BNC-929CM003-BD-PLANSPart-1.pdf
PDF 18 MB Posted
- Solicitation number
- 36C78626B0029_1
About this file
This document is a set of expansion construction bid documents for Bakersfield National Cemetery in Kern County, California, prepared by the U.S. Department of Veterans Affairs (Project Number 929CM003, Issue Date July 30, 2026).
The construction project encompasses expansion of cemetery facilities with a total of 8,152 interment sites, including 2,152 in-ground cremain sites (4'x4'), 1,560 pre-placed double depth crypts in Section 19 (3'x8'), 1,444 pre-placed double depth crypts in Section 20 (3'x8'), and 3,000 columbarium niches (1,500 each in Plazas C and D). The project includes site development, grading and drainage systems, pavement repair, storm sewer infrastructure, and landscaping/irrigation components across multiple phases. Base bid work covers utility plans, site layout, grading, drainage, burial section development, columbarium plazas, site signage, furnishings, and landscaping. Bid options include pavement repair (Option 2), rostrum and technology building construction (Option 3), and administrative/commitment shelter buildings. The bid documents comprise 163 drawing sheets organized by discipline (civil, site/utility, columbarium, landscaping, irrigation, architectural, structural, electrical, technology, and plumbing) and include construction sequencing plans, erosion and sediment control measures for two phases, site demolition plans, and detailed specifications for all site improvements. The design team includes Integrity Federal Services-The LA Group Joint Venture as architect/engineer of record, with consulting firms specializing in civil engineering, surveying, landscape design, structural work, and utility infrastructure.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KERN COUNTY, CALIFORNIA
EXPANSION CONSTRUCTION DOCUMENTS
PROJECT NUMBER: 929CM003
BID DOCUMENTS
CONSULTANTS
Know what's below.
before you dig.Call
R
BAKERSFIELD NATIONAL CEMETERY
PREPARED BY
U.S. DEPARTMENT
OF VETERANS AFFAIRSVA
INTEGRITY FEDERAL SERVICES - THE LA GROUP JOINT VENTURE, LLC
THE LA GROUP
40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
REGIONAL MAP
(N.T.S.)
LOCAL MAP
(N.T.S.)
AQUA ENGINEERING
300 Boardwalk Dr, Unit 4B Fort Collins, CO 80525-3093
(970) 229-9668
DAVY ARCHITECTURE
1053 Tenth Avenue San Diego, CA 92101
(619) 238-3811
AES GROUP, INC
11031 S Pikes Peak Dr, Suite 202 Parker, CO 80138
(303) 841-3922
WALTER P MOORE
633 West 5th St, Suite 7200 Los Angeles, CA 90071
(310) 254-1900
GRAVESITE YIELD SUMMARY
INTERMENT TYPESECTION
6 IN-GROUND CREMAIN SITES (4'x4')
CEMETERY FEATURE SUMMARY
GRAVEL TYPE 1 -
STABILIZED GREY
CRUSHED STONE
(ACRES)
3.23
NATIVE GROUND
COVER AREA (ACRES)
6 0.47
GRID MONUMENT
MARKERS (QUANTITY)
39 12.25
SECTION MARKERS
(QUANTITY)
GRAVEL TYPE 2 -
GOLD STONE FINES:
BURIAL AREAS
(ACRES)
GI001
COVER SHEET
DRAWING INDEX
1. GI001 COVER SHEET
SITE/CIVIL
2. CI001 CIVIL NOTES, SYMBOLS, AND ABBREVIATIONS
3. VL001 EXISTING CONDITIONS SURVEY
4. VL002 EXISTING CONDITIONS SURVEY
5. VL003 EXISTING CONDITIONS SURVEY
6. VL004 EXISTING CONDITIONS SURVEY
7. VL005 EXISTING CONDITIONS SURVEY
8. VL006 EXISTING CONDITIONS SURVEY
9. VL007 EXISTING CONDITIONS SURVEY
10. VL008 EXISTING CONDITIONS SURVEY
11. VL009 EXISTING CONDITIONS SURVEY
12. VL010 EXISTING CONDITIONS SURVEY
13. VL100 OVERALL EXISTING CONDITIONS PLAN
14. VL101 EXISTING CONDITIONS PLAN
15. VL102 EXISTING CONDITIONS PLAN
16. VL103 EXISTING CONDITIONS PLAN
17. VL104 EXISTING CONDITIONS PLAN
18. VL105 EXISTING CONDITIONS PLAN
19. VL106 EXISTING CONDITIONS PLAN
20. B-100 SUBSURFACE BORING LOCATION PLAN
21. B-101 SUBSURFACE BORING LOGS
22. B-102 SUBSURFACE BORING LOGS
23. C-100 OVERALL SITE DEVELOPMENT PLAN
24. C-200 CONSTRUCTION SEQUENCING PLAN
25. C-300 TEMPORARY CONSTRUCTION FENCING PLAN
26. GC001 EROSION AND SEDIMENT CONTROL NARRATIVE
27. GC101 PHASE I EROSION AND SEDIMENT CONTROL PLAN
28. GC102 PHASE I EROSION AND SEDIMENT CONTROL PLAN
29. GC103 PHASE I EROSION AND SEDIMENT CONTROL PLAN
30. GC104 PHASE I EROSION AND SEDIMENT CONTROL PLAN
31. GC105 PHASE I EROSION AND SEDIMENT CONTROL PLAN
32. GC106 PHASE I EROSION AND SEDIMENT CONTROL PLAN
33. GC201 PHASE II EROSION AND SEDIMENT CONTROL PLAN
34. GC202 PHASE II EROSION AND SEDIMENT CONTROL PLAN
35. GC203 PHASE II EROSION AND SEDIMENT CONTROL PLAN
36. GC204 PHASE II EROSION AND SEDIMENT CONTROL PLAN
37. GC205 PHASE II EROSION AND SEDIMENT CONTROL PLAN
38. GC206 PHASE II EROSION AND SEDIMENT CONTROL PLAN
39. GC501 EROSION AND SEDIMENT CONTROL DETAILS
40. GC502 EROSION AND SEDIMENT CONTROL DETAILS
41. GC503 EROSION AND SEDIMENT CONTROL DETAILS
42. CD101 SITE DEMOLITION PLAN
43. CD102 SITE DEMOLITION PLAN
44. CD103 SITE DEMOLITION PLAN
45. CD104 SITE DEMOLITION PLAN
46. CD105 SITE DEMOLITION PLAN
47. CD106 SITE DEMOLITION PLAN
48. CS100 OVERALL SITE LAYOUT AND UTILITY PLAN
49. CS101 SITE LAYOUT AND UTILITY PLAN (BASE BID)
50. CS102 SITE LAYOUT AND UTILITY PLAN (BASE BID)
51. CS103 SITE LAYOUT AND UTILITY PLAN (BASE BID)
52. CS104 SITE LAYOUT AND UTILITY PLAN (BASE BID)
53. CS105 SITE LAYOUT AND UTILITY PLAN (BASE BID)
54. CS106 SITE LAYOUT AND UTILITY PLAN (BASE BID)
55. CS151 BURIAL SECTION 6 NUMBERING PLAN
56. CS152 BURIAL SECTION 19 NUMBERING PLAN
57. CS153 BURIAL SECTION 20 NUMBERING PLAN
58. CP101 SITE PAVEMENT REPAIR PLAN (BID OPTION 2)
59. CG100 OVERALL SITE GRADING AND DRAINAGE PLAN
60. CG101 SITE GRADING AND DRAINAGE PLAN (BASE BID)
61. CG102 SITE GRADING AND DRAINAGE PLAN (BASE BID)
62. CG103 SITE GRADING AND DRAINAGE PLAN (BASE BID)
63. CG104 SITE GRADING AND DRAINAGE PLAN (BASE BID)
64. CG105 SITE GRADING AND DRAINAGE PLAN (BASE BID)
65. CG106 SITE GRADING AND DRAINAGE PLAN (BASE BID)
66. CG151 BURIAL SECTION 6 GRADING ENLARGEMENT
67. CG152 BURIAL SECTION 19 GRADING ENLARGEMENT
68. CG153 BURIAL SECTION 20 GRADING ENLARGEMENT
69. CG154 ROSTRUM GRADING AND DRAINAGE ENLARGEMENT (BID OPTION 3)
70. CG155 FLOWER WATERING STATION DRAIN LINE ENLARGEMENTS (BASE BID)
71. CU201 STORM SEWER PROFILES (BASE BID)
72. CU202 STORM SEWER PROFILES (BASE BID)
73. CT101 ROAD CENTERLINE PLAN AND PROFILE (BASE BID)
74. CT102 ROAD CENTERLINE PLAN AND PROFILE (BASE BID)
75. CT501 TYPICAL ROAD CROSS SECTIONS (BASE BID)
76. CS501 SITE DETAILS
77. CS502 SITE DETAILS
78. CS503 SITE DETAILS
79. CS504 SITE DETAILS
80. CS505 SITE DETAILS
81. CJ501 SWM POND DETAILS
COLUMBARIUM, ROSTRUM, SIGNAGE AND SITE FURNISHINGS
82. CS401 COLUMBARIUM PLAZA C LAYOUT PLAN ENLARGEMENT (BASE BID)
83. CS402 COLUMBARIUM PLAZA C PAVEMENT LAYOUT PLAN ENLARGEMENT (BASE BID)
84. CS403 COLUMBARIUM PLAZA D LAYOUT PLAN ENLARGEMENT (BASE BID)
85. CS404 COLUMBARIUM PLAZA D PAVEMENT LAYOUT PLAN ENLARGEMENT (BASE BID)
86. CS405 ROSTRUM LAYOUT PLAN ENLARGEMENT (BID OPTION 3)
87. CS406 ROSTRUM LAYOUT PAVEMENT PLAN ENLARGEMENT (BID OPTION 3)
88. CG401 COLUMBARIUM PLAZA C GRADING PLAN ENLARGEMENT (BASE BID)
89. CG402 COLUMBARIUM PLAZA C DRAINAGE PLAN ENLARGEMENT (BASE BID)
90. CG403 COLUMBARIUM PLAZA D GRADING PLAN ENLARGEMENT (BASE BID)
91. CG404 COLUMBARIUM PLAZA D DRAINAGE PLAN ENLARGEMENT (BASE BID)
92. CG405 ROSTRUM GRADING PLAN ENLARGEMENT (BID OPTION 3)
93. CI101 OVERALL SITE SIGNAGE AND FURNISHINGS PLAN (NEW) (BASE BID)
94. CI102 SITE SIGNAGE AND FURNISHINGS PLAN: AREA 1 (BASE BID)
95. CI103 SITE SIGNAGE AND FURNISHINGS PLAN: AREA 2 (BASE BID)
96. CI104 SITE SIGNAGE AND FURNISHINGS PLAN: AREA 3 (BASE BID)
97. CI105 SITE SIGNAGE AND FURNISHINGS PLAN: AREA 4 (BASE BID)
98. CI106 SITE SIGNAGE AND FURNISHINGS PLAN: AREA 5 (BASE BID)
99. CI107 SIGNAGE SCHEDULES (BASE BID)
100. CI130 SITE SIGNAGE AND FURNISHINGS REPLACEMENT KEY PLAN (BASE BID)
101. CI131 SITE SIGNAGE AND FURNISHINGS REPLACEMENT - AREA 1 (BASE BID)
102. CI132 SITE SIGNAGE AND FURNISHINGS REPLACEMENT - AREA 2 (BASE BID)
103. CI133 SITE SIGNAGE AND FURNISHINGS REPLACEMENT - AREA 3 (BASE BID)
104. CI134 SITE SIGNAGE AND FURNISHINGS REPLACEMENT - AREA 4 (BASE BID)
105. CI135 SITE SIGNAGE AND FURNISHINGS REPLACEMENT - AREA 5 (BASE BID)
106. CI136 SITE SIGNAGE AND FURNISHINGS REPLACEMENT KEY PHOTOS 1
107. CI137 SITE SIGNAGE AND FURNISHINGS REPLACEMENT KEY PHOTOS 2
108. CI138 SITE SIGNAGE AND FURNISHINGS REPLACEMENT KEY PHOTOS 3
109. CI139 SITE SIGNAGE AND FURNISHINGS REPLACEMENT KEY PHOTOS 4
110. CI140 SITE SIGNAGE AND FURNISHINGS REPLACEMENT KEY PHOTOS 5
111. CI141 SITE SIGNAGE AND FURNISHINGS REPLACEMENT SCHEDULES (BASE BID)
112. CI501 SITE FURNISHINGS DETAILS 1 (BASE BID)
113. CI502 SITE FURNISHINGS DETAILS 2 (BASE BID)
114. CI503 SITE FURNISHINGS DETAILS 3 (BASE BID)
115. CI510 SITE SIGNAGE DETAILS 1 (BASE BID)
116. CI511 SITE SIGNAGE DETAILS 2 (BASE BID)
117. CI512 SITE SIGNAGE DETAILS 3 (BASE BID)
118. CI701 COLUMBARIUM ELEVATIONS (BASE BID)
119. CI702 COLUMBARIUM DETAILS 1 (BASE BID)
120. CI703 COLUMBARIUM DETAILS 2 (BASE BID)
121. CI704 COLUMBARIUM DETAILS 3 (BASE BID)
122. CI705 COLUMBARIUM DETAILS 4 (BASE BID)
123. CI706 COLUMBARIUM C SEATWALL ELEVATIONS (BASE BID)
124. CI707 COLUMBARIUM D SEATWALL ELEVATIONS (BASE BID)
125. CI710 ROSTRUM DETAILS 1 (BID OPTION 3)
126. CI711 ROSTRUM DETAILS 2 (BID OPTION 3)
LANDSCAPING
127. LP101 LANDSCAPE OVERALL PLAN
128. LP102 LANDSCAPE PLAN: AREA 1 (BASE BID)
129. LP103 LANDSCAPE PLAN: AREA 2 (BASE BID)
130. LP104 LANDSCAPE PLAN: AREA 3 (BASE BID)
131. LP105 LANDSCAPE PLAN: AREA 4 (BASE BID)
132. LP106 LANDSCAPE ENLARGEMENT PLAN: ROSTRUM (BID OPTION 3)
133. LP107 LANDSCAPE ENLARGEMENT PLAN: COLUMBARIUM C (BASE BID)
134. LP108 LANDSCAPE ENLARGEMENT PLAN: COLUMBARIUM D (BASE BID)
135. LP501 LANDSCAPE DETAILS
136. LP601 PLANT LIST
IRRIGATION
137. IR100 IRRIGATION COVER SHEET
138. IR200 IRRIGATION PLAN (BASE BID)
139. IR201 IRRIGATION PLAN (BASE BID)
140. IR202 IRRIGATION PLAN (BASE BID)
141. IR500 IRRIGATION DETAILS (BASE BID)
142. IR501 IRRIGATION DETAILS (BASE BID)
ARCHITECTURAL
143. A-101 FLOOR PLAN (E) ADMIN AND PUBLIC RESTROOM (BID OPTION 3)
144. A-102 FLOOR PLAN (E) COMMITTAL SHELTER (BID OPTION 3)
145. A-501 ELEVATIONS AND DETAILS (BID OPTION 3)
STRUCTURAL
146. S-001 STRUCTURAL NOTES
147. S-401 STRUCTURAL ENLARGED PLANS (BID OPTION 3)
148. S-402 STRUCTURAL ENLARGED PLANS (BASE BID)
149. S-501 STRUCTURAL DETAILS
150. S-502 STRUCTURAL DETAILS
ELECTRICAL
151. ES101 ELECTRICAL SITE PLAN (BID OPTION 3)
152. EP601 ELECTRICAL SCHEDULES (BID OPTION 3)
TECHNOLOGY
153. T-001 TECHNOLOGY LEGEND, ABBREV, & GENERAL NOTES (BID OPTION 3)
154. T-100 TECHNOLOGY SITE PLAN (BID OPTION 3)
155. TD100 TECHNOLOGY MAINTENANCE YARD SITE PLAN - DEMO (BID OPTION 3)
156. TD101 TECHNOLOGY BUILDING PLANS - DEMOLITION (BID OPTION 3)
157. TN100 TECHNOLOGY MAINTENANCE YARD SITE PLAN - NEW WORK (BID OPTION 3)
158. TN101 TECHNOLOGY BUILDING PLANS - NEW WORK (BID OPTION 3)
PLUMBING
159. P-001 PLUMBING LEGEND, ABBREV, & GENERAL NOTES (BASE BID)
160. PS101 SITE PLAN - PLUMBING (BASE BID)
161. PP101 FLOOR PLAN - PLUMBING PRESSURE (BASE BID)
162. P-501 METER PHOTOS - PLUMBING - EXISTING (BASE BID)
163. P-601 PLUMBING RISER DIAGRAMS (BASE BID)
NO. DRAWING DRAWING TITLE NO. DRAWING DRAWING TITLE
FLOWER WATERING
STATIONS (QUANTITY)
GRAVEL TYPE 3 -
BURGUNDY LAVA
ROCK MULCH
(ACRES)
3.80
GRAVEL TYPE 4 -
GOLD CRUSHED
STONE MULCH
(ACRES)
0.51
QUANTITY
2,152
ACRES
0.86
19 PRE-PLACED DOUBLE DEPTH CRYPTS (3'x8') 1,560 0.92
20 PRE-PLACED DOUBLE DEPTH CRYPTS (3'x8') 1,444 1.06
PLAZA C COLUMBARIUM NICHES 1,500
PLAZA D 1,500
TOTAL INTERMENT SITES 8,152
N/A
N/A
2.84
COLUMBARIUM NICHES
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\G
I00 1.D
W G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026
ABOVE GROUP
305 East Drive, Suite H Melbourne, FL 32904
(321) 345-9026
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\C
I00 1.D
W G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 CI001
CIVIL NOTES, SYMBOLS, AND
ABBREVIATIONS
ABBREVIATIONSCIVIL GENERAL NOTES:
1. THE PROPOSED SITE IMPROVEMENTS FOR 'BAKERSFIELD NATIONAL CEMETERY EXPANSION CONSTRUCTION DOCUMENTS'' INCLUDES, BUT IS NOT LIMITED TO THE
CONSTRUCTION OF PREPLACED CRYPTS, IN-GROUND CREMAINS, COLUMBARIUM WALLS, IRRIGATION EXTENSIONS, ASPHALT PAVEMENT, CONCRETE CURB & GUTTER, STORM DRAIN INFRASTRUCTURE, SITE FURNISHINGS, LANDSCAPING, ORNAMENTAL FENCING, IT UPGRADES, ACCESS IMPROVEMENTS TO THE ASSEMBLY AREA, CLEANING AND REPAIR OF WALL FINISHES THROUGHOUT THE CEMETERY, EXPANSION AND REPAIR OF THE COMMITTAL SHELTER ROOF, ETC.. THE PROJECT IS LOCATED IN ARVIN, KERN COUNTY, CALIFORNIA.
2. THE TOPOGRAPHIC CONTOUR INTERVAL IS ONE (1) FOOT. TOPOGRAPHIC INFORMATION IS BASED ON AN AERIAL SURVEY PERFORMED BY NELMS SURVEYING, INC. DATED SEPTEMBER 26, 2025. HORIZONTAL DATUM REFERENCED TO NAD 1983. VERTICAL DATUM REFERENCED TO NAVD 1988.
3. THE SUBJECT PROPERTY IS LOCATED ON F.E.M.A. MAP 06029C2370E DATED SEPTEMBER 26, 2008. NO PORTIONS OF THE PROJECT AREA ARE LOCATED WITHIN THE
100-YEAR FLOODPLAIN AREA (ZONE AE). THE PROPERTY IS ENTIRELY IN ZONE X.
4. SEE THIS SHEET FOR LEGEND OF SYMBOLS USED HEREIN.
5. BURIAL CEREMONIES MAY BE SCHEDULED THROUGHOUT THE COURSE OF THIS PROJECT. DURING ALL CEREMONIES, ALL WORK MUST STOP, ESPECIALLY WHEN HEAVY EQUIPMENT ACTIVITY OR NOISE PRODUCING WORK IS BEING DONE. LIGHT WORK ACTIVITY CAN CONTINUE IF IT DOES NOT CREATE NOISE OR DISTRACTIONS TO THE CEREMONY. COORDINATE DAILY ACTIVITIES WITH THE CEMETERY DIRECTOR OR HIS APPROVED REPRESENTATIVE TO ACCOMMODATE SCHEDULED BURIALS.
6. DUE TO THE SENSITIVE NATURE OF THE CEMETERY SITE, CONTRACTOR SHALL MAINTAIN EACH WORK AREA IN A CLEAN AND ORDERLY APPEARANCE. TRASH AND WASTE MATERIALS SHALL BE STORED IN APPROVED CONTAINERS AND ROUTINELY DISPOSED OF OFF-SITE. CLEANUP SHALL BE REQUIRED AT THE END OF EACH DAY AND/OR
MORE FREQUENTLY AS REQUIRED.
7. AFFECT OF WORK ON PUBLIC ACCESS SHALL BE MINIMIZED AND SHALL BE COORDINATED WITH THE CEMETERY DIRECTOR. ANY ALTERED PUBLIC TRAFFIC ROUTES SHALL BE WELL DEFINED WITH PROFESSIONALLY MADE SIGNAGE AND/OR OTHER APPROVED CONVENTIONAL METHODS. CONTRACTOR SHALL PROVIDE TWO SIGNS SIMILAR TO THE CEMETERY'S "PARDON OUR APPEARANCE" SIGNS. SIZE TO BE A MINIMUM OF 4'X5' HIGH MOUNTED ON TWO 4"X4" POSTS, PLACED IN A LOCATION AS DETERMINED BY THE CEMETERY DIRECTOR. TEXT SIZE SHALL BE MAXIMUM SIZE PROPORTIONAL TO WIDTH/HEIGHT OF SIGN. TEXT WILL BE PROVIDED BY CEMETERY DIRECTOR.
8. THERE SHALL BE AT ALL TIMES WHEN WORK IS BEING DONE, A COMPETENT PERSON WHO IS APPRISED OF THE CONDITION AND PROGRESS OF ALL AREAS OF WORK ON SITE. THIS PERSON SHALL BE ABLE TO SPEAK FOR AND ACT IN THE BEHALF OF THE CONTRACTOR. THEY SHALL BE AWARE AND KNOWLEDGEABLE OF ALL THE SAFETY CONCERNS ON THE JOB SITE. THEY SHALL BE EMPOWERED TO IMMEDIATELY AND EFFECTIVELY MITIGATE THE ACTIONS OF ANY WORKMAN ON SITE.
CIVIL CONSTRUCTION NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING THE PLANS PRIOR TO CONSTRUCTION AND NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY CIRCUMSTANCES FOUND WITHIN THESE PLANS IN NEED OF VERIFICATION SO THAT APPROPRIATE REVISIONS CAN BE MADE, IF WARRANTED.
2. DEVELOPMENT OF THE SITE INCLUDING CONSTRUCTION AND MATERIALS SHALL BE IN CONFORMANCE WITH THE U.S. DEPARTMENT OF VETERANS AFFAIRS REQUIREMENTS
AND LOCAL, STATE, AND FEDERAL STANDARDS AND SPECIFICATIONS, WHERE APPLICABLE.
3. EROSION AND SEDIMENT CONTROL DEVICES ARE TO BE IN PLACE PRIOR TO ANY CONSTRUCTION. REFER TO EROSION AND SEDIMENT CONTROL PLAN FOR PHASING AND
DETAILS.
4. ALL LAND ON OR OFF-SITE WHICH IS DISTURBED BY CONSTRUCTION AND WHICH IS NOT BUILT UPON OR SURFACED SHALL BE ADEQUATELY STABILIZED TO CONTROL
EROSION AND SEDIMENTATION.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE RE/COR OF ANY CHANGES OR CONDITIONS ASSOCIATED WITH THE APPROVED PLANS FOR CONSTRUCTION.
6. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING TRUCKS AND/OR EQUIPMENT OF MUD AND DEBRIS, PRIOR TO ENTERING PAVED AREAS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CLEAN STREETS OF MUD AND/OR LAYING DUST AND TO TAKE ALL APPROPRIATE MEASURES NECESSARY TO ENSURE THAT STREETS
ARE KEPT IN A CLEAN AND DUST FREE CONDITION AT ALL TIMES.
7. THE CONTRACTOR SHALL VISIT THE SITE AND SHALL VERIFY EXISTING CONDITIONS PRIOR TO STARTING CONSTRUCTION ACTIVITIES.
8. THE CONTRACTOR SHALL CLEAR THE SITE OF ALL TREES, BUILDINGS, FOUNDATIONS, ETC. WITHIN THE LIMITS OF CONSTRUCTION AND SHALL BE RESPONSIBLE FOR COORDINATING ANY DISCONNECTION AND/OR ABANDONMENT OF EXISTING UTILITIES AND STRUCTURES. IF NECESSARY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND ABANDONING ALL EXISTING WELLS AND/OR SEPTIC DRAIN FIELDS AND COORDINATING THEIR ABANDONMENT WITH THE HEALTH DEPARTMENT.
9. CONTRACTOR SHALL CONTACT CALIFORNIA 811 AT 1-800-422-4133 OR BY DIALING 811 ON A CALIFORNIA PHONE LINE OR DIGALERT.ORG A MINIMUM OF TWO (2) BUSINESS DAYS PRIOR TO ANY EXCAVATION WITHIN AREAS SERVED BY UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE PRESENCE OF ANY
UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION.
10. IFS DOES NOT CERTIFY TO THE LOCATION OF OR THE EXISTENCE OF ANY EXISTING UNDERGROUND UTILITIES. ANY UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABLE RECORDS AND DISCUSSION WITH THE OWNER. THIS DOES NOT CONSTITUTE A GUARANTEE OF THEIR ACTUAL LOCATIONS OR THAT THEY HAVE ALL BEEN SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES PRIOR TO BEGINNING ANY CONSTRUCTION. THESE TEST HOLES WILL BE MADE TO VERIFY ALL CROSSINGS BETWEEN NEW AND EXISTING FACILITIES AND AT CRITICAL GRADE CHANGES. IF CONDITIONS ARE FOUND IN THE FIELD, WHICH ARE MATERIALLY DIFFERENT FROM THE PLANS, THE CONTRACTOR SHALL NOTIFY THE VA SO THAT APPROPRIATE REVISIONS IF WARRANTED CAN BE MADE.
11. IFS DOES NOT CERTIFY TO THE SUB-SURFACE CONDITIONS OF THE SITE, THE LOCATION OF UNDERLYING ROCK, OR THE LOCATION OF POTENTIAL SINKHOLES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES TO VERIFY SUB-SURFACE CONDITIONS PRIOR TO BEGINNING ANY CONSTRUCTION. IF SINKHOLES ARE FOUND IN THE FIELD, REMEDIATION WILL BE REQUIRED AS SPECIFIED BY A QUALIFIED GEOTECHNICAL ENGINEERING FIRM.
12. ALL TESTS, STUDIES, ETC., REQUIRED DURING CONSTRUCTION WILL BE CARRIED OUT BY A THIRD PARTY ENGINEERING FIRM AND PAID FOR BY THE CONTRACTOR.
13. ALL PROPOSED ELEVATIONS AS SHOWN HEREIN ARE FINISHED GRADE UNLESS OTHERWISE NOTED.
14. MAINTAIN A MINIMUM VERTICAL CLEARANCE OF ONE (1) FOOT SIX (6) INCHES BETWEEN CROSSING OF ALL UTILITY LINES UNLESS OTHERWISE NOTED.
15. EARTHWORK SHALL BE COMPACTED IN ACCORDANCE WITH SPECIFICATION 31 20 00.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE RE/COR OF ANY CONDITIONS FOUND IN THE FIELD PRIOR TO STAKEOUT THAT VARY FROM THE APPROVED PLANS OR THAT MAKE CONSTRUCTABILITY IMPOSSIBLE SO THAT APPROPRIATE REVISIONS CAN BE MADE PRIOR TO STAKEOUT AND/OR CONSTRUCTION. ANY OBSERVATIONS REGARDING APPARENT INCONSISTENCIES IN THE PLANS SHALL BE BROUGHT TO THE U.S. DEPARTMENT OF VETERANS AFFAIRS ATTENTION FOR
VERIFICATION PRIOR TO STAKEOUT.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE PERFORMANCE OF ITS WORK AND THE WORK OF ITS SUBCONTRACTORS. IFS SHALL NOT HAVE CONTROL OVER, CHARGE OF, OR RESPONSIBILITY FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK.
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING A SAFE WORK AREA AT ALL TIMES. TEMPORARY BARRICADES, ROAD CLOSURE SIGNAGE, FENCES AND OTHER WARNING DEVICES SHALL BE USED TO PREVENT PUBLIC ACCESS TO CONSTRUCTION WORK AREAS. VA MAINTENANCE OPERATIONS SHALL NOT BE UNDULY IMPEDED BY THE
CONTRACTOR'S OPERATIONS.
19. THE CONTRACTOR SHALL NOTIFY THE CEMETERY DIRECTOR AND THE RE/COR TWO DAYS BEFORE ANY DEMOLITION WORK BEGINS. ANY PLANNED INTERRUPTIONS IN
SERVICES SHALL BE COORDINATED WITH THE RE/COR AT LEAST TWO DAYS IN ADVANCE.
20. THE CONTRACTOR SHALL CONFINE THEIR EQUIPMENT AND OPERATIONS TO THE LIMITS OF CONSTRUCTION SHOWN. THE CONTRACTOR ASSUMES FULL RESPONSIBILITY FOR
THE SAFETY AND SECURITY OF ALL MATERIALS AND EQUIPMENT ON SITE.
21. THE CONTRACTOR SHALL USE ONLY APPROVED ROADWAYS FOR CONSTRUCTION AND DELIVERY ACCESS. DAMAGE TO THE EXISTING ROADS SHALL BE REPAIRED AT NO
EXPENSE TO THE GOVERNMENT.
22. THE CONTRACTOR IS RESPONSIBLE FOR RESTORATION OF ANY EXISTING GROUND DISTURBED DUE TO CONSTRUCTION ACTIVITY.
23. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS PRIOR TO CONSTRUCTION ACTIVITY.
24. THE CONTRACTOR SHALL PHASE CONSTRUCTION TO MAINTAIN ACCESS TO ALL BUILDINGS DURING CONSTRUCTION.
25. THE CONTRACTOR SHALL PROVIDE A PHASING PLAN FOR ALL ROAD CLOSURES FOR VA CEMETERY APPROVAL. CONTRACTOR SHALL MAINTAIN CEMETERY ACCESS THROUGHOUT CONSTRUCTION. CONTRACTOR TO PROVIDE TRAFFIC CONTROL SIGNAGE WHERE NECESSARY.
26. ALL EXCAVATION IN THE IMMEDIATE AREA OF EXISTING UTILITIES SHALL BE PERFORMED BY HAND AND WITH THE UTMOST CARE TO PROTECT EXISTING UTILITIES.
27. WORK WITH EXTREME CARE NEAR EXISTING DUCTS, CONDUITS, AND OTHER UTILITIES TO AVOID DAMAGING THEM.
28. PROTECT EXISTING SITE ELEMENTS TO REMAIN (TREES, SIGNS, CURBS, ETC) AND REPLACE IN KIND, IF DAMAGED. CONTRACTOR SHALL SALVAGE AND REPLACE ANY SITE SIGNS, FIXTURES, ETC. AS NEEDED TO COMPLETE THE INSTALLATION OF UTILITIES SHOWN ON THESE PLANS. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO UTILITIES
OR OTHER ITEMS DESIGNATED TO REMAIN.
29. TEST PITS ARE IDENTIFIED AT KNOWN EXISTING UTILITY CROSSINGS, BUT IN NO WAY LIMIT THE AMOUNT AND LOCATION OF TEST PITS REQUIRED TO BE PERFORMED BY THE CONTRACTOR. ELEVATION OF ALL EXISTING UTILITIES AT CROSSINGS WITH THE PROPOSED UTILITY PATHWAYS SHALL BE VERIFIED BY THE CONTRACTOR WITH A TEST PIT
PRIOR TO ANY EXCAVATION AT NO EXPENSE TO THE GOVERNMENT.
30. COORDINATE ALL TEMPORARY UTILITY DISRUPTIONS WITH VA CEMETERY STAFF.
31. CONTRACTOR SHALL RESTORE ALL AREAS DISTURBED FOR CONSTRUCTION IN KIND WITHIN 14 CALENDAR DAYS OF COMPLETING WORK IN SPECIFIC AREAS.
32. LIMITS OF CONSTRUCTION ARE APPROXIMATE. ALL AREAS DISTURBED BY THE CONTRACTOR SHALL BE RESTORED.
33. WHERE OPEN CUTTING OF PAVEMENT IS REQUIRED FOR INSTALLATION OF UTILITIES, CONTRACTOR SHALL REPLACE PAVEMENT TO MATCH EXISTING MATERIALS & DEPTHS.
NEW PAVEMENT SHALL BE FLUSH WITH EXISTING PAVEMENT SURFACES. ANY PAVEMENT MARKINGS DISTURBED OR REMOVED DURING CONSTRUCTION SHALL BE REPLACED
TO ORIGINAL CONDITION BY THE CONTRACTOR AT NO EXPENSE TO THE GOVERNMENT.
34. ALL ITEMS DESIGNATED TO BE REMOVED SHALL BE REMOVED COMPLETELY INCLUDING ALL SUBGRADE MATERIALS DIRECTLY ASSOCIATED WITH ITEMS TO BE REMOVED.
35. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND COORDINATED AND REPORT ANY DISCREPANCIES TO THE RE/COR PRIOR TO ANY CONSTRUCTION.
36. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING THRUST BLOCKS WHICH ARE RESTRAINING EXISTING UTILITIES. EXISTING THRUST BLOCKS SHALL NOT BE UNDERMINED, ANY DISTURBED THRUST BLOCKS SHALL BE REPLACED AT NO COST TO THE GOVERNMENT.
37. EXISTING MAINS TO WHICH CONNECTIONS SHALL BE MADE ARE SIZED AND LOCATED IN ACCORDANCE WITH THE BEST INFORMATION AVAILABLE THE CONTRACTOR SHALL VERIFY SIZE/TYPE OF CONNECTION WITH TEST PITS AT THE BEGINNING OF THE PROJECT, AND ORDER MATERIALS ACCORDINGLY.
38. ALL TRENCHES SHALL BE BACKFILLED AS SOON AS PRACTICABLE, OPEN TRENCHES SHALL BE KEPT TO A MINIMUM. OPEN TRENCHES SHALL BE STEEL PLATED WHEN THEY CANNOT BE IMMEDIATELY COVERED. UPON BACKFILLING THE CONTRACTOR SHALL BROOM SWEEP STREETS AND USE APPROPRIATE METHODS TO CONTROL DUST AND HOSE DOWN PAVEMENT TO KEEP SURFACES CLEAN. TRENCHES WITHIN THE ROADWAY SHALL BE BACKFILLED AT THE END OF EACH WORK DAY. WHERE FIRE ACCESS MUST BE MAINTAINED ON A STREET, CONTRACTOR SHALL ASSURE A MINIMUM, OF 15' STABILIZED ROUTE AROUND THE EXCAVATION.
39. ALL GRAVESITE GRID MONUMENTS SHALL BE LAID OUT BY A LICENSED LAND SURVEYOR ENGAGED BY THE CONTRACTOR, USING COORDINATES AND BEARINGS SHOWN.
A AREA OR ARC
AC ACRE
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
AGE ABOVE GROUND ELECTRIC
AGEC ABOVE GROUND ELECTRIC CONDUIT
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASPH ASPHALT
AST ABOVE-GROUND STORAGE TANK
ATS ACTIVE TREATMENT SYSTEM
AVE AVENUE
AWWA AMERICAN WATER WORKS ASSOCIATION
A/C AIR CONDITIONING
BC BOTTOM OF CURB
BF BASEMENT FLOOR
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BITUM BITUMINOUS
BL BASE LINE
BLDG BUILDING
BLVD BOULEVARD
BM BENCHMARK, BASELINE MARKER
BMP BEST MANAGEMENT PRACTICES
BOE BOTTOM OF EXCAVATION
BOV BLOW OFF VALVE
BRG BEARING
BRL BUILDING RESTRICTION LINE
BV BALL VALVE
BW BOTTOM OF WALL
C COEFFICIENT OF RUNOFF
CALC CALCULATE
CB CATCH BASIN OR CHORD BEARING
CC CENTER TO CENTER
CCTV CLOSED CIRCUIT TELEVISION
CD CONSTRUCTION DOCUMENTS, CONTRACT DOCUMENTS OR CHECK DAM
CDW CHILLED DRINKING WATER
CDWR CHILLED DRINKING WATER RETURN
CDWS CHILLED DRINKING WATER SUPPLY
CE CONSTRUCTION ENTRANCE
CEM CEMENT OR CEMETERY
CF CONTRACTOR FURNISHED
CFS CUBIC FEET PER SECOND OR COMPOST FILTER SOCK
CG CURB AND GUTTER
CHD CHORD
CIP CAST IRON PIPE OR CULVERT INLET PROTECTION
CJ CONTRACTION JOINT
CL CENTERLINE, CLASS
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CN CURVE NUMBER
CND CONDUIT
CNR CORNER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATIONS
CONC CONCRETE
COND CONDITION OR CONDENSER
CONF CONFERENCE
CONN CONNECTION
CON CONTAMINATED
CONSTR CONSTRUCTION
CONT CONTINUATION
CONTR CONTRACT OR CONTRACTOR
COR CONTRACTING OFFICER'S REPRESENTATIVE
COTG CLEANOUT TO GRADE
COV COVER OF CUT OFF VALVE
CPv CHANNEL PROTECTION VOLUME
CPPE CONSERVATION PRACTICE PHYSICAL EFFECTS
CPP CORRUGATED PLASTIC PIPE
CRN CROWN
CSB CONCRETE SPLASH BLOCK
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
CSS COMMITTAL SERVICE SHELTER
CSP CONCRETE SEWER PIPE
CT COURT
CTR CENTER OR CONTOUR
CTRL CONTROL
CTS COOLING TOWER SUPPLY
CTV CABLE TELEVISION
CV CONTROL VALVE
CW CLOCKWISE OR CONCRETE WASHOUT
CWP COLD WATER PIPING
D DEPTH
DAT DATUM
DB DEED BOOK; DESIGN-BUILD; DRAIN BASIN
DBL DOUBLE
DD DIVERSION DIKE
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DESC DESCRIPTION
DET DETAIL
DI DROP INLET
DIA DIAMETER
DIFF DIFFERENCE
DIP DUCTILE IRON PIPE
DIST DISTANCE
DM DROP MANHOLE
DOC DOCUMENT
DOM DOMESTIC
DR DRIVE
DRE DECOMPOSED ROCK ELEVATION
DS DOWNSPOUT
DWG DRAWING
D/W DRIVEWAY
D DELTA
EA EACH
EBL EAST BOUND LANE
EC EDGE OF CONCRETE
ECL EROSION CONTROL LOG
EG EDGE OF GUTTER
EJ EXPANSION JOINT
ELEV ELEVATION
ELEC ELECTRICAL
ENTR ENTRANCE
EOI END OF INFORMATION
EP EDGE OF PAVEMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
E&S EROSION & SEDIMENT
ES END SECTION
ESMT EASEMENT
ETO EARLY TURNOVER
EPT EXTERNAL PIPE THREAD
EQ EQUAL
EW END WALL
EXP EXPANSION
EX EXISTING
EXT EXTERIOR
FAR FLOOR AREA RATIO
FC FACE OF CURB
FD FOUNTAIN DRAIN
FF FIRST FLOOR OR FINISHED FLOOR
FG FINISHED GRADE
FH FIRE HYDRANT
FIN FINISHED
FLR FLOOR
FN FENCE
FP FLOOD PLAIN
FOC FACE OF CURB
FOTG FIELD OFFICE TECHNICAL GUIDE
FOY FOYER
FP FLAG POLE OR FIRE PROTECTION
FPS FEET PER SECOND
FR FROM
FS FILTER SOCK
FT FEET
FWS FLOWER WATERING STATION
G GAS
GAL GALLON
GDR GUARD RAIL
GEN GENERATOR
GFA GROSS FLOOR AREA
GIP GALVANIZED IRON PIPE
GL GROUND LEVEL
GOVT GOVERNMENT
GR GRADE
GR GUARD RAIL
GS GROUND SHOT
H HORIZONTAL
HC HANDICAP
HCP HANDICAPPED
HDPE HIGH DENSITY POLYETHYLENE
HDR HEADER
HDWL HEADWALL
HGL HYDRAULIC GRADE LINE
HH HAND HOLE
HLBC HOT LAID BITUMINOUS CONCRETE
HMA MOT-MIX ASPHALT
HP HIGH POINT OR HIGH PRESSURE
HR HAND RAIL
HT HEIGHT
HW HOT WATER
HWSR HOT WATER SUPPLY & RETURN
HWY HIGHWAY
HYD HYDRANT
HYDR HYDRAULIC
I RAINFALL INTENSITY
ID INSIDE DIAMETER
IGC IN-GROUND CRYPT
IN INCH
INV INVERT
IP IRON PIPE OR INLET PROTECTION
IPF IRON PIPE FOUND
IPS IRON PIPE SET
IRR IRRIGATION
IW IRRIGATION WATER
JB JUNCTION BOX
K ONE THOUSAND (KILO)
KWY KEYWAY
L LENGTH
LAT LATERAL
LF LINEAR FEET
LOC LOCATION
LONG LONGITUDE
LOS LINE OF SIGHT
LP LOW POINT OR LOW PRESSURE
LT LIGHT OR LEFT
LL LOWER LEVEL
M MARKER
MAINT MAINTENANCE
MAT MATERIAL
MAX MAXIMUM
MB MAIL BOX
MECH MECHANICAL
MED MEDIUM
MEMO MEMORANDUM
MEP MECHANICAL, ELECTRICAL, PLUMBING
MFG MANUFACTURING
MGT MANAGEMENT
MH MANHOLE
MI MILE
MIN MINIMUM
MISC MISCELLANEOUS
ML MATERIALS LIST
MN MAGNETIC NORTH
MOD MODEL OR MODIFY
MON MONUMENT
MS MEDIAN STRIP
MSL MEAN SEA LEVEL
MTG MEETING
MTL MATERIAL
MULT MULTIPLE
MUNIC MUNICIPAL
N NORTH
N/F NOW OR FORMERLY
NA NOT APPLICABLE
NAT NATURAL
NATL NATIONAL
NBC NATIONAL BUILDING CODE
NBL NORTH BOUND LANE
NCA NATIONAL CEMETERY ADMINISTRATION
NCPS NATIONAL CONSERVATION PRACTICE STANDARDS
NCTCOG NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS
NE NOT EXCEEDING
NFA NET FLOOR AREA
NHCP NATIONAL HANDBOOK OF CONSERVATION PRACTICES
NIC NOT IN CONTRACT
NO NUMBER
NOI NOTICE OF INTENT
NOM NOMINAL
NPDES NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
NRCP NON-REINFORCED CONCRETE PIPE
NRCS NATURAL RESOURCES CONSERVATION SERVICE
NTP NOT TO PROCEED
NTS NOT TO SCALE
OC ON CENTER
OCEW ON CENTER EACH WAY
OD OUTSIDE DIAMETER
OFB ORGANIC FILTER BERM
OFD OVERFLOW DRAIN
OFT ORGANIC FILTER TUBE
OH OVERHANG
OHC OVERHEAD COMMUNICATIONS
OHE OVERHEAD ELECTRIC
OP OUTLET PROTECTION
OS OVER-SIZED
OZ OUNCE
P PERIMETER, RAINFALL DEPTH
PAR PARALLEL
PAT PATTERN
PB PULL BOX
PC POINT OF CURVATURE
PCA PORTLAND CEMENT ASSOCIATION
PCC POINT OF COMPOUND CURVE
PCEP POINT OF CURVE, EDGE OF PAVEMENT
PCT PERCENT
PCTC POINT OF CURVE, TOP OF CURB
PERF PERFORATED
PED PEDESTAL
PG PAGE
PGL POINT OF GRADE LINE
PH PROFILE HOLE
PI POINT OF INTERSECTION
PIC PUBLIC INFORMATION CENTER
PIV POST INDICATOR VALVE
PL PROPERTY LINE
POTW POTABLE WATER
PP POLYPROPYLENE (PLASTIC)
PPC PRE-PLACED CRYPT
PRC POINT OF REVERSE CURVE
PRELIM PRELIMINARY
POTW PUBLICLY-OWNED TREATMENT WORKS
PROP PROPOSED
PSI POUNDS PER SQUARE INCH
PSL PIPE SLEEVE
PT POINT OF TANGENCY
PTS PASSIVE TREATMENT SYSTEM
PV PRIVATE VAULT
PVC POLY VINYL CHLORIDE (PLASTIC PIPE)
PVI POINT OF VERTICAL INTERSECTION
PVMT PAVEMENT
PVT POINT OF VERTICAL TANGENCY
P&P PLAN AND PROFILE
Q FLOW, AMOUNT OF RUNOFF
Qf EXTREME FLOOD VOLUME Qp OVERBANK FLOOD PROTECTION VOLUME
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RISER, RADIUS
RAD RADIANS
RCN RUNOFF CURVE NUMBER
RCP REINFORCED CONCRETE PIPE, REFLECTED CEILING PLAN
RD ROAD, ROOF DRAIN
RDC REDUCER
RE RESIDENT ENGINEER
REP REPAIR
REQ REQUIRED
REV REVISION
REv RECHARGE VOLUME
RGP ROUGH GRADING PLAN
RPA RESOURCE PROTECTION AREA
RR RAILROAD
RTE ROUTE
RT RIGHT
RV RELIEF VALVE
RW RETAINING WALL
R/W RIGHT-OF-WAY
SAN SANITARY
SB SPLASH BLOCK OR SEDIMENT BASIN
SBL SOUTH BOUND LANE
SCF SEDIMENT CONTROL FENCE
SCHED SCHEDULE
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SEC SECTION
SEG SEGMENT
SEL SELECT
SEW SEWER
SF SQUARE FEET OR SILT FENCE
SSF SUPER SILT FENCE
SJ SCORED JOINT
SLV SLEEVE
SM SECTION MARKER
SMH STEAM MANHOLE
SOV SHUT OFF VALVE
SP SITE PLAN
SPEC SPECIFICATION
SPKLR SPRINKLER
SQ SQUARE
SS SANITARY SEWER, STORM SEWER OR STEAM SUPPLY
ST STREET OR SEDIMENT TRAP
STA STATION
STD STANDARD
STE STEAM
STK STACK
STM STORM
SUPT SUPPORT
SURV SURVEY
SVC SERVICE
SWM STORMWATER MANAGEMENT
S/W SIDEWALK
SWPPP STORM WATER POLLUTION PREVENTION PLAN (SWP3)
SWG SEWAGE
Sx CROSS SLOPE
SYM SYMBOL
T TANGENT
T&M TIME AND MATERIALS
TB TEST BORE
TC TOP OF CURB
Tc TIME OF CONCENTRATION
TCP TERRA COTTA PIPE, TRAFFIC CONTROL PLAN
TELE TELEPHONE
TH TEST HOLE
TNL TUNNEL
TOB TOP OF BANK
TOC TOP OF CURB
TOP TOP OF PAVEMENT
TOPO TOPOGRAPHY
TP TEST PIT, TELEPHONE POLE, OR TREE PROTECTION
TW TOP OF WALL
TYP TYPICAL
UD UNDERDRAIN
U/G UNDERGROUND
UGC UNDERGROUND COMMUNICATIONS
UGE UNDERGROUND ELECTRIC
UFC UNIFORM FIRE CODE
UL UPPER LEVEL
UON UNLESS OTHERWISE NOTED
UP UTILITY POLE
USACE U.S. ARMY CORPS OF ENGINEERS
USDA U.S. DEPARTMENT OF AGRICULTURE
UTIL UTILITY
V VERTICAL
VA VETERANS ADMINISTRATION, VIRGINIA
VAR VARIES
VC VERTICAL CURVE
VEL VELOCITY
VERT VERTICAL
VF VERTICAL FOOT
VIC VICINITY
VID VIDEO
VIF VERIFY IN FIELD
VOL VOLUME
W WATER, WEST OR WIDE
W/ WITH
W/O WITHOUT
WBL WEST BOUND LANE
WI WROUGHT IRON
WL WATER LINE
WM WATER MAIN OR WATER METER
WO WORK ORDER
WQv WATER QUALITY VOLUME
WSE WATER SURFACE ELEVATION
WT WATER TIGHT
WW WASTE WATER
X-ING CROSSING
YI YARD INLET
YR YEAR
Z SIDE SLOPES
CIVIL LEGEND:
FEATURE WALL
HEADSTONE FACE DIRECTION
DRAINAGE FLOW ARROW
DETAIL LABEL
KEYNOTE REFERENCE LABEL
F
XX
XX
XXXXX
WETLANDS
FLAG POLEF
DETAIL NO.
SHEET REFERENCE
DIRECTION OF TRAFFIC ARROWS
FEATURE WALL
TEST PIT LOCATION
ROAD CENTERLINE
HEADER CURB
CURB & GUTTER
EDGE OF PAVEMENT
CHAIN LINK FENCE
WATER MAIN
BUILDINGS
SIDEWALK
SANITARY SEWER MAIN
STORM SEWER LINE
TREES/SHRUBS
LIMITS OF CONSTRUCTION
INDEX CONTOUR LINE
INTERMEDIATE CONTOUR LINE
SPOT ELEVATIONS
MISCELLANEOUS SIGNS
SITE LIGHT WITH POLE
LOC LOC
DRIP LINE OF TREES
REVERSE CURB
543.6
EX. BLDG
XX XX
XXXX
BOARD FENCE
SSSS
W W8" W/M8" W/M
8" PVC SAN. SEW.
15" HDPE
TRANS.CURB
SOIL BOUNDARY
HbB HgC
WIRE FENCE X X X
XXX
EDGE OF GRAVEL
GUARDRAIL
EDGE OF CONCRETE
SANITARY SEWER STRUCTURES
STORM SEWER MANHOLE
STORM SEWER INLETS
STORM SEWER RIP-RAP
STORM SEWER END SECTION
WATER SRUCTURES
MAIL BOX
UTILITY POLE
BUILDING MOUNTED LIGHT
UTILITY POLE GUY WIRE
SANITARY SEWER FORCE MAIN FM FMFM
W W
SSSS 8" PVC SAN. SEW.
15" HDPE
EX. CC RBF
CONCRETE MONUMENT/IRON REBAR
TBSCC-TBSIPF
C3
W
W
W
W
WWW
45 0
GS 45 0
TC 45 0
INV
EX.
X
MB
MONVDH
EX. VDH
CO CO
30EX.
12 30
FIBER OPTIC LINE
TELEPHONE LINE
OHF OHF
OHT OHTT T
FO
OVERHEAD UNDER GROUND
FO
OVERHEAD UNDER GROUND
EXISTING PROPOSED
BOUNDARY/RIGHT-OF-WAY LINE
ADJACENT BOUNDARY LINE
EASEMENT LINE
FH
CABLE LINE
UNDERGROUND GAS LINEG G G G
GRADING
SITE
PROPERTY
UTILITIES
OHC OHCC C
WV WMFHWV WM
ELECTRIC LINEOHE OHEE E
WROUGHT IRON FENCE
PR. BLDG
MB
LIMITS OF GRADING LOG LOG
LIMITS OF WORK LOW LOW
BURIAL CRYPT PLOTS
IN-GROUND CREMAIN PLOTS
BURIAL SECTION MARKER
GRAVESITE GRID MONUMENT
NORTH ARROW
BENCHMARK (BASED ON EXISTING RECORD INFORMATION
PROVIDED BY THE VA, NOT FIELD VERIFIED)
SECT. #
TP-#
VL001
EXISTING CONDITIONS SURVEY
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\V
L0
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
Above Group
(321) 345-9026 3 OF 163
VL002
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\V
L0
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
(321) 345-9026 4 OF 163
VL003
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\V
L0
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
(321) 345-9026 5 OF 163
VL004
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\V
L0
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
(321) 345-9026 6 OF 163
VL005
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\V
L0
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
(321) 345-9026 7 OF 163
VL006
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\V
L0
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
(321) 345-9026 8 OF 163
VL007
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
KERN COUNTY, CALIFORNIA
929CM003
JULY 30, 2026 RPP RJP
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
BAKERSFIELD NATIONAL CEMETERY
EXPANSION CONSTRUCTION
DOCUMENTS
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\50
-0
1 N
CA
B
AK
ER
SF
IE
LD
E
XP
AN
SI
ON
\E
NG
IN
\P
LA
NS
\V
L0
.D W
G
Integrity Federal Services - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Walter P Moore
(310) 254-1900
AES Group, Inc.
(303) 841-3922
Davy Architecture
(619) 238-3811
Aqua Engineering
(970) 229-9668
(321) 345-9026 9 OF 163
File details come from the government source that posted it. Updated .