2027-08 Inlet Pipe Modifications - WPCF - Drawings.pdf

PDF 2 MB Posted

Attached to
Diversion Chamber C Inlet Pipe Modifications -WPCF
Solicitation number
BID 2027-08
Issued by
Fairfield County, Connecticut

About this file

This is a set of design drawings for pipe modification work at the Town of Stratford Water Pollution Control Facility (WPCF) in Stratford, Connecticut, issued for bidding in September 2026. The project involves dewatering, cleaning, ground water control, CCTV inspection, and Cured-in-Place (CIPP) lining of approximately 225 linear feet of 54-inch corrugated metal pipe (CMP) stormwater pipe and approximately 105 linear feet of 12-inch reinforced concrete pipe (RCP) stormwater pipe located at Diversion Chamber C. The work scope includes removal and disposal of sediment (estimated 12-24 inches) from the existing pipe, retrieval of a jetter and cable stuck approximately 70 feet from the Diversion Chamber C inlet, identification and excavation of a buried 12-inch RCP inlet headwall, and proper plugging of the pipe to prevent river water or wetland flow from entering during construction. A prebid meeting is scheduled for September 29, 2026, at 10:00 AM. Contractor access will utilize existing access points at Diversion Chamber C and the catch basin for liner insertion and termination.

The lining work must occur during dry weather and low river conditions, with the contractor responsible for monitoring rainfall and river levels throughout installation, curing, and testing phases. The contractor is responsible for all site safety, utility support and protection, traffic control, erosion control protocols, and compliance with applicable local, state, and federal regulations. Ground water was observed 5 feet below grade, and the contractor must identify and control groundwater infiltration that may interfere with installation or curing. All construction-related waste materials and debris must be removed and disposed of in accordance with applicable regulations. The drawings note that a non-operational sluice gate exists on the Chamber C structure and should not be relied upon for work execution. Electronic bid submission is prohibited.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

105 BEACON

POINT ROAD

TOWN OF STRATFORD, CONNECTICUT

DIVERSION CHAMBER C - INLET PIPE MODIFICATIONS

TOWN OF STRATFORD WATER POLLUTION

CONTROL AUTHORITY

ISSUED FOR BIDDING

SEPTEMBER 2026

SITE LOCATION MAP

SCALE: 1" = 250'

PREPARED BY:

Pl ot te d

O n:

S ep

6, 6- 1:

pm

B y:

T Th at ch er La st S av ed

9/

/2

Ti gh e

B on d:

J

S \S

S tr at fo rd \0

W

PC

F

S to rm w at er

S tu dy \D ra w in gs

\A ut oC A D

\P ip e Li ni ng

\S he et \S

-0

A -C

-0

-C O

V R .d w g

COMPLETE SET 4 SHEETS

PREPARED FOR:

TOWN OF STRATFORD

PRASHANTH EMMANUEL, PE MILES MOFFATT, PE, BCEE

1000 Bridgeport Avenue Suite 320 Shelton, CT 06484 T 203.712.1100

LIST OF DRAWINGS

SHEET NO. DRAWING NO. DRAWING TITLE

GENERAL

1 G-001 COVER SHEET

2 C-001 GENERAL NOTES, LEGEND AND ABBREVIATIONS

CIVIL

3 C-101 PIPE LINING PLAN

4 C-201 MISCELLANEOUS EXISTING STRUCTURES

09/16/2026

09/17/2026

C-001

GENERAL NOTES, LEGEND

AND ABBREVIATIONS

M.SANSONE

AS SHOWNSCALE:

FILE:

DATE:

PROJECT NO:

MARK DATE DESCRIPTION

S1924-053A-C-001-GENR.dwg

SEPTEMBER 2026

S1924-053A

CHECKED BY:

DRAWN BY:

APPROVED BY:

DESIGNED BY:

Pl ot te d

O n:

S ep

6, 6- 1:

pm

B y:

T Th at ch er La st S av ed

8/

/2

Ti gh e

B on d:

J

S \S

S tr at fo rd \0

W

PC

F

S to rm w at er

S tu dy \D ra w in gs

\A ut oC A D

\P ip e Li ni ng

\S he et \S

-0

A -C

-0

-G

EN

R .d w g

1000 Bridgeport Avenue Suite 320 Shelton, CT 06484 T 203.712.1100

Stratford, Connecticut

Diversion Chamber C - Inlet Pipe Modifications

M.MOFFATT

ISSUED FOR

BID

Town of Stratford Water Pollution Control Facility

EXISTING PROPOSEDDESCRIPTION

ABBREVIATIONS

ABDN('D) ABANDON(ED)

AC ASBESTOS CEMENT PIPE

BC BITUMINOUS CURB

BFP BACKFLOW PREVENTOR

BIT BITUMINOUS

BL BASELINE

BLDG BUILDING

BND BOUND

BOC BOTTOM OF CURB

BOT BOTTOM

BS BOTTOM OF STEP

BW BOTTOM OF WALL

CATV CABLE TELEVISION

CB CATCH BASIN

CCW CEMENT CONCRETE WALK

CEM CEMENT

CI CAST IRON PIPE

CL CENTERLINE

CLF CHAIN LINK FENCE

CO CLEAN OUT

CONC CONCRETE

CMP CORRUGATED METAL PIPE

CPP CORRUGATED

POLYETHYLENE PIPE

CY CUBIC YARD

DH DRILL HOLE

DI DUCTILE IRON PIPE

DIA DIAMETER

DMH DRAIN MANHOLE

E EAST

EF EACH FACE

EG EXISTING GRADE

EL/ELEV ELEVATION

ELEC ELECTRIC

EMH ELECTRIC MANHOLE

EOP EDGE OF PAVEMENT

EW EACH WAY

EXIST EXISTING

FES FLARED END SECTION

FF FINISH FLOOR

FM FORCE MAIN

G GAS

GG GAS GATE

GRAN GRANITE

HC HANDICAP

HDPE HIGH DENSITY

POLYETHYLENE

HMA HOT MIX ASPHALT

HYD HYDRANT

IN INCHES

INV INVERT

IP IRON PIN

L LENGTH OF CURB

LP LIGHT POLE

LT LEFT

MAX MAXIMUM

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MON MONUMENT

MJ MECHANICAL JOINT

PROPERTY LINE

PROPERTY LINE ADJACENT

RIGHT-OF-WAY LINE

EASEMENT LINE

INTERMEDIATE CONTOURS

INDEX CONTOURS

SPOT GRADE

MAGNITUDE & DIRECTION OF SLOPE

STORM DRAIN

STORM UNDERDRAIN

GZA WALL UNDERDRAIN

GZA WALL PILING

GRAVITY SANITARY SEWER

SANITARY SEWER FORCE MAIN

SANITARY SEWER LOW PRESSURE

SANITARY SEWER COMBINED

WATER SERVICE

PLANT WATER

FIRE SERVICE

HIGH PRESSURE FIRE SERVICE

UNDERGROUND ELECTRIC

PRIMARY ELECTRIC SERVICE

SECONDARY ELECTRIC

OVERHEAD ELECTRIC

TELEPHONE SERVICE

TEL-DATA SERVICE

COMMUNICATIONS SERVICE

CABLE TV SERVICE

GAS SERVICE

HOT WATER RETURN

HOT WATER SUPPLY

STEAM CONDENSATE

LOW PRESSURE STEAM

MEDIUM PRESSURE STEAM

HIGH PRESSURE STEAM

OXYGEN SERVICE

OVERHEAD UTILITY (UNSPECIFIED)

CURB

EDGE OF PAVEMENT

DIRT ROAD

SIDEWALK

RETAINING WALL

STONE WALL

FENCE - UNSPECIFIED

FENCE - CHAIN LINK

FENCE - WOOD POST

GUARDRAIL

METAL BEAM RAIL

TRAIN TRACKS

STORM DRAIN STRUCTURES

SANITARY SEWER STRUCTURES

WATER SERVICE STRUCTURES

GAS SERVICE STRUCTURES

ELECTRIC SERVICE STRUCTURES

TELECOMMUNICATIONS MANHOLE

TREELINE

TREE

SD

SS SS

UD

SFM

SSLP

COMB

W W

PW PW

F F

F-HP F-HP

E E

PE PE

SE SE

OE OE

T-D T-D

T-C T-C

CTV CTV

G G

HWR HWR

HWS HWS

C C

LPS LPS

MPS MPS

HPS HPS

O O

X X X

0.0%

AREA

DRAIN

MANHOLE CATCH

BASIN

D

S

HYDRANT MANHOLE VALVE

T

W

MANHOLE VALVEG

UTILITY CO.

POLE #

MANHOLE E LIGHT

EVERGREEN DECIDUOUS

RESOURCE AREAS

VEGETATED WETLAND LIMIT

TOP OF BANK

MEAN ANNUAL HIGH WATER

LAND SUBJECT TO FLOODING

100-FOOT BUFFER ZONE

200-FOOT RIVERFRONT AREA

LOCAL RESOURCE AREA

LOCAL BUFFER ZONE - 1

LOCAL BUFFER ZONE - 2

WETLAND DELINEATION

WETLANDS WATER COURSE

WETLAND FLAG

MEAN HIGH TIDE LINE

COASTAL JURISDICTION LINE

ABBREVIATIONS CONT'D

N NORTH

NITC NOT IN THIS CONTRACT

NTS NOT TO SCALE

N/A NOT APPLICABLE

N/F NOW OR FORMERLY

OC ON CENTER

OCS OUTLET CONTROL STRUCTURE

OH OVERHEAD

PB PLANT BED

PC POINT OF CURVATURE

PCC POINT OF COMPOUND

CURVATURE

PCPP PERFORATED CORRUGATED

POLYETHYLENE PIPE

PERF PERFORATED

PI POINT OF INTERSECTION

PRC POINT OF REVERSE CURVATURE

PROT PROTECT

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT POINT OF TANGENCY

PVC POLYVINYL CHLORIDE

PVMT PAVEMENT

R RADIUS

RCP REINFORCED CONCRETE PIPE

RD ROOF DRAIN

REV REVISION

ROW RIGHT OF WAY

RT RIGHT

R&D REMOVE AND DISPOSE

R&R REMOVE AND RESET

R&S REMOVE AND STACK

S SOUTH

SAN SANITARY

SCH SCHEDULE

SF SQUARE FOOT

SMH SEWER MANHOLE

SS STAINLESS STEEL

STA STATION

STL STEEL

STRM STORM

T TANGENT LENGTH

TC TOP OF CURB

TEL TEL-DATA

TP TEST PIT

TS TOP OF STEP

TW TOP OF WALL

TYP TYPICAL

UP UTILITY POLE

W WATER

WG WATER GATE

WV WATER VALVE

XFMR TRANSFORMER

LEGEND

LEGEND

32.0

T T

GENERAL NOTES

1. NOTIFY "CALL BEFORE YOU DIG" AT 1-800-922-4455 AND OTHER UTILITY OWNERS IN THE AREA NOT ON THE "CALL BEFORE YOU DIG" LIST AT LEAST 72 HOURS PRIOR TO ANY DIGGING, TRENCHING, ROCK REMOVAL, DEMOLITION, BORING, BACKFILLING, GRADING, LANDSCAPING, OR ANY OTHER

EARTH MOVING OPERATIONS.

2. REFERENCE IS MADE TO SURVEY ENTITLED "PROPERTY SURVEY OF 105 BEACON POINT ROAD, STRATFORD, CONNECTICUT; PREPARED FOR STRATFORD WPCA" PREPARED BY ACCURATE LAND SURVEYING LLC, DATED AUGUST 26, 2024 AND 1974 HURRICANE DIKE PROJECT.

3. EXISTING CONDITIONS ARE BASED IN PART ON AN AS-BUILT PLAN PREPARED BY CDM CAMP DRESSER & MCKEE INC., DATED MARCH 2006.

ELEVATIONS IN FEET CORRESPOND TO NGVD29+100'. NAVD88=NGVD29-1.1'.

4. THE CONTRACTOR IS RESPONSIBLE FOR SUPPORT OF EXISTING UTILITIES AND REPAIR OR REPLACEMENT COSTS OF UTILITIES DAMAGED DURING CONSTRUCTION, WHETHER ABOVE OR BELOW GRADE. REPLACE DAMAGED UTILITIES IMMEDIATELY AT NO ADDITIONAL COST TO THE OWNER.

5. NOT ALL OF THE UTILITY SERVICES TO BUILDINGS ARE SHOWN. THE CONTRACTOR SHALL ANTICIPATE THAT EACH PROPERTY HAS SERVICE

CONNECTIONS FOR THE VARIOUS UTILITIES.

6. BOLD TEXT AND LINES INDICATE PROPOSED WORK. LIGHT TEXT AND LINES INDICATE APPROXIMATE EXISTING CONDITIONS.

7. TIGHE & BOND ASSUMES NO RESPONSIBILITY FOR ANY ISSUES, LEGAL OR OTHERWISE, RESULTING FROM CHANGES MADE TO THESE DRAWINGS

WITHOUT WRITTEN AUTHORIZATION FROM TIGHE & BOND.

8. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR SITE SAFETY, COORDINATION WITH THE OWNER, SUBCONTRACTORS, AND OTHER CONTRACTORS WORKING WITHIN THE LIMITS OF WORK, AND THE MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES OF CONSTRUCTION.

9. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO CONSTRUCTION. IF FIELD CONDITIONS ARE OBSERVED THAT VARY SIGNIFICANTLY FROM THOSE SHOWN ON THE DRAWINGS, IMMEDIATELY NOTIFY THE ENGINEER IN WRITING FOR RESOLUTION OF THE CONFLICTING INFORMATION.

10. PROTECT AND MAINTAIN ALL UTILITIES IN THE AREAS UNDER CONSTRUCTION DURING THE WORK. LEAVE ALL PIPES AND STRUCTURES WITHIN THE LIMITS OF THE CONTRACT IN A CLEAN AND OPERABLE CONDITION AT THE COMPLETION OF THE WORK. TAKE ALL NECESSARY PRECAUTIONS TO

PREVENT SAND AND SILT FROM DISTURBED AREAS FROM ENTERING THE DRAINAGE SYSTEM.

11. NOTIFY THE ENGINEER IN WRITING OF ANY CONFLICT, ERROR, AMBIGUITY, OR DISCREPANCY WITH THE PLANS OR BETWEEN THE PLANS AND ANY APPLICABLE LAW, REGULATION, CODE, STANDARD SPECIFICATION, OR MANUFACTURER'S INSTRUCTIONS.

12. EXCAVATE WITH EQUIPMENT SELECTED TO MINIMIZE DAMAGE TO EXISTING UTILITIES OR OTHER FACILITIES. HAND EXCAVATE AS NECESSARY TO

LOCATE UTILITIES AND AVOID DAMAGE.

13. TAKE NECESSARY MEASURES AND PROVIDE CONTINUOUS BARRIERS OF SUFFICIENT TYPE, SIZE, AND STRENGTH TO PREVENT ACCESS TO ALL WORK

AND STAGING AREAS AT THE COMPLETION OF EACH DAY'S WORK.

14. NO OPEN TRENCHES WILL BE ALLOWED OVERNIGHT. THE USE OF ROAD PLATES TO PROTECT THE EXCAVATION WILL BE CONSIDERED UPON REQUEST, BUT BACKFILLING IS PREFERRED.

15. THE CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY TRAFFIC CONTROL/SAFETY DEVICES TO ENSURE SAFE VEHICULAR AND PEDESTRIAN ACCESS THROUGH THE WORK AREA, OR FOR SAFELY IMPLEMENTING DETOURS AROUND THE WORK AREA. PERFORM TRAFFIC CONTROL IN ACCORDANCE WITH

THE CONTRACTOR'S APPROVED TRAFFIC CONTROL PLAN.

16. MAINTAIN EMERGENCY ACCESS TO ALL PROPERTIES WITHIN THE PROJECT AREA AT ALL TIMES DURING CONSTRUCTION.

17. REMOVE AND DISPOSE OF ALL CONSTRUCTION-RELATED WASTE MATERIALS AND DEBRIS IN STRICT ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL LAWS.

18. THE TERM "DEMOLISH" USED ON THE DRAWINGS MEANS TO REMOVE AND DISPOSE OF IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL

REQUIREMENTS.

19. THE TERM "ABANDON" USED ON THE DRAWINGS MEANS TO LEAVE IN PLACE AND TAKE APPROPRIATE MEASURES TO DECOMMISSION AS SPECIFIED

OR NOTED ON THE DRAWINGS.

20. ALL PROPOSED WORK MAY BE ADJUSTED IN THE FIELD BY THE OWNER'S PROJECT REPRESENTATIVE TO MEET EXISTING CONDITIONS.

21. CONTRACTOR TO ENSURE ALL SOIL AND EROSION PROTOCOLS AS LISTED IN WATER POLLUTION CONTROL FACILITY STRATFORD, CONNECTICUT FLOOD PROTECTION SYSTEM IMPROVEMENTS, 100% DESIGN DRAWINGS, JULY 2024 ARE FOLLOWED DURING LINING WORK.

T.SCHWARTZ

P. EMMANUEL

W W

W W

C-101

PIPE LINING

PLAN

1" = 20'SCALE:

FILE:

DATE:

PROJECT NO:

MARK DATE DESCRIPTION

S1924-053A-C-101-PIPE.dwg

SEPTEMBER 2026

S1924-053A

CHECKED BY:

DRAWN BY:

APPROVED BY:

DESIGNED BY:

Pl ot te d

O n:

S ep

6, 6- 1:

pm

B y:

T Th at ch er La st S av ed

9/

/2

Ti gh e

B on d:

J

S \S

S tr at fo rd \0

W

PC

F

S to rm w at er

S tu dy \D ra w in gs

\A ut oC A D

\P ip e Li ni ng

\S he et \S

-0

A -C

-1

-P

IP

E.

dw g

1000 Bridgeport Avenue Suite 320 Shelton, CT 06484 T 203.712.1100

Stratford, Connecticut

Diversion Chamber C - Inlet Pipe Modifications

M.MOFFATT

ISSUED FOR

BID

Town of Stratford Water Pollution Control Facility

00 20' 40'

SCALE: 1" = 20'

N

NORTH ROAD

PIPE LINING PLAN LEGEND:

PROPERTY LINE -

LINE EXISTING 54" CMP

CONTINUOUSLY FROM

DIV CHAMBER C TO

TYPE "C-L" CATCH BASIN

EXISTING

TYPE "C-L" CB

TOP OF PIPE=1.6

INV=-2.9

PIPE LINING PLAN NOTES:

1. THE 1974 DRAWING SHOWS THE DIVERSION C INLET PIPE AS 54-INCH CMP.

2. LINING WORK FOR THIS PROJECT WILL BE FROM CATCH BASIN TO DIVERSION CHAMBER C STRUCTURE.

3. CONTRACTOR TO USE EXISTING ACCESS POINTS (DIVERSION CHAMBER C AND CATCH BASIN) FOR INSERTION AND

TERMINATION OF THE LINER.

4. CONTRACTOR TO NOTE THAT GROUND WATER WAS OBSERVED 5-FEET BELOW GRADE. THE CONTRACTOR SHALL IDENTIFY AND CONTROL GROUNDWATER INFILTRATION THAT MAY INTERFERE WITH INSTALLATION OR CURING OF THE CIPP WORK.

5. LINING WORK WILL NEED TO OCCUR DURING DRY WEATHER AND LOW RIVER CONDITIONS. CONTRACTOR SHALL MONITOR RAINFALL, RIVER LEVELS FOR THE DURATION OF THE LINING WORK (INSTALL, CURING AND TESTING) TO MINIMIZE THE

NEED FOR DIVERTING THE INLAND WETLAND FLOW INTO THE EFFLUENT PUMP STATION.

6. CONTRACTOR SHALL PLUG PIPE TO ENSURE RIVER WATER OR WETLAND FLOW WILL NOT ENTER THE CHAMBER C PIPE

DURING THE CIPP WORK.

7. EXISTING DRAWINGS SHOW A SLUICE GATE ON THE CHAMBER C STRUCTURE. THIS GATE IS NOT OPERATIONAL AND

CONTRACTOR SHALL NOT RELY ON THIS FOR CIPP WORK.

8. REFER TO SHEET C-201 FOR ADDITIONAL VIEWS OF DIVERSION CHAMBER C, CATCH BASIN & MANHOLE STRUCTURE

9. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION

10. THE 54" LINE IS ANTICIPATED TO HAVE APPROXIMATELY 12- 24 INCHES OF SEDIMENT. CONTRACTOR TO REMOVE AND

DISPOSE SEDIMENT ACCORDINGLY PRIOR TO CIPP WORK.

11. THE 12" RCP INLET HEADWALL IS BURIED AND CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING AND EXCAVATING THE

INLET PRIOR TO CLEANING, CCTV AND LINING WORK.

M.SANSONE

R. RICHARDSON

P. EMMANUEL

91.5'

DIVERSION CHAMBER "C'

54 INCH CMP PIPE

INV=-3.85

EXISTING MANHOLE

TF = 9.33 (APPROX)

120.5'

LINE EXISTING 54" CMP

SEE NOTE "6"

SEE NOTE "6"

LOCATE ENTRANCE DURING CLEANING

AND EXCAVATE AND MARK-OUT

LINE EXISTING 12" RCP

2'±

70'±

BASED ON TIDAL RIVER LEVELS,

RIVER WATER ENTERS DIV.CHAMBER C.

(SEE NOTE 6)

WETLAND FLOW

(SEE NOTE 6)

TOWN'S JETTER IS STUCK APPROXIMATELY 70 FEET

FROM DIV CHAMBER C INLET.

CONTRACTOR TO RETRIEVE JETTER/CABLE

AND HAND OVER TO TOWN

C-201

MISCELLANEOUS

EXISTING STRUCTURES

AS SHOWNSCALE:

FILE:

DATE:

PROJECT NO:

MARK DATE DESCRIPTION

S1924-053A-C-201-DETL.dwg

SEPTEMBER 2026

S1924-053A

CHECKED BY:

DRAWN BY:

APPROVED BY:

DESIGNED BY:

Pl ot te d

O n:

S ep

6, 6- 1:

pm

B y:

T Th at ch er La st S av ed

9/

/2

Ti gh e

B on d:

J

S \S

S tr at fo rd \0

W

PC

F

S to rm w at er

S tu dy \D ra w in gs

\A ut oC A D

\P ip e Li ni ng

\S he et \S

-0

A -C

-2

-D

ET

L.

dw g

1000 Bridgeport Avenue Suite 320 Shelton, CT 06484 T 203.712.1100

Stratford, Connecticut

Diversion Chamber C - Inlet Pipe Modifications

M.MOFFATT

ISSUED FOR

BID

Town of Stratford Water Pollution Control Facility

NOTES

1. THE EXISTING STRUCTURES WERE OBTAINED FROM THE 1974 DWGS. CONTRACTOR TO

CONFIRM OPENINGS OF THE EXISITING STRUCTURES MATCH ACTUAL CONDITION AND

MODIFICTIONS OF THESE STRUCTURES ARE NOT ANTICIPATED FOR THE CIPP WORK.

DETAIL-

- NO SCALE

FRAME AND GRATE FOR TIDAL STRUCTURE

DETAIL-

- NO SCALE

MANHOLE

DETAIL-

- NO SCALE

MANHOLE FRAME AND COVER

M.SANSONE

R. RICHARDSON

P. EMMANUEL

DETAIL-

- NO SCALE

TYPE "C-L" CATCH BASIN

DETAIL-

- NO SCALE

DIVERSION CHAMBER C

File details come from the government source that posted it. Updated .