

BAKERSFIELD NATIONAL CEMETERY

EXPANSION CONSTRUCTION

DOCUMENTS

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

B

AK

ER

SF

IE

LD

E

XP

AN

SI

ON

\E

NG

IN

\P

LA

NS

\C

G1

.D W

G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Walter P Moore

(310) 254-1900

AES Group, Inc.

(303) 841-3922

Davy Architecture

(619) 238-3811

Aqua Engineering

(970) 229-9668

Above Group

(321) 345-9026

KEY MAP

(NOT TO SCALE)

1 2 3

CG104

SITE GRADING AND DRAINAGE

PLAN

NORTHGRAPHICAL SCALE: 1"=30'

RANCHO EL TEJON CIR.

RANCHO EL TEJON CIR.

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLA

NTER

PLA

NTER

ADA RAMP

ADA RAMP

ADA RAMP

15MPH

SPEED SIGN

SIGN

DIRECTION

SIGNS

EXISTNG

SIGN

BENCHMARK #2 SET:

CHISELED "+" ON TOP OF CURB.

ELEV. = 1950.67' (NAVD88)N = 2279686.511E = 6361548.818

SECTION 18

SECTION 17

COLUMBARIUM COMPLEX A

4' WIDE

V-GUTTER

WALL

COMMS. RISER

BENCH

VAULT

VAULT

VAULT

I.C.V.

IRR. BOX

IRR. BOX

IRR. BOX

IRR. BOX

IRR. BOXES IRR. BOX

IRR. BOXES

IRR. BOX

VAULT

POST

POST

POST

POST

POST

W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W W W W

W W

W W

W W

W W

W

W

W

W W

W W

W

WWWWWWWW

W

W

W W

W

W

W

W

W

W

W W

W W W W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

COLUMBARIUM B

E

E

E

E

EEEEEE

E E

E E

E E

E E

E E

EEEEEEEEEE

E

E E

E E

EEEEE

E

E E

E

E

E

E

E

E

E E

E E

E

E

C C

C

C

C

C

C

C

C

C

C C

C C C C C C C

C

C

C

C

C

C

C

C

C

C

C

C

C

C C

C C C C C

C C

C C

C C C C C C C C C C C

C C

C C

C

C

C

C

C

E

E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

C

C

C

E

E

E E

W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W W W W

W W

W W

W W

W W

W

W

W

W W

W W

W

WWWWWWWW

W

W

W W

W

W

W

W

W

W

W W

W W W W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

COLUMBARIUM B

LOC

LOC

LOC

LOC

LOC LOC LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC LOC LOC

LOCLOC

LOC

LOC

LOC

LO

C

LOC

LOC

LOC LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC LOC LOC

LO

C

LO

C

LOC

LO

C

LOC

LO

C

LO

C

LO

C

LO

C

LO

C

LOC

LO

C

LO

C

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

TP

TPTP

TP

TP

TP

TP

TP

TP

TP TP

TP

TP

TP

TP

TP

M19A

M19B

BM19

M20A

M20B

BM20

SM20A

SM20B

SM19A

SM19B

LOOP CONNECTOR ROAD

+0

+0

+0

13+00

14+00

+0

+0

+0

13+00

14+00

R236.7' R263.3'

R263.3'

R236.7'

R30' R30'

R94'

R106' R206'R194'

R194'R206'

R194'

R206'

R106'R94'

R1 5'

R15'

13.3' 13.3'

13.

3'

13.

3'

13.3' 13.3'

3'

3'

45'

72'

3'

3'

45'

72'

12'

SECTION 19

1,560 DOUBLE-DEPTH

PRE-PLACED CRYPTS

(WITHIN 3'x8' PLOTS)

SECTION 20

1,444 DOUBLE-DEPTH

PRE-PLACED CRYPTS

(WITHIN 3'x8' PLOTS)

4:1 4:14:1

4:1

5:1

4:1

4:1

4:1

5:1

52 63

TC

51 92

TC-LP

51 34

TC

51 92

TC-LP

54 23

TC

54 23

TC

69 15

TC

69 15

TC

70 29

TC

70 29

TC

53 85

TOP

51 96

TOP

51 97

TOP

58 44

TOP

60 70

TOP

65 12

TOP

65 11

TOP

57 63

TOP

71 61

TOP

71 71

TOP

48 43

GS

48 08

GS

48 70

GS

48 46

GS

48 73

GS

48 85

GS

50 71

GS

50 95

GS

53 20

GS

52 96

GS

60 34

GS60 10

GS

61 64

GS

61 88

GS

62 58

GS

62 82

GS

63 75

GS

63 99

GS

66 67

GS

66 91

GS

51 87

LP

59 00

TOP

1961196219631964

52 14

TC-HP

52 27

GS

6 6

11 15

63 11

GS

61 25

GS

60 58

GS

59 88

GS

57 84

GS

58 84

GS

60 88

GS

61 58

GS

58 63

GS

62 50

GS

61 84

GS

65 94

GS

64 94

GS 61 33

GS

.8%

2.0

2.0

2.0

2.0

2.0

6.3%

2.8%

11 11

19 19

LOG

LOG

LOG

LOG

LOG

LOGLOG

LO

G

LO

G

LO

G

LOG

LOG

45 50

INV

42 79

INV

62 33

GS

66 00

GS

1961 1958

15" HDPE

15" HDPE

24" HDPE

" H

DP

E

15" HDPE

15" HDPE

" H

DP

E

15" H

DPE

24" HDPE

24" HDPE

24" HDPE

15" HDPE

15" HDPE

" R

CP

C

L I

II

8' RIP-RAP EMERGENCY SPILLWAY

ELEV. = 1947.00'

SEE DETAIL 3 ON CJ501

26A

25A

25 25C

25D

21B

21C

SWM 1 RISER

SWM 1 ES

25B

24" HDPE

21A

LOC LIMITS OF CONSTRUCTION

STORM SEWER PIPE

TC TOP OF CURB

GS GROUND SPOT

EP EDGE OF PAVEMENT

TOP TOP OF STRUCTURE

INV. INVERT OF STRUCTURE

EXISTING STORM PIPE

STORM STRUCTURE

EXISTING STORM STRUCTURE

1. CONTRACTOR SHALL PERFORM UTILITY LOCATION FOR ALL UNDERGROUND

UTILITIES AND NOTIFY THE VA IN THE EVENT ADJUSTMENTS ARE REQUIRED TO

ENSURE THE IMPROVEMENTS ARE CONSTRUCTED IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES.

2. HORIZONTAL DATUM IS REFERENCED TO THE CALIFORNIA STATE PLANES, ZONE V

(NAD 83) COORDINATE SYSTEM. VERTICAL DATUM IS REFERENCED TO NAVD 88.

3. STORM SEWER TOP ELEVATIONS SHOWN FOR CURB INLET STRUCTURES REFER TO

THE ELEVATION AT THE CENTER OF THE STRUCTURE.

4. SEE SHEETS CG151-CG153 FOR DETAILED BURIAL SECTION GRADING AND

DRAINAGE INFORMATION.

VERTICAL DRAIN

HP HIGH POINT

LP LOW POINT

4" DRAIN LINE

LEGEND:

GRADING NOTES:

CO

DRAINAGE FLOW ARROW

VERTICAL DRAIN (TYP.)

TYPE A STORM STRUCTURE (TYP.)

END SECTION (TYP.)

KEYNOTE LEGEND:

DESCRIPTION

VERTICAL DRAIN CLEAN OUT (TYP.)

VERTICAL DRAIN TO 4" DRAIN

LINE TRANSITION (TYP.)

VELOCITY DISSIPATION DEVICES

ADS NYLOPLAST DOME TOP INLET (TYP.)

TYPE C MANHOLE STRUCTURE (TYP.)

REMOVE SECTION OF EXISTING STORM SEWER

PIPE AND INSTALL TYPE C MANHOLE. CONNECT

EXISTING PIPES INTO NEW MANHOLE

EXISTING INDEX CONTOUR

EXISTING INTERMEDIATE CONTOUR

PROPOSED INDEX CONTOUR

PROPOSED INTERMEDIATE CONTOUR

45 0

XX PROPOSED SPOT ELEVATIONS

DRY WELL10

4" DRAIN LINE CLEAN OUT (TYP.)11

CRYPT PERIMETER UNDER DRAIN (TYP.)12

CRYPT UNDER DRAIN CLEAN OUT (TYP.)13

DRY WELL CLEAN OUT14

FLOWER WATERING STATION DRAIN LINE (SEE

SHEETS CG151-CG153 FOR DESIGN INFORMATION15

4" CRYPT PERIMETER UNDERDRAIN (PERFORATED)

CONTRACTOR TO VERIFY LOCATION OF EXISTING

INFILTRATION SWALE AND REESTABLISH IF

DISTURBED BY GRADING ACTIVITIES.

(SHADED AREA)

JUTE MATTING CHANNEL/SWALE PROTECTION17

ADS NYLOPLAST 24" X 4" WYE W/ GASKETED SWR BELL18

GRADED BERM19

TP TP TREE PROTECTION

RIP-RAP CHANNEL/SWALE PROTECTION20

LOG

LIMITS OF GRADING NEAR PROTECTED

TREE. (FILL ONLY, NO CUT WITHIN TP)

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

KERN COUNTY, CALIFORNIA

929CM003

JULY 30, 2026 RPP RJP

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

BAKERSFIELD NATIONAL CEMETERY

EXPANSION CONSTRUCTION

DOCUMENTS

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

B

AK

ER

SF

IE

LD

E

XP

AN

SI

ON

\E

NG

IN

\P

LA

NS

\C

G1

.D W

G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Walter P Moore

(310) 254-1900

AES Group, Inc.

(303) 841-3922

Davy Architecture

(619) 238-3811

Aqua Engineering

(970) 229-9668

Above Group

(321) 345-9026

KEY MAP

(NOT TO SCALE)

1 2 3

CG105

SITE GRADING AND DRAINAGE

PLAN

NORTHGRAPHICAL SCALE: 1"=30'

WHITE WOLF DRIVE

TEHACHAPI WAY

3.5" ALUMINUM CAP1" REBAR

1" REBAR 1" REBAR

1" REBAR

3.5" ALUMINUM CAP 3.5" ALUMINUM CAP

3.5" ALUMINUM CAP

3.5" ALUMINUM CAP 3.5" ALUMINUM CAP

1" REBAR

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X X

X

PLANTERPLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

PLANTER

WHITE

STRIPE

ADA RAMP

ADA RAMP

ADA RAMP

ADA RAMP

ADA

RAMP

ADA RAMP

ADA RAMP

ADA

RAMP

ADA

RAMPADA

DIRECTION

SIGNS

EXISTNG

SIGN

SNAKES SIGNS

MONUMENT

SIGN

SECTION 10 A

SECTION 10

SECTION 11

SECTION 12

SECTION 9

SECTION 8

SECTION 17

SECTION 8SECTION 12SECTION 17

SECTION 18

V-GUTTER

INLET

CULVERT

POST

SUMP

GRAVEL

GRAVEL

PAVERS

BENCH

POST

BENCH

POST

BENCH

IRR. BOXES

IRR.

BOXES

IRR. BOX

IRR. BOXES

IRR. BOX

WATER VALVES

POST

POST

POST

POST POST

POST

POST

POST POST

POST

POST

POST

IRR. BOXES

SD

SD SD

SD

X

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

WWWW

W

W W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

WILDFLOWER WAY

PUBLIC INFORMATION CENTER

& ADMINISTRATION BUILDING

SS

SS

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E

C C

C

C

C

C

E E

E

E

E E

E E

E E

E

E

E

E

E

C

C

C

C

C

C

C

C

C

C

C

C

C

C C

C C

C C

C

C

C

C C

E

E E

E E

E E

E E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E E

E E

E E

E E

E

E

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

E

E

E E

E E E E

E E E

E

E

E

EE

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

C

C

C

E

E

E

E

E

E

SD

SD SD

SD

X

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W W

WWWW

W

W W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

WILDFLOWER WAY

PUBLIC INFORMATION CENTER

& ADMINISTRATION BUILDING

SS

SS

LOC LOC LOC

LOC

LOCLOCLOC

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LO

C

LOCLOC

LOC

LOCLOC

LOC

LO

C

LO

C

LOC

LO

C

LOC

LO

C

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LO

C

LOC

LOC

LOC

LOC LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

LOC

13.32' 10'

13.32' 10'

13.32' 10'

LOOP ROAD

10+00

11+00

12+00 13+00

+0

+0

+0

STORMWATER

MANAGEMENT

IMPROVEMENTS

10+00

11+00

12+00 13+00

+0

+0

+0

R30'

R30'

R30'

R2

.3'

R3

R3

.4'

R314.1'

R287.4'

R287.4'

R314.1'

R252.2'

R288.9'

R278.9'

R513.3'

R486.7'

R486.7'

R278.9'

R3

.3'

.3'

8'

13.32' 13.32'

13.32'

13.32'

13.32'

4:1

4:1

4:1

47 11

TC

44 50

TC

43 97

TC

43 75

TC

34 28

TC

33 72

TC

33 57

TC

30 99

TC

30 67

TC

30 80

TC

31 08

TC

32 85

TC

34 33

TC

31 08

TC

33 58

TC

44 20

TC

46 69

TC

45 68

TOP

43 99

TOP

43 66

TOP

34 68

TOP

34 39

TOP

32 18

TOP

30 81

TOP

30 82

TOP

31 34

TOP

44 53

GS

44 28

GS

44 14

GS

42 95

GS

42 83

GS

40 66

GS

40 78

GS

37 65

GS

37 57

GS

35 71

GS

35 59

GS

34 20

GS

33 41

GS

33 21

GS

29 10

TOP

30 79

LP

31 67

GS

32 60

GS 32 55

GS

33 05

GS

33 10

GS

34 14

GS

30 98

GS

45 05

GS

45 91

GS

45 87

GS

46 80

GS46 84

GS

44 43

GS

REFER TO COLUMBARIUM

DRAWINGS FOR DETAILED

GRADING AND DRAINAGE

INFORMATION WITHIN

COLUMBARIUM COMPLEX "C"

REFER TO COLUMBARIUM

DRAWINGS FOR DETAILED

GRADING AND DRAINAGE

INFORMATION WITHIN

COLUMBARIUM COMPLEX "D"

191719181919

19341934

37 21

HP

30 21

GS

33 21

GS

31 44

GS

31 00

GS

27 81

GS

32 42

GS

30 61

GS

1921 1921

6.6

6.6%

16.0%

33 08

GS

29 34

GS

29 50

GS

34 00

GS

1932 1933 1934 1936

18 00

INV

" H

DP

E

" H

DP

E

15" HDPE

15" HDPE

15" HDPE

18" HDPE

15" HDPE

15" HDPE

EX. 18" HDPE

" H

DP

E

" H

DP

E

" R

CP

C

L I

II

8' RIP-RAP

EMERGENCY SPILLWAY

ELEV. = 1921.00

SEE DETAIL 6 ON CJ501

5A 5

4A

2A

2B

SMW 2 ES

SWM 2 RISER

LOC LIMITS OF CONSTRUCTION

STORM SEWER PIPE

TC TOP OF CURB

GS GROUND SPOT

EP EDGE OF PAVEMENT

TOP TOP OF STRUCTURE

INV. INVERT OF STRUCTURE

EXISTING STORM PIPE

STORM STRUCTURE

EXISTING STORM STRUCTURE

1. CONTRACTOR SHALL PERFORM UTILITY LOCATION FOR ALL UNDERGROUND

UTILITIES AND NOTIFY THE VA IN THE EVENT ADJUSTMENTS ARE REQUIRED TO

ENSURE THE IMPROVEMENTS ARE CONSTRUCTED IN ACCORDANCE WITH THE

CONTRACT DOCUMENTS PRIOR TO COMMENCING CONSTRUCTION ACTIVITIES.

2. HORIZONTAL DATUM IS REFERENCED TO THE CALIFORNIA STATE PLANES, ZONE V

(NAD 83) COORDINATE SYSTEM. VERTICAL DATUM IS REFERENCED TO NAVD 88.

3. STORM SEWER TOP ELEVATIONS SHOWN FOR CURB INLET STRUCTURES REFER TO

THE ELEVATION AT THE CENTER OF THE STRUCTURE.

4. SEE SHEETS CG151-CG153 FOR DETAILED BURIAL SECTION GRADING AND

DRAINAGE INFORMATION.

VERTICAL DRAIN

HP HIGH POINT

LP LOW POINT

4" DRAIN LINE

LEGEND:

GRADING NOTES:

CO

DRAINAGE FLOW ARROW

VERTICAL DRAIN (TYP.)

TYPE A STORM STRUCTURE (TYP.)

END SECTION (TYP.)

KEYNOTE LEGEND:

DESCRIPTION

VERTICAL DRAIN CLEAN OUT (TYP.)

VERTICAL DRAIN TO 4" DRAIN

LINE TRANSITION (TYP.)

VELOCITY DISSIPATION DEVICES

ADS NYLOPLAST DOME TOP INLET (TYP.)

TYPE C MANHOLE STRUCTURE (TYP.)

REMOVE SECTION OF EXISTING STORM SEWER

PIPE AND INSTALL TYPE C MANHOLE. CONNECT

EXISTING PIPES INTO NEW MANHOLE

EXISTING INDEX CONTOUR

EXISTING INTERMEDIATE CONTOUR

PROPOSED INDEX CONTOUR

PROPOSED INTERMEDIATE CONTOUR

45 0

XX PROPOSED SPOT ELEVATIONS

DRY WELL10

4" DRAIN LINE CLEAN OUT (TYP.)11

CRYPT PERIMETER UNDER DRAIN (TYP.)12

CRYPT UNDER DRAIN CLEAN OUT (TYP.)13

DRY WELL CLEAN OUT14

FLOWER WATERING STATION DRAIN LINE (SEE

SHEETS CG151-CG153 FOR DESIGN INFORMATION15

4" CRYPT PERIMETER UNDERDRAIN (PERFORATED)

CONTRACTOR TO VERIFY LOCATION OF EXISTING

INFILTRATION SWALE AND REESTABLISH IF

DISTURBED BY GRADING ACTIVITIES.

