BNC-929CM003-BD-PLANSPart-5.pdf
PDF 10 MB Posted
- Solicitation number
- 36C78626B0029_1
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WHITE WOLF DRIVE
TEHACHAPI WAY
3.5" ALUMINUM CAP1" REBAR
1" REBAR 1" REBAR
1" REBAR
3.5" ALUMINUM CAP 3.5" ALUMINUM CAP
3.5" ALUMINUM CAP
3.5" ALUMINUM CAP 3.5" ALUMINUM CAP
1" REBAR
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
PLANTERPLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
WHITE
STRIPE
ADA RAMP
ADA RAMP
ADA RAMP
ADA RAMP
ADA
RAMP
ADA RAMP
ADA RAMP
ADA
RAMP
ADA
RAMPADA
DIRECTION
SIGNS
EXISTNG
SIGN
SNAKES SIGNS
MONUMENT
SIGN
SECTION 10 A
SECTION 10
SECTION 11
SECTION 12
SECTION 9
SECTION 8
SECTION 17
SECTION 8SECTION 12SECTION 17
SECTION 18
V-GUTTER
INLET
CULVERT
STMH
CULV
ER
T
CULVERT
POST
PLANTER
SUMP
GRAVEL
GRAVEL
PAVERS
BENCH
POST
BENCH
POST
BENCH
IRR. BOXES
IRR.
BOXES
IRR. BOX
IRR. BOXES
IRR. BOX
WATER VALVES
IRR. BOX
POST
POST
POST
POST POST
POST
POST
POST POST
POST
POST
POST
IRR. BOXES
SD
SD SD
SD
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
WWWW
W
W W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WILDFLOWER WAY
PUBLIC INFORMATION CENTER
& ADMINISTRATION BUILDING
SS
SS
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E
C C
C
C
C
C
E E
E
E
E E
E E
E E
E
E
E
E
E
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C C
C C
C
C
C
C C
E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E
E
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E
E
E E
E E E E
E E E
E
E
E
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
C
C
C
E
E
E
E
E
E
SD
SD SD
SD
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
WWWW
W
W W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WILDFLOWER WAY
PUBLIC INFORMATION CENTER
& ADMINISTRATION BUILDING
SS
SS
LOC LOC LOC
LOC
LOCLOCLOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOCLOC
LOC
LOCLOC
LOC
LO
C
LO
C
LOC
LO
C
LOC
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LOC
LOC
LOC
LOC LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
X X
X
X X
X
X
REMOVE OR RECYCLE EX. PAVEMENT/CONCRETE.
INCLUDES ALL PAVEMENT COURSES AND
AGGREGATE BASES. PAVEMENT REMOVAL TO BE
PERFORMED ONCE BURIAL EXPANSION IS
COMPLETE.
DEMOLITION LEGEND:
1. THE DEMOLITION PLAN IS A GENERAL GUIDE OF WHAT NEEDS TO BE
DEMOLISHED. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO IDENTIFY ALL
ITEMS THAT REQUIRE DEMOLITION TO COMPLETE THE PROPOSED
CONSTRUCTION.
2. SITE FEATURES SHOWN IN BOLD TO BE REMOVED.
3. THE LENGTH OF CURBING TO BE REMOVED SHALL BE CARRIED TO THE NEAREST
EXPANSION JOINT, OR SAW CUT IF THE JOINT IS LOCATED MORE THAN FIVE FEET
FROM THE END OF CURB REMOVAL.
4. REFER TO LANDSCAPE PLAN FOR REMOVAL / TRANSPLANT OF EXISTING TREES
AND SHRUBS.
DEMOLITION NOTES:
REMOVE SIGN
REMOVE / RELOCATE IRRIGATION INFRASTRUCTURE.
(SEE IRRIGATION DRAWINGS)
DEMOLISH STORM STRUCTURE. CONTRACTOR TO PLUG
EXISTING STORM SEWER LINE.
DEMOLITION KEYNOTE LEGEND:
DESCRIPTION
DEMOLISH FLOWER WATERING STATION AND ASSOCIATED
PLUMBING (CONTRACTOR TO SAVE TRASH BINS FOR
REUSE.)
REMOVE TREES / VEGETATION (TYP.)
REMOVE DECOMPOSED GRANITE / DIRT ROAD
REMOVE CURB AND GUTTER / CONCRETE
DIVERSION DITCH. (SEE NOTE 3.)X
REMOVE EX. STORM PIPE
REMOVE EX. FEATURE
PAVEMENT UTILITY TRENCH
LIMITS OF CONSTRUCTIONLOC
MAINTAIN PORTION OF CONCRETE DIVERSION
DITCH FOR EROSION AND SEDIMENT CONTROL
PURPOSES. DEMOLISH ONCE GRADING ACTIVITIES
ARE COMPLETE AND FILL IN DITCH.
CONTRACTOR TO COORDINATE WITH LOCAL UTILITY
PROVIDER TO RELOCATE TELECOMMUNICATIONS
BOX.
PROTECT / ADJUST EXISTING IRRIGATION
INFRASTRUCTURE TO GRADE UNLESS OTHERWISE
NOTED ON IRRIGATION PLANS.
TREE TO BE TRANSPLANTED
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\C
D1
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026
KEY MAP
(NOT TO SCALE)
1 2 3
CD106
SITE DEMOLTION PLAN
NORTHGRAPHICAL SCALE: 1"=30'
30 15 0 30 60 90
RANCHO EL TEJONCIR.
WHITE WOLF DRIVE
EAST BEAR MOUNTAIN BLVD.
STATE HIGHWAY 223
RANCHO EL TEJON CIR.
TEHACHAPI WAY
COMMITTAL SHELTER
LOOP
MAINTENANCE ACCESS ROAD
MAINTENANCE ACCESS ROAD
EAST BEAR MOUNTAIN BLVD.
STATE HIGHWAY 223
X X
X
X
X X
X X
X X
X X
X X
X X
X
X X X X X X X X X X X X X X X X X X X X X
X
X
X
X X
X
SECTION 10 A
SECTION 10
SECTION 11
SECTION 12
SECTION 9
SECTION 8
SECTION 7
SECTION 18
SECTION 17
SECTION 16
SECTION 15
COLUMBARIUM COMPLEX A
ASSEMBLY AREA
X
XX
X
X
X
X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X X
X X
X
X X
X X
X X
X X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
W
W
W
W
W
W
W
WW
W
W
W
W W
W
W W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W
W
WWW
W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W
W
XX
XX
XX
XX
XX
XX
WILDFLOWER WAY
MAINTENANCE FACILITY
COLUMBARIUM B
PUBLIC INFORMATION CENTER
& ADMIN. BUILDING
MEMORIAL WALK
POW / MIA FLAGPOLE
OSSUARY
COMMITTAL SHELTER 1
U.S. FLAG
CORTEGE LANE
SS
SS
E
E
E
E
E
E
EE
E
E
EEEE
E
EE
E
E
E
E
E E
E E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E
E E
E
E
E E
C
C
C C
C C
C C
C
E
E
E E
E
E
E
E
E E
E E
C
C
C
C
C
C C
C
C
C
C
C C
C
E E
E
E
E E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E
E
E
E
C
C
C
C
C
C
C
C
C
C
C
CC
C C
C
C
C C
C C C
C C C C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C C C
C C C C
C
C
C
C
C
E E E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
EE
E
E
E
E
E E
E
E
E
E
E
E
E
X
XX
X
X
X
X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X X X X X X X X X X X X X X X X X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X X
X X
X
X X
X X
X X
X X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
W
W
W
W
W
W
W
WW
W
W
W
W W
W
W W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W
W
WWW
W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W
W
XX
XX
XX
XX
XX
XX
WILDFLOWER WAY
MAINTENANCE FACILITY
COLUMBARIUM B
PUBLIC INFORMATION CENTER
& ADMIN. BUILDING
MEMORIAL WALK
POW / MIA FLAGPOLE
OSSUARY
COMMITTAL SHELTER 1
U.S. FLAG
CORTEGE LANE
SS
SS
LO
C LOC
LOC
LOC
LOC
LOC
LOCLOCLOCLOC
LOC
LOC
LOC LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC LOC LOC LOC
LOC
LOCLOCLOC
LOC
LOC LOC LOC LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LOC
LOC LOC
LO
C
LO
C
LO
C
LOC
LO
C
LOC
LOC LOC LOC
LOC
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC
TP
TP
TP TP
TP
REFER TO COLUMBARIUM
DRAWINGS FOR DETAILED
DESIGN INFORMATION WITHIN
COLUMBARIUM COMPLEX "D"
REFER TO COLUMBARIUM
DRAWINGS FOR DETAILED
DESIGN INFORMATION WITHIN
COLUMBARIUM COMPLEX "C"
REFER TO ROSTRUM DRAWINGS
FOR DETAILED DESIGN
INFORMATION WITHIN THE
ROSTRUM COMPLEX
SECTION 19
1,560 DOUBLE-DEPTH
PRE-PLACED CRYPTS
(WITHIN 3'x8' PLOTS)
SECTION 6
2,152 IN-GROUND CREMAIN
SITES (WITHIN 4'x4' PLOTS)
SECTION 20
1,444 DOUBLE-DEPTH
PRE-PLACED CRYPTS
(WITHIN 3'x8' PLOTS)
SEE SHEET CP101 FOR
PAVEMENT REPAIR
SEE SHEET CP101 FOR
PAVEMENT REPAIR
SEE SHEET CP101 FOR
PAVEMENT REPAIR
SEE SHEET CP101 FOR
PAVEMENT REPAIR
SEE SHEET CP101 FOR
PAVEMENT REPAIR
SEE SHEET CP101 FOR
PAVEMENT REPAIR
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\C
S1
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 CS100
OVERALL SITE LAYOUT AND UTILITY
PLAN
NORTHGRAPHICAL SCALE: 1"=100'
100 50 0 100 200 300
CS101 CS102
CS103
CS104 CS105
CS106
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X
X
X
X
X
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WWWW
W
W W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W W
Dirt Rd.
Dirt Rd.
Dirt Rd.
Dirt Rd.
Dirt Rd.
MAINTENANCE ACCESS ROAD
X X X X X X X X X X X
WOOD POST
FIBERGLASS
MARKER
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X X X X X
X
X
X
X
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WWWW
W
W W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W W
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E E E E E E E E E E E
C C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C C
C C C C C C C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LO
C LOC LOC LOC LOC
LO
C
LO
C
GRAVESITE GRID MONUMENT
CONCRETE BURIAL SECTION MARKER
LEGEND:
LIMITS OF CONSTRUCTIONLOC
DIRECTION OF TRAFFIC ARROWS
(FOR INFORMATION ONLY)
HEADSTONE FACE DIRECTION
PRE-PLACED CRYPTS
4" CONCRETE PAVEMENT
INTERIOR CRYPT (TYP.)
PERIMETER CRYPT (TYP.)
IN-GROUND CREMAIN SITES
MOUNTABLE CURB & GUTTER
GC503
1 & 2
CS502
CS503
1 - 3
CS501
CI702
FLUSH CURB 6
CS503
1. WHEN ADJACENT TO CURB AND GUTTER, SITE LAYOUT DIMENSIONS AND RADII
ARE BASED ON THE FACE OF CURB (FLOW LINE OF MOUNTABLE CURB) UNLESS
OTHERWISE NOTED ON THE PLANS.
SITE LAYOUT NOTES:
ASPHALT PAVEMENT 4
CS503
KEYNOTE LEGEND:
DESCRIPTION
PAVEMENT TRENCH REPAIR
FLOWER WATERING STATION
(SEE SITE FURNISHINGS PLANS)
GRAVEL ACCESS ROAD 12
CS503
PAVEMENT TRENCH REPAIR 4
CS504
SITE SIGNAGE (SEE SITE FURNISHINGS PLANS)
VALLEY GUTTER
CURB AND GUTTER TRANSITION
DETAIL / PG.
TIE INTO EXISTING CURB IN GUTTER. TRANSITION
MOUNTABLE CURB AND GUTTER TO MATCH
EXISTING CURB AND GUTTER.
5 TEST PIT TO LOCATE EXISTING UTILITY
REPLACE CURB TO ACCOMMODATE PIPE
CROSSING INSTALLATION / DRAINAGE BASIN
INSTALLATION. CURB REPLACEMENT TO BE TO
NEAREST JOINT
FULL DEPTH PAVEMENT .REPLACEMENT TO
OCCUR ONCE BURIAL EXPANSION IS COMPLETE.
CONTRACTOR TO LIMIT REPLACEMENT IN A WAY
THAT ALLOWS TRAFFIC TO ACCESS THE ENTIRE
CEMETERY.
FULL DEPTH ASPHALT
PAVEMENT REPLACEMENT
CS503
CS503
CS503
CS504
CS503
8 & 9
CS503
8 PAVEMENT WEDGE
CS503
VALLEY GUTTER 7
CS503
RIP-RAP CHANNEL/SWALE
PROTECTION
GC503
CURB & GUTTER TRANSITION FLUSH CURB CURB & GUTTER TRANSITION 8 & 9
CS503
JUTE MATTING CHANNEL/SWALE
PROTECTION.
EARTHEN BERM (3' WIDE TOP. OVERFILL
BY 5% TO ALLOW FOR SETTLEMENT)
TP TP TREE PROTECTION
CS502
GC503
VELOCITY DISSIPATION DEVICE 3
GC502
KEY MAP
(NOT TO SCALE)
1 2 3
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\C
S1
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 CS101
SITE LAYOUT AND UTILITY PLAN
NORTHGRAPHICAL SCALE: 1"=30'
X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X
Dirt Rd.
Dirt Rd.
Dirt Rd.
Dirt Rd.
EAST BEAR MOUNTAIN BLVD.
STATE HIGHWAY 223
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
OAK TREE
PLANTER
FOG LINE
FOG LINE
YELLOW STRIPES
FOG LINE
FOG LINE
YELLOW STRIPES
POST MILE
SIGN
UTILITY
VAULT
POST
POST
X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X X X X X X X X X X X X X X X X X X
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E E
E
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOCLOC
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
" H
DP
E
15" HDPE
15" HDPE
15" HDPE
" H
DP
E
15" HDPE
15" HDPE
28A
27A
26A
LOOP ROAD
LOOP CONNECTOR ROAD
25+00
26+00
27+00 28+0028+61
+0
+0
+5
+0
+0
+5
25+00
26+00
27+00 28+0028+61
R743.5'
R770.1'
R30'R30'
R213.3'
R186.7'
R263.3'
R236.7'
R236.7'
R15'
R15'
R62 'R50'
R15'
R15'
R106'
R94'
R94'
R106' R206'R194'
.3'
.3'
13.3' 13.3'
12'
12'
GRAVESITE GRID MONUMENT
CONCRETE BURIAL SECTION MARKER
LEGEND:
LIMITS OF CONSTRUCTIONLOC
DIRECTION OF TRAFFIC ARROWS
(FOR INFORMATION ONLY)
HEADSTONE FACE DIRECTION
PRE-PLACED CRYPTS
4" CONCRETE PAVEMENT
INTERIOR CRYPT (TYP.)
PERIMETER CRYPT (TYP.)
IN-GROUND CREMAIN SITES
MOUNTABLE CURB & GUTTER
GC503
1 & 2
CS502
CS503
1 - 3
CS501
CI702
FLUSH CURB 6
CS503
1. WHEN ADJACENT TO CURB AND GUTTER, SITE LAYOUT DIMENSIONS AND RADII
ARE BASED ON THE FACE OF CURB (FLOW LINE OF MOUNTABLE CURB) UNLESS
OTHERWISE NOTED ON THE PLANS.
SITE LAYOUT NOTES:
ASPHALT PAVEMENT 4
CS503
KEYNOTE LEGEND:
DESCRIPTION
PAVEMENT TRENCH REPAIR
FLOWER WATERING STATION
(SEE SITE FURNISHINGS PLANS)
GRAVEL ACCESS ROAD 12
CS503
PAVEMENT TRENCH REPAIR 4
CS504
SITE SIGNAGE (SEE SITE FURNISHINGS PLANS)
VALLEY GUTTER
CURB AND GUTTER TRANSITION
DETAIL / PG.
TIE INTO EXISTING CURB IN GUTTER. TRANSITION
MOUNTABLE CURB AND GUTTER TO MATCH
EXISTING CURB AND GUTTER.
5 TEST PIT TO LOCATE EXISTING UTILITY
REPLACE CURB TO ACCOMMODATE PIPE
CROSSING INSTALLATION / DRAINAGE BASIN
INSTALLATION. CURB REPLACEMENT TO BE TO
NEAREST JOINT
FULL DEPTH PAVEMENT .REPLACEMENT TO
OCCUR ONCE BURIAL EXPANSION IS COMPLETE.
CONTRACTOR TO LIMIT REPLACEMENT IN A WAY
THAT ALLOWS TRAFFIC TO ACCESS THE ENTIRE
CEMETERY.
FULL DEPTH ASPHALT
PAVEMENT REPLACEMENT
CS503
CS503
CS503
CS504
CS503
8 & 9
CS503
8 PAVEMENT WEDGE
CS503
VALLEY GUTTER 7
CS503
RIP-RAP CHANNEL/SWALE
PROTECTION
GC503
CURB & GUTTER TRANSITION FLUSH CURB CURB & GUTTER TRANSITION 8 & 9
CS503
JUTE MATTING CHANNEL/SWALE
PROTECTION.
EARTHEN BERM (3' WIDE TOP. OVERFILL
BY 5% TO ALLOW FOR SETTLEMENT)
TP TP TREE PROTECTION
CS502
GC503
VELOCITY DISSIPATION DEVICE 3
GC502
KEY MAP
(NOT TO SCALE)
1 2 3
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\C
S1
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 CS102
SITE LAYOUT AND UTILITY PLAN
NORTHGRAPHICAL SCALE: 1"=30'
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
Dirt Rd.
Dirt Rd.
Dirt Rd.
Dir t R d.
W
HITE W
OLF DRIVE
3.5" ALUMINUM CAP 3.5" ALUMINUM CAP
3.5" ALUMINUM CAP 1" REBAR
X X
X X
X X
X X
X X
X
X
XXXX
X X X X X X X X X X X X X X X X X X X X X
X
X X
X X
X X
X X
X X
X X
X
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTERPLANTER
WHITE STRIPE
FOG LINE
FOG LINEDOUBLE YELLOW STRIPES
WHITE STRIPE
FOG LINE
FOG LINE
DOUBLE YELLOW STRIPES
RAMP
ADA
RAMPADA
RAMP
MEDIAN
ISLAND SIGN
MEDIAN
ISLAND SIGN
BAKERSFIELD NATIONAL
CEMETERY MONUMENT SIGN
WHITE WOLF
DRIVE SIGN
STREET SIGN
STOP SIGN
BENCHMARK #3 SET:
CHISELED "+" ON TOP OF CURB.
ELEV. = 1971.83' (NAVD88)
N = 2279930.124 E = 6362583.43
SECTION 7
SECTION 16
SECTION 15
SECTION 8SECTION 12SECTION 17
CULVERT
V-GUTTER
4" PVC
6" PVC
POST
SLIDING GATE
SLIDING GATE
WALL
WALL
WALL
WROUGHT
IRON FENCE
WROUGHT
IRON FENCE
WALL
WALL
W
OOD CHIPS
WOOD CHIPS
GRAVEL
GRAVEL
POST
POST
POST
TRASH
BINS
BENCH
BURIED
UTILITY LINE
UTILITY BOX
BENCH
IRR. BOXES IRR. BOXES
IRR.
BOXES
IRR. BOX
IRR. BOX
IRR. BOX
IRR. BOX
I.C.V.
I.C.V.
I.C.V.
I.C.V.
I.C.V.
IRR. BOX.
IRR. BOX.
IRR. BOX.
IRR. BOX.
IRR. BOX.
IRR. BOX. IRR. BOX. IRR. BOX.
IRR. BOX.
IRR. BOX.
WATER
BOXES
5-I.C.V.
IRR. BOXES
POST
POST
POST
POST
POST
POST POST
POST
POST
I.C.V.
X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X X
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
E
E
E
E
E
E
E
E
E
E
E E
E
E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E
E E
E E
E E
E E
E E
E E E
E E
E
E E
E E
E E
E E
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C C C
C C C C
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E
E
E
E
E E
E
LOC
LOC
LOC
LO
C
LO
C
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LOC
LOC
LOC
LOCLOC
LOC
LOC
LOC
LOC LOC LOC
LOC
LOC
LOC
LOC
LO
C
LOC LOC LOC LOC LOC LOC LOC LOC LOC
LOC
LOC
LOC
LOC
LOCLOCLOCLOCLOCLOCLOCLOCLOCLOC
LOC
LOC
LOC
LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LOC
LOC
LO
C
LO
C
LO
C LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOCLOCLOCLOC
LOC
LOC
LOC
15" HDPE
15" HDPE
" H
DP
E
15" HDPE
15" HDPE
15" HDPE
15" HDPE
15" HDPE
7A
7B
13.32' 10'
M6A M6BBM6
SM6A
SM6B
LOOP ROAD
LOOP ROAD
+0
17+00
18+00
19+00
20+
21+00
22+00
23+00
24+00
25+00
+0
17+00
18+00
19+00
20+
21+00
22+00
23+00
24+00
25+00
R3 0'
R30'
R3 0'
R30'
R413.3'
R386.7'
R186.7'
R213.3'
R241.7'
R268.3'
R30'
R2
.3'
R15'
R15'
R62
R15'
R15'
R106'
R94'
R2
.3'
13.3' 13.3'
4' 4'
48'
72'
12'
12'
13.32' 13.32'
13.32'
REFER TO COLUMBARIUM
DRAWINGS FOR DETAILED
DESIGN INFORMATION WITHIN
COLUMBARIUM COMPLEX "C"
SECTION 6
2,152 IN-GROUND CREMAIN SITES
(WITHIN 4'x4' PLOTS)
GRAVESITE GRID MONUMENT
CONCRETE BURIAL SECTION MARKER
LEGEND:
LIMITS OF CONSTRUCTIONLOC
DIRECTION OF TRAFFIC ARROWS
(FOR INFORMATION ONLY)
HEADSTONE FACE DIRECTION
PRE-PLACED CRYPTS
4" CONCRETE PAVEMENT
INTERIOR CRYPT (TYP.)
PERIMETER CRYPT (TYP.)
IN-GROUND CREMAIN SITES
MOUNTABLE CURB & GUTTER
GC503
1 & 2
CS502
CS503
1 - 3
CS501
CI702
FLUSH CURB 6
CS503
1. WHEN ADJACENT TO CURB AND GUTTER, SITE LAYOUT DIMENSIONS AND RADII
ARE BASED ON THE FACE OF CURB (FLOW LINE OF MOUNTABLE CURB) UNLESS
OTHERWISE NOTED ON THE PLANS.
SITE LAYOUT NOTES:
ASPHALT PAVEMENT 4
CS503
KEYNOTE LEGEND:
DESCRIPTION
PAVEMENT TRENCH REPAIR
FLOWER WATERING STATION
(SEE SITE FURNISHINGS PLANS)
GRAVEL ACCESS ROAD 12
CS503
PAVEMENT TRENCH REPAIR 4
CS504
SITE SIGNAGE (SEE SITE FURNISHINGS PLANS)
VALLEY GUTTER
CURB AND GUTTER TRANSITION
DETAIL / PG.
TIE INTO EXISTING CURB IN GUTTER. TRANSITION
MOUNTABLE CURB AND GUTTER TO MATCH
EXISTING CURB AND GUTTER.
5 TEST PIT TO LOCATE EXISTING UTILITY
REPLACE CURB TO ACCOMMODATE PIPE
CROSSING INSTALLATION / DRAINAGE BASIN
INSTALLATION. CURB REPLACEMENT TO BE TO
NEAREST JOINT
FULL DEPTH PAVEMENT .REPLACEMENT TO
OCCUR ONCE BURIAL EXPANSION IS COMPLETE.
CONTRACTOR TO LIMIT REPLACEMENT IN A WAY
THAT ALLOWS TRAFFIC TO ACCESS THE ENTIRE
CEMETERY.
FULL DEPTH ASPHALT
PAVEMENT REPLACEMENT
CS503
CS503
CS503
CS504
CS503
8 & 9
CS503
8 PAVEMENT WEDGE
CS503
VALLEY GUTTER 7
CS503
RIP-RAP CHANNEL/SWALE
PROTECTION
GC503
CURB & GUTTER TRANSITION FLUSH CURB CURB & GUTTER TRANSITION 8 & 9
CS503
JUTE MATTING CHANNEL/SWALE
PROTECTION.
EARTHEN BERM (3' WIDE TOP. OVERFILL
BY 5% TO ALLOW FOR SETTLEMENT)
TP TP TREE PROTECTION
CS502
GC503
VELOCITY DISSIPATION DEVICE 3
GC502
6362635.5715
NORTHING
MONUMENT LAYOUT CHART
EASTINGMONUMENT
M6A 2280048.1606
2280097.2674 6362582.9167
M6B
BASELINE BEARING [DEFINED BY]
BM6 N46° 59' 49"E [M6A TO M6B]
6362547.9079
NORTHING
SEC. MARKER LAYOUT CHART
EASTINGMONUMENT
SM6A 2280142.7632
2280078.855 6362570.4818
SM6B
KEY MAP
(NOT TO SCALE)
1 2 3
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\C
S1
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 CS103
SITE LAYOUT AND UTILITY PLAN
NORTHGRAPHICAL SCALE: 1"=30'
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
XXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X WWWW
W
W W
W W W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
Dirt Rd.
Dirt Rd.
Dirt R d.
RANCHO EL TEJON CIR.
MAINTENANCE ACCESS ROAD
X
Ground Not Visible
Dense Trees
GUARDRAIL
CULVERT
FLAG
POLE
FLAG
POLE
FLAG
POLE
VAULT
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
XXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X WWWW
W
W W
W W W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E
E
E E
E
C
C C
C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E
LO
C LOC LOC LOC LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LOC
LOC
LOC
LO
C
LO
C
LOC
LOC
GRAVESITE GRID MONUMENT
CONCRETE BURIAL SECTION MARKER
LEGEND:
LIMITS OF CONSTRUCTIONLOC
DIRECTION OF TRAFFIC ARROWS
(FOR INFORMATION ONLY)
HEADSTONE FACE DIRECTION
PRE-PLACED CRYPTS
4" CONCRETE PAVEMENT
INTERIOR CRYPT (TYP.)
PERIMETER CRYPT (TYP.)
IN-GROUND CREMAIN SITES
MOUNTABLE CURB & GUTTER
GC503
1 & 2
CS502
CS503
1 - 3
CS501
CI702
FLUSH CURB 6
CS503
1. WHEN ADJACENT TO CURB AND GUTTER, SITE LAYOUT DIMENSIONS AND RADII
ARE BASED ON THE FACE OF CURB (FLOW LINE OF MOUNTABLE CURB) UNLESS
OTHERWISE NOTED ON THE PLANS.
SITE LAYOUT NOTES:
ASPHALT PAVEMENT 4
CS503
KEYNOTE LEGEND:
DESCRIPTION
PAVEMENT TRENCH REPAIR
FLOWER WATERING STATION
(SEE SITE FURNISHINGS PLANS)
GRAVEL ACCESS ROAD 12
CS503
PAVEMENT TRENCH REPAIR 4
CS504
SITE SIGNAGE (SEE SITE FURNISHINGS PLANS)
VALLEY GUTTER
CURB AND GUTTER TRANSITION
DETAIL / PG.
TIE INTO EXISTING CURB IN GUTTER. TRANSITION
MOUNTABLE CURB AND GUTTER TO MATCH
EXISTING CURB AND GUTTER.
5 TEST PIT TO LOCATE EXISTING UTILITY
REPLACE CURB TO ACCOMMODATE PIPE
CROSSING INSTALLATION / DRAINAGE BASIN
INSTALLATION. CURB REPLACEMENT TO BE TO
NEAREST JOINT
FULL DEPTH PAVEMENT .REPLACEMENT TO
OCCUR ONCE BURIAL EXPANSION IS COMPLETE.
CONTRACTOR TO LIMIT REPLACEMENT IN A WAY
THAT ALLOWS TRAFFIC TO ACCESS THE ENTIRE
CEMETERY.
FULL DEPTH ASPHALT
PAVEMENT REPLACEMENT
CS503
CS503
CS503
CS504
CS503
8 & 9
CS503
8 PAVEMENT WEDGE
CS503
VALLEY GUTTER 7
CS503
RIP-RAP CHANNEL/SWALE
PROTECTION
GC503
CURB & GUTTER TRANSITION FLUSH CURB CURB & GUTTER TRANSITION 8 & 9
CS503
JUTE MATTING CHANNEL/SWALE
PROTECTION.
EARTHEN BERM (3' WIDE TOP. OVERFILL
BY 5% TO ALLOW FOR SETTLEMENT)
TP TP TREE PROTECTION
CS502
GC503
VELOCITY DISSIPATION DEVICE 3
GC502
KEY MAP
(NOT TO SCALE)
1 2 3
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\C
S1
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 CS104
SITE LAYOUT AND UTILITY PLAN
NORTHGRAPHICAL SCALE: 1"=30'
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W
W W
W W
W W
W W
W
W
W
W W
W W
W
WWWWWWWW
W
W
W W
W
W
W
W
W
W
W W
W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
COLUMBARIUM B
RANCHO EL TEJON CIR.
RANCHO EL TEJON CIR.
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLA
NTER
PLA
NTER
ADA RAMP
ADA RAMP
ADA RAMP
15MPH
SPEED SIGN
SIGN
DIRECTION
SIGNS
EXISTNG
SIGN
BENCHMARK #2 SET:
CHISELED "+" ON TOP OF CURB.
ELEV. = 1950.67' (NAVD88)N = 2279686.511E = 6361548.818
SECTION 18
SECTION 17
COLUMBARIUM COMPLEX A
4' WIDE
V-GUTTER
WALL
COMMS. RISER
BENCH
VAULT
VAULT
VAULT
I.C.V.
IRR. BOX
IRR. BOX
IRR. BOX
IRR. BOX
IRR. BOXES IRR. BOX
IRR. BOXES
IRR. BOX
VAULT
POST
POST
POST
POST
POST
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W
W W
W W
W W
W W
W
W
W
W W
W W
W
WWWWWWWW
W
W
W W
W
W
W
W
W
W
W W
W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
COLUMBARIUM B
E
E
E
E
EEEEEE
E E
E E
E E
E E
E E
EEEEEEEEEE
E
E E
E E
EEEEE
E
E E
E
E
E
E
E
E
E E
E E
E
E
C C
C
C
C
C
C
C
C
C
C C
C C C C C C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C C C C C
C C
C C
C C C C C C C C C C C
C C
C C
C
C
C
C
C
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
C
C
C
E
E
E E
LOC
LOC
LOC
LOC
LOC LOC LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC LOC LOC
LOCLOC
LOC
LOC
LOC
LO
C
LOC
LOC
LOC LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC LOC LOC
LO
C
LO
C
LOC
LO
C
LOC
LO
C
LO
C
LO
C
LO
C
LO
C
LOC
LO
C
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
TP
TPTP
TP
TP
TP
TP
TP
TP
TP TP
TP
TP
TP
TP
TP
15" HDPE
15" HDPE
24" HDPE
" H
DP
E
15" HDPE
15" HDPE
" H
DP
E
15" H
DPE
24" HDPE
24" HDPE
24" HDPE
15" HDPE
15" HDPE
" R
CP
C
L I
II
8' RIP-RAP EMERGENCY SPILLWAY
ELEV. = 1947.00'
SEE DETAIL 3 ON CJ501
26A
25A
25 25C
25D
21B
21C
SWM 1 RISER
SWM 1 ES
25B
24" HDPE
21A
M19A
M19B
BM19
M20A
M20B
BM20
SM20A
SM20B
SM19A
SM19B
LOOP CONNECTOR ROAD
+0
+0
+0
13+00
14+00
+0
+0
+0
13+00
14+00
R236.7' R263.3'
R263.3'
R236.7'
R30' R30'
R94'
R106' R206'R194'
R194'R206'
R194'
R206'
R106'R94'
R1 5'
R15'
13.3' 13.3'
13.
3'
13.
3'
13.3' 13.3'
3'
3'
45'
72'
3'
3'
45'
72'
12'
SECTION 19
1,560 DOUBLE-DEPTH
PRE-PLACED CRYPTS
(WITHIN 3'x8' PLOTS)
SECTION 20
1,444 DOUBLE-DEPTH
PRE-PLACED CRYPTS
(WITHIN 3'x8' PLOTS)
GRAVESITE GRID MONUMENT
CONCRETE BURIAL SECTION MARKER
LEGEND:
LIMITS OF CONSTRUCTIONLOC
DIRECTION OF TRAFFIC ARROWS
(FOR INFORMATION ONLY)
HEADSTONE FACE DIRECTION
PRE-PLACED CRYPTS
4" CONCRETE PAVEMENT
INTERIOR CRYPT (TYP.)
PERIMETER CRYPT (TYP.)
IN-GROUND CREMAIN SITES
MOUNTABLE CURB & GUTTER
GC503
1 & 2
CS502
CS503
1 - 3
CS501
CI702
FLUSH CURB 6
CS503
1. WHEN ADJACENT TO CURB AND GUTTER, SITE LAYOUT DIMENSIONS AND RADII
ARE BASED ON THE FACE OF CURB (FLOW LINE OF MOUNTABLE CURB) UNLESS
OTHERWISE NOTED ON THE PLANS.
SITE LAYOUT NOTES:
ASPHALT PAVEMENT 4
CS503
KEYNOTE LEGEND:
DESCRIPTION
PAVEMENT TRENCH REPAIR
FLOWER WATERING STATION
(SEE SITE FURNISHINGS PLANS)
GRAVEL ACCESS ROAD 12
CS503
PAVEMENT TRENCH REPAIR 4
CS504
SITE SIGNAGE (SEE SITE FURNISHINGS PLANS)
VALLEY GUTTER
CURB AND GUTTER TRANSITION
DETAIL / PG.
TIE INTO EXISTING CURB IN GUTTER. TRANSITION
MOUNTABLE CURB AND GUTTER TO MATCH
EXISTING CURB AND GUTTER.
5 TEST PIT TO LOCATE EXISTING UTILITY
REPLACE CURB TO ACCOMMODATE PIPE
CROSSING INSTALLATION / DRAINAGE BASIN
INSTALLATION. CURB REPLACEMENT TO BE TO
NEAREST JOINT
FULL DEPTH PAVEMENT .REPLACEMENT TO
OCCUR ONCE BURIAL EXPANSION IS COMPLETE.
CONTRACTOR TO LIMIT REPLACEMENT IN A WAY
THAT ALLOWS TRAFFIC TO ACCESS THE ENTIRE
CEMETERY.
FULL DEPTH ASPHALT
PAVEMENT REPLACEMENT
CS503
CS503
CS503
CS504
CS503
8 & 9
CS503
8 PAVEMENT WEDGE
CS503
VALLEY GUTTER 7
CS503
RIP-RAP CHANNEL/SWALE
PROTECTION
GC503
CURB & GUTTER TRANSITION FLUSH CURB CURB & GUTTER TRANSITION 8 & 9
CS503
JUTE MATTING CHANNEL/SWALE
PROTECTION.
EARTHEN BERM (3' WIDE TOP. OVERFILL
BY 5% TO ALLOW FOR SETTLEMENT)
TP TP TREE PROTECTION
CS502
GC503
VELOCITY DISSIPATION DEVICE 3
GC502
6361704.6847
NORTHING
MONUMENT LAYOUT CHART
EASTINGMONUMENT
M19A 2279642.6149
2279589.9601 6361655.578
M19B
BASELINE BEARING [DEFINED BY]
BM19 S43° 00' 11"E [M19A TO M19B]
6361524.3076
NORTHING
SEC. MARKER LAYOUT CHART
EASTINGMONUMENT
SM19A 2279743.2177
2279612.514 6361706.2079
SM19B
6361292.4793
SM20A 2279536.1403
2279394.4634 6361422.8053
SM20B
6361408.5014 M20A 2279366.3896
2279313.7347 6361359.3947
M20B
BM20 S43° 00' 11"E [M20A TO M20B]
KEY MAP
(NOT TO SCALE)
1 2 3
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\C
S1
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 CS105
SITE LAYOUT AND UTILITY PLAN
NORTHGRAPHICAL SCALE: 1"=30'
SD
SD SD
SD
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
WWWW
W
W W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WILDFLOWER WAY
PUBLIC INFORMATION CENTER
& ADMINISTRATION BUILDING
SS
SS
WHITE WOLF DRIVE
TEHACHAPI WAY
3.5" ALUMINUM CAP1" REBAR
1" REBAR 1" REBAR
1" REBAR
3.5" ALUMINUM CAP 3.5" ALUMINUM CAP
3.5" ALUMINUM CAP
3.5" ALUMINUM CAP 3.5" ALUMINUM CAP
1" REBAR
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
PLANTERPLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
PLANTER
WHITE
STRIPE
ADA RAMP
ADA RAMP
ADA RAMP
ADA RAMP
ADA
RAMP
ADA RAMP
ADA RAMP
ADA
RAMP
ADA
RAMPADA
DIRECTION
SIGNS
EXISTNG
SIGN
SNAKES SIGNS
MONUMENT
SIGN
SECTION 10 A
SECTION 10
SECTION 11
SECTION 12
SECTION 9
SECTION 8
SECTION 17
SECTION 8SECTION 12SECTION 17
SECTION 18
V-GUTTER
INLET
CULVERT
POST
SUMP
GRAVEL
GRAVEL
PAVERS
BENCH
POST
BENCH
POST
BENCH
IRR. BOXES
IRR.
BOXES
IRR. BOX
IRR. BOXES
IRR. BOX
WATER VALVES
POST
POST
POST
POST POST
POST
POST
POST POST
POST
POST
POST
IRR. BOXES
SD
SD SD
SD
X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
WWWW
W
W W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WILDFLOWER WAY
PUBLIC INFORMATION CENTER
& ADMINISTRATION BUILDING
SS
SS
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E
C C
C
C
C
C
E E
E
E
E E
E E
E E
E
E
E
E
E
C
C
C
C
C
C
C
C
C
C
C
C
C
C C
C C
C C
C
C
C
C C
E
E E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E
E
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E
E
E E
E E E E
E E E
E
E
E
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
C
C
C
E
E
E
E
E
E
LOC LOC LOC
LOC
LOCLOCLOC
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LO
C
LOCLOC
LOC
LOCLOC
LOC
LO
C
LO
C
LOC
LO
C
LOC
LO
C
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LO
C
LOC
LOC
LOC
LOC LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC
LOC15
" H
DP
E
" H
DP
E
15" HDPE
15" HDPE
15" HDPE
18" HDPE
15" HDPE
15" HDPE
EX. 18" HDPE
" H
DP
E
" H
DP
E
" R
CP
C
L I
II
8' RIP-RAP
EMERGENCY SPILLWAY
ELEV. = 1921.00
SEE DETAIL 6 ON CJ501
5A 5
4A
2A
2B
SMW 2 ES
SWM 2 RISER
13.32' 10'
13.32' 10'
13.32' 10'
LOOP ROAD
10+00
11+00
12+00 13+00
+0
+0
+0
STORMWATER
MANAGEMENT
IMPROVEMENTS
10+00
11+00
12+00 13+00
+0
+0
+0
R30'
R30'
R30'
R2
.3'
R3
R3
.4'
R314.1'
R287.4'
R287.4'
R314.1'
R252.2'
R288.9'
R278.9'
R513.3'
R486.7'
R486.7'
R278.9'
R3
.3'
.3'
8'
13.32' 13.32'
13.32'
13.32'
13.32'
REFER TO COLUMBARIUM
DRAWINGS FOR DETAILED DESIGN
INFORMATION WITHIN
COLUMBARIUM COMPLEX "D"
REFER TO COLUMBARIUM
DRAWINGS FOR DETAILED
DESIGN INFORMATION WITHIN
COLUMBARIUM COMPLEX "C"
4 4
GRAVESITE GRID MONUMENT
CONCRETE BURIAL SECTION MARKER
LEGEND:
LIMITS OF CONSTRUCTIONLOC
DIRECTION OF TRAFFIC ARROWS
(FOR INFORMATION ONLY)
HEADSTONE FACE DIRECTION
PRE-PLACED CRYPTS
4" CONCRETE PAVEMENT
INTERIOR CRYPT (TYP.)
PERIMETER CRYPT (TYP.)
IN-GROUND CREMAIN SITES
MOUNTABLE CURB & GUTTER
GC503
1 & 2
CS502
CS503
1 - 3
CS501
CI702
FLUSH CURB 6
CS503
1. WHEN ADJACENT TO CURB AND GUTTER, SITE LAYOUT DIMENSIONS AND RADII
ARE BASED ON THE FACE OF CURB (FLOW LINE OF MOUNTABLE CURB) UNLESS
OTHERWISE NOTED ON THE PLANS.
SITE LAYOUT NOTES:
ASPHALT PAVEMENT 4
CS503
KEYNOTE LEGEND:
DESCRIPTION
PAVEMENT TRENCH REPAIR
FLOWER WATERING STATION
(SEE SITE FURNISHINGS PLANS)
GRAVEL ACCESS ROAD 12
CS503
PAVEMENT TRENCH REPAIR 4
CS504
SITE SIGNAGE (SEE SITE FURNISHINGS PLANS)
VALLEY GUTTER
CURB AND GUTTER TRANSITION
DETAIL / PG.
TIE INTO EXISTING CURB IN GUTTER. TRANSITION
MOUNTABLE CURB AND GUTTER TO MATCH
EXISTING CURB AND GUTTER.
5 TEST PIT TO LOCATE EXISTING UTILITY
REPLACE CURB TO ACCOMMODATE PIPE
CROSSING INSTALLATION / DRAINAGE BASIN
INSTALLATION. CURB REPLACEMENT TO BE TO
NEAREST JOINT
FULL DEPTH PAVEMENT .REPLACEMENT TO
OCCUR ONCE BURIAL EXPANSION IS COMPLETE.
CONTRACTOR TO LIMIT REPLACEMENT IN A WAY
THAT ALLOWS TRAFFIC TO ACCESS THE ENTIRE
CEMETERY.
FULL DEPTH ASPHALT
PAVEMENT REPLACEMENT
CS503
CS503
CS503
CS504
CS503
8 & 9
CS503
8 PAVEMENT WEDGE
CS503
VALLEY GUTTER 7
CS503
RIP-RAP CHANNEL/SWALE
PROTECTION
GC503
CURB & GUTTER TRANSITION FLUSH CURB CURB & GUTTER TRANSITION 8 & 9
CS503
JUTE MATTING CHANNEL/SWALE
PROTECTION.
EARTHEN BERM (3' WIDE TOP. OVERFILL
BY 5% TO ALLOW FOR SETTLEMENT)
TP TP TREE PROTECTION
CS502
GC503
VELOCITY DISSIPATION DEVICE 3
GC502
KEY MAP
(NOT TO SCALE)
1 2 3
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\C
S1
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 CS106
SITE LAYOUT AND UTILITY PLAN
NORTHGRAPHICAL SCALE: 1"=30'
LEGEND:
PRE-PLACED CRYPTS
INTERIOR CRYPT (TYP.)
PERIMETER CRYPT (TYP.)
CONCRETE SECTION MARKER
HEADSTONE FACE DIRECTION
GRAVESITE GRID MONUMENT
IN-GROUND CREMAIN SITES
X
X
17+00 17+00
665A
LOOP ROAD
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\C
S1
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 CS151
BURIAL SECTION 6 NUMBERING
PLAN
NORTH
GRAPHICAL SCALE: 1"=10'
10 5 0 10 20 30
BURIAL SECTION 6
2,152 IN-GROUND CREMAIN SITES
(WITHIN 4x4' PLOTS)
INTERIOR CRYPT (TYP.)
PERIMETER CRYPT (TYP.)
CONCRETE SECTION MARKER
HEADSTONE FACE DIRECTION
GRAVESITE GRID MONUMENT
IN-GROUND CREMAIN SITES
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W
W
W
W
W
W W
W W
W W
W
WWWWWWWWWW
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
RANCHO EL TEJON CIR.
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W
W
W
W
W
W W
W W
W W
W
WWWWWWWWWW
W W
W W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
E E
E E
E E E E E E E E E E E E E E E E
E E
E E
E
E
E
C
C
C
C
C
C
C
C
C
C
C
C C
C C
C C
CCCCCCCCCCCCCCCC
C
C C
C C
C
C
C
C
C
C
C
C
C
C
C
C C
C C
C C
C C
C C
C C
C
E
5A
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\C
S1
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 CS152
BURIAL SECTION 19 NUMBERING
PLAN
NORTH
GRAPHICAL SCALE: 1"=10'
10 5 0 10 20 30
BURIAL SECTION 19
1,560 DOUBLE DEPTH PPC
(WITHIN 3x8' PLOTS)
INTERIOR CRYPT (TYP.)
PERIMETER CRYPT (TYP.)
CONCRETE SECTION MARKER
HEADSTONE FACE DIRECTION
GRAVESITE GRID MONUMENT
IN-GROUND CREMAIN SITES
W W
W W
W
WWWWWWWW
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W W W W W W W W W W W W W W W W W W W
RANCHO EL TEJON CIR.
W W
W W
W
WWWWWWWW
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W W W W W W W W W W W W W W W W W W W
E E
E E
E E E E E E E E E E E E E E E E
E E
E E
E
C C
C C
C
CCCCCCCCCCC
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
CCCCCCCCCCCCCCCCCCCCCCCC
5A
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\C
S1
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 CS153
BURIAL SECTION 20 NUMBERING
PLAN
NORTH
GRAPHICAL SCALE: 1"=10'
10 5 0 10 20 30
BURIAL SECTION 20
1,444 DOUBLE DEPTH PPC
(WITHIN 3x8' PLOTS)
CURB REPLACEMENT 11
CS503
CRACK SEAL AND SEAL
COAT, REPAINT PAVEMENT
LINES AND MARKINGS
NOTES:
CONTRACTOR SHALL SEAL COAT ALL ROADS AND PAINT/REPAINT
ALL PAVEMENT MARKINGS IN ACCORDANCE WITH NCA AND/OR
DEPARTMENT OF TRANSPORTATION (DOT) REQUIREMENTS /
STANDARDS.
X
XX
X
X
X
X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X
X X X X X X X X X X X X X X X X X X X
X X X X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X X
X X
X
X X
X X
X X
X X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
W
W
W
W
W
W
W
WW
W
W
W
W W
W W W
W
W W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W
W
WWW
W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W
W
XX
XXXXXX
XX
XXXXXXXXXX
XX
XXXXXX
XX
XX
XX
XX
XX XX XX XX XX XX
XX
XX
XX
XX
XX
WILDFLOWER WAY
MAINTENANCE FACILITY
COLUMBARIUM B
PUBLIC INFORMATION CENTER
& ADMIN. BUILDING
MEMORIAL WALK
POW / MIA FLAGPOLE
OSSUARY
COMMITTAL SHELTER 1
U.S. FLAG
CORTEGE LANE
SS
SS
RANCHO EL TEJONCIR.
WHITE WOLF DRIVE
EAST BEAR MOUNTAIN BLVD.
STATE HIGHWAY 223
RANCHO EL TEJON CIR.
TEHACHAPI WAY
COMMITTAL SHELTER
LOOP
MAINTENANCE ACCESS ROAD
MAINTENANCE ACCESS ROAD
EAST BEAR MOUNTAIN BLVD.
STATE HIGHWAY 223
X X
X
X
X X
X X
X X
X X
X X
X X
X
X X X X X X X X X X X X X X X X X X X X X
X
X
X
X X
X
SECTION 10 A
SECTION 10
SECTION 11
SECTION 12
SECTION 9
SECTION 8
SECTION 7
SECTION 18
SECTION 17
SECTION 16
SECTION 15
COLUMBARIUM COMPLEX A
ASSEMBLY AREA
X
XX
X
X
X
X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X
X X X X X X X X X X X X X X X X X X X
X X X X X
X X
X X
X X
X X
X X
X X
X X
X X X X X X X X X
X
X
X
X
X
X
X
X
X
X
X X
X X
X
X X
X X
X X
X X
X
X
XX
X
X
X
X
X
X
X
X
X
X
X
X
W
W
W
W
W
W
W
WW
W
W
W
W W
W W W
W
W W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W
W
WWW
W
W
W
W
W
W
W
W
W
W
W
W
W W W
W
W
W
XX
XXXXXX
XX
XXXXXXXXXX
XX
XXXXXX
XX
XX
XX
XX
XX XX XX XX XX XX
XX
XX
XX
XX
XX
WILDFLOWER WAY
MAINTENANCE FACILITY
COLUMBARIUM B
PUBLIC INFORMATION CENTER
& ADMIN. BUILDING
MEMORIAL WALK
POW / MIA FLAGPOLE
OSSUARY
COMMITTAL SHELTER 1
U.S. FLAG
CORTEGE LANE
SS
SS
E
E
E
E
E
E
EE
E
E
EEEE
E
EE
E
E
E
E
E E
E E
E
E
E
E
E
E
E
E
E
E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E E E E E E E E E E E E E E E E E E E E E E E E E E E E
E E
E
E
E E
C
C
E
E
E
E
C
C
C C
C C
C
C
C
C
C
C C
C C
CCC
E
E
E
E
E
E E
E
E E
E
E E
E
E
E E
E E
C
C
C
C
C
C C
C
C
C
C
C C
C
E
E E
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E
E
E
E
C
C
C
C
C
C
C
C
C
C
C
CC
C C
C
C
C C
C C C
C C C C C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C C C C
C C C C
C
C
C
C
C
E E E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E
E
E
E
E E
E
E
E
E
E
E
E
E
E
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
10+00
11+00
12+00
13+00
+0
+0
+0
17+00
18+00
19+00
20+
21+00
22+00
23+0024+00 25+00
26+00 27+0028+0028+61
+0
+0
+0
13+00
14+00
+0
+0
+5
+0
+0
+0
13+00
14+00
+0
+0
+5
10+00
11+00
12+00
13+00
+0
+0
+0
17+00
18+00
19+00
20+
21+00
22+00
23+0024+00 25+00
26+00 27+0028+0028+61
REFER TO ROSTRUM DRAWINGS
FOR DETAILED DESIGN
INFORMATION WITHIN THE
ROSTRUM COMPLEX
SECTION 19
1,560 DOUBLE-DEPTH
PRE-PLACED CRYPTS
(WITHIN 3'x8' PLOTS)
SECTION 6
2,152 IN-GROUND CREMAIN
SITES (WITHIN 4'x4' PLOTS)
SECTION 20
1,444 DOUBLE-DEPTH
PRE-PLACED CRYPTS
(WITHIN 3'x8' PLOTS)
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\C
P1
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026
KEY MAP
(NOT TO SCALE)
CP101
SITE PAVEMENT REPAIR PLAN (BID
OPTION 3)
NORTHGRAPHICAL SCALE: 1"=100'
100 50 0 100 200 300
File details come from the government source that posted it. Updated .