ALTERNATE BID FORM YOS Bldg 7 HVAC 092916.pdf
PDF 23 KB Posted
- Attached to
- CTF YOS Building 7 HVAC CMS92454
- Solicitation number
- DQ1 CAAA 2017000355 2
- Issued by
- Ouray County, Colorado Springs City, Colorado
About this file
This is a Bid Alternates Form issued by the State of Colorado Office of the State Architect State Buildings Programs for the Colorado Department of Corrections Facility Management Services. The document pertains to Project YOS1601, a Heating, Ventilation, and Air Conditioning (HVAC) replacement project for Building 7 at the Youthful Offender System (YOS) facility. The form indicates that additive alternates are available for consideration, with reference made to a Documented Quote and Addendum No. 1 for detailed descriptions of the add alternates. The document specifies that deductive alternates are not applicable to this bid. Bidders are required to enter their proposed pricing for Additive Alternate No. 1, which covers Electrical Work.
The bid structure stipulates that additive and deductive alternates are mutually exclusive—if additive alternates are accepted, only those will be used to modify the base bid amount, and deductive alternates cannot be employed simultaneously. The form requires bidder submission of company name, signature, and date to complete the bidding process. No specific pricing guidance, funding sources, contract term information, or award dates are specified in this document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
State Form SBP –6.131 Issued 7/2010
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAMS
BID ALTERNATES FORM
Institution/Agency: Colorado Department of Corrections / Facility Management Services
Project No./Name: YOS1601 / YOS Bldg 7 HVAC Replacement
Additive alternates will not be used if deductible alternates are used and deductible alternates will not be used if additive alternates are used.
Additive Alternates (If Applicable) Refer to Documented Quote and Addendum No 1 for descriptions of add alternates. If the add alternates are accepted, the base bid would be modified by the amount entered by the bidder.
A.A. No. 1 Electrical Work Add $
Deductive Alternates (NOT Applicable)
THE BIDDER:
Company Name
Signature Date
File details come from the government source that posted it. Updated .