(SHADED AREA)

JUTE MATTING CHANNEL/SWALE PROTECTION17

ADS NYLOPLAST 24" X 4" WYE W/ GASKETED SWR BELL18

GRADED BERM19

TP TP TREE PROTECTION

RIP-RAP CHANNEL/SWALE PROTECTION20

LOG

LIMITS OF GRADING NEAR PROTECTED

TREE. (FILL ONLY, NO CUT WITHIN TP)

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

KERN COUNTY, CALIFORNIA

929CM003

JULY 30, 2026 RPP RJP

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

BAKERSFIELD NATIONAL CEMETERY

EXPANSION CONSTRUCTION

DOCUMENTS

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

B

AK

ER

SF

IE

LD

E

XP

AN

SI

ON

\E

NG

IN

\P

LA

NS

\C

G1

.D W

G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Walter P Moore

(310) 254-1900

AES Group, Inc.

(303) 841-3922

Davy Architecture

(619) 238-3811

Aqua Engineering

(970) 229-9668

Above Group

(321) 345-9026

KEY MAP

(NOT TO SCALE)

1 2 3

CG106

SITE GRADING AND DRAINAGE

PLAN

NORTHGRAPHICAL SCALE: 1"=30'

17+00 17+00

X

X

4" P

VC SDR 35

4" PVC SDR 35 4" PVC SDR 35 4" PVC SDR 35 4" PVC SDR 35 4" PVC SDR 35 4" PVC SDR 35 4" PVC SDR 35

4" PVC SDR 35

4" PVC SDR 35 4" PVC SDR 35

FG: 1956.03 FG: 1956.13

FG: 1956.24

FG: 1956.35

FG: 1956.46

FG: 1956.56 FG: 1956.81 FG: 1956.84 FG: 1957.28 FG: 1957.32 FG: 1957.48

FG: 1957.46

FG: 1957.43

FG: 1957.40

FG: 1957.38

FG: 1957.35

FG: 1957.32

FG: 1957.30

FG: 1956.85 FG: 1956.89 FG: 1956.96

FG: 1956.88

FG: 1956.79

FG: 1956.70

FG: 1956.61

FG: 1956.53

FG: 1956.44

FG: 1956.35

FG: 1956.27

FG: 1955.12

FG: 1954.68FG: 1954.64FG: 1954.20FG: 1954.16FG: 1953.72FG: 1953.67FG: 1953.23FG: 1953.19FG: 1953.11

FG: 1953.18

FG: 1953.25

FG: 1953.38

FG: 1953.51

FG: 1954.49

FG: 1954.66

FG: 1954.96

FG: 1955.13

FG: 1955.30 FG: 1955.39

FG: 1955.43

FG: 1956.39

INV.: 1954.64

FG: 1955.14

INV.: 1953.39FG: 1954.66

INV.: 1952.91

FG: 1957.46

INV.: 1955.71

FG: 1957.39

INV.: 1955.64

FG: 1954.18

INV.: 1952.43FG: 1953.70

INV.: 1951.95

FG: 1956.91

INV.: 1955.16

FG: 1955.49

INV.: 1953.74

FG: 1953.21

INV.: 1951.46 FG: 1955.16 FG: 1955.36

FG: 1956.07

FG: 1956.09

FG: 1956.11

FG: 1956.12FG: 1956.04

FG: 1956.00

FG: 1956.24

4" PVC SDR 35

" H

DP

E

7B

15" NYLOPLAST STRUCTURE

INV IN:1944.09 4"

INV OUT:1942.62 15"

UD7

WYE CONNECTION

INV IN:1953.30 4"

INV IN:1953.30 4"

INV OUT:1953.30 4"

UD6

WYE CONNECTION

INV IN:1952.81 4"

INV IN:1952.81 4"

INV OUT:1952.81 4"

UD5

WYE CONNECTION

INV IN:1952.34 4"

INV IN:1952.34 4"

INV OUT:1952.34 4"

UD3

WYE CONNECTION

INV IN:1951.61 4"

INV IN:1951.61 4"

INV OUT:1951.61 4"

UD2

WYE CONNECTION

INV IN:1951.13 4"

INV IN:1951.13 4"

INV OUT:1951.13 4"

UD1

45° ELBOW

INV IN:1950.93 4"

INV OUT:1950.93 4"

UD8

CLEANOUT

RIM:1955.05

INV OUT:1953.35 4"

UD4

CLEANOUT

RIM:1953.82

INV IN:1951.85 4"

INV OUT:1951.85 4"

FWS 2

FWS DRAIN

INV OUT:1951.50 4"

FIELD CONNECTION

INV IN:1951.03 4"

FIELD CONNECTION

INV IN:1942.95 4"

FINISHED GRADE

PITCH:1.88%

N13°35'21"W

149.00'-12" HDPE VERTICAL

DRAIN @

1.53%

205.00'-12" HDPE VERTICAL

DRAIN @

1.57%

205.00'-12" HDPE VERTICAL

DRAIN @

1.57%

181.00'-12" HDPE VERTICAL

DRAIN @

1.55%

85.00'-12" HDPE VERTICAL

DRAIN @

1.47%

FG: 1136.90

TL: 1135.15

LOC

ELEVATION LABEL

FINISHED GRADE ELEVATIONFG

TOP OF CRYPT LID ELEVATIONTL

EXISTING CONTOUR (5' INTERVAL)

EXISTING CONTOUR (1' INTERVAL)

PROPOSED CONTOUR (5' INTERVAL)

PROPOSED CONTOUR (1' INTERVAL)

1. CONTRACTOR SHALL PROVIDE, AS A SUBMITTAL, A PROPOSED PLAN FOR

CONSTRUCTING AND PERFORMING THE GRADING IN CRYPT FIELDS TO THE

CEMETERY DIRECTOR FOR REVIEW AND APPROVAL. PLAN TO ADDRESS ANY

POTENTIAL RAIN IMPACTS DURING EXCAVATION OF THE CRYPT FIELDS.

2. NO BACKFILL SHALL BE PLACED ON THE CRYPTS PRIOR TO BEING INSPECTED AND

ACCEPTED BY THE COR THAT THE LID AND CRYPT NUMBERS MATCH

3. HORIZONTAL DATUM IS REFERENCED TO THE CALIFORNIA STATE PLANES, ZONE V

(NAD 83) COORDINATE SYSTEM. VERTICAL DATUM IS REFERENCED TO NAVD 88.

GRADING NOTES:

LEGEND:

PRE-PLACED CRYPTS

INTERIOR CRYPT (TYP.)

PERIMETER CRYPT (TYP.)

CONCRETE SECTION MARKER

HEADSTONE FACE DIRECTION

GRAVESITE GRID MONUMENT

IN-GROUND CREMAIN SITES

UNDERDRAIN INVERTINV.

LIMITS OF WORK

CG151

NORTH

GRAPHICAL SCALE: 1"=10'

10 5 0 10 20 30

BURIAL SECTION 6

2,152 IN-GROUND CREMAIN SITES

(WITHIN 4x4' PLOTS)

BURIAL SECTION 6 GRADING

ENLARGEMENT

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

KERN COUNTY, CALIFORNIA

929CM003

JULY 30, 2026 RPP RJP

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

BAKERSFIELD NATIONAL CEMETERY

EXPANSION CONSTRUCTION

DOCUMENTS

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

B

AK

ER

SF

IE

LD

E

XP

AN

SI

ON

\E

NG

IN

\P

LA

NS

\C

G1

.D W

G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Walter P Moore

(310) 254-1900

AES Group, Inc.

(303) 841-3922

Davy Architecture

(619) 238-3811

Aqua Engineering

(970) 229-9668

Above Group

(321) 345-9026 66 OF 163

FG: 1136.90

TL: 1135.15

LOC

ELEVATION LABEL

FINISHED GRADE ELEVATIONFG

TOP OF CRYPT LID ELEVATIONTL

EXISTING CONTOUR (5' INTERVAL)

EXISTING CONTOUR (1' INTERVAL)

PROPOSED CONTOUR (5' INTERVAL)

PROPOSED CONTOUR (1' INTERVAL)

1. CONTRACTOR SHALL PROVIDE, AS A SUBMITTAL, A PROPOSED PLAN FOR

CONSTRUCTING AND PERFORMING THE GRADING IN CRYPT FIELDS TO THE

CEMETERY DIRECTOR FOR REVIEW AND APPROVAL. PLAN TO ADDRESS ANY

POTENTIAL RAIN IMPACTS DURING EXCAVATION OF THE CRYPT FIELDS.

2. NO BACKFILL SHALL BE PLACED ON THE CRYPTS PRIOR TO BEING INSPECTED AND

ACCEPTED BY THE COR THAT THE LID AND CRYPT NUMBERS MATCH

3. HORIZONTAL DATUM IS REFERENCED TO THE CALIFORNIA STATE PLANES, ZONE V

(NAD 83) COORDINATE SYSTEM. VERTICAL DATUM IS REFERENCED TO NAVD 88.

GRADING NOTES:

LEGEND:

PRE-PLACED CRYPTS

INTERIOR CRYPT (TYP.)

PERIMETER CRYPT (TYP.)

CONCRETE SECTION MARKER

HEADSTONE FACE DIRECTION

GRAVESITE GRID MONUMENT

IN-GROUND CREMAIN SITES

UNDERDRAIN INVERTINV.

LIMITS OF WORK

RANCHO EL TEJON CIR.

W

W

W

W

W

W

W

W

W

W

W

W W

W W

W W

W W

W W

W

W

W

W

W

W W

W W

W W

W

WWWWWWWWWW

W W

W W

W W

W

W

W

W

W

W

W

W

W

W

W

W

E

E E

E E

E E

E E E E E E E E E E E E E E E

E E

E E

E

E

C

C

C

C

C

C

C

C

C

C

C

C C

C C

C C

CCCCCCCCCCCCCCCC

C

C C

C C

C

C

C

C

C

C

C

C

C

C

C C

C C

C C

C C

C C

C C

C

E

C

E

4" P

VC

S

DR

4" PVC SDR 35

4" PVC SDR 35 4" PVC SDR 35

4" PVC SDR 354" PVC SDR 35

4" PVC SDR 35

4" PVC SDR 35

4" PVC SDR 354" PVC SDR 35

FG: 1949.71

TL: 1947.88

FG: 1949.94

TL: 1948.11

FG: 1950.18

TL: 1948.35

FG: 1950.27

TL: 1948.44

FG: 1950.55

TL: 1948.72

FG: 1950.53

TL: 1948.70

FG: 1950.42

TL: 1948.59

FG: 1950.79

TL: 1948.96

FG: 1951.03

TL: 1949.20

FG: 1951.26

TL: 1949.43

FG: 1951.97

TL: 1950.14

FG: 1952.24

TL: 1950.41

FG: 1952.27

TL: 1950.44

FG: 1952.65

TL: 1950.82

FG: 1952.67

TL: 1950.84

FG: 1953.05

TL: 1951.22

FG: 1953.07

TL: 1951.24

FG: 1953.45

TL: 1951.62

FG: 1953.48

TL: 1951.65

FG: 1953.85

TL: 1952.02

FG: 1953.74

TL: 1951.91

FG: 1953.75

TL: 1951.92

FG: 1953.72

TL: 1951.89

FG: 1953.63

TL: 1951.80

FG: 1953.54

TL: 1951.71

FG: 1953.39

TL: 1951.56

FG: 1953.26

TL: 1951.43

FG: 1953.03

TL: 1951.20

FG: 1952.51

TL: 1950.68

FG: 1951.51

TL: 1949.68

FG: 1951.13

TL: 1949.30

FG: 1951.28

TL: 1949.45

FG: 1951.25

TL: 1949.42FG: 1951.04

TL: 1949.21

FG: 1951.02

TL: 1949.19

FG: 1951.16

TL: 1949.33

FG: 1951.13

TL: 1949.30FG: 1950.76

TL: 1948.93

FG: 1950.73

TL: 1948.90

FG: 1950.36

TL: 1948.53

FG: 1950.33

TL: 1948.50

FG: 1949.95

TL: 1948.12

FG: 1949.93

TL: 1948.10

FG: 1950.34

INV.: 1948.59

FG: 1950.74

INV.: 1948.99

FG: 1951.15

INV.: 1949.40

FG: 1951.26

INV.: 1949.51 FG: 1951.52

INV.: 1949.77

FG: 1953.13

INV.: 1951.38

FG: 1953.64

INV.: 1951.89

FG: 1953.96

INV.: 1952.21

FG: 1953.55

INV.: 1951.80

FG: 1953.15

INV.: 1951.40

FG: 1952.75

INV.: 1951.00

FG: 1952.35

INV.: 1950.60

FG: 1950.54

INV.: 1948.79

FG: 1953.35

TL: 1951.52

FG: 1953.28

TL: 1951.45

FG: 1953.84

TL: 1952.01

FG: 1949.94

INV.: 1948.19

4" P

ER

FO

RA

TE

D

PV

C

4" PVC SDR 35

4" P

ER

FO

RA

TE

D

PV

C

4" PERFORATED PVC

4" PERFORATED PVC

4" PERFORATED PVC

4" PERFORATED PVC

4" PERFORATED PVC

4" PVC SDR 35

4" PVC SDR 35

TYPE A STORM STRUCTURE (7' OPENING)

INV IN:1947.41 15"

INV IN:1948.18 4"

INV OUT:1946.66 24"

UD11

WYE CONNECTION

INV IN:1941.43 4"

INV IN:1941.36 4"

INV OUT:1941.36 4"

UD13

WYE CONNECTION

INV IN:1945.36 4"

INV IN:1945.36 4"

INV OUT:1945.36 4"

UD14

WYE CONNECTION

INV IN:1945.81 4"

INV IN:1945.81 4"

INV OUT:1945.81 4"

UD16

WYE CONNECTION

INV IN:1946.26 4"

INV IN:1947.85 4"

INV OUT:1946.26 4"

UD34

WYE CONNECTION

INV IN:1948.76 4"

INV IN:1948.76 4"

INV OUT:1948.76 4"

UD31

WYE CONNECTION

INV IN:1948.52 4"

INV IN:1948.52 4"

INV OUT:1948.53 4"

UD30

WYE CONNECTION

INV IN:1948.30 4"

INV IN:1948.30 4"

INV OUT:1948.30 4"

UD35

CLEANOUT

RIM:1950.67

INV OUT:1948.79 4"

UD27

CLEANOUT

RIM:1952.06

INV OUT:1943.88 4"

UD26

22.5° ELBOW

INV IN:1942.99 4"

INV OUT:1942.99 4"

UD25

22.5° ELBOW

INV IN:1942.37 4"

INV OUT:1942.37 4"

UD24

45° ELBOW

INV IN:1942.18 4"

INV OUT:1942.18 4"

UD22

45° ELBOW

INV IN:1941.94 4"

INV OUT:1941.94 4"

UD18

WYE CONNECTION

INV IN:1941.45 4"

INV IN:1941.46 4"

INV OUT:1941.45 4"

UD12

WYE CONNECTION

INV IN:1941.43 4"

INV IN:1941.43 4"

INV OUT:1941.43 4"

UD19

22.5° ELBOW

INV IN:1942.77 4"

INV OUT:1942.77 4"

UD20

22.5° ELBOW

INV IN:1942.85 4"

INV OUT:1942.85 4"

UD32

22.5° ELBOW

INV IN:1948.55 4"

INV OUT:1948.55 4"

UD21

CLEANOUT

INV OUT:1943.38 4"

UD17

CLEANOUT

RIM:1950.58

INV OUT:1946.31 4"UD15

WYE CONNECTION

INV IN:1946.17 4"

INV IN:1946.17 4"

INV OUT:1946.17 4"

FWS 5

FWS 5 DRAIN

INV OUT:1946.25 4"

UD10

90° ELBOW

INV IN:1941.30 4"

INV OUT:1941.30 4"

UD9

CLEANOUT

RIM:1949.05

INV IN:1941.27 4"

INV OUT:1941.27 4"

DW1

OUTFALL TO DRY WELL

INV IN:1941.25 4"

INV OUT:1942.16 4"

DW0

CLEAN OUT

RIM:1950.17

INV IN:1941.76 4"

4" P

ER

FO

RA

TE

D

PV

C

4" PVC SDR 35

4" PVC SDR 35 4" PVC SDR 35

4" PVC SDR 35

4" PVC SDR 354" PVC SDR 354" PVC SDR 35

4" PVC SDR 35

FIN

ISH

ED

G

RA

DE

PIT

CH

: 2 .0%

N1 6°

'14

"W

101.00'-12" HDPE VERTICAL

DRAIN @

1.70%

157.00'-12" HDPE VERTICAL

DRAIN @

1.70%

157.00'-12" HDPE VERTICAL

DRAIN @

1.70%

157.00'-12" HDPE VERTICAL

DRAIN @

1.70%

157.00'-12" HDPE VERTICAL

DRAIN @

1.69%

133.00'-12" HDPE VERTICAL

DRAIN @

1.70%

95.37'-12" HDPE VERTICAL

DRAIN @

1.87%

FG: 1953.71

TL: 1951.88

FG: 1953.25

TL: 1951.42

CG152

NORTH

GRAPHICAL SCALE: 1"=10'

10 5 0 10 20 30

BURIAL SECTION 19 GRADING

ENLARGEMENT

BURIAL SECTION 19

1,408 DOUBLE DEPTH PPC

(WITHIN 3x8' PLOTS)

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

KERN COUNTY, CALIFORNIA

929CM003

JULY 30, 2026 RPP RJP

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

BAKERSFIELD NATIONAL CEMETERY

EXPANSION CONSTRUCTION

DOCUMENTS

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

B

AK

ER

SF

IE

LD

E

XP

AN

SI

ON

\E

NG

IN

\P

LA

NS

\C

G1

.D W

G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Walter P Moore

(310) 254-1900

AES Group, Inc.

(303) 841-3922

Davy Architecture

(619) 238-3811

Aqua Engineering

(970) 229-9668

(321) 345-9026 67 OF 163

FG: 1136.90

TL: 1135.15

LOC

ELEVATION LABEL

FINISHED GRADE ELEVATIONFG

TOP OF CRYPT LID ELEVATIONTL

EXISTING CONTOUR (5' INTERVAL)

EXISTING CONTOUR (1' INTERVAL)

PROPOSED CONTOUR (5' INTERVAL)

PROPOSED CONTOUR (1' INTERVAL)

1. CONTRACTOR SHALL PROVIDE, AS A SUBMITTAL, A PROPOSED PLAN FOR

CONSTRUCTING AND PERFORMING THE GRADING IN CRYPT FIELDS TO THE

CEMETERY DIRECTOR FOR REVIEW AND APPROVAL. PLAN TO ADDRESS ANY

POTENTIAL RAIN IMPACTS DURING EXCAVATION OF THE CRYPT FIELDS.

2. NO BACKFILL SHALL BE PLACED ON THE CRYPTS PRIOR TO BEING INSPECTED AND

ACCEPTED BY THE COR THAT THE LID AND CRYPT NUMBERS MATCH

3. HORIZONTAL DATUM IS REFERENCED TO THE CALIFORNIA STATE PLANES, ZONE V

(NAD 83) COORDINATE SYSTEM. VERTICAL DATUM IS REFERENCED TO NAVD 88.

GRADING NOTES:

LEGEND:

PRE-PLACED CRYPTS

INTERIOR CRYPT (TYP.)

PERIMETER CRYPT (TYP.)

CONCRETE SECTION MARKER

HEADSTONE FACE DIRECTION

GRAVESITE GRID MONUMENT

IN-GROUND CREMAIN SITES

UNDERDRAIN INVERTINV.

LIMITS OF WORK

RANCHO EL TEJON CIR.

W W

W W

W

WWWWWWWW

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W

W W W W W W W W W W W W W W W W W W W W

E E

E E

E E E E E E E E E E E E E E E E

E E

E E

E

C C

C C

C

CCCCCCCCCCC

C C

C C

C C

C C

C C

C C

C C

C C

C C

C C

CCCCCCCCCCCCCCCCCCCCCCCC

4"

PVC SDR 35

4" PVC SDR 35

4" PVC SDR 35

4" P

VC SDR 35

4" P

VC SDR 35

4" PVC SDR 35

4" PVC SDR 35

4" PVC SDR 35

4" P

VC SDR 35

4" PVC SDR 35

4" PVC SDR 35

4" PVC SDR 35

4" P

VC SDR 35

4" PVC SDR 35

4" P

VC SDR 35

FG: 1953.95

TL: 1952.12

FG: 1954.33

TL: 1952.50

FG: 1954.36

TL: 1952.53

FG: 1954.88

TL: 1953.05

FG: 1954.91

TL: 1953.08

FG: 1955.28

TL: 1953.45

FG: 1955.31

TL: 1953.48

FG: 1955.53

TL: 1953.70

FG: 1955.83

TL: 1954.00

FG: 1955.86

TL: 1954.03

FG: 1956.13

TL: 1954.30

FG: 1956.33

TL: 1954.50

FG: 1956.53

TL: 1954.70

FG: 1956.96

TL: 1955.13

FG: 1956.98

TL: 1955.15

FG: 1957.09

TL: 1955.26

FG: 1957.43

TL: 1955.60

FG: 1957.63

TL: 1955.80

FG: 1958.17

TL: 1956.34

FG: 1958.32

TL: 1956.49

FG: 1958.51

TL: 1956.68

FG: 1957.97

TL: 1956.14

FG: 1958.83

TL: 1957.00

FG: 1958.94

TL: 1957.11

FG: 1959.28

TL: 1957.45

FG: 1959.48

TL: 1957.65

FG: 1959.68

TL: 1957.85

FG: 1960.11

TL: 1958.28

FG: 1959.84

TL: 1958.01

FG: 1959.81

TL: 1957.98

FG: 1959.43

TL: 1957.60

FG: 1959.41

TL: 1957.58

FG: 1959.03

TL: 1957.20

FG: 1959.00

TL: 1957.17

FG: 1958.62

TL: 1956.79

FG: 1958.60

TL: 1956.77

FG: 1958.22

TL: 1956.39

FG: 1958.19

TL: 1956.36

FG: 1957.81

TL: 1955.98

FG: 1957.79

TL: 1955.96

FG: 1957.52

TL: 1955.69

FG: 1956.31

TL: 1954.48

FG: 1955.97

TL: 1954.14

FG: 1958.80

TL: 1956.97

FG: 1954.34

INV.: 1952.59

FG: 1955.30

INV.: 1953.55

FG: 1955.85

INV.: 1954.10

FG: 1959.51

INV.: 1957.76

FG: 1959.10

INV.: 1957.35

FG: 1958.70

INV.: 1956.95

FG: 1957.89

INV.: 1956.14

FG: 1956.59

INV.: 1954.84

FG: 1954.63

TL: 1952.80

4" PERFORATED PVC

4" P

ERFORATED PVC

4" PERFORATED PVC

4" P

ERFORATED PVC

4" PERFORATED PVC

4" PVC SDR 35

4" PVC SDR 35

TYPE A STORM STRUCTURE (7' OPENING)

INV IN:1946.19 24"

INV IN:1946.14 24"

INV OUT:1946.09 24"

UD40

45° ELBOW

INV IN:1949.38 4"

INV OUT:1949.38 4"

UD41

WYE CONNECTION

INV OUT:1949.65 4"

INV OUT:1949.65 4"

CO42

45° ELBOW

INV IN:1949.98 4"

INV OUT:1949.98 4"

UD43

45° ELBOW

INV IN:1950.10 4"

INV OUT:1950.10 4"

UD45

WYE CONNECTION

INV IN:1950.58 4"

INV OUT:1950.58 4"

CO48

45° ELBOW

INV IN:1950.86 4"

INV OUT:1950.86 4"

UD49

45° ELBOW

INV IN:1950.97 4"

INV OUT:1950.97 4"

UD50

WYE CONNECTION

INV IN:1951.08 4"

INV IN:1952.41 4"

INV OUT:1951.09 4"

UD51

45° ELBOW

INV IN:1951.40 4"

INV OUT:1951.40 4"

UD52

WYE CONNECTION

INV IN:1952.92 4"

INV IN:1951.59 4"

INV OUT:1951.59 4"

UD53

CLEANOUT

RIM:1956.50

INV OUT:1951.64 4"

UD44

CLEANOUT

RIM:1954.99

INV IN:1950.38 4"

INV OUT:1950.38 4"UD60

CLEAN OUT

RIM:1953.44

INV IN:1945.55 4"

INV OUT:1945.55 4"

UD61

45° ELBOW

INV IN:1945.60 4"

INV OUT:1945.60 4"

UD62

45° ELBOW

INV IN:1946.42 4"

INV OUT:1946.42 4"

UD63

45° ELBOW

INV IN:1946.66 4"

INV OUT:1946.66 4"

UD64

45° ELBOW

INV IN:1947.33 4"

INV OUT:1947.33 4"

UD65

45° ELBOW

INV IN:1947.56 4"

INV OUT:1947.56 4"

UD66

CLEANOUT

RIM:1956.12

INV OUT:1947.96 4"

FWS 4

FWS 4 DRAIN

INV OUT:1950.78 4"

UD46

WYE CONNECTION

INV IN:1950.61 4"

INV OUT:1950.61 4"

DW3

OUTFALL TO DRY WELL

INV IN:1945.50 4"

INV OUT:1945.50 4"

4" P

ER

FO

RA

TE

D

PV

C

DW2

CLEAN OUT

RIM:1953.36

INV IN:1945.10 4"

FIN

ISH

ED

G

RA

DE

PIT

CH

:2.

N1

6°

'17 "W

197.00'-12" HDPE VERTICAL

DRAIN @

1.80%

196.15'-12" HDPE VERTICAL

DRAIN @

1.80%

181.00'-12" HDPE VERTICAL

DRAIN @

1.80%

162.00'-12" HDPE VERTICAL

DRAIN @

1.80%

FG: 1955.75

TL: 1953.92

FG: 1956.62

TL: 1954.79

FG: 1956.91

TL: 1955.08

FG: 1957.61

TL: 1955.78

FG: 1957.33

TL: 1955.50

FG: 1956.37

TL: 1954.54

FG: 1956.03

TL: 1954.20

FG: 1955.09

TL: 1953.26

FG: 1955.24

TL: 1953.41

FG: 1955.33

TL: 1953.50

FG: 1956.49

TL: 1954.66

FG: 1956.52

TL: 1954.69

FG: 1955.19

TL: 1953.36

FG: 1955.22

TL: 1953.39

FG: 1955.89

TL: 1954.06

FG: 1955.86

TL: 1954.03

FG: 1957.59

TL: 1955.76

FG: 1955.61

TL: 1953.78

FG: 1957.18

TL: 1955.35

FG: 1957.21

TL: 1955.38

FG: 1955.31

TL: 1953.48

FG: 1955.34

TL: 1953.51

21A

48" ADS NYLOPLAST STRUCTURE

INV IN:1946.32 24"

INV IN:1949.23 4"

INV OUT:1946.32 24"

CG153

NORTH

GRAPHICAL SCALE: 1"=10'

10 5 0 10 20 30

BURIAL SECTION 20 GRADING

ENLARGEMENT

BURIAL SECTION 20

1,596 DOUBLE DEPTH PPC

(WITHIN 3x8' PLOTS)

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

KERN COUNTY, CALIFORNIA

929CM003

JULY 30, 2026 RPP RJP

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

BAKERSFIELD NATIONAL CEMETERY

EXPANSION CONSTRUCTION

DOCUMENTS

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

B

AK

ER

SF

IE

LD

E

XP

AN

SI

ON

\E

NG

IN

\P

LA

NS

\C

G1

.D W

G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Walter P Moore

(310) 254-1900

AES Group, Inc.

(303) 841-3922

Davy Architecture

(619) 238-3811

Aqua Engineering

(970) 229-9668

(321) 345-9026 68 OF 163

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

DISCHARGE TO GRADE

107.81'-4" PERFORATED

FOUNDATION DRAIN @ MIN. 1%

55'-4" PVC HEADER PIPE @ MIN.

1%

REFER TO SHEET CG405 FOR

DETAILED GRADING WITHIN THE

ROSTRUM AREA

FG: 1975.39

FG: 1975.34

FG: 1975.44

FG: 1975.81

FG: 1976.14

FG: 1975.82

FG: 1975.44

FG: 1974.29

FG: 1975.39

CG154

GRAPHICAL SCALE: 1"=10'

10 5 0 10 20 30

ROSTRUM GRADING AND

DRAINAGE ENLARGEMENT

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

KERN COUNTY, CALIFORNIA

929CM003

JULY 30, 2026 RPP RJP

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

BAKERSFIELD NATIONAL CEMETERY

EXPANSION CONSTRUCTION

DOCUMENTS

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

B

AK

ER

SF

IE

LD

E

XP

AN

SI

ON

\E

NG

IN

\P

LA

NS

\C

G1

.D W

G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304) 725-8456

Walter P Moore

(310) 254-1900

AES Group, Inc.

(303) 841-3922

Davy Architecture

(619) 238-3811

Aqua Engineering

(970) 229-9668

Above Group

(321) 345-9026

NORTH

SCALE: 1" = 10'

ROSTRUM GRADING AND DRAINAGE ENLARGEMENT1

4" PVC SDR 35

" H

DP

E

FWS 3

FWS DRAIN

INV OUT:1943.16 4"

FIELD CONNECTION

INV IN:1942.95 4"

4" PVC SDR 35

5A

INV IN:1939.74 4"

INV OUT:1938.44 15"

FWS 8

FWS DRAIN

INV OUT:1940.12 4"

20+00 20+00

E

E

E

E

E E

E E

E

4" PVC SDR 35

FWS 1

FWS DRAIN

INV OUT:1962.67 4"

INV IN:1961.42 15"

INV IN:1962.32 4"

INV OUT:1961.32 15"

13+0013+00

4" PVC SDR 35

4A

INV IN:1929.34 4"

INV OUT:1928.42 15"FWS 7

FWS DRAIN

INV OUT:1929.81 4"

4" PVC SDR 35

FWS 6

FWS DRAIN

INV OUT:1927.19 4"

INV IN:1924.33 15"

INV IN:1924.33 15"

INV IN:1926.87 4"

INV OUT:1924.08 18"

CG155

NORTH

GRAPHICAL SCALE: 1"=10'

10 5 0 10 20 30

FLOWER WATERING STATION

DRAIN LINE ENLARGEMENTS

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9

KERN COUNTY, CALIFORNIA

929CM003

JULY 30, 2026 RPP RJP

Office of Design and Construction

Service U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved: Project Director

Phase

Building Number

BID DOCUMENTS

VA FORM 08 - 6231

321 4 5 6 7 8 9

BAKERSFIELD NATIONAL CEMETERY

EXPANSION CONSTRUCTION

DOCUMENTS

Fil e P ath : G

:\P

RO

JE

CT

\S

BU

\50

-0

1 N

CA

B

AK

ER

SF

IE

LD

E

XP

AN

SI

ON

\E

NG

IN

\P

LA

NS

\C

G1

.D W

G

Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866

(518) 587-8100

INTEGRITY FEDERAL SERVICES

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

(304)…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .