BLDG - 229 3RD FLR.pdf
PDF 4 MB Posted
- Attached to
- B229 PV Array
- Solicitation number
- AEW-0170-0555
- Issued by
- Macomb County, Westland City, Michigan
About this file
These architectural floor plans are for Building 229, a three-story office complex located at the United States Army Garrison - Detroit Tank Arsenal. The plans, drafted by Anderson Jackson Westrick, Inc., depict detailed floor layouts for the 3rd floor across three separate area sections (Area-1, Area-2, and a full floor plan). The floor plans show multiple office spaces, conference rooms, reception areas, storage rooms, mechanical rooms, hallways, and stairwells. Each floor plan includes a north-oriented compass rose, a small key plan showing the building's overall footprint, and architectural grid lines for precise spatial referencing.
The architectural drawings are part of a project to install a new photovoltaic (PV) array on Building 229, which involves an Inter-governmental Service Agreement between the United States Army Garrison and the City of Center Line, Michigan. The floor plans provide a comprehensive view of the building's interior configuration, which will be critical for planning the PV array installation, understanding potential roof access points, and evaluating structural considerations for the solar energy project. The technical drawings include specific room designations, spatial dimensions, and are prepared with professional architectural notation and standards typical of government infrastructure and capital improvement projects.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFS CIRM 2025-01_ BLDG 229 PV ARRAY_DRAWINGS_BID ISSUE__250129.pdf | ||
| Appendix D - Asbestos Survey.pdf | ||
| Appendix G - ENG_FORM_4288-R.pdf | ||
| Appendix B - Rad Contractor Process.pdf | ||
| IMG_7927.JPG | JPG image | |
| IMG_7928.JPG | JPG image | |
| BLDG - 229 4TH FLR.pdf | ||
| IMG_7932.JPG | JPG image | |
| Appendix E - DTA-F-004-24_ClearancePermitRequest-v1.1 (new).pdf | ||
| 00 20 00 - Request for Proposals.pdf | ||
| IMG_7925.MOV | MOV file | |
| Appendix C - Construction Impact Notification.pdf | ||
| IMG_7933.JPG | JPG image | |
| BLDG - 229 BASEMENT FLR.pdf | ||
| BLDG - 229 2ND FLR.pdf | ||
| IMG_7934.JPG | JPG image | |
| Appendix H - STA_Form17_FEB2024.v3.0_Single.pdf | ||
| 6-A Addenda #1_0170-0555_DTA B229_250218.pdf | ||
| IMG_7925.JPG | JPG image | |
| BLDG - 229 1ST FLR.pdf | ||
| IMG_7931.JPG | JPG image | |
| RFS CIRM 2025-01_ BLDG 229 PV ARRAY_SPEC_BID ISSUE__250129.pdf | ||
| IMG_7926.JPG | JPG image | |
| IMG_7930.JPG | JPG image | |
| Appendix F - SOW DTA IGSA-CI 25-01 B229 PV Array.pdf | ||
| IMG_7929.JPG | JPG image |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A-FPF301-BLDG_229 - A12 A-FPF301-BLDG_229 (AREA-1)
| A-FPF301-BLDG_229 - A12 A-FPF301-BLDG_229 (AREA-2) |
| A-FPF301-BLDG_229 - A12 A-FPF301-BLDG_229 (COMPO) |
File details come from the government source that posted it. Updated .