Appendix C - Construction Impact Notification.pdf
PDF 255 KB Posted
- Attached to
- B229 PV Array
- Solicitation number
- AEW-0170-0555
- Issued by
- Macomb County, Westland City, Michigan
About this file
The document is a Construction Impact Notification Form for the US Army Garrison - Detroit Arsenal's Directorate of Public Works, dated 11 December 2023. This form is a standardized template requiring contractors to provide detailed information about upcoming construction activities at least 14 days in advance, specifically for the B229 PV Array project involving the installation of a new photovoltaic array on Building 229. The form requires comprehensive details including project name, contract number, contractor information, point of contact, and a detailed description of work being performed.
The form is designed to capture critical information about potential impacts to facility infrastructure and operations, with checkboxes for various potential disruptions such as electrical, telecommunications, traffic, and utility systems. Contractors must specify the exact location of construction, proposed schedule, after-hours or weekend work plans, and any special coordination requirements. The document indicates that drawings showing location and impact must be attached, and the responsible point of contact for coordination is Brent Atkinson, reachable at (586) 282-5262. This notification process appears to be part of an inter-governmental service agreement between the US Army Garrison and the City of Center Line for managing capital improvement projects.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFS CIRM 2025-01_ BLDG 229 PV ARRAY_DRAWINGS_BID ISSUE__250129.pdf | ||
| Appendix D - Asbestos Survey.pdf | ||
| Appendix G - ENG_FORM_4288-R.pdf | ||
| Appendix B - Rad Contractor Process.pdf | ||
| IMG_7927.JPG | JPG image | |
| IMG_7928.JPG | JPG image | |
| BLDG - 229 4TH FLR.pdf | ||
| IMG_7932.JPG | JPG image | |
| Appendix E - DTA-F-004-24_ClearancePermitRequest-v1.1 (new).pdf | ||
| BLDG - 229 3RD FLR.pdf | ||
| 00 20 00 - Request for Proposals.pdf | ||
| IMG_7925.MOV | MOV file | |
| IMG_7933.JPG | JPG image | |
| BLDG - 229 BASEMENT FLR.pdf | ||
| BLDG - 229 2ND FLR.pdf | ||
| IMG_7934.JPG | JPG image | |
| Appendix H - STA_Form17_FEB2024.v3.0_Single.pdf | ||
| 6-A Addenda #1_0170-0555_DTA B229_250218.pdf | ||
| IMG_7925.JPG | JPG image | |
| BLDG - 229 1ST FLR.pdf | ||
| IMG_7931.JPG | JPG image | |
| RFS CIRM 2025-01_ BLDG 229 PV ARRAY_SPEC_BID ISSUE__250129.pdf | ||
| IMG_7926.JPG | JPG image | |
| IMG_7930.JPG | JPG image | |
| Appendix F - SOW DTA IGSA-CI 25-01 B229 PV Array.pdf | ||
| IMG_7929.JPG | JPG image |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Directorate of Public Works Detroit Arsenal
APPENDIX C
Appendix C - Construction Impact Notification (11-Dec-2023) a [lilf:l;Mi]
Form: CIN Last Revision: 11 December 2023
Construction Impact Notification Form US Army Garrison - Detroit Arsenal
Directorate of Public Works This information is required 14 days in advance for notification of all construction activities and must be submitted in electronic format. Drawings must be attached showing location and impact. This may be submitted in conjunction with an excavation permit application. The responsible USAG DPW POC for coordination of this document at the Detroit Arsenal, MI, is Brent Atkinson (586) 282-5262.
• Project Name: ______________________________
• Contract No.: ______________________________
• Contractor Name: ____________________________
• POC Name & Phone No. ________________________
• Date Submitted: Click or tap to enter a date.
1. Describe Work Being Performed that is causing the impact:
2. What will be impacted? Provide a short summary and describe any mitigating being taken.
Check the below boxes as applicable.
IMPACT SUMMARY:
☐ Electrical Substation ☐ Lighting ☐ Water ☐ Telecom ☐ Compressed Air ☐ Loss of heat ☐ Loss of cooling ☐ Fire Alarm ☐ Fire Suppression ☐ Mass Notification ☐ Vehicular Traffic ☐ Parking ☐ Pedestrian Traffic ☐ Other: ________
3. Describe/show the Exact Location (including limits of construction – show in attached map):
4. Schedule:
Start Date (indicate time if less than full day): ________________ End Date (indicate time if less than full day): _________________ Any dates omitted? (I.e., weekends): _________________
5. Describe work activities during after-hours or weekend work: _________________
6. Describe any special needs, requests, coordination, or support required: ____________
7. Any additional comments? _________________
| Appendix C - Construction Impact Notification Cover Sheet |
| Construction Impact Notification_2023 |