Text version
TEMPORARY STABILIZED
CONSTRUCTION ENTRANCE
/ EXIT
SILT FENCE
TEMPORARY DRAINAGE SWALE
STORM DRAIN INLET
PROTECTION
EROSION & SEDIMENT CONTROL LEGEND
SYMBOLKEY DESCRIPTION DETAIL
TEMPORARY SEDIMENT TRAP
ST
CWS CONCRETE WASTE
MANAGEMENT
CE
OP OUTLET PROTECTION
SFSF
DS
IP
TEMPORARY SEDIMENT BASIN
(TO BE DEWATERED VIA
PUMPING INTO FILTER BAG)
SB
#1
V
MDS
R
CS
S
TEMPORARY EQUIPMENT WASH, FUELLING,
AND MAINTENANCE AREA (ADHERE TO
CASQA NS-8, NS-9, & NS-10)
TEMPORARY CONTAMINATED SOIL
MANAGEMENT AREA (ADHERE TO CASQA WM-7)
TEMPORARY MATERIAL STOCKPILE AREA
(ADHERE TO CASQA WM-3)
TEMPORARY MATERIAL DELIVERY AND
STORAGE AREA (ADHERE TO CASQA WM-1)
TEMPORARY SANITARY-SEPTIC WASTE
MANAGEMENT AREA (ADHERE TO CASQA WM-8)
AREA FOR SOLID, HAZARDOUS, AND LIQUID
WASTE MANAGEMENT (ADHERE TO CASQA
WM-5, WM-6, & WM-10)
WSA
X
TEMPORARY CONSTRUCTION SAFETY FENCE
(REFER TO SPEC SECTION 01 00 02 PART 1.7).
NOTES
1. SCHEDULING (CASQA EC-1): CONTRACTOR SHALL IMPLEMENT AND
COMPLY WITH THE SWPPP PREPARED BY INTEGRITY FEDERAL
SERVICES DATED XX. CONTRACTOR SHALL IMPLEMENT SCHEDULING
PRACTICES AS SET FORTH BY CASQA ES-1.
2. PRESERVATION OF EXISTING VEGETATION (CASQA EC-2):
CONTRACTOR TO LIMIT REMOVAL OF TREES AND VEGETATION TO
AREAS ONLY INSIDE THE LIMITS OF CONSTRUCTION.
3. WIND EROSION CONTROL (CASQA WE-1): CONTRACTOR IS
RESPONSIBLE FOR CONTROLLING DUST AND MAINTINING COMPLIANCE
WITH ALL SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT
(SCAQMD) RULES AND REGULATIONS.
LIMITS OF CONSTRUCTION
SAF
LOC
ENTRANCE/EXIT TIRE WASH
MAINTAIN CONCRETE LINED DITCH AS
DIVERSION UNTIL GRADING ACTIVITIES ARE
COMPLETE. ONCE GRADING IS COMPLETE,
DEMOLISH CONCRETE LINED DITCH.
POTENTIAL SAMPLING LOCATIONSL
DRAINAGE DIVIDES
GC503TP TP TREE PROTECTION
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X
X
X
X
X
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WWWW
W
W W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W W
Dirt Rd.
Dirt Rd.
Dirt Rd.
Dirt Rd.
Dirt Rd.
MAINTENANCE ACCESS ROAD
X X X X X X X X X X X
WOOD POST
FIBERGLASS
MARKER
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X
X
X
X
X
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WWWW
W
W W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W W
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E E E E E E E E E E E
C C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C C
C C C C C C C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LO
C LOC LOC LOC LOC
LO
C
LO
C
CWSCE
TEMPORARYCONTRACTOR TRAILER
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
SAF
CE
V
WSA
MDS
R
CS S
TEMPORARY
CONSTRUCTION
ACCESS PATH
PROPOSED
CONTRACTOR
YARD
CONTRACTOR TO
ENSURE POSITIVE
DRAINAGE
SL
SAMPLING LOCATION #2
DIVERT WATER AROUND SITE
CONTRACTOR TO
ENSURE POSITIVE
DRAINAGE
BREAK DRAINAGE DIVIDE
DISCHARGE DIVERSION
DITCH AT LOW POINT OF
CONCRETE SURFACE.
DS
#1
19711972
KEY MAP
(NOT TO SCALE)
1 2 3
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\G
C1
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 GC101
PHASE I EROSION AND SEDIMENT
CONTROL PLAN
NORTHGRAPHICAL SCALE: 1"=30'
30 15 0 30 60 90
/ EXIT
SILT FENCE
TEMPORARY DRAINAGE SWALE
STORM DRAIN INLET
PROTECTION
EROSION & SEDIMENT CONTROL LEGEND
SYMBOLKEY DESCRIPTION DETAIL
TEMPORARY SEDIMENT TRAP
ST
CWS CONCRETE WASTE
MANAGEMENT
CE
OP OUTLET PROTECTION
SFSF
DS
IP
TEMPORARY SEDIMENT BASIN
(TO BE DEWATERED VIA
PUMPING INTO FILTER BAG)
SB
#1
V
MDS
R
CS
S
TEMPORARY EQUIPMENT WASH, FUELLING,
AND MAINTENANCE AREA (ADHERE TO
CASQA NS-8, NS-9, & NS-10)
TEMPORARY CONTAMINATED SOIL
MANAGEMENT AREA (ADHERE TO CASQA WM-7)
TEMPORARY MATERIAL STOCKPILE AREA
(ADHERE TO CASQA WM-3)
TEMPORARY MATERIAL DELIVERY AND
STORAGE AREA (ADHERE TO CASQA WM-1)
TEMPORARY SANITARY-SEPTIC WASTE
MANAGEMENT AREA (ADHERE TO CASQA WM-8)
AREA FOR SOLID, HAZARDOUS, AND LIQUID
WASTE MANAGEMENT (ADHERE TO CASQA
WM-5, WM-6, & WM-10)
WSA
X
TEMPORARY CONSTRUCTION SAFETY FENCE
(REFER TO SPEC SECTION 01 00 02 PART 1.7).
NOTES
1. SCHEDULING (CASQA EC-1): CONTRACTOR SHALL IMPLEMENT AND
COMPLY WITH THE SWPPP PREPARED BY INTEGRITY FEDERAL
SERVICES DATED XX. CONTRACTOR SHALL IMPLEMENT SCHEDULING
PRACTICES AS SET FORTH BY CASQA ES-1.
2. PRESERVATION OF EXISTING VEGETATION (CASQA EC-2):
CONTRACTOR TO LIMIT REMOVAL OF TREES AND VEGETATION TO
AREAS ONLY INSIDE THE LIMITS OF CONSTRUCTION.
3. WIND EROSION CONTROL (CASQA WE-1): CONTRACTOR IS
RESPONSIBLE FOR CONTROLLING DUST AND MAINTINING COMPLIANCE
WITH ALL SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT
(SCAQMD) RULES AND REGULATIONS.
LIMITS OF CONSTRUCTION
SAF
LOC
ENTRANCE/EXIT TIRE WASH
MAINTAIN CONCRETE LINED DITCH AS
DIVERSION UNTIL GRADING ACTIVITIES ARE
COMPLETE. ONCE GRADING IS COMPLETE,
DEMOLISH CONCRETE LINED DITCH.
POTENTIAL SAMPLING LOCATIONSL
DRAINAGE DIVIDES
GC503TP TP TREE PROTECTION
X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X
Dirt Rd.
Dirt Rd.
Dirt Rd.
Dirt Rd.
Dirt Rd.
Dirt Rd.
EAST BEAR MOUNTAIN BLVD.
STATE HIGHWAY 223
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
OAK TREE
PLANTER
FOG LINE
FOG LINE
YELLOW STRIPES
FOG LINE
FOG LINE
YELLOW STRIPES
POST MILE
SIGN
UTILITY
VAULT
POST
POST
X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E
E
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOCLOC
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
TEMPORARY
CONSTRUCTION
ACCESS PATH
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
CONTRACTOR TO
ENSURE POSITIVE
DRAINAGE
DIVERT WATER AROUND SITE
DIVERT WATER AROUND SITE
DIVERT WATER AROUND SITE
DS
#1
DS
#1
DS
#1
DS
#5
KEY MAP
(NOT TO SCALE)
1 2 3
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\G
C1
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 GC102
PHASE I EROSION AND SEDIMENT
CONTROL PLAN
NORTHGRAPHICAL SCALE: 1"=30'
/ EXIT
SILT FENCE
TEMPORARY DRAINAGE SWALE
STORM DRAIN INLET
PROTECTION
EROSION & SEDIMENT CONTROL LEGEND
SYMBOLKEY DESCRIPTION DETAIL
TEMPORARY SEDIMENT TRAP
ST
CWS CONCRETE WASTE
MANAGEMENT
CE
OP OUTLET PROTECTION
SFSF
DS
IP
TEMPORARY SEDIMENT BASIN
(TO BE DEWATERED VIA
PUMPING INTO FILTER BAG)
SB
#1
V
MDS
R
CS
S
TEMPORARY EQUIPMENT WASH, FUELLING,
AND MAINTENANCE AREA (ADHERE TO
CASQA NS-8, NS-9, & NS-10)
TEMPORARY CONTAMINATED SOIL
MANAGEMENT AREA (ADHERE TO CASQA WM-7)
TEMPORARY MATERIAL STOCKPILE AREA
(ADHERE TO CASQA WM-3)
TEMPORARY MATERIAL DELIVERY AND
STORAGE AREA (ADHERE TO CASQA WM-1)
TEMPORARY SANITARY-SEPTIC WASTE
MANAGEMENT AREA (ADHERE TO CASQA WM-8)
AREA FOR SOLID, HAZARDOUS, AND LIQUID
WASTE MANAGEMENT (ADHERE TO CASQA
WM-5, WM-6, & WM-10)
WSA
X
TEMPORARY CONSTRUCTION SAFETY FENCE
(REFER TO SPEC SECTION 01 00 02 PART 1.7).
NOTES
1. SCHEDULING (CASQA EC-1): CONTRACTOR SHALL IMPLEMENT AND
COMPLY WITH THE SWPPP PREPARED BY INTEGRITY FEDERAL
SERVICES DATED XX. CONTRACTOR SHALL IMPLEMENT SCHEDULING
PRACTICES AS SET FORTH BY CASQA ES-1.
2. PRESERVATION OF EXISTING VEGETATION (CASQA EC-2):
CONTRACTOR TO LIMIT REMOVAL OF TREES AND VEGETATION TO
AREAS ONLY INSIDE THE LIMITS OF CONSTRUCTION.
3. WIND EROSION CONTROL (CASQA WE-1): CONTRACTOR IS
RESPONSIBLE FOR CONTROLLING DUST AND MAINTINING COMPLIANCE
WITH ALL SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT
(SCAQMD) RULES AND REGULATIONS.
LIMITS OF CONSTRUCTION
SAF
LOC
ENTRANCE/EXIT TIRE WASH
MAINTAIN CONCRETE LINED DITCH AS
DIVERSION UNTIL GRADING ACTIVITIES ARE
COMPLETE. ONCE GRADING IS COMPLETE,
DEMOLISH CONCRETE LINED DITCH.
POTENTIAL SAMPLING LOCATIONSL
DRAINAGE DIVIDES
GC503TP TP TREE PROTECTION
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
Dirt Rd.
Dirt Rd.
Dirt Rd.
Dirt Rd.
Dirt Rd.
Dir t R d.
W
HITE W
OLF DRIVE
3.5" ALUMINUM CAP 3.5" ALUMINUM CAP
3.5" ALUMINUM CAP 1" REBAR
X X
X X
X X
X X
X X
X
X
XXXX
X X X X X X X X X X X X X X X X X X X X X
X
X X
X X
X X
X X
X X
X X
X
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTERPLANTER
WHITE STRIPE
FOG LINE
FOG LINEDOUBLE YELLOW STRIPES
WHITE STRIPE
FOG LINE
FOG LINE
DOUBLE YELLOW STRIPES
RAMP
ADA
RAMPADA
RAMP
MEDIAN
ISLAND SIGN
MEDIAN
ISLAND SIGN
BAKERSFIELD NATIONAL
CEMETERY MONUMENT SIGN
WHITE WOLF
DRIVE SIGN
STREET SIGN
STOP SIGN
BENCHMARK #3 SET:
CHISELED "+" ON TOP OF CURB.
ELEV. = 1971.83' (NAVD88)
N = 2279930.124 E = 6362583.43
SECTION 7
SECTION 16
SECTION 15
SECTION 8SECTION 12SECTION 17
CULVERT
V-GUTTER
4" PVC
6" PVC
POST
SLIDING GATE
SLIDING GATE
WALL
WALL
WALL
WROUGHT
IRON FENCE
WROUGHT
IRON FENCE
WALL
WALL
GATE POSTS
ATT VAULT
W
OOD CHIPS
WOOD CHIPS
GRAVEL
GRAVEL
POST
POST
POST
TRASH
BINS
BENCH
BURIED
UTILITY LINE
TRASH
BINS
UTILITY BOX
BENCH
IRR. BOXES IRR. BOXES
IRR.
BOXES
IRR. BOX
IRR. BOX
IRR. BOX
IRR. BOX
I.C.V.
I.C.V.
I.C.V.
I.C.V.
I.C.V.
I.C.V.
IRR. BOX.
IRR. BOX.
IRR. BOX.
IRR. BOX.
IRR. BOX.
IRR. BOX. IRR. BOX. IRR. BOX.
IRR. BOX.
IRR. BOX.
WATER
BOXES
5-I.C.V.
IRR. BOXES
POST
POST
POST
POST
POST
POST POST
POST
POST
I.C.V.
I.C.V.
WATER
METER
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
E
E
E
E
E
E
E
E
E
E
E E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E
E E
E E
E E
E E
E E
E E E
E E
E
E E
E E
E E
E E
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C C C
C C C C
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E
E
E
E
E E
E
LOC
LOC
LOC
LO
C
LO
C
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LOC
LOC
LOC
LOCLOC
LOC
LOC
LOC
LOC LOC LOC
LOC
LOC
LOC
LOC
LO
C
LOC LOC LOC LOC LOC LOC LOC LOC LOC
LOC
LOC
LOC
LOC
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LOC
LOC
LOC
LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LOC
LOC
LO
C
LO
C
LO
C LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOCLOCLOCLOC
LOC
LOC
LOC
CE
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SFSFSF
SF
SF
SF
SF
SF
SF
12" CMP
CULVERT
IP
SF
SF
SF
OP
SL
SAMPLING LOCATION #3
PLACE GRAVEL BAG INLET
PROTECTION AT CURB CUT TO
DIVERT ROAD DRAINAGE
AROUND CONSTRUCTION SITE
SF
SF
DIVERT WATER AROUND SITE
DIVERT WATER AROUND SITE
DIVERT WATER AROUND SITE
DIVERT WATER AROUND SITE
DIVERT WATER TO SEDIMENT TRAP
DIVERT WATER TO SEDIMENT TRAP
DIVERT WATER TO SEDIMENT TRAP
DS
#5
DS
#5
DS
#5
DS
#6
DS
#6
DS
#7
DS
#7
DS
#7
DS
#8
KEY MAP
(NOT TO SCALE)
1 2 3
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\G
C1
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 GC103
PHASE I EROSION AND SEDIMENT
CONTROL PLAN
NORTHGRAPHICAL SCALE: 1"=30'
/ EXIT
SILT FENCE
TEMPORARY DRAINAGE SWALE
STORM DRAIN INLET
PROTECTION
EROSION & SEDIMENT CONTROL LEGEND
SYMBOLKEY DESCRIPTION DETAIL
TEMPORARY SEDIMENT TRAP
ST
CWS CONCRETE WASTE
MANAGEMENT
CE
OP OUTLET PROTECTION
SFSF
DS
IP
TEMPORARY SEDIMENT BASIN
(TO BE DEWATERED VIA
PUMPING INTO FILTER BAG)
SB
#1
V
MDS
R
CS
S
TEMPORARY EQUIPMENT WASH, FUELLING,
AND MAINTENANCE AREA (ADHERE TO
CASQA NS-8, NS-9, & NS-10)
TEMPORARY CONTAMINATED SOIL
MANAGEMENT AREA (ADHERE TO CASQA WM-7)
TEMPORARY MATERIAL STOCKPILE AREA
(ADHERE TO CASQA WM-3)
TEMPORARY MATERIAL DELIVERY AND
STORAGE AREA (ADHERE TO CASQA WM-1)
TEMPORARY SANITARY-SEPTIC WASTE
MANAGEMENT AREA (ADHERE TO CASQA WM-8)
AREA FOR SOLID, HAZARDOUS, AND LIQUID
WASTE MANAGEMENT (ADHERE TO CASQA
WM-5, WM-6, & WM-10)
WSA
X
TEMPORARY CONSTRUCTION SAFETY FENCE
(REFER TO SPEC SECTION 01 00 02 PART 1.7).
NOTES
1. SCHEDULING (CASQA EC-1): CONTRACTOR SHALL IMPLEMENT AND
COMPLY WITH THE SWPPP PREPARED BY INTEGRITY FEDERAL
SERVICES DATED XX. CONTRACTOR SHALL IMPLEMENT SCHEDULING
PRACTICES AS SET FORTH BY CASQA ES-1.
2. PRESERVATION OF EXISTING VEGETATION (CASQA EC-2):
CONTRACTOR TO LIMIT REMOVAL OF TREES AND VEGETATION TO
AREAS ONLY INSIDE THE LIMITS OF CONSTRUCTION.
3. WIND EROSION CONTROL (CASQA WE-1): CONTRACTOR IS
RESPONSIBLE FOR CONTROLLING DUST AND MAINTINING COMPLIANCE
WITH ALL SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT
(SCAQMD) RULES AND REGULATIONS.
LIMITS OF CONSTRUCTION
SAF
LOC
ENTRANCE/EXIT TIRE WASH
MAINTAIN CONCRETE LINED DITCH AS
DIVERSION UNTIL GRADING ACTIVITIES ARE
COMPLETE. ONCE GRADING IS COMPLETE,
DEMOLISH CONCRETE LINED DITCH.
POTENTIAL SAMPLING LOCATIONSL
DRAINAGE DIVIDES
GC503TP TP TREE PROTECTION
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
XXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X WWWW
W
W W
W W W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
Dirt Rd.
Dirt Rd.
Dirt R d.
RANCHO EL TEJON CIR.
MAINTENANCE ACCESS ROAD
X
Ground Not Visible
Dense Trees
GUARDRAIL
CULVERT
FLAG
POLE
FLAG
POLE
FLAG
POLE
VAULT
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
XXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X WWWW
W
W W
W W W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E
E
E E
E
C
C C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E
LO
C LOC LOC LOC LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC
LO
C
LO
C
LOC
LOC
CWSCE
SAMPLING LOCATION #5
CONTRACTOR TO
ENSURE POSITIVE
DRAINAGE
DIVERT WATER TO SEDIMENT BASIN
DIVERT WATER TO SEDIMENT BASIN
DIVERT WATER TO SEDIMENT BASIN
DS
#2
DS
#2
19711972
KEY MAP
(NOT TO SCALE)
1 2 3
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\G
C1
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 GC104
PHASE I EROSION AND SEDIMENT
CONTROL PLAN
NORTHGRAPHICAL SCALE: 1"=30'
/ EXIT
SILT FENCE
TEMPORARY DRAINAGE SWALE
STORM DRAIN INLET
PROTECTION
EROSION & SEDIMENT CONTROL LEGEND
SYMBOLKEY DESCRIPTION DETAIL
TEMPORARY SEDIMENT TRAP
ST
CWS CONCRETE WASTE
MANAGEMENT
CE
OP OUTLET PROTECTION
SFSF
DS
IP
TEMPORARY SEDIMENT BASIN
(TO BE DEWATERED VIA
PUMPING INTO FILTER BAG)
SB
#1
V
MDS
R
CS
S
TEMPORARY EQUIPMENT WASH, FUELLING,
AND MAINTENANCE AREA (ADHERE TO
CASQA NS-8, NS-9, & NS-10)
TEMPORARY CONTAMINATED SOIL
MANAGEMENT AREA (ADHERE TO CASQA WM-7)
TEMPORARY MATERIAL STOCKPILE AREA
(ADHERE TO CASQA WM-3)
TEMPORARY MATERIAL DELIVERY AND
STORAGE AREA (ADHERE TO CASQA WM-1)
TEMPORARY SANITARY-SEPTIC WASTE
MANAGEMENT AREA (ADHERE TO CASQA WM-8)
AREA FOR SOLID, HAZARDOUS, AND LIQUID
WASTE MANAGEMENT (ADHERE TO CASQA
WM-5, WM-6, & WM-10)
WSA
X
TEMPORARY CONSTRUCTION SAFETY FENCE
(REFER TO SPEC SECTION 01 00 02 PART 1.7).
NOTES
1. SCHEDULING (CASQA EC-1): CONTRACTOR SHALL IMPLEMENT AND
COMPLY WITH THE SWPPP PREPARED BY INTEGRITY FEDERAL
SERVICES DATED XX. CONTRACTOR SHALL IMPLEMENT SCHEDULING
PRACTICES AS SET FORTH BY CASQA ES-1.
2. PRESERVATION OF EXISTING VEGETATION (CASQA EC-2):
CONTRACTOR TO LIMIT REMOVAL OF TREES AND VEGETATION TO
AREAS ONLY INSIDE THE LIMITS OF CONSTRUCTION.
3. WIND EROSION CONTROL (CASQA WE-1): CONTRACTOR IS
RESPONSIBLE FOR CONTROLLING DUST AND MAINTINING COMPLIANCE
WITH ALL SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT
(SCAQMD) RULES AND REGULATIONS.
LIMITS OF CONSTRUCTION
SAF
LOC
ENTRANCE/EXIT TIRE WASH
MAINTAIN CONCRETE LINED DITCH AS
DIVERSION UNTIL GRADING ACTIVITIES ARE
COMPLETE. ONCE GRADING IS COMPLETE,
DEMOLISH CONCRETE LINED DITCH.
POTENTIAL SAMPLING LOCATIONSL
DRAINAGE DIVIDES
GC503TP TP TREE PROTECTION
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W
W W
W W
W W
W W
W
W
W
W W
W W
W
WWWWWWWW
W
W
W W
W
W
W
W
W
W
W W
W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
COLUMBARIUM B
GRAVEL ROAD
RANCHO EL TEJON CIR.
RANCHO EL TEJON CIR.
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLA
NTER
PLA
NTER
ADA RAMP
ADA RAMP
ADA RAMP
15MPH
SPEED SIGN
SIGN
DIRECTION
SIGNS
EXISTNG
SIGN
BENCHMARK #2 SET:
CHISELED "+" ON TOP OF CURB.
ELEV. = 1950.67' (NAVD88)N = 2279686.511E = 6361548.818
SECTION 18
SECTION 17
COLUMBARIUM COMPLEX A
4' WIDE
V-GUTTER
WALL
COMMS. RISER
BENCH
VAULT
VAULT
VAULT
I.C.V.
IRR. BOX
IRR. BOX
IRR. BOX
IRR. BOX
IRR. BOXES IRR. BOX
IRR. BOXES
IRR. BOX
VAULT
POST
POST
POST
POST
POST
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W
W W
W W
W W
W W
W
W
W
W W
W W
W
WWWWWWWW
W
W
W W
W
W
W
W
W
W
W W
W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
COLUMBARIUM B
E
E
E
E
EEEEEE
E E
E E
E E
E E
E E
EEEEEEEEEE
E
E E
E E
EEEEE
E
E E
E
E
E
E
E
E
E E
E E
E
E
C C
C
C
C
C
C
C
C
C
C C
C C C C C C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C C C C C
C C
C C
C C C C C C C C C C C
C C
C C
C
C
C
C
C
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
C
C
C
E
E
E E
LOC
LOC
LOC
LOC
LOC LOC LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC LOC LOC
LOCLOC
LOC
LOC
LOC
LO
C
LOC
LOC
LOC LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC LOC LOC
LO
C
LO
C
LOC
LO
C
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
TP
TPTP
TP
TP
TP
TP
TP
TP
TP TP
TP
TP
TP
TP
TP
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SFSFSF
SF
SF
SF
SF
SF
SF
SFSF
195 4
195 2
1951195 2
195 4
SB
#1
SF
SF
SF
SL
SAMPLING LOCATION #1
SF
SF
SF
CONTRACTOR TO
ENSURE POSITIVE
DRAINAGE
BREAK DRAINAGE
DIVIDE.
CONTRACTOR TO
ENSURE POSITIVE
DRAINAGE
DIVERT WATER AROUND SITE
DIVERT WATER AROUND SITE
DIVERT WATER TO SEDIMENT BASIN
DIVERT WATER TO SEDIMENT BASIN
D.A.= AC.
TO SED. BASIN 01
14.21
DS
#2
DS
#3
DS
#4
194019451950
19551960
19701975
KEY MAP
(NOT TO SCALE)
1 2 3
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\G
C1
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 GC105
PHASE I EROSION AND SEDIMENT
CONTROL PLAN
NORTHGRAPHICAL SCALE: 1"=30'
/ EXIT
SILT FENCE
TEMPORARY DRAINAGE SWALE
STORM DRAIN INLET
PROTECTION
EROSION & SEDIMENT CONTROL LEGEND
SYMBOLKEY DESCRIPTION DETAIL
TEMPORARY SEDIMENT TRAP
ST
CWS CONCRETE WASTE
MANAGEMENT
CE
OP OUTLET PROTECTION
SFSF
DS
IP
TEMPORARY SEDIMENT BASIN
(TO BE DEWATERED VIA
PUMPING INTO FILTER BAG)
SB
#1
V
MDS
R
CS
S
TEMPORARY EQUIPMENT WASH, FUELLING,
AND MAINTENANCE AREA (ADHERE TO
CASQA NS-8, NS-9, & NS-10)
TEMPORARY CONTAMINATED SOIL
MANAGEMENT AREA (ADHERE TO CASQA WM-7)
TEMPORARY MATERIAL STOCKPILE AREA
(ADHERE TO CASQA WM-3)
TEMPORARY MATERIAL DELIVERY AND
STORAGE AREA (ADHERE TO CASQA WM-1)
TEMPORARY SANITARY-SEPTIC WASTE
MANAGEMENT AREA (ADHERE TO CASQA WM-8)
AREA FOR SOLID, HAZARDOUS, AND LIQUID
WASTE MANAGEMENT (ADHERE TO CASQA
WM-5, WM-6, & WM-10)
WSA
X
TEMPORARY CONSTRUCTION SAFETY FENCE
(REFER TO SPEC SECTION 01 00 02 PART 1.7).
NOTES
1. SCHEDULING (CASQA EC-1): CONTRACTOR SHALL IMPLEMENT AND
COMPLY WITH THE SWPPP PREPARED BY INTEGRITY FEDERAL
SERVICES DATED XX. CONTRACTOR SHALL IMPLEMENT SCHEDULING
PRACTICES AS SET FORTH BY CASQA ES-1.
2. PRESERVATION OF EXISTING VEGETATION (CASQA EC-2):
CONTRACTOR TO LIMIT REMOVAL OF TREES AND VEGETATION TO
AREAS ONLY INSIDE THE LIMITS OF CONSTRUCTION.
3. WIND EROSION CONTROL (CASQA WE-1): CONTRACTOR IS
RESPONSIBLE FOR CONTROLLING DUST AND MAINTINING COMPLIANCE
WITH ALL SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT
(SCAQMD) RULES AND REGULATIONS.
LIMITS OF CONSTRUCTION
SAF
LOC
ENTRANCE/EXIT TIRE WASH
MAINTAIN CONCRETE LINED DITCH AS
DIVERSION UNTIL GRADING ACTIVITIES ARE
COMPLETE. ONCE GRADING IS COMPLETE,
DEMOLISH CONCRETE LINED DITCH.
POTENTIAL SAMPLING LOCATIONSL
DRAINAGE DIVIDES
GC503TP TP TREE PROTECTION
SD
SD SD
SD
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
WWWW
W
W W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WILDFLOWER WAY
PUBLIC INFORMATION CENTER
& ADMINISTRATION BUILDING
SS
SS
WHITE WOLF DRIVE
TEHACHAPI WAY
3.5" ALUMINUM CAP1" REBAR
1" REBAR 1" REBAR
1" REBAR
3.5" ALUMINUM CAP 3.5" ALUMINUM CAP
3.5" ALUMINUM CAP
3.5" ALUMINUM CAP 3.5" ALUMINUM CAP
1" REBAR
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
PLANTERPLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
WHITE
STRIPE
ADA RAMP
ADA RAMP
ADA RAMP
ADA RAMP
ADA
RAMP
ADA RAMP
ADA RAMP
ADA
RAMP
ADA
RAMPADA
DIRECTION
SIGNS
EXISTNG
SIGN
SNAKES SIGNS
MONUMENT
SIGN
SECTION 10 A
SECTION 10
SECTION 11
SECTION 12
SECTION 9
SECTION 8
SECTION 17
SECTION 8SECTION 12SECTION 17
SECTION 18
V-GUTTER
INLET
CULVERT
STMH
CULV
ER
T
CULVERT
POST
PLANTER
SUMP
GRAVEL
GRAVEL
PAVERS
BENCH
POST
BENCH
POST
BENCH
IRR. BOXES
IRR.
BOXES
IRR. BOX
IRR. BOXES
IRR. BOX
WATER VALVES
IRR. BOX
POST
POST
POST
POST POST
POST
POST
POST POST
POST
POST
POST
IRR. BOXES
SD
SD SD
SD
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
WWWW
W
W W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WILDFLOWER WAY
PUBLIC INFORMATION CENTER
& ADMINISTRATION BUILDING
SS
SS
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E
C C
C
C
C
C
E E
E
E
E E
E E
E E
E
E
E
E
E
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C C
C C
C
C
C
C C
E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E
E
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E
E
E E
E E E E
E E E
E
E
E
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
C
C
C
E
E
E
E
E
E
LOC LOC LOC
LOC
LOCLOCLOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOCLOC
LOC
LOCLOC
LOC
LO
C
LO
C
LOC
LO
C
LOC
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LOC
LOC
LOC
LOC LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
ST
#1
SF
SF
SF
SF
SF
SF
IP
IP
SF
1922192319241925 192519241923192219211920
SF
SF
SF
SL
SAMPLING LOCATION #4
SAMPLING LOCATION #6 1921
SF
SF
D.A.= AC.
TO SED. TRAP 1
4.98
DIVERT WATER TO SEDIMENT TRAP
DIVERT WATER TO SEDIMENT TRAP
DIVERT WATER TO AROUND SITE
DIVERT WATER TO AROUND SITE
DIVERT WATER TO AROUND SITE
DIVERT WATER TO AROUND SITE
CHANNEL SEDIMENT TRAP
DISCHARGE OFF SITE
"C"=
D.A.=
AC.
TO STRC. XX
0.500.50
DS
#7
DS
#8
DS
#10
DS
#10
DS
#10
DS
#11
DS
#12
DS
DS
#9
19511952
192619271928192919311932
KEY MAP
(NOT TO SCALE)
1 2 3
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\G
C1
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 GC106
PHASE I EROSION AND SEDIMENT
CONTROL PLAN
NORTHGRAPHICAL SCALE: 1"=30'
CONSTRUCTION ENTRANCE /
EXIT
SILT FENCE
INLET PROTECTION
EROSION & SEDIMENT CONTROL LEGEND
SYMBOLKEY DESCRIPTION DETAIL
CWS CONCRETE WASTE
MANAGEMENT
CE
OP OUTLET PROTECTION
GRAVEL BAG CHECK DAM
SFSF
DS
CD
V
MDS
R
CS
S
TEMPORARY EQUIPMENT WASH, FUELLING,
AND MAINTENANCE AREA (ADHERE TO
CASQA NS-8, NS-9, & NS-10)
TEMPORARY CONTAMINATED SOIL
MANAGEMENT AREA (ADHERE TO CASQA WM-7)
TEMPORARY MATERIAL STOCKPILE AREA
(ADHERE TO CASQA WM-3)
TEMPORARY MATERIAL DELIVERY AND
STORAGE AREA (ADHERE TO CASQA WM-1)
TEMPORARY SANITARY-SEPTIC WASTE
MANAGEMENT AREA (ADHERE TO CASQA WM-8)
AREA FOR SOLID, HAZARDOUS, AND LIQUID
WASTE MANAGEMENT (ADHERE TO CASQA
WM-5, WM-6, & WM-10)
WSA
X X
TEMPORARY CONSTRUCTION SAFETY FENCE
(REFER TO SPEC SECTION 01 00 02 PART 1.7).
NOTES
1. SCHEDULING (CASQA EC-1): CONTRACTOR SHALL IMPLEMENT AND
COMPLY WITH THE SWPPP PREPARED BY INTEGRITY FEDERAL
SERVICES DATED XX. CONTRACTOR SHALL IMPLEMENT SCHEDULING
PRACTICES AS SET FORTH BY CASQA ES-1.
2. PRESERVATION OF EXISTING VEGETATION (CASQA EC-2):
CONTRACTOR TO LIMIT REMOVAL OF TREES AND VEGETATION TO
AREAS ONLY INSIDE THE LIMITS OF CONSTRUCTION.
3. WIND EROSION CONTROL (CASQA WE-1): CONTRACTOR IS
RESPONSIBLE FOR CONTROLLING DUST AND MAINTINING COMPLIANCE
WITH ALL SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT
(SCAQMD) RULES AND REGULATIONS.
4. ONCE STABILIZATION IS ACHIEVED, CONTRACTOR IS TO REMOVE ALL
TEMPORARY EROSION AND SEDIMENT CONTROL BMP'S.
LIMITS OF CONSTRUCTION
FIBER ROLLS
SAF
TEMPORARY/PERMANENT SEEDING (REFER
TO CASQA SECTION 3)
LOC
IP
PS
TEMPORARY DRAINAGE SWALE
TS
GC503TP TP TREE PROTECTION
RIP-RAP CHANNEL/SWALE PROTECTION
JUTE MATTING CHANNEL/SWALE
PROTECTION.
VELOCITY DISSIPATION DEVICE
Dirt Rd.
Dirt Rd.
Dirt Rd.
Dirt Rd.
Dirt Rd.
MAINTENANCE ACCESS ROAD
X X X X X X X X X X X
WOOD POST
FIBERGLASS
MARKER
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X
X
X
X
X
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WWWW
W
W W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W W
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E E E E E E E E E E E
C C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C C
C C C C C C C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X
X
X
X
X
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WWWW
W
W W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W W
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LO
C LOC LOC LOC LOC
LO
C
LO
C
19711972
TEMPORARY
CONSTRUCTION
ACCESS PATH
SF
TEMPORARYCONTRACTOR TRAILER
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
V
WSA
MDS
R
CS S
PROPOSED
CONTRACTOR
YARD
TS
CWSCE
SF
SAF
CE
PS
DD
#1
KEY MAP
(NOT TO SCALE)
1 2 3
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\G
C2
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 GC201
PHASE II EROSION AND SEDIMENT
CONTROL PLAN
NORTHGRAPHICAL SCALE: 1"=30'
Dirt Rd.
Dirt Rd.
Dirt Rd.
Dirt Rd.
EAST BEAR MOUNTAIN BLVD.
STATE HIGHWAY 223
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
OAK TREE
PLANTER
FOG LINE
FOG LINE
YELLOW STRIPES
FOG LINE
FOG LINE
YELLOW STRIPES
POST MILE
SIGN
UTILITY
VAULT
POST
POST
X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E
E
X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X
LOOP ROAD
LOOP CONNECTOR ROAD
25+00
26+00
27+00 28+0028+61
+0
+0
+5
+0
+0
+5
25+00
26+00
27+00 28+0028+61
R743.5'
R770.1'
R30'R30'
R213.3'
R186.7'
R263.3'
R236.7'
R236.7'
R15'
R15'
R62 'R50'
R15'
R15'
R106'
R94'
R94'
R106' R206'R194'
.3'
.3'
13.3' 13.3'
12'
12'
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOCLOC
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
4:1
5:1
1976 1977 1978
19791975
741974
1976197719781979 198119821983
.8%
5.9%
6.4%
" H
DP
E
15" HDPE
15" HDPE
15" HDPE
" H
DP
E
15" HDPE
15" HDPE
28A
27A
26A
SF
TS
TS
TS
CD
IP
IP
IP
IP
IP
IP
IP
PS
PS
PS
DD
#1
DD
#1
DD
#1
DD
#5
CD
TEMPORARY STABILIZED
CONSTRUCTION ENTRANCE /
EXIT
SILT FENCE
INLET PROTECTION
EROSION & SEDIMENT CONTROL LEGEND
SYMBOLKEY DESCRIPTION DETAIL
CWS CONCRETE WASTE
MANAGEMENT
CE
OP OUTLET PROTECTION
GRAVEL BAG CHECK DAM
SFSF
DS
CD
V
MDS
R
CS
S
TEMPORARY EQUIPMENT WASH, FUELLING,
AND MAINTENANCE AREA (ADHERE TO
CASQA NS-8, NS-9, & NS-10)
TEMPORARY CONTAMINATED SOIL
MANAGEMENT AREA (ADHERE TO CASQA WM-7)
TEMPORARY MATERIAL STOCKPILE AREA
(ADHERE TO CASQA WM-3)
TEMPORARY MATERIAL DELIVERY AND
STORAGE AREA (ADHERE TO CASQA WM-1)
TEMPORARY SANITARY-SEPTIC WASTE
MANAGEMENT AREA (ADHERE TO CASQA WM-8)
AREA FOR SOLID, HAZARDOUS, AND LIQUID
WASTE MANAGEMENT (ADHERE TO CASQA
WM-5, WM-6, & WM-10)
WSA
X X
TEMPORARY CONSTRUCTION SAFETY FENCE
(REFER TO SPEC SECTION 01 00 02 PART 1.7).
NOTES
1. SCHEDULING (CASQA EC-1): CONTRACTOR SHALL IMPLEMENT AND
COMPLY WITH THE SWPPP PREPARED BY INTEGRITY FEDERAL
SERVICES DATED XX. CONTRACTOR SHALL IMPLEMENT SCHEDULING
PRACTICES AS SET FORTH BY CASQA ES-1.
2. PRESERVATION OF EXISTING VEGETATION (CASQA EC-2):
CONTRACTOR TO LIMIT REMOVAL OF TREES AND VEGETATION TO
AREAS ONLY INSIDE THE LIMITS OF CONSTRUCTION.
3. WIND EROSION CONTROL (CASQA WE-1): CONTRACTOR IS
RESPONSIBLE FOR CONTROLLING DUST AND MAINTINING COMPLIANCE
WITH ALL SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT
(SCAQMD) RULES AND REGULATIONS.
4. ONCE STABILIZATION IS ACHIEVED, CONTRACTOR IS TO REMOVE ALL
TEMPORARY EROSION AND SEDIMENT CONTROL BMP'S.
LIMITS OF CONSTRUCTION
FIBER ROLLS
SAF
TEMPORARY/PERMANENT SEEDING (REFER
TO CASQA SECTION 3)
LOC
IP
PS
TEMPORARY DRAINAGE SWALE
TS
GC503TP TP TREE PROTECTION
RIP-RAP CHANNEL/SWALE PROTECTION
JUTE MATTING CHANNEL/SWALE
PROTECTION.
VELOCITY DISSIPATION DEVICE
KEY MAP
(NOT TO SCALE)
1 2 3
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\G
C2
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 GC202
PHASE II EROSION AND SEDIMENT
CONTROL PLAN
NORTHGRAPHICAL SCALE: 1"=30'
Dirt Rd.
Dirt Rd.
Dirt Rd.
Dir t R d.
W
HITE W
OLF DRIVE
3.5" ALUMINUM CAP 3.5" ALUMINUM CAP
3.5" ALUMINUM CAP 1" REBAR
X X
X X
X X
X X
X X
X
X
XXXX
X X X X X X X X X X X X X X X X X X X X X
X
X X
X X
X X
X X
X X
X X
X
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTERPLANTER
WHITE STRIPE
FOG LINE
FOG LINEDOUBLE YELLOW STRIPES
WHITE STRIPE
FOG LINE
FOG LINE
DOUBLE YELLOW STRIPES
RAMP
ADA
RAMPADA
RAMP
MEDIAN
ISLAND SIGN
MEDIAN
ISLAND SIGN
BAKERSFIELD NATIONAL
CEMETERY MONUMENT SIGN
WHITE WOLF
DRIVE SIGN
STREET SIGN
STOP SIGN
BENCHMARK #3 SET:
CHISELED "+" ON TOP OF CURB.
ELEV. = 1971.83' (NAVD88)
N = 2279930.124 E = 6362583.43
SECTION 7
SECTION 16
SECTION 15
SECTION 8SECTION 12SECTION 17
CULVERT
V-GUTTER
4" PVC
6" PVC
POST
SLIDING GATE
SLIDING GATE
WALL
WALL
WALL
WROUGHT
IRON FENCE
WROUGHT
IRON FENCE
WALL
WALL
W
OOD CHIPS
WOOD CHIPS
GRAVEL
GRAVEL
POST
POST
POST
TRASH
BINS
BENCH
BURIED
UTILITY LINE
UTILITY BOX
BENCH
IRR. BOXES IRR. BOXES
IRR.
BOXES
IRR. BOX
IRR. BOX
IRR. BOX
IRR. BOX
I.C.V.
I.C.V.
I.C.V.
I.C.V.
I.C.V.
IRR. BOX.
IRR. BOX.
IRR. BOX.
IRR. BOX.
IRR. BOX.
IRR. BOX. IRR. BOX. IRR. BOX.
IRR. BOX.
IRR. BOX.
WATER
BOXES
5-I.C.V.
IRR. BOXES
POST
POST
POST
POST
POST
POST POST
POST
POST
I.C.V.
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
E
E
E
E
E
E
E
E
E
E
E E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E
E E
E E
E E
E E
E E
E E E
E E
E
E E
E E
E E
E E
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C C C
C C C C
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E
E
E
E
E E
E
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
13.32' 10'
M6A M6BBM6
SM6A
SM6B
LOOP ROAD
LOOP ROAD
+0
17+00
18+00
19+00
20+
21+00
22+00
23+00
24+00
25+00
+0
17+00
18+00
19+00
20+
21+00
22+00
23+00
24+00
25+00
R3 0'
R30'
R3 0'
R30'
R413.3'
R386.7'
R186.7'
R213.3'
R241.7'
R268.3'
R30'
R2
.3'
R15'
R15'
R62
R15'
R15'
R106'
R94'
R2
.3'
13.3' 13.3'
4' 4'
48'
72'
12'
12'
13.32' 13.32'
13.32'
REFER TO COLUMBARIUM
DRAWINGS FOR DETAILED
DESIGN INFORMATION WITHIN
COLUMBARIUM COMPLEX "C"
SECTION 6
2,152 IN-GROUND CREMAIN SITES
(WITHIN 4'x4' PLOTS)
LOC
LOC
LOC
LO
C
LO
C
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LOC
LOC
LOC
LOCLOC
LOC
LOC
LOC
LOC LOC LOC
LOC
LOC
LOC
LOC
LO
C
LOC LOC LOC LOC LOC LOC LOC LOC LOC
LOC
LOC
LOC
LOC
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LOC
LOC
LOC
LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LOC
LOC
LO
C
LO
C
LO
C LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOCLOCLOCLOC
LOC
LOC
LOC
4:1
4:1
4:1
4:1
4:1
4:1
4:1
REFER TO COLUMBARIUM
DRAWINGS FOR DETAILED
GRADING AND DRAINAGE
INFORMATION WITHIN
COLUMBARIUM COMPLEX "C"
4:1
1964 1964
197119721973
19611962
1966 19
6.4%
1.9%
1.8%
1.8%
15" HDPE
15" HDPE
" H
DP
E
15" HDPE
15" HDPE
15" HDPE
15" HDPE
15" HDPE
7A
7B
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
TS
TS
TS
TS
TS
SF
SF
SF
SF
SF
IP
IP
IP
IP
IP
IP
IP
PS
PS
PS
PS
PS
DD
#5
DD
#5
DD
#5
DD
#6
DD
#6
TEMPORARY STABILIZED
CONSTRUCTION ENTRANCE /
EXIT
SILT FENCE
INLET PROTECTION
EROSION & SEDIMENT CONTROL LEGEND
SYMBOLKEY DESCRIPTION DETAIL
CWS CONCRETE WASTE
MANAGEMENT
CE
OP OUTLET PROTECTION
GRAVEL BAG CHECK DAM
SFSF
DS
CD
V
MDS
R
CS
S
TEMPORARY EQUIPMENT WASH, FUELLING,
AND MAINTENANCE AREA (ADHERE TO
CASQA NS-8, NS-9, & NS-10)
TEMPORARY CONTAMINATED SOIL
MANAGEMENT AREA (ADHERE TO CASQA WM-7)
TEMPORARY MATERIAL STOCKPILE AREA
(ADHERE TO CASQA WM-3)
TEMPORARY MATERIAL DELIVERY AND
STORAGE AREA (ADHERE TO CASQA WM-1)
TEMPORARY SANITARY-SEPTIC WASTE
MANAGEMENT AREA (ADHERE TO CASQA WM-8)
AREA FOR SOLID, HAZARDOUS, AND LIQUID
WASTE MANAGEMENT (ADHERE TO CASQA
WM-5, WM-6, & WM-10)
WSA
X X
TEMPORARY CONSTRUCTION SAFETY FENCE
(REFER TO SPEC SECTION 01 00 02 PART 1.7).
NOTES
1. SCHEDULING (CASQA EC-1): CONTRACTOR SHALL IMPLEMENT AND
COMPLY WITH THE SWPPP PREPARED BY INTEGRITY FEDERAL
SERVICES DATED XX. CONTRACTOR SHALL IMPLEMENT SCHEDULING
PRACTICES AS SET FORTH BY CASQA ES-1.
2. PRESERVATION OF EXISTING VEGETATION (CASQA EC-2):
CONTRACTOR TO LIMIT REMOVAL OF TREES AND VEGETATION TO
AREAS ONLY INSIDE THE LIMITS OF CONSTRUCTION.
3. WIND EROSION CONTROL (CASQA WE-1): CONTRACTOR IS
RESPONSIBLE FOR CONTROLLING DUST AND MAINTINING COMPLIANCE
WITH ALL SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT
(SCAQMD) RULES AND REGULATIONS.
4. ONCE STABILIZATION IS ACHIEVED, CONTRACTOR IS TO REMOVE ALL
TEMPORARY EROSION AND SEDIMENT CONTROL BMP'S.
LIMITS OF CONSTRUCTION
FIBER ROLLS
SAF
TEMPORARY/PERMANENT SEEDING (REFER
TO CASQA SECTION 3)
LOC
IP
PS
TEMPORARY DRAINAGE SWALE
TS
GC503TP TP TREE PROTECTION
RIP-RAP CHANNEL/SWALE PROTECTION
JUTE MATTING CHANNEL/SWALE
PROTECTION.
VELOCITY DISSIPATION DEVICE
KEY MAP
(NOT TO SCALE)
1 2 3
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\G
C2
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 GC203
PHASE II EROSION AND SEDIMENT
CONTROL PLAN
NORTHGRAPHICAL SCALE: 1"=30'
Dirt Rd.
Dirt Rd.
Dirt R d.
RANCHO EL TEJON CIR.
MAINTENANCE ACCESS ROAD
X
Ground Not Visible
Dense Trees
GUARDRAIL
CULVERT
FLAG
POLE
FLAG
POLE
FLAG
POLE
VAULT
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
XXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X WWWW
W
W W
W W W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E
E
E E
E
C
C C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
XXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X WWWW
W
W W
W W W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
LO
C LOC LOC LOC LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC
LO
C
LO
C
LOC
LOC
19711972
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
SF
TS
TS
TS
TS
CWSCE
SF
SF
SF
PS
PS
PS
TEMPORARY STABILIZED
CONSTRUCTION ENTRANCE /
EXIT
SILT FENCE
INLET PROTECTION
EROSION & SEDIMENT CONTROL LEGEND
SYMBOLKEY DESCRIPTION DETAIL
CWS CONCRETE WASTE
MANAGEMENT
CE
OP OUTLET PROTECTION
GRAVEL BAG CHECK DAM
SFSF
DS
CD
V
MDS
R
CS
S
TEMPORARY EQUIPMENT WASH, FUELLING,
AND MAINTENANCE AREA (ADHERE TO
CASQA NS-8, NS-9, & NS-10)
TEMPORARY CONTAMINATED SOIL
MANAGEMENT AREA (ADHERE TO CASQA WM-7)
TEMPORARY MATERIAL STOCKPILE AREA
(ADHERE TO CASQA WM-3)
TEMPORARY MATERIAL DELIVERY AND
STORAGE AREA (ADHERE TO CASQA WM-1)
TEMPORARY SANITARY-SEPTIC WASTE
MANAGEMENT AREA (ADHERE TO CASQA WM-8)
AREA FOR SOLID, HAZARDOUS, AND LIQUID
WASTE MANAGEMENT (ADHERE TO CASQA
WM-5, WM-6, & WM-10)
WSA
X X
TEMPORARY CONSTRUCTION SAFETY FENCE
(REFER TO SPEC SECTION 01 00 02 PART 1.7).
NOTES
1. SCHEDULING (CASQA EC-1): CONTRACTOR SHALL IMPLEMENT AND
COMPLY WITH THE SWPPP PREPARED BY INTEGRITY FEDERAL
SERVICES DATED XX. CONTRACTOR SHALL IMPLEMENT SCHEDULING
PRACTICES AS SET FORTH BY CASQA ES-1.
2. PRESERVATION OF EXISTING VEGETATION (CASQA EC-2):
CONTRACTOR TO LIMIT REMOVAL OF TREES AND VEGETATION TO
AREAS ONLY INSIDE THE LIMITS OF CONSTRUCTION.
3. WIND EROSION CONTROL (CASQA WE-1): CONTRACTOR IS
RESPONSIBLE FOR CONTROLLING DUST AND MAINTINING COMPLIANCE
WITH ALL SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT
(SCAQMD) RULES AND REGULATIONS.
4. ONCE STABILIZATION IS ACHIEVED, CONTRACTOR IS TO REMOVE ALL
TEMPORARY EROSION AND SEDIMENT CONTROL BMP'S.
LIMITS OF CONSTRUCTION
FIBER ROLLS
SAF
TEMPORARY/PERMANENT SEEDING (REFER
TO CASQA SECTION 3)
LOC
IP
PS
TEMPORARY DRAINAGE SWALE
TS
GC503TP TP TREE PROTECTION
RIP-RAP CHANNEL/SWALE PROTECTION
JUTE MATTING CHANNEL/SWALE
PROTECTION.
VELOCITY DISSIPATION DEVICE
KEY MAP
(NOT TO SCALE)
1 2 3
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\G
C2
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 GC204
PHASE II EROSION AND SEDIMENT
CONTROL PLAN
NORTHGRAPHICAL SCALE: 1"=30'
RANCHO EL TEJON CIR.
RANCHO EL TEJON CIR.
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLA
NTER
PLA
NTER
ADA RAMP
ADA RAMP
ADA RAMP
15MPH
SPEED SIGN
SIGN
DIRECTION
SIGNS
EXISTNG
SIGN
BENCHMARK #2 SET:
CHISELED "+" ON TOP OF CURB.
ELEV. = 1950.67' (NAVD88)N = 2279686.511E = 6361548.818
SECTION 18
SECTION 17
COLUMBARIUM COMPLEX A
4' WIDE
V-GUTTER
WALL
COMMS. RISER
BENCH
VAULT
VAULT
VAULT
I.C.V.
IRR. BOX
IRR. BOX
IRR. BOX
IRR. BOX
IRR. BOXES IRR. BOX
IRR. BOXES
IRR. BOX
VAULT
POST
POST
POST
POST
POST
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W
W W
W W
W W
W W
W
W
W
W W
W W
W
WWWWWWWW
W
W
W W
W
W
W
W
W
W
W W
W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
COLUMBARIUM B
E
E
E
E
EEEEEE
E E
E E
E E
E E
E E
EEEEEEEEEE
E
E E
E E
EEEEE
E
E E
E
E
E
E
E
E
E E
E E
E
E
C C
C
C
C
C
C
C
C
C
C C
C C C C C C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C C C C C
C C
C C
C C C C C C C C C C C
C C
C C
C
C
C
C
C
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
C
C
C
E
E
E E
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W
W W
W W
W W
W W
W
W
W
W W
W W
W
WWWWWWWW
W
W
W W
W
W
W
W
W
W
W W
W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
COLUMBARIUM B
M19A
M19B
BM19
M20A
M20B
BM20
SM20A
SM20B
SM19A
SM19B
LOOP CONNECTOR ROAD
+0
+0
+0
13+00
14+00
+0
+0
+0
13+00
14+00
R236.7' R263.3'
R263.3'
R236.7'
R30' R30'
R94'
R106' R206'R194'
R194'R206'
R194'
R206'
R106'R94'
R1 5'
R15'
13.3' 13.3'
13.
3'
13.
3'
13.3' 13.3'
3'
3'
45'
72'
3'
3'
45'
72'
12'
SECTION 19
1,560 DOUBLE-DEPTH
PRE-PLACED CRYPTS
(WITHIN 3'x8' PLOTS)
SECTION 20
1,444 DOUBLE-DEPTH
PRE-PLACED CRYPTS
(WITHIN 3'x8' PLOTS)
LOC
LOC
LOC
LOC
LOC LOC LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC LOC LOC
LOCLOC
LOC
LOC
LOC
LO
C
LOC
LOC
LOC LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC LOC LOC
LO
C
LO
C
LOC
LO
C
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
TP
TPTP
TP
TP
TP
TP
TP
TP
TP TP
TP
TP
TP
TP
TP
4:1 4:14:1
4:1
5:1
4:1
4:1
4:1
5:1
1961196219631964
52 27
GS
.8%
2.0
2.0
2.0
2.0
2.0
6.3%
2.8%
LOG
LOG
LOG
LOG
LOG
LOGLOG
LO
G
LO
G
LO
G
LOG
LOG
1961 1958
15" HDPE
15" HDPE
24" HDPE
" H
DP
E
15" HDPE
15" HDPE
" H
DP
E
15" H
DPE
24" HDPE
24" HDPE
24" HDPE
15" HDPE
15" HDPE
" R
CP
C
L I
II
8' RIP-RAP EMERGENCY SPILLWAY
ELEV. = 1947.00'
SEE DETAIL 3 ON CJ501
26A
25A
25 25C
25D
21B
21C
SWM 1 RISER
SWM 1 ES
25B
24" HDPE
21A
194019451950
19551960
19701975
SF
SF
SFSF
SF
SF
SF
SF
SF
SF
SF
SF
SF SF SF
SF
SF
SF
SF
SF
SF
SF SF SF
SF
TS
TS
TS TS
TS
SF
SF
SF
CD
CD
CD
IP
IP
IP
IP
IP
IP
IP
IP
IP
IP
PS
PS
PS PS
PS
DD
#3
DD
#4
OP
OP
TEMPORARY STABILIZED
CONSTRUCTION ENTRANCE /
EXIT
SILT FENCE
INLET PROTECTION
EROSION & SEDIMENT CONTROL LEGEND
SYMBOLKEY DESCRIPTION DETAIL
CWS CONCRETE WASTE
MANAGEMENT
CE
OP OUTLET PROTECTION
GRAVEL BAG CHECK DAM
SFSF
DS
CD
V
MDS
R
CS
S
TEMPORARY EQUIPMENT WASH, FUELLING,
AND MAINTENANCE AREA (ADHERE TO
CASQA NS-8, NS-9, & NS-10)
TEMPORARY CONTAMINATED SOIL
MANAGEMENT AREA (ADHERE TO CASQA WM-7)
TEMPORARY MATERIAL STOCKPILE AREA
(ADHERE TO CASQA WM-3)
TEMPORARY MATERIAL DELIVERY AND
STORAGE AREA (ADHERE TO CASQA WM-1)
TEMPORARY SANITARY-SEPTIC WASTE
MANAGEMENT AREA (ADHERE TO CASQA WM-8)
AREA FOR SOLID, HAZARDOUS, AND LIQUID
WASTE MANAGEMENT (ADHERE TO CASQA
WM-5, WM-6, & WM-10)
WSA
X X
TEMPORARY CONSTRUCTION SAFETY FENCE
(REFER TO SPEC SECTION 01 00 02 PART 1.7).
NOTES
1. SCHEDULING (CASQA EC-1): CONTRACTOR SHALL IMPLEMENT AND
COMPLY WITH THE SWPPP PREPARED BY INTEGRITY FEDERAL
SERVICES DATED XX. CONTRACTOR SHALL IMPLEMENT SCHEDULING
PRACTICES AS SET FORTH BY CASQA ES-1.
2. PRESERVATION OF EXISTING VEGETATION (CASQA EC-2):
CONTRACTOR TO LIMIT REMOVAL OF TREES AND VEGETATION TO
AREAS ONLY INSIDE THE LIMITS OF CONSTRUCTION.
3. WIND EROSION CONTROL (CASQA WE-1): CONTRACTOR IS
RESPONSIBLE FOR CONTROLLING DUST AND MAINTINING COMPLIANCE
WITH ALL SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT
(SCAQMD) RULES AND REGULATIONS.
4. ONCE STABILIZATION IS ACHIEVED, CONTRACTOR IS TO REMOVE ALL
TEMPORARY EROSION AND SEDIMENT CONTROL BMP'S.
LIMITS OF CONSTRUCTION
FIBER ROLLS
SAF
TEMPORARY/PERMANENT SEEDING (REFER
TO CASQA SECTION 3)
LOC
IP
PS
TEMPORARY DRAINAGE SWALE
TS
GC503TP TP TREE PROTECTION
RIP-RAP CHANNEL/SWALE PROTECTION
JUTE MATTING CHANNEL/SWALE
PROTECTION.
VELOCITY DISSIPATION DEVICE
KEY MAP
(NOT TO SCALE)
1 2 3
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\G
C2
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 GC205
PHASE II EROSION AND SEDIMENT
CONTROL PLAN
NORTHGRAPHICAL SCALE: 1"=30'
WHITE WOLF DRIVE
TEHACHAPI WAY
3.5" ALUMINUM CAP1" REBAR
1" REBAR 1" REBAR
1" REBAR
3.5" ALUMINUM CAP 3.5" ALUMINUM CAP
3.5" ALUMINUM CAP
3.5" ALUMINUM CAP 3.5" ALUMINUM CAP
1" REBAR
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
PLANTERPLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
WHITE
STRIPE
ADA RAMP
ADA RAMP
ADA RAMP
ADA RAMP
ADA
RAMP
ADA RAMP
ADA RAMP
ADA
RAMP
ADA
RAMPADA
DIRECTION
SIGNS
EXISTNG
SIGN
SNAKES SIGNS
MONUMENT
SIGN
SECTION 10 A
SECTION 10
SECTION 11
SECTION 12
SECTION 9
SECTION 8
SECTION 17
SECTION 8SECTION 12SECTION 17
SECTION 18
V-GUTTER
INLET
CULVERT
POST
SUMP
GRAVEL
GRAVEL
PAVERS
BENCH
POST
BENCH
POST
BENCH
IRR. BOXES
IRR.
BOXES
IRR. BOX
IRR. BOXES
IRR. BOX
WATER VALVES
POST
POST
POST
POST POST
POST
POST
POST POST
POST
POST
POST
IRR. BOXES
SD
SD SD
SD
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
WWWW
W
W W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WILDFLOWER WAY
PUBLIC INFORMATION CENTER
& ADMINISTRATION BUILDING
SS
SS
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E
C C
C
C
C
C
E E
E
E
E E
E E
E E
E
E
E
E
E
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C C
C C
C
C
C
C C
E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E
E
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E
E
E E
E E E E
E E E
E
E
E
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
C
C
C
E
E
E
E
E
E
SD
SD SD
SD
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
WWWW
W
W W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WILDFLOWER WAY
PUBLIC INFORMATION CENTER
& ADMINISTRATION BUILDING
SS
SS
13.32' 10'
13.32' 10'
13.32' 10'
LOOP ROAD
10+00
11+00
12+00 13+00
+0
+0
+0
STORMWATER
MANAGEMENT
IMPROVEMENTS
10+00
11+00
12+00 13+00
+0
+0
+0
R30'
R30'
R30'
R2
.3'
R3
R3
.4'
R314.1'
R287.4'
R287.4'
R314.1'
R252.2'
R288.9'
R278.9'
R513.3'
R486.7'
R486.7'
R278.9'
R3
.3'
.3'
8'
13.32' 13.32'
13.32'
13.32'
13.32'
REFER TO COLUMBARIUM
DRAWINGS FOR DETAILED DESIGN
INFORMATION WITHIN
COLUMBARIUM COMPLEX "D"
REFER TO COLUMBARIUM
DRAWINGS FOR DETAILED
DESIGN INFORMATION WITHIN
COLUMBARIUM COMPLEX "C"
LOC LOC LOC
LOC
LOCLOCLOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOCLOC
LOC
LOCLOC
LOC
LO
C
LO
C
LOC
LO
C
LOC
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LOC
LOC
LOC
LOC LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
4:1
4:1
4:1
REFER TO COLUMBARIUM
DRAWINGS FOR DETAILED
GRADING AND DRAINAGE
INFORMATION WITHIN
COLUMBARIUM COMPLEX "C"
REFER TO COLUMBARIUM
DRAWINGS FOR DETAILED
GRADING AND DRAINAGE
INFORMATION WITHIN
COLUMBARIUM COMPLEX "D"
191719181919
19341934
1921 1921
6.6
6.6%
16.0%
1932 1933 1934 1936
" H
DP
E
" H
DP
E
15" HDPE
15" HDPE
15" HDPE
18" HDPE
15" HDPE
15" HDPE
EX. 18" HDPE
" H
DP
E
" H
DP
E
" R
CP
C
L I
II
8' RIP-RAP
EMERGENCY SPILLWAY
ELEV. = 1921.00
SEE DETAIL 6 ON CJ501
5A 5
4A
2A
2B
SMW 2 ES
SWM 2 RISER
19511952
192619271928192919311932
SF
SF
SF
SF
SF
SF
SF
SF
SF
TS
TS
TS
TS
TS
SF
IP
IP
IP
IP
IP
IP
IP
IP
PS
PS
PS
PS
PS
DD
#12
OP
TEMPORARY STABILIZED
CONSTRUCTION ENTRANCE /
EXIT
SILT FENCE
INLET PROTECTION
EROSION & SEDIMENT CONTROL LEGEND
SYMBOLKEY DESCRIPTION DETAIL
CWS CONCRETE WASTE
MANAGEMENT
CE
OP OUTLET PROTECTION
GRAVEL BAG CHECK DAM
SFSF
DS
CD
V
MDS
R
CS
S
TEMPORARY EQUIPMENT WASH, FUELLING,
AND MAINTENANCE AREA (ADHERE TO
CASQA NS-8, NS-9, & NS-10)
TEMPORARY CONTAMINATED SOIL
MANAGEMENT AREA (ADHERE TO CASQA WM-7)
TEMPORARY MATERIAL STOCKPILE AREA
(ADHERE TO CASQA WM-3)
TEMPORARY MATERIAL DELIVERY AND
STORAGE AREA (ADHERE TO CASQA WM-1)
TEMPORARY SANITARY-SEPTIC WASTE
MANAGEMENT AREA (ADHERE TO CASQA WM-8)
AREA FOR SOLID, HAZARDOUS, AND LIQUID
WASTE MANAGEMENT (ADHERE TO CASQA
WM-5, WM-6, & WM-10)
WSA
X X
TEMPORARY CONSTRUCTION SAFETY FENCE
(REFER TO SPEC SECTION 01 00 02 PART 1.7).
NOTES
1. SCHEDULING (CASQA EC-1): CONTRACTOR SHALL IMPLEMENT AND
COMPLY WITH THE SWPPP PREPARED BY INTEGRITY FEDERAL
SERVICES DATED XX. CONTRACTOR SHALL IMPLEMENT SCHEDULING
PRACTICES AS SET FORTH BY CASQA ES-1.
2. PRESERVATION OF EXISTING VEGETATION (CASQA EC-2):
CONTRACTOR TO LIMIT REMOVAL OF TREES AND VEGETATION TO
AREAS ONLY INSIDE THE LIMITS OF CONSTRUCTION.
3. WIND EROSION CONTROL (CASQA WE-1): CONTRACTOR IS
RESPONSIBLE FOR CONTROLLING DUST AND MAINTINING COMPLIANCE
WITH ALL SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT
(SCAQMD) RULES AND REGULATIONS.
4. ONCE STABILIZATION IS ACHIEVED, CONTRACTOR IS TO REMOVE ALL
TEMPORARY EROSION AND SEDIMENT CONTROL BMP'S.
LIMITS OF CONSTRUCTION
FIBER ROLLS
SAF
TEMPORARY/PERMANENT SEEDING (REFER
TO CASQA SECTION 3)
LOC
IP
PS
TEMPORARY DRAINAGE SWALE
TS
GC503TP TP TREE PROTECTION
RIP-RAP CHANNEL/SWALE PROTECTION
JUTE MATTING CHANNEL/SWALE
PROTECTION.
VELOCITY DISSIPATION DEVICE
KEY MAP
(NOT TO SCALE)
1 2 3
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\G
C2
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .