About this file

This specifications document pertains to Inlet Pipe Modifications at the Water Pollution Control Facility (WPCF) Diversion Chamber C for the Town of Stratford, Connecticut under ITB 2027-08. The project encompasses dewatering, cleaning, groundwater control, CCTV inspection, and Cured-in-Place (CIPP) lining services for approximately 225 linear feet of 54-inch corrugated metal pipe (CMP) stormwater pipe and approximately 105 linear feet of 12-inch reinforced concrete pipe (RCP) stormwater pipe. The mandatory prebid meeting is scheduled for September 29, 2026 at 10:00 a.m. EDT, with bids due October 16, 2026 at 10:00 a.m. EDT. Physical bid submission only is permitted; electronic submission is prohibited. The scope includes removal and disposal of sediment (estimated 12-24 inches), retrieval of equipment stuck approximately 70 feet from the inlet, excavation of a buried 12-inch RCP inlet headwall, and plugging the pipe to prevent water infiltration during construction. CIPP lining must occur during dry weather and low river conditions, with the contractor responsible for monitoring rainfall and river levels throughout installation, curing, and testing. Groundwater was observed 5 feet below grade, requiring the contractor to identify and control infiltration.

The contractor bears full responsibility for site safety, utility protection, traffic control, erosion control, and regulatory compliance. Access utilizes existing points at Diversion Chamber C and the catch basin. A non-operational sluice gate exists on the Chamber C structure and should not be relied upon. All vendors are eligible for consideration. The vendor question period extends through October 7, 2026 at 12:00 p.m. EDT, with all inquiries submitted in writing to Phillip Ryan, Purchasing Agent at pryan@townofstratford.com. Payment terms are Net 30 Days upon approval by all Town boards. No contract value estimate is disclosed in the specifications.

View the file

Other files

File Type Posted
BID 2027-08_Nov_11_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_12_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_20_26_solicitation_doc.pdf PDF
BID 2027-08_Oct_27_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_13_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_3_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_10_26_solicitation_doc.pdf PDF
BID 2027-08_Sep_23_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_6_26_solicitation_doc.pdf PDF
2027-08 Addendum 1.pdf PDF
BID 2027-08_Nov_5_26_solicitation_doc.pdf PDF
BID 2027-08_Sep_30_26_solicitation_doc.pdf PDF
BID 2027-08_Oct_23_26_solicitation_doc.pdf PDF
BID 2027-08_Oct_6_26_solicitation_doc.pdf PDF
2027-08 Inlet Pipe Modifications - WPCF - Drawings.pdf PDF
BID 2027-08_Nov_24_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_19_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_4_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_18_26_solicitation_doc.pdf PDF
BID 2027-08_Sep_18_26_solicitation_doc.pdf PDF
BID 2027-08_Oct_15_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_17_26_solicitation_doc.pdf PDF
BID 2027-08_Oct_19_26_solicitation_doc.pdf PDF
BID 2027-08_Sep_22_26_solicitation_doc.pdf PDF
BID 2027-08_Sep_29_26_solicitation_doc.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .