BID 2027-08_Nov_12_26_solicitation_doc.pdf

PDF 15 KB Posted

Attached to
Diversion Chamber C Inlet Pipe Modifications -WPCF
Solicitation number
BID 2027-08
Issued by
Fairfield County, Connecticut

About this file

This is an Invitation to Bid (ITB) document issued by the Town of Stratford, Connecticut for Solicitation Number BID 2027-08 concerning Diversion Chamber C Inlet Pipe Modifications at the Water Pollution Control Facility (WPCF). The project scope includes dewatering, cleaning, groundwater control, CCTV inspection, and Cured-in-Place (CIPP) lining services for approximately 225 linear feet of 54-inch corrugated metal pipe (CMP) stormwater pipe and approximately 105 linear feet of 12-inch reinforced concrete pipe (RCP) stormwater pipe. Additional work includes removal and disposal of sediment estimated at 12 to 24 inches, retrieval of a jetter and cable stuck approximately 70 feet from the inlet, excavation of a buried 12-inch RCP inlet headwall, and plugging the pipe to prevent river water or wetland flow during construction. The solicitation opened on September 17, 2026 at 1:00 p.m. EDT and closes on October 16, 2026 at 10:00 a.m. EDT. A mandatory prebid meeting is scheduled for September 29, 2026 at 10:00 a.m. The vendor question period runs through October 7, 2026 at 12:00 p.m. EDT, with all inquiries to be submitted in writing to Phillip Ryan, Purchasing Agent. All vendors are eligible to respond; electronic bid submission is prohibited.

Payment terms are Net 30 Days upon approval by all Town boards. No estimated contract value is disclosed in the solicitation. Contractors are responsible for all site safety, utility protection, traffic control, erosion control, and regulatory compliance. CIPP lining must occur during dry weather and low river conditions, requiring contractors to monitor rainfall and river levels throughout installation, curing, and testing. Groundwater was observed 5 feet below grade, and contractors must identify and control infiltration. Access to the site utilizes existing points at Diversion Chamber C and the catch basin, and a non-operational sluice gate exists on the Chamber C structure that should not be relied upon. Supporting documents include drawings, specifications, a sign-in sheet, and Addendum 1.

View the file

Other files

File Type Posted
BID 2027-08_Nov_11_26_solicitation_doc.pdf PDF
2027-08 Inlet Pipe Modifications - WPCF - Specifications.pdf PDF
BID 2027-08_Nov_20_26_solicitation_doc.pdf PDF
BID 2027-08_Oct_27_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_13_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_3_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_10_26_solicitation_doc.pdf PDF
BID 2027-08_Sep_23_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_6_26_solicitation_doc.pdf PDF
2027-08 Addendum 1.pdf PDF
BID 2027-08_Nov_5_26_solicitation_doc.pdf PDF
BID 2027-08_Sep_30_26_solicitation_doc.pdf PDF
BID 2027-08_Oct_23_26_solicitation_doc.pdf PDF
BID 2027-08_Oct_6_26_solicitation_doc.pdf PDF
2027-08 Inlet Pipe Modifications - WPCF - Drawings.pdf PDF
BID 2027-08_Nov_24_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_19_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_4_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_18_26_solicitation_doc.pdf PDF
BID 2027-08_Sep_18_26_solicitation_doc.pdf PDF
BID 2027-08_Oct_15_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_17_26_solicitation_doc.pdf PDF
BID 2027-08_Oct_19_26_solicitation_doc.pdf PDF
BID 2027-08_Sep_22_26_solicitation_doc.pdf PDF
BID 2027-08_Sep_29_26_solicitation_doc.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: BID 2027-08

Diversion Chamber C Inlet Pipe Modifications -WPCF

Invitation to Bid (ITB)

Stratford, Town of

September 17, 2026 - October 16, 2026

Page:2

General Header Information

This bid has no questions defined.

BID 2027-08

No. BID 2027-08 Title: Diversion Chamber C Inlet Pipe Modifications -WPCF Start Date: September 17, 2026 at 1:00:00 PM EDT End Date: October 16, 2026 at 10:00:00 AM EDT Vendor Q&A Start Date: September 17, 2026 at 1:15:00 PM EDT Vendor Q&A End Date: October 07, 2026 at 12:00:00 PM EDT Estimated Total Value:

Who can respond to this bid? : All Vendors Description: Dewatering, cleaning, ground water control, CCTV, Cured-in-Place

(CIPP) lining of located on the Water Pollution Control Facility (WPCF).

Approximately 225 linear feet of 54-inch corrugated metal pipe (CMP) stormwater pipe. Approximately 105 linear feet of 12-inch reinforced concrete pipe (RCP) stormwater pipe. PREBID MEETING: 09/29/2026 -

10:00AM. ***DO NOT SUBMIT BIDS ELECTRONICALLY***

Delivery Terms: N/A: Not Applicable Payment Terms: Net 30 Days Payment Notes: Upon approval by all Town boards.

Contact Information: Stratford, Town of

Phillip Ryan, Purchasing Agent Email: pryan@townofstratford.com Submit all requests for information (RFI) to email address above.

Verbal communication will NOT be accepted.

Contact Details: If you have any questions, please contact:

Phillip Ryan, Purchasing Agent Email: pryan@townofstratford.com Submit all requests for information (RFI) to email address above.

Verbal communication will NOT be accepted.

Selected Categories:

Page:3

Documents:

2027-08 Inlet Pipe Modifications - WPCF - Drawings.pdf

2027-08 Inlet Pipe Modifications - WPCF - Specifications.pdf

2027-08 Sign-in Sheet.pdf

2027-08 Addendum 1.pdf

Page:4

Item Specifications Solicitation has been designated as having no line items.

Page:5

File details come from the government source that posted it. Updated .