This is a bid form issued by the State of Colorado Office of the State Architect, State Buildings Programs, on behalf of the Colorado Department of Corrections Facility Management Services for Project YOS1601, an HVAC replacement project at the Youth Offenders System Building 7. The bid form requires contractors to submit a base bid amount and establish timelines for project completion, including separate periods from Notice to Proceed to Substantial Completion and from Substantial Completion to Final Acceptance. Bidders must acknowledge receipt of any addenda, confirm examination of bidding documents and the project site, and agree to commence work within ten calendar days of receiving the Notice to Proceed. Contractors selected for award must execute required agreements, provide performance and labor/material payment bonds, obtain appropriate insurance, and submit an Affidavit Regarding Unauthorized Immigrants within ten days of the Notice of Award.

The bid form specifies compliance requirements including the 80% Colorado Labor requirement for state public works projects, meaning at least 80% of work must be performed by Colorado residents. Bidders indicating non-compliance must submit written justification with their bid submission. The form also requests identification of Service-Disabled Veteran Owned Small Businesses with attached proof of certification from the U.S. Department of Veteran Affairs Center for Veteran Enterprise. Bidders must submit a bid guarantee with their proposal, which may be retained until the contractor executes required agreements and provides necessary bonds and insurance documentation. The form requires submission of wage rates for both prime contractors and subcontractors as requested in the solicitation documents. Any bid alternates must be submitted using State Form SBP-6.13.1.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

State Form SBP-6.13 Rev.7/2015

STATE OF COLORADO

OFFICE OF THE STATE ARCHITECT

STATE BUILDINGS PROGRAMS

BID

Institution/Agency: Colorado Department of Corrections / Facility Management Services

Project No./Name: YOS1601 / YOS Bldg 7 HVAC Replacement

Bidder Acknowledges Receipt of Addenda Numbers:

Bidder Anticipates Services outside the United States or Colorado: No Yes If Yes see 3A below Bidder will comply with 80% Colorado Labor on project above $500,000: Yes No If No see 3B below Bidder is a Service-Disabled Veteran Owned Small Business: No Yes If Yes see 3C below

Base Bid $

(Refer to Bid Alternate Form SC-6.13.1 Attached, If Applicable)

Bidder’s Time of Completion

a. Time Period from Notice to Proceed to Substantial Completion:

b. Time Period from Substantial Completion to Final Acceptance:

c. Total Time of Completion of Entire Project (a + b):

1. BID: Pursuant to the advertisement by the State of Colorado dated the undersigned bidder hereby proposes to furnish all the labor and materials and to perform all the work required for the complete and prompt execution of everything described or shown in or reasonably implied from the Bidding Documents, including the Drawings and Specifications, for the work and for the base bid indicated above. Bidders should include all taxes that are applicable.

2. EXAMINATION OF DOCUMENTS AND SITE: The bidder has carefully examined the Bidding Documents, including the Drawings and Specifications, and has examined the site of the Work, so as to make certain of the conditions at the site and to gain a clear understanding of the work to be done.

3. PARTIES INTERESTED IN BID: The bidder hereby certifies that the only persons or parties interested in this Bid are those named herein, and that no other bidder or prospective bidder has given any information concerning this Bid.

A. If the bidder anticipates services under the contract or any subcontracts will be performed outside the United States or Colorado, the bidder shall provide in a written statement which must include, but need not be limited to the type of services that will be performed at a location outside the United States or Colorado and the reason why it is necessary or advantageous to go outside the United States or Colorado to perform such services. (Does not apply to any project that receives federal moneys)

B. For State Public Works projects per C.R.S. 8-17-101, Colorado labor shall be employed to perform at least 80% of the work. Colorado Labor means any person who is a resident of the state of Colorado at the time of the Public Works project. Bidders indicating that their bid proposal will not comply with the 80% Colorado Labor requirement are required to submit written justification along with the bid submission. (Does not apply to any project that receives federal moneys–

C. A Service-Disabled Veteran Owned Small Business (SDVOSB) per C.R.S. 24-103-211, means a business that is incorporated or organized in Colorado or maintains a place of business or has an office in Colorado and is officially registered and verified by the Center for Veteran Enterprise within the U.S. Department of Veteran Affairs. Attach proof of certification along with the bid submission.

4. BID GUARANTEE: This Bid is accompanied by the required Bid Guarantee. You are authorized to hold said Bid Guarantee for a period of not more than thirty (30) days after the opening of the Bids for the work above indicated, unless the undersigned bidder is awarded the Contract, within said period, in which event the Director, State Buildings Programs, may retain said Bid Guarantee, until the undersigned bidder has executed the required Agreement and furnished the required Performance Bond, Labor and Material Payment Bond, Insurance Policy and Certificates of Insurance and Affidavit Regarding Unauthorized Immigrants.

5. TIME OF COMPLETION: The bidder agrees to achieve Substantial Completion of the Project from the date of the Notice to Proceed within the number of calendar days entered above, and in addition, further agrees that the period between Substantial Completion and Final Acceptance of the Project will not exceed the number of

State Form SBP-6.13 Rev.7/2015 calendar days noted above. If awarded the Work, the bidder agrees to begin performance within ten (10) days from the date of the Notice to Proceed subject to Article 46, Time of Completion and Liquidated Damages of The General Conditions of the Contract, and agrees to prosecute the Work with due diligence to completion. The bidder represents that Article 7D of the Contractor’s Agreement (SC-6.21) has been reviewed to determine the type and amount of any liquidated damages that may be specified for this contract.

6. EXECUTION OF DOCUMENTS: The bidder understands that if this Bid is accepted, bidder must execute the required Agreement and furnish the required Performance Bond, Labor and Material Payment Bond, Insurance Policy and Certificates of Insurance and Affidavit Regarding Unauthorized Immigrants within ten (10) days from the date of the Notice of Award, and that the bidder will be required to sign to acknowledge and accept the Contract Documents, including the Drawings and Specifications.

7. ALTERNATES: Refer to the Information for Bidders (SC-6.12) for Method of Award for Alternates and use State Form SBP-6.13.1 Bid Alternates form to be submitted with this bid form if alternates are requested by the institution/agency in the solicitation documents.

8. Submit wage rates (direct labor costs) for prime contractor and subcontractor as requested by the institution/agency in the solicitation documents.

9. The right is reserved to waive informalities and to reject any and all Bids.

SIGNATURES: If the Bid is being submitted by a Corporation, the Bid shall be signed by an officer, i.e., President or Vice-President. If a sole proprietorship or a partnership is submitting the Bid, the Bid shall so indicate and be properly signed.

Dated this Day of , 20

THE BIDDER: