This is a set of design drawings for pipe modification work at the Town of Stratford Water Pollution Control Facility (WPCF) in Stratford, Connecticut, issued for bidding in September 2026. The project involves dewatering, cleaning, ground water control, CCTV inspection, and Cured-in-Place (CIPP) lining of approximately 225 linear feet of 54-inch corrugated metal pipe (CMP) stormwater pipe and approximately 105 linear feet of 12-inch reinforced concrete pipe (RCP) stormwater pipe located at Diversion Chamber C. The work scope includes removal and disposal of sediment (estimated 12-24 inches) from the existing pipe, retrieval of a jetter and cable stuck approximately 70 feet from the Diversion Chamber C inlet, identification and excavation of a buried 12-inch RCP inlet headwall, and proper plugging of the pipe to prevent river water or wetland flow from entering during construction. A prebid meeting is scheduled for September 29, 2026, at 10:00 AM. Contractor access will utilize existing access points at Diversion Chamber C and the catch basin for liner insertion and termination.
The lining work must occur during dry weather and low river conditions, with the contractor responsible for monitoring rainfall and river levels throughout installation, curing, and testing phases. The contractor is responsible for all site safety, utility support and protection, traffic control, erosion control protocols, and compliance with applicable local, state, and federal regulations. Ground water was observed 5 feet below grade, and the contractor must identify and control groundwater infiltration that may interfere with installation or curing. All construction-related waste materials and debris must be removed and disposed of in accordance with applicable regulations. The drawings note that a non-operational sluice gate exists on the Chamber C structure and should not be relied upon for work execution. Electronic bid submission is prohibited.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
105 BEACON
POINT ROAD
TOWN OF STRATFORD, CONNECTICUT
DIVERSION CHAMBER C - INLET PIPE MODIFICATIONS
TOWN OF STRATFORD WATER POLLUTION
CONTROL AUTHORITY
ISSUED FOR BIDDING
SEPTEMBER 2026
SITE LOCATION MAP
SCALE: 1" = 250'
PREPARED BY:
Pl ot te d
O n:
S ep
6, 6- 1:
pm
B y:
T Th at ch er La st S av ed
9/
/2
Ti gh e
B on d:
J
S \S
S tr at fo rd \0
W
PC
F
S to rm w at er
S tu dy \D ra w in gs
\A ut oC A D
\P ip e Li ni ng
\S he et \S
-0
A -C
-0
-C O
V R .d w g
COMPLETE SET 4 SHEETS
PREPARED FOR:
TOWN OF STRATFORD
PRASHANTH EMMANUEL, PE MILES MOFFATT, PE, BCEE
1000 Bridgeport Avenue Suite 320 Shelton, CT 06484 T 203.712.1100
LIST OF DRAWINGS
SHEET NO. DRAWING NO. DRAWING TITLE
GENERAL
1 G-001 COVER SHEET
2 C-001 GENERAL NOTES, LEGEND AND ABBREVIATIONS
CIVIL
3 C-101 PIPE LINING PLAN
4 C-201 MISCELLANEOUS EXISTING STRUCTURES
09/16/2026
09/17/2026
C-001
GENERAL NOTES, LEGEND
AND ABBREVIATIONS
M.SANSONE
AS SHOWNSCALE:
FILE:
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
S1924-053A-C-001-GENR.dwg
SEPTEMBER 2026
S1924-053A
CHECKED BY:
DRAWN BY:
APPROVED BY:
DESIGNED BY:
Pl ot te d
O n:
S ep
6, 6- 1:
pm
B y:
T Th at ch er La st S av ed
8/
/2
Ti gh e
B on d:
J
S \S
S tr at fo rd \0
W
PC
F
S to rm w at er
S tu dy \D ra w in gs
\A ut oC A D
\P ip e Li ni ng
\S he et \S
-0
A -C
-0
-G
EN
R .d w g
1000 Bridgeport Avenue Suite 320 Shelton, CT 06484 T 203.712.1100
Stratford, Connecticut
Diversion Chamber C - Inlet Pipe Modifications
M.MOFFATT
ISSUED FOR
BID
Town of Stratford Water Pollution Control Facility
EXISTING PROPOSEDDESCRIPTION
ABBREVIATIONS
ABDN('D) ABANDON(ED)
AC ASBESTOS CEMENT PIPE
BC BITUMINOUS CURB
BFP BACKFLOW PREVENTOR
BIT BITUMINOUS
BL BASELINE
BLDG BUILDING
BND BOUND
BOC BOTTOM OF CURB
BOT BOTTOM
BS BOTTOM OF STEP
BW BOTTOM OF WALL
CATV CABLE TELEVISION
CB CATCH BASIN
CCW CEMENT CONCRETE WALK
CEM CEMENT
CI CAST IRON PIPE
CL CENTERLINE
CLF CHAIN LINK FENCE
CO CLEAN OUT
CONC CONCRETE
CMP CORRUGATED METAL PIPE
CPP CORRUGATED
POLYETHYLENE PIPE
CY CUBIC YARD
DH DRILL HOLE
DI DUCTILE IRON PIPE
DIA DIAMETER
DMH DRAIN MANHOLE
E EAST
EF EACH FACE
EG EXISTING GRADE
EL/ELEV ELEVATION
ELEC ELECTRIC
EMH ELECTRIC MANHOLE
EOP EDGE OF PAVEMENT
EW EACH WAY
EXIST EXISTING
FES FLARED END SECTION
FF FINISH FLOOR
FM FORCE MAIN
G GAS
GG GAS GATE
GRAN GRANITE
HC HANDICAP
HDPE HIGH DENSITY
POLYETHYLENE
HMA HOT MIX ASPHALT
HYD HYDRANT
IN INCHES
INV INVERT
IP IRON PIN
L LENGTH OF CURB
LP LIGHT POLE
LT LEFT
MAX MAXIMUM
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MON MONUMENT
MJ MECHANICAL JOINT
PROPERTY LINE
PROPERTY LINE ADJACENT
RIGHT-OF-WAY LINE
EASEMENT LINE
INTERMEDIATE CONTOURS
INDEX CONTOURS
SPOT GRADE
MAGNITUDE & DIRECTION OF SLOPE
STORM DRAIN
STORM UNDERDRAIN
GZA WALL UNDERDRAIN
GZA WALL PILING
GRAVITY SANITARY SEWER
SANITARY SEWER FORCE MAIN
SANITARY SEWER LOW PRESSURE
SANITARY SEWER COMBINED
WATER SERVICE
PLANT WATER
FIRE SERVICE
HIGH PRESSURE FIRE SERVICE
UNDERGROUND ELECTRIC
PRIMARY ELECTRIC SERVICE
SECONDARY ELECTRIC
OVERHEAD ELECTRIC
TELEPHONE SERVICE
TEL-DATA SERVICE
COMMUNICATIONS SERVICE
CABLE TV SERVICE
GAS SERVICE
HOT WATER RETURN
HOT WATER SUPPLY
STEAM CONDENSATE
LOW PRESSURE STEAM
MEDIUM PRESSURE STEAM
HIGH PRESSURE STEAM
OXYGEN SERVICE
OVERHEAD UTILITY (UNSPECIFIED)
CURB
EDGE OF PAVEMENT
DIRT ROAD
SIDEWALK
RETAINING WALL
STONE WALL
FENCE - UNSPECIFIED
FENCE - CHAIN LINK
FENCE - WOOD POST
GUARDRAIL
METAL BEAM RAIL
TRAIN TRACKS
STORM DRAIN STRUCTURES
SANITARY SEWER STRUCTURES
WATER SERVICE STRUCTURES
GAS SERVICE STRUCTURES
ELECTRIC SERVICE STRUCTURES
TELECOMMUNICATIONS MANHOLE
TREELINE
TREE
SD
SS SS
UD
SFM
SSLP
COMB
W W
PW PW
F F
F-HP F-HP
E E
PE PE
SE SE
OE OE
T-D T-D
T-C T-C
CTV CTV
G G
HWR HWR
HWS HWS
C C
LPS LPS
MPS MPS
HPS HPS
O O
X X X
0.0%
AREA
DRAIN
MANHOLE CATCH
BASIN
D
S
HYDRANT MANHOLE VALVE
T
W
MANHOLE VALVEG
UTILITY CO.
POLE #
MANHOLE E LIGHT
EVERGREEN DECIDUOUS
RESOURCE AREAS
VEGETATED WETLAND LIMIT
TOP OF BANK
MEAN ANNUAL HIGH WATER
LAND SUBJECT TO FLOODING
100-FOOT BUFFER ZONE
200-FOOT RIVERFRONT AREA
LOCAL RESOURCE AREA
LOCAL BUFFER ZONE - 1
LOCAL BUFFER ZONE - 2
WETLAND DELINEATION
WETLANDS WATER COURSE
WETLAND FLAG
MEAN HIGH TIDE LINE
COASTAL JURISDICTION LINE
ABBREVIATIONS CONT'D
N NORTH
NITC NOT IN THIS CONTRACT
NTS NOT TO SCALE
N/A NOT APPLICABLE
N/F NOW OR FORMERLY
OC ON CENTER
OCS OUTLET CONTROL STRUCTURE
OH OVERHEAD
PB PLANT BED
PC POINT OF CURVATURE
PCC POINT OF COMPOUND
CURVATURE
PCPP PERFORATED CORRUGATED
POLYETHYLENE PIPE
PERF PERFORATED
PI POINT OF INTERSECTION
PRC POINT OF REVERSE CURVATURE
PROT PROTECT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT OF TANGENCY
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
R RADIUS
RCP REINFORCED CONCRETE PIPE
RD ROOF DRAIN
REV REVISION
ROW RIGHT OF WAY
RT RIGHT
R&D REMOVE AND DISPOSE
R&R REMOVE AND RESET
R&S REMOVE AND STACK
S SOUTH
SAN SANITARY
SCH SCHEDULE
SF SQUARE FOOT
SMH SEWER MANHOLE
SS STAINLESS STEEL
STA STATION
STL STEEL
STRM STORM
T TANGENT LENGTH
TC TOP OF CURB
TEL TEL-DATA
TP TEST PIT
TS TOP OF STEP
TW TOP OF WALL
TYP TYPICAL
UP UTILITY POLE
W WATER
WG WATER GATE
WV WATER VALVE
XFMR TRANSFORMER
LEGEND
LEGEND
32.0
T T
GENERAL NOTES
1. NOTIFY "CALL BEFORE YOU DIG" AT 1-800-922-4455 AND OTHER UTILITY OWNERS IN THE AREA NOT ON THE "CALL BEFORE YOU DIG" LIST AT LEAST 72 HOURS PRIOR TO ANY DIGGING, TRENCHING, ROCK REMOVAL, DEMOLITION, BORING, BACKFILLING, GRADING, LANDSCAPING, OR ANY OTHER
EARTH MOVING OPERATIONS.
2. REFERENCE IS MADE TO SURVEY ENTITLED "PROPERTY SURVEY OF 105 BEACON POINT ROAD, STRATFORD, CONNECTICUT; PREPARED FOR STRATFORD WPCA" PREPARED BY ACCURATE LAND SURVEYING LLC, DATED AUGUST 26, 2024 AND 1974 HURRICANE DIKE PROJECT.
3. EXISTING CONDITIONS ARE BASED IN PART ON AN AS-BUILT PLAN PREPARED BY CDM CAMP DRESSER & MCKEE INC., DATED MARCH 2006.
ELEVATIONS IN FEET CORRESPOND TO NGVD29+100'. NAVD88=NGVD29-1.1'.
4. THE CONTRACTOR IS RESPONSIBLE FOR SUPPORT OF EXISTING UTILITIES AND REPAIR OR REPLACEMENT COSTS OF UTILITIES DAMAGED DURING CONSTRUCTION, WHETHER ABOVE OR BELOW GRADE. REPLACE DAMAGED UTILITIES IMMEDIATELY AT NO ADDITIONAL COST TO THE OWNER.
5. NOT ALL OF THE UTILITY SERVICES TO BUILDINGS ARE SHOWN. THE CONTRACTOR SHALL ANTICIPATE THAT EACH PROPERTY HAS SERVICE
CONNECTIONS FOR THE VARIOUS UTILITIES.
6. BOLD TEXT AND LINES INDICATE PROPOSED WORK. LIGHT TEXT AND LINES INDICATE APPROXIMATE EXISTING CONDITIONS.
7. TIGHE & BOND ASSUMES NO RESPONSIBILITY FOR ANY ISSUES, LEGAL OR OTHERWISE, RESULTING FROM CHANGES MADE TO THESE DRAWINGS
WITHOUT WRITTEN AUTHORIZATION FROM TIGHE & BOND.
8. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR SITE SAFETY, COORDINATION WITH THE OWNER, SUBCONTRACTORS, AND OTHER CONTRACTORS WORKING WITHIN THE LIMITS OF WORK, AND THE MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES OF CONSTