This is an Invitation for Bids (IFB) for the Bakersfield National Cemetery Gravesite Expansion and Facility Condition Assessment (FCA) Deficiencies project issued by the Department of Veterans Affairs National Cemetery Administration. The solicitation number is 36C78626B0029_1, and bids are due September 18, 2026, at 2:00 PM ET. An organized pre-bid site visit is scheduled for September 2, 2026, at 11:00 AM PT, with questions due by September 4, 2026. The project involves expansion of gravesite capacity at Bakersfield National Cemetery and remediation of facility condition assessment deficiencies identified at the cemetery.
The IFB is a competitive sealed bid procurement with standard federal contracting terms. Prospective bidders are required to attend or acknowledge the pre-bid site visit, submit technical and cost proposals, and comply with federal acquisition regulations. This is a fixed-price or unit-price contract type typical for construction and facility improvement projects. All bidders must be prepared to address both the gravesite expansion scope and the identified FCA deficiencies as part of their bid submissions.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C78626B0029 Section M
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C78626B0029 X
929CM3003
36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 Michael.giaquinto2@va.gov
Michael Giaquinto 917-943-8284
Project Title: Bakersfield National Cemetery Gravesite Expansion AND FCA Deficiencies Project Location: Bakersfield National Cemetery, 30338 E Bear Mountain Blvd, Arvin, CA 93203
NAICS code 237990 is applicable for this procurement with the small business size standard of $45 million.
The magnitude of construction for this project is estimated to be between $10,000,000 and $20,000,000.
NOTICE OF SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) SET ASIDE IN ACCORDANCE WITH PUBLIC LAW 109-461.
PERIOD OF PERFORMANCE: 730 DAYS AFTER NTP
There is an organized pre-bid site visit scheduled for 9/2/2026 at 11:00 AM.
Location: Bakersfield National Cemetery, 30338 E Bear Mountain Blvd, Arvin, CA 93203 Attendees are to meet at the cemetery Administration Building
Bid Opening Teleconference Information
Phone Number: +1 347-566-4838,446532635# United States, New York City Phone conference ID: 446 532 635#
X X
52.211-10 X
2:00 pm
EDT
09-18-2026 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
36C786 Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 http://www.tungsten-network.com/customer -campaigns/veterans-affairs/
1-877-752-0900
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS | 7 |
| B.1 PRICE SCHEDULE | 7 |
| ITEM INFORMATION | 7 |
| SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK | 8 |
| SECTION D - PACKAGING AND MARKING | 9 |
| [For this IFB, there are NO clauses in this Section] | 9 |
| SECTION E - INSPECTION AND ACCEPTANCE | 10 |
| [For this IFB, there are NO clauses in this Section] | 10 |
| SECTION F - DELIVERIES OR PERFORMANCE | 11 |
| [For this IFB, there are NO clauses in this Section] | 11 |
| SECTION G - CONTRACT ADMINISTRATION DATA | 12 |
| G.1 INVOICES: | 12 |
| G.2 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM: | 12 |
| G.3 STANDARD FORM 1413: | 13 |
| G.4 CERTIFIED PAYROLL FORMS: | 14 |
| G.5 DAVIS-BACON POSTER: | 14 |
| G.6 WAGE DETERMINATION: | 14 |
| SECTION H - SPECIAL CONTRACT REQUIREMENTS | 15 |
| H.1 NCA Dignity Clause | 15 |
| PART II - CONTRACT CLAUSES | 16 |
| SECTION I - CONTRACT CLAUSES | 16 |
| I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 16 |
| I.3 FAR 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025) (DEVIATION NOV 2025) | 19 |
| I.4 52.222-90 Addressing DEI Discrimination by Federal Contractors (APR 2026) | 22 |
| I.5 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008) | 23 |
| I.6 FAR 52.223-21 FOAMS (MAY 2024) | 23 |
| I.7 FAR 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (NOV 2023) DEVIATION NOV 2025 | 24 |
| I.8 SUPPLEMENTAL INSURANCE REQUIREMENTS | 30 |
| I.9 52.240-91 Security Prohibitions and Exclusions (DEVIATION NOV 2025) | 31 |
| I.10 FAR 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020) | 37 |
| I.11 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022) | 37 |
| I.12 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 37 |
| I.13 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION) | 37 |
| I.14 \VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) | 40 |
| I.15 VAAR 852.222-71 COMPLIANCE WITH EXECUTIVE ORDER 13899 (DEVIATION)(APR 2025) | 42 |
| I.16 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 42 |
| I.17 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 42 |
| I.18 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (INCLUDING NAS– CPM) (NOV 2018) | 43 |
| I.19 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 46 |
| I.20 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 47 |
| I.21 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 48 |
| I.22 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 48 |
| I.23 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020) | 49 |
| I.24 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 50 |
| I.25 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 50 |
| I.26 MANDATORY WRITTEN DISCLOSURES | 51 |
| PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS | 53 |
| SECTION J - LIST OF ATTACHMENTS | 53 |
| PART IV - REPRESENTATIONS AND INSTRUCTIONS | 54 |
| SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS | 54 |
| K.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025) (DEVIATIONS FEB 2025) | 54 |
| K.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) (DEVIATION NOV 2025) | 58 |
| K.3 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021) (DEVIATION NOV 2025) | 59 |
| K.6 52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND REPRESENTATION (JUN 2020) DEVIATION SEP 2025 | 61 |
| SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS | 63 |
| L.1 INSTRUCTIONS TO BIDDERS | 63 |
| CONTRACTOR'S SIGNATURE | 63 |
| TECHNICAL QUESTIONS AND INQUIRIES | 63 |
| BIDDING MATERIAL | 63 |
| PREPARATION OF BIDS | 64 |
| BID SUBMISSION DOCUMENTS | 64 |
| DELIVERY OF BIDS | 64 |
| BID OPENING | 64 |
| INFORMATION REGARDING BID GUARANTEE AND BONDS | 65 |
| VETS 4212 | 65 |
| SYSTEM FOR AWARD MANAGEMENT (SAM) | 65 |
| L.2 FAR 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 65 |
| L.4 FAR 52.216-1 TYPE OF CONTRACT (APR 1984) (DEVIATION NOV 2025) | 66 |
| L.6 FAR 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) | 66 |
| L.7 FAR 52.228-1 BID GUARANTEE (SEP 1996) | 67 |
| L.8 FAR 52.233-2 SERVICE OF PROTEST (SEP 2006) (DEVIATION NOV 2025) | 68 |
| L.10 FAR 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020) | 69 |
| L.11 VAAR 852.223-70 INSTRUCTIONS TO OFFERORS—SUSTAINABLE ACQUISITION PLAN (SEP 2019) | 69 |
| L.12 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 69 |
| L.13 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 70 |
| SECTION M - EVALUATION FACTORS FOR AWARD | 71 |
System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
SECTION B - SUPPLIES OR SERVICES AND PRICE/COSTS
B.1 PRICE SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
BASE BID, GENERAL CONSTRUCTION Bakersfield National Cemetery, CA Gravesite Expansion AND FCA Deficiencies Project 929CM3003 Construction Services in accordance with attached Statement of Work, Bid Drawings, Bid Specifications, and attached supporting documents Contract Period: Base POP Begin: TBD POP End: 730 days after NTP PRINCIPAL NAICS CODE: 237990 - Other Heavy and Civil Engineering Construction PRODUCT/SERVICE CODE: Y1PZ - Construction of Other Non-Building Facilities
| 0002 |
| OPTION 1-N/A |
1.00 JB __________
OPTION 2 – ROADWAY: Installation of all work as shown on the plans and described in the specifications.
Construction Services in accordance with attached Statement of Work, Bid Drawings, Bid Specifications, and attached supporting documents Contract Period: Base POP Begin: TBD POP End: 730 days after NTP PRINCIPAL NAICS CODE: 237990 - Other Heavy and Civil Engineering Construction PRODUCT/SERVICE CODE: Y1PZ - Construction of Other Non-Building Facilities
1.00 JB _____
OPTION 3 - FCA DEFICIENCIES:
of all work as shown on the plans and described in the specifications.
Construction Services in accordance with attached Statement of Work, Bid Drawings, Bid Specifications, and attached supporting documents Contract Period: Base POP Begin: TBD POP End: 730 days after NTP PRINCIPAL NAICS CODE: 237990 - Other Heavy and Civil Engineering Construction PRODUCT/SERVICE CODE: Y1PZ - Construction of Other Non-Building Facilities
| GRAND TOTAL |
| _ |
36C78626B0029 Section B
Page 1 of Page 1 of
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
SEE ATTACHED SOW and specifications for more information and detail
36C78626B0029 Section C
Page 1 of Page 1 of
SECTION D - PACKAGING AND MARKING
[For this IFB, there are NO clauses in this Section] 36C78626B0029 Section D
Page 1 of Page 1 of
SECTION E - INSPECTION AND ACCEPTANCE
SECTION F - DELIVERIES OR PERFORMANCE
36C78626B0029 Section F
Page 1 of Page 1 of
SECTION G - CONTRACT ADMINISTRATION DATA
All contract administration matters will be handled by the following individuals:
a. CONTRACTOR: TBD
| Unique Entity ID: |
| Tax ID Number: |
| Contact Person: |
| Telephone #: |
| Email address: |
b. GOVERNMENT: Michael Giaquinto Contracting Officer (36C786) Department of Veterans Affairs, National Cemetery Administration Contracting Service 18434 Joplin Road Triangle, VA 22172
G.1 INVOICES:
All invoices from the Contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 “Electronic Submission of Payment Requests.” to the following web address: http://www.fsc.va.gov/einvoice.asp. For questions regarding invoice receipt or payment, please call VAFSC directly at 1-877-353-9791 or email vafsccshd@va.gov
G.2 CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM:
a. FAR 42.1502 directs all Federal agencies to collect Past Performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One (1) or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
b. The Past Performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
c. It is requested that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than thirty (30) days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
d. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
e. Within sixty (60) days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
1. Contractor Representatives may then provide comments in response to the evaluation or return the evaluation without comment.
2. Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
3. All information provided should be reviewed for accuracy prior to submission.
4. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
5. Your response is due within sixty (60) calendar days after receipt of the CPAR. On day fifteen (15), the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed. If you do not sign and submit the CPAR within sixty (60) days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
f. The following guidelines apply concerning your use of the past performance evaluation:
1. Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions. Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
2. Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
g. If you wish to discuss a Past Performance evaluation, you should request a meeting in writing to the CO no later than seven (7) days following your receipt of the evaluation. The meeting will be held via telephone or other means during your sixty (60)-day review period.
A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
G.3 STANDARD FORM 1413:
Contractor is to submit to the administering Contract Specialist via email a copy of all Standard Form 1413’s for subcontractors performing on this project prior to work being started.
G.4 CERTIFIED PAYROLL FORMS:
Contractor is to submit to the administering Contract Specialist via email a copy of all certified payrolls for all prime and subcontractor employees performing work on this project in accordance with FAR clause 52.222-8.
G.5 DAVIS-BACON POSTER:
Contractor shall post the Davis-Bacon Poster and applicable wage determination at the site of work in a prominent and accessible place where it may be easily seen by employees.
G.6 WAGE DETERMINATION:
36C78626B0029 Section G Full text of the Wage Determination(s) are provided as an attachment to this solicitation.
Page 1 of
36C78625B0019 Section G
Page 1 of
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 NCA Dignity Clause Every action by contractor personnel at a national cemetery must be performed with the special care, reverence, dignity, and respect that acknowledges the cemetery as the final resting place that commemorates the service and sacrifice that service members, Veterans and their families made for our Nation. Critically important is the awareness required of the Contractor employees of the remains buried in the grounds where the work is performed. The utmost care must be given to these remains and the headstones and flat grave markers that mark those gravesites and memorialize the service of individuals.
H.2 Special Clauses (SPC)1: Exercise of Option The government may require the delivery of the numbered line items identified in the schedule as option items in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the options by written notice to the contractor within 90 calendar days after award of the base contract.
36C78626B0029 Section H
PART II - CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far https://www.va.gov/oal/library/vaar/
(End of Clause)
| FAR Number |
| Title |
| Date |
| 52.202-1 |
| DEFINITIONS |
| JUN 2020 |
| 52.203-3 |
| GRATUITIES |
| APR 1984 |
| 52.203-5 |
| COVENANT AGAINST CONTINGENT FEES |
| MAY 2014 |
| 52.203-6 |
| RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT |
| JUN 2020 |
| 52.203-7 |
| ANTI-KICKBACK PROCEDURES |
| JUN 2020 |
| 52.203-8 |
| CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY |
| MAY 2014 |
| 52.203-10 |
| PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY |
| MAY 2014 |
| 52.203-12 |
| LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS |
| JUN 2020 |
| 52.203-13 |
| CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT |
| NOV 2021 |
| 52.203-14 |
| DISPLAY OF HOTLINE POSTER(S) |
| NOV 2021 |
| 52.203-17 |
| CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS |
| NOV 2023 |
| 52.203-19 |
| PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR STATEMENTS |
| JAN 2017 |
| 52.204-10 |
| REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS |
| NOV 2025 |
| 52.204-13 |
| SYSTEM FOR AWARD MANAGEMENT MAINTENANCE |
| NOV 2025 |
| 52.204-14 |
| SERVICE CONTRACT REPORTING REQUIREMENTS |
| NOV 2025 |
| 52.204-19 |
| INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS |
| DEC 2014 |
| 52.209-6 |
| PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, PROPOSED FOR DEBARMENT, OR VOLUNTARILY EXCLUDED |
| NOV 2025 |
| 52.209-9 |
| UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS |
| NOV 2025 |
| 52.209-10 |
| PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS |
| NOV 2025 |
| 52.210-1 |
| MARKET RESEARCH |
| JUN 2025 |
| 52.214-26 |
| AUDIT AND RECORDS—SEALED BIDDING |
| NOV 2025 |
| 52.214-27 |
| PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA—MODIFICATIONS—SEALED BIDDING |
| JUN 2020 |
| 52.214-28 |
| SUBCONTRACTOR CERTIFIED COST OR PRICING DATA—MODIFICATIONS—SEALED BIDDING |
| NOV 2025 |
| 52.219-8 |
| UTILIZATION OF SMALL BUSINESS CONCERNS |
| NOV 2025 |
| 52.219-27 |
| NOTICE OF SET-ASIDE FOR, OR SOLE-SOURCE AWARD TO, SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS (SDVOSB) CONCERNS ELIGIBLE UNDER THE SDVOSB PROGRAM |
| NOV 2025 |
| 52.222-3 |
| CONVICT LABOR |
| NOV 2025 |
| 52.222-4 |
| CONTRACT WORK HOURS AND SAFETY STANDARDS—OVERTIME COMPENSATION |
| NOV 2025 |
| 52.222-6 |
| Construction Wage Rate Requirements |
| NOV 2025 |
| 52.222-7 |
| WITHHOLDING OF FUNDS |
| NOV 2025 |
| 52.222-8 |
| PAYROLLS AND BASIC RECORDS |
| NOV 2025 |
| 52.222-10 |
| COMPLIANCE WITH COPELAND ACT REQUIREMENTS |
| NOV 2025 |
| 52.222-11 |
| Subcontracts (Labor Standards) |
| NOV 2025 |
| 52.222-12 |
| Contract Termination-Debarment |
| FEB 2025 |
| 52.222-13 |
| COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS |
| MAY 2014 |
| 52.222-14 |
| DISPUTES CONCERNING LABOR STANDARDS |
| NOV 2025 |
| 52.222-15 |
| CERTIFICATION OF ELIGIBILITY |
| MAY 2014 |
| 52.222-19 |
| CHILD LABOR—COOPERATION WITH AUTHORITIES AND REMEDIES |
| NOV 2025 |
| 52.222-35 |
| EQUAL OPPORTUNITY FOR VETERANS |
| NOV 2025 |
| 52.222-36 |
| EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES |
| NOV 2025 |
| 52.222-37 |
| EMPLOYMENT REPORTS ON VETERANS |
| NOV 2025 |
| 52.222-40 |
| NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT |
| NOV 2025 |
| 52.222-50 |
| COMBATING TRAFFICKING IN PERSONS |
| NOV 2025 |
| 52.222-54 |
| EMPLOYMENT ELIGIBILITY VERIFICATION |
| NOV 2025 |
| 52.222-55 |
| MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE ORDER 14026 (DEVIATION) |
| NOV 2025 |
| 52.222-62 |
| PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 |
| JAN 2022 |
| 52.223-2 |
| REPORTING OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS |
| NOV 2025 |
| 52.223-5 |
| POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION |
| MAY 2024 |
| 52.223-23 |
| SUSTAINABLE PRODUCTS AND SERVICES |
| NOV 2025 |
| 52.226-7 |
| DRUG-FREE WORKPLACE |
| MAY 2024 |
| 52.226-8 |
| ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING |
| MAY 2024 |
| 52.227-1 |
| AUTHORIZATION AND CONSENT |
| JUN 2020 |
| 52.227-2 |
| NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT |
| JUN 2020 |
| 52.227-4 |
| PATENT INDEMNITY—CONSTRUCTION CONTRACTS |
| DEC 2007 |
| 52.228-2 |
| ADDITIONAL BOND SECURITY |
| OCT 1997 |
| 52.228-5 |
| Insurance-Work on a Government Installation |
| JAN 1997 |
| 52.228-11 |
| INDIVIDUAL SURETY—PLEDGE OF ASSETS |
| FEB 2021 |
| 52.228-12 |
| PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS |
| DEC 2022 |
| 52.228-14 |
| IRREVOCABLE LETTER OF CREDIT |
| NOV 2014 |
| 52.228-15 |
| PERFORMANCE AND PAYMENT BONDS—CONSTRUCTION |
| JUN 2020 |
| 52.229-3 |
| FEDERAL, STATE, AND LOCAL TAXES |
| SEP 2025 |
| 52.229-12 |
| TAX ON CERTAIN FOREIGN PROCUREMENTS |
| SEP 2025 |
| 52.232-5 |
| PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS |
| MAY 2014 |
| 52.232-17 |
| INTEREST |
| MAY 2014 |
| 52.232-23 |
| ASSIGNMENT OF CLAIMS |
| MAY 2014 |
| 52.232-27 |
| PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS |
| JAN 2017 |
| 52.232-33 |
| PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM FOR AWARD MANAGEMENT |
| OCT 2018 |
| 52.232-39 |
| UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS |
| JUN 2013 |
| 52.232-40 |
| PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS |
| MAR 2023 |
| 52.233-1 |
| DISPUTES ALTERNATE I (DEC 1991) |
| NOV 2025 |
| 52.233-3 |
| PROTEST AFTER AWARD |
| NOV 2025 |
| 52.233-4 |
| APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM |
| NOV 2025 |
| 52.236-2 |
| DIFFERING SITE CONDITIONS |
| AUG 2025 |
| 52.236-3 |
| SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK |
| APR 1984 |
| 52.236-5 |
| MATERIAL AND WORKMANSHIP |
| AUG 2025 |
| 52.236-6 |
| SUPERINTENDENCE BY THE CONTRACTOR |
| AUG 2025 |
| 52.236-7 |
| PERMITS AND RESPONSIBILITIES |
| AUG 2025 |
| 52.236-8 |
| OTHER CONTRACTS |
| AUG 2025 |
| 52.236-9 |
| PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS |
| AUG 2025 |
| 52.236-10 |
| OPERATIONS AND STORAGE AREAS |
| AUG 2025 |
| 52.236-11 |
| USE AND POSSESSION PRIOR TO COMPLETION |
| AUG 2025 |
| 52.236-12 |
| CLEANING UP |
| AUG 2025 |
| 52.236-13 |
| ACCIDENT PREVENTION |
| AUG 2025 |
| 52.236-15 |
| SCHEDULES FOR CONSTRUCTION CONTRACTS |
| AUG 2025 |
| 52.236-17 |
| LAYOUT OF WORK |
| AUG 2025 |
| 52.236-21 |
| SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION ALTERNATE I (APR 1984) |
| AUG 2025 |
| 52.236-26 |
| PRECONSTRUCTION CONFERENCE |
| FEB 1995 |
| 52.240-1 |
| PROHIBITION ON UNMANNED AIRCRAFT SYSTEMS MANUFACTURED OR ASSEMBLED BY AMERICAN SECURITY DRONE ACT—COVERED FOREIGN ENTITIES |
| NOV 2024 |
| 52.242-13 |
| BANKRUPTCY |
| JUL 1995 |
| 52.242-14 |
| Suspension of Work |
| APR 1984 |
| 52.243-4 |
| CHANGES |
| JUL 2025 |
| 52.244-6 |
| Subcontracts for Commercial Products and Commercial Services |
| APR 2026 |
| 52.245-1 |
| GOVERNMENT PROPERTY |
| SEP 2021 |
| 52.245-9 |
| USE AND CHARGES |
| APR 2012 |
| 52.246-12 |
| Inspection of Construction |
| AUG 1996 |
| 52.246-21 |
| WARRANTY OF CONSTRUCTION |
| MAR 1994 |
| 52.248-3 |
| VALUE ENGINEERING—CONSTRUCTION |
| OCT 2020 |
| 52.249-2 |
| TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) ALTERNATE I (SEPT 1996) |
| APR 2012 |
| 52.249-10 |
| DEFAULT (FIXED-PRICE CONSTRUCTION) |
| APR 1984 |
| 52.253-1 |
| COMPUTER GENERATED FORMS |
| JAN 1991 |
I.3 FAR 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025) (DEVIATION NOV 2025)
(a) Definitions. As used in this clause— Long-term contract means a contract of more than five years in duration, including options. However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern—
(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (d) of this clause.
(2) Affiliates, as used in this definition, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.
(b) If the Contractor represented that it was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, upon occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts—
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) If the Contractor represented its status as any of the small business concerns identified at 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (f) of this clause or, if applicable, paragraph (h) of this clause, for the NAICS code assigned to an order (except that paragraphs (c)(1) through (3) of this clause do not apply to an order issued under a Federal Supply Schedule contract at subpart 8.4)—
(1) Set aside exclusively for a small business concern identified at 19.000(a)(3) that is issued under an unrestricted multiple-award contract, unless the order is issued under the reserved portion of an unrestricted multiple-award contract (e.g., an order set aside for a woman-owned small business under a multiple-award contract that is not set-aside, unless the order is issued under the reserved portion of the multiple-award contract);
(2) Issued under a multiple-award contract set aside for small businesses that is further set aside for a specific socioeconomic category that differs from the underlying multiple-award contract (e.g., an order set aside for a HUBZone small business concern under a multiple-award contract that is set aside for small businesses);
(3) Issued under the part of the multiple-award contract that is set aside for small businesses that is further set aside for a specific socioeconomic category that differs from the underlying set-aside part of the multiple-award contract (e.g., an order set aside for a WOSB concern under the part of the multiple-award contract that is partially set aside for small businesses); and
(4) When the Contracting Officer explicitly requires it for an order issued under a multiple-award contract, including for an order issued under a Federal Supply Schedule contract (see 8.405–5(b) and 19.301–2(b)(2)).
(d) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document/support--table-size-standards.
(e) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition—
(1) Was set aside for small business and has a value above the simplified acquisition threshold;
(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or
(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(f) Except as provided in paragraph (h) of this clause, the Contractor shall make the representation(s) required by paragraphs (b) and (c) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting officer in writing within the timeframes specified in paragraph (b) of this clause, or with its offer for an order (see paragraph (c) of this clause), that the data have been validated or updated, and provide the date of the validation or update.
(g) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (f) or (h) of this clause.
(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code 237990 assigned to contract number .
(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1001.
(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.
(4) Women-owned small business (WOSB) concern eligible under the WOSB Program. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: _____.]
(5) Economically disadvantaged women-owned small business (EDWOSB) joint venture. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: _____.]
(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a veteran-owned small business concern.
(7) [Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.] The Contractor represents that it [ ] is, [ ] is not a service-disabled veteran-owned small business concern.
(8) Service-disabled veteran-owned small business (SDVOSB) joint venture eligible under the SDVOSB Program. The Contractor represents that it [ ] is, [ ] is not an SDVOSB joint venture eligible under the SDVOSB Program that complies with the requirements of 13 CFR 128.402. [The Contractor shall enter the name and unique entity identifier of each party to the joint venture: __.]
(9) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that—
(i) It [ ] is, [ ] is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and
(ii) It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture. [The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: _____.] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.
[Contractor to sign and date and insert authorized signer's name and title.] (End of Clause) I.4 52.222-90 Addressing DEI Discrimination by Federal Contractors (APR 2026)
(a) Definitions. As used in this clause— Program participation means membership or participation in, or access or admission to: training, mentoring, or leadership development programs; educational opportunities; clubs; associations; or similar opportunities that are sponsored or established by the contractor or subcontractor. Racially discriminatory diversity, equity, and inclusion (DEI) activities means disparate treatment based on race or ethnicity in the recruitment, employment (e.g., hiring, promotions), contracting (e.g., vendor agreements), program participation, or allocation or deployment of an entity's resources. (b) In connection with the performance of work under this contract, the Contractor agrees as follows: (1) The Contractor will not engage in any racially discriminatory DEI activities. (2) The Contractor will furnish all information and reports, including providing access to books, records, and accounts, as required by the Contracting Officer, for purposes of ascertaining compliance with this clause. (3) In the event of the Contractor's or a subcontractor's noncompliance with this clause, this contract may be canceled, terminated, or suspended in whole or in part, and the Contractor or subcontractor may be declared ineligible for further Government contracts. (4) The Contractor will report any subcontractor's known or reasonably knowable conduct that may violate this clause to the Contracting Officer and take any appropriate remedial actions directed by the Contracting Officer. (5) The Contractor will inform the Contracting Officer if a subcontractor sues the Contractor and the suit puts at issue, in any way, the validity of this clause. (6) The Contractor recognizes that compliance with the requirements of this clause are material to the Government's payment decisions for purposes of 31 U.S.C. 3729(b)(4). (c) The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, for which the place of delivery or performance is in the United States.
(End of clause)] I.5 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008)
(a) Definitions. As used in this clause— "Postconsumer material" means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of "recovered material."
"Recovered material" means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b) The Contractor, on completion of this contract, shall—
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of postconsumer material content; and
(2) Submit this estimate to the Contracting Officer’s Representative.
(End of Clause)
I.6 FAR 52.223-21 FOAMS (MAY 2024)
(a) Definitions. As used in this clause— Global warming potential means how much a given mass of a chemical contributes to global warming over a given time period compared to the same mass of carbon dioxide. Carbon dioxide's global warming potential is defined as 1.0.
High global warming potential hydrofluorocarbons means any hydrofluorocarbons in a particular end use for which EPA's Significant New Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at 40 CFR part 82, subpart G, with supplemental tables of alternatives available at https://www.epa.gov/snap/.
Hydrofluorocarbons means compounds that contain only hydrogen, fluorine, and carbon.
(b) Unless otherwise specified in the contract, the Contractor shall reduce its use, release, and emissions of high global warming potential hydrofluorocarbons and refrigerant blends containing hydrofluorocarbons, when feasible, from foam blowing agents, under this contract. When determining feasibility of using a particular alternative, the Contractor shall consider environmental, technical, and economic factors such as—
(1) In-use emission rates, energy efficiency, and safety;
(2) Ability to meet performance requirements; and
(3) Commercial availability at a reasonable cost.
(c) The Contractor shall refer to EPA's SNAP program to identify alternatives. The SNAP list of alternatives is found at 40 CFR part 82, subpart G, with supplemental tables available at https://www.epa.gov/snap/.
(End of Clause) I.7 FAR 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (NOV 2023) DEVIATION NOV 2025 (a)Definitions. As used in this clause— Caribbean Basin country construction material means a construction material that— (1)Is wholly the growth, product, or manufacture of a Caribbean Basin country; or (2)In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a Caribbean Basin country into a new and different construction material distinct from the materials from which it was transformed.
Commercially available off-the-shelf (COTS) item— (1)Means any item of supply (including construction material) that is– (i)A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);
(ii)Sold in substantial quantities in the commercial marketplace; and (iii)Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and (2)Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means— (1)For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or (2)For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.
Designated country means any of the following countries:
(1)A World Trade Organization Government Procurement Agreement (WTO GPA) country (Armenia, Aruba, Australia, Austria, Belgium, Bulgaria, Canada, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro, Netherlands, New Zealand, North Macedonia, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan, Ukraine, or United Kingdom);
(2)A Free Trade Agreement (FTA) country (Australia, Bahrain, Chile, Colombia, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Korea (Republic of), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);
(3)A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, South Sudan, Tanzania, Timor-Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or (4)A Caribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize, Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti, Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St. Vincent and the Grenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).
Designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, a least developed country construction material, or a Caribbean Basin country construction material.
Domestic construction material means— (1)For construction material that does not consist wholly or predominantly of iron or steel or a combination of both- (i)An unmanufactured construction material mined or produced in the United States; or (ii)A construction material manufactured in the United States, if— (A)The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029.
(B)The construction material is a COTS item; or (2)For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Free Trade Agreement country construction material means a construction material that-
(1) Is wholly the growth, product, or manufacture of a Free Trade Agreement (FTA) country; or (2)In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a FTA country into a new and different construction material distinct from the materials from which it was transformed.
Least developed country construction material means a construction material that-
(1) Is wholly the growth, product, or manufacture of a least developed country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
United States means the 50 States, the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .