6-A Addenda #1_0170-0555_DTA B229_250218.pdf

PDF 66 KB Posted

Attached to
B229 PV Array
Solicitation number
AEW-0170-0555
Issued by
Macomb County, Westland City, Michigan

About this file

This document is Addendum Number 1 for the Detroit Arsenal Building 229 PV Array project, issued by Anderson, Eckstein & Westrick, Inc. on behalf of the U.S. Army Garrison – Detroit Arsenal. The addendum provides clarifications and responses to bidder questions, including confirmation that construction drawings are posted on BidNet, guidance on conduit routing through electrical/mechanical rooms, and specification that the project is not a prevailing wage job. The document also indicates that delivery drivers will need to be pre-authorized and badged before entering the facility.

The addendum includes several key attachments such as an Asbestos Survey (Appendix D), miscellaneous photos, and floor plans for the basement and first through fourth floors of Building 229. Notable responses to bidder questions include that contractors will be responsible for determining the best conduit routing path from the PV array to the electrical room, and that no architectural or electrical drawing revisions are required at this time. The addendum is part of the original bidding documents dated 1/29/2025 and requires bidders to acknowledge receipt and acceptance by noting the addendum number in their bid form.

View the file

Other files

File Type Posted
RFS CIRM 2025-01_ BLDG 229 PV ARRAY_DRAWINGS_BID ISSUE__250129.pdf PDF
Appendix D - Asbestos Survey.pdf PDF
Appendix G - ENG_FORM_4288-R.pdf PDF
Appendix B - Rad Contractor Process.pdf PDF
IMG_7927.JPG JPG image
IMG_7928.JPG JPG image
BLDG - 229 4TH FLR.pdf PDF
IMG_7932.JPG JPG image
Appendix E - DTA-F-004-24_ClearancePermitRequest-v1.1 (new).pdf PDF
BLDG - 229 3RD FLR.pdf PDF
00 20 00 - Request for Proposals.pdf PDF
IMG_7925.MOV MOV file
Appendix C - Construction Impact Notification.pdf PDF
IMG_7933.JPG JPG image
BLDG - 229 BASEMENT FLR.pdf PDF
BLDG - 229 2ND FLR.pdf PDF
IMG_7934.JPG JPG image
Appendix H - STA_Form17_FEB2024.v3.0_Single.pdf PDF
IMG_7925.JPG JPG image
BLDG - 229 1ST FLR.pdf PDF
IMG_7931.JPG JPG image
RFS CIRM 2025-01_ BLDG 229 PV ARRAY_SPEC_BID ISSUE__250129.pdf PDF
IMG_7926.JPG JPG image
IMG_7930.JPG JPG image
Appendix F - SOW DTA IGSA-CI 25-01 B229 PV Array.pdf PDF
IMG_7929.JPG JPG image
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOCUMENT 00 91 00

ADDENDA

ADDENDUM NUMBER 1

DATE: February 19, 2025

PROJECT: Detroit Arsenal Building 229 PV Array

RFS CIRM 2025-01

Work Order DTA-001322

AEW Project No.: 0170-0555

OWNER: U.S. Army Garrison – Detroit Arsenal

ARCHITECT/ENGINEER: Anderson, Eckstein & Westrick, Inc.

TO: Prospective Bidders

This Addendum forms a part of the Contract Documents and modifies the

Bidding Documents dated 1/29/2025, with amendments and additions noted below.

The following changes to and/or clarifications of the Contract Documents will be incorporated in said Contract Documents and such changes shall be allowed for in the price bid by the Contractor, such that the price indicated in the Proposal shall represent the conditions as set forth in the original Contract Documents as modified by this Addendum.

Acknowledgment of receipt of this Addendum and the Bidder’s Acceptance of these revised conditions prior to submittal of the bid shall be indicated by adding the Addendum number in the space provided in the Bid Form. Failure to do so may disqualify the Bidder.

A. BIDDER QUESTIONS AND RESPONSES:

1. Asbestos Report for the building?

A: See the attached report

2. Conduit routing to get from the Array to the Electrical Room 299?

A: There are stacked electrical/mechanical rooms on each floor of the building. North of the main rest rooms on each floor. See the floor plans included in this addendum. It will be the contractor’s responsibility to determine the best route thought those rooms.

3. Is this project prevailing wage?

A: No

4. Is there a proposed pathway from the roof to the electrical room, or is it the contractor’s responsibility to determine one?

A: There are stacked electrical/mechanical rooms on each floor of the building. North of the main rest rooms on each floor. See the floor plans included in this addendum It will be the contractor’s responsibility to determine the best route thought those rooms.

5. Who will prepare the construction drawings? When will they be available.

A: They are currently posted to BidNet.

6. Do delivery drivers need to be preauthorized and badged before entering the facility?

A: Yes, see the addendum documents posted to BidNet.

B. DOCUMENT REVISIONS:

ARCHITECTURAL DRAWING ITEMS:

None

ELECTRICAL DRAWING ITEMS:

SPECIFICATIONS

1. 00 20 00 Request for Proposals

C. SUBSTITUTIONS:

D. ATTACHMENTS:

1. Appendix D - Asbestos Survey

2. Misc. Photos

3. BLDG – BASEMENT FLR

4. BLDG - 229 1ST FLR

5. BLDG - 229 2ND FLR

6. BLDG - 229 3RD FLR

7. BLDG - 229 4TH FLR

8. 00 20 00 Request for Proposals

End of Addenda