This is a solicitation document for the Town of Stratford, Connecticut, issued under Invitation to Bid (ITB) 2027-08 for dewatering, cleaning, groundwater control, closed-circuit television (CCTV) inspection, and Cured-in-Place (CIPP) lining services at the Water Pollution Control Facility (WPCF) Diversion Chamber C. The project scope encompasses approximately 225 linear feet of 54-inch corrugated metal pipe (CMP) stormwater pipe and approximately 105 linear feet of 12-inch reinforced concrete pipe (RCP) stormwater pipe. Work includes removal and disposal of sediment estimated at 12 to 24 inches, retrieval of a jetter and cable stuck approximately 70 feet from the inlet, excavation of a buried 12-inch RCP inlet headwall, and plugging the pipe to prevent river water or wetland flow during construction. A mandatory prebid meeting is scheduled for September 29, 2026 at 10:00 a.m., and bids are due October 16, 2026 at 10:00 a.m. EDT. Physical bid submission is required; electronic submission is prohibited. The vendor question period closes October 7, 2026 at 12:00 p.m. EDT, with all inquiries directed to Phillip Ryan, Purchasing Agent at pryan@townofstratford.com.
The contractor is responsible for all site safety, utility protection, traffic control, erosion control, and regulatory compliance. CIPP lining must occur during dry weather and low river conditions, with the contractor monitoring rainfall and river levels throughout installation, curing, and testing. Groundwater was observed 5 feet below grade, requiring the contractor to identify and control infiltration. Access is available through existing points at Diversion Chamber C and the catch basin. A non-operational sluice gate exists on the Chamber C structure and should not be relied upon. All vendors are eligible to bid. Payment terms are Net 30 Days upon approval by all Town boards. No contract value estimate is disclosed in the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: BID 2027-08
Diversion Chamber C Inlet Pipe Modifications -WPCF
Invitation to Bid (ITB)
Stratford, Town of
September 17, 2026 - October 16, 2026
Page:2
General Header Information
This bid has no questions defined.
BID 2027-08
No. BID 2027-08 Title: Diversion Chamber C Inlet Pipe Modifications -WPCF Start Date: September 17, 2026 at 1:00:00 PM EDT End Date: October 16, 2026 at 10:00:00 AM EDT Vendor Q&A Start Date: September 17, 2026 at 1:15:00 PM EDT Vendor Q&A End Date: October 07, 2026 at 12:00:00 PM EDT Estimated Total Value:
Who can respond to this bid? : All Vendors Description: Dewatering, cleaning, ground water control, CCTV, Cured-in-Place
(CIPP) lining of located on the Water Pollution Control Facility (WPCF).
Approximately 225 linear feet of 54-inch corrugated metal pipe (CMP) stormwater pipe. Approximately 105 linear feet of 12-inch reinforced concrete pipe (RCP) stormwater pipe. PREBID MEETING: 09/29/2026 -
10:00AM. ***DO NOT SUBMIT BIDS ELECTRONICALLY***
Delivery Terms: N/A: Not Applicable Payment Terms: Net 30 Days Payment Notes: Upon approval by all Town boards.
Contact Information: Stratford, Town of
Phillip Ryan, Purchasing Agent Email: pryan@townofstratford.com Submit all requests for information (RFI) to email address above.
Verbal communication will NOT be accepted.
Contact Details: If you have any questions, please contact:
Phillip Ryan, Purchasing Agent Email: pryan@townofstratford.com Submit all requests for information (RFI) to email address above.
Verbal communication will NOT be accepted.
Selected Categories:
Page:3
Documents:
2027-08 Inlet Pipe Modifications - WPCF - Drawings.pdf
2027-08 Inlet Pipe Modifications - WPCF - Specifications.pdf
2027-08 Sign-in Sheet.pdf
2027-08 Addendum 1.pdf
Page:4
Item Specifications Solicitation has been designated as having no line items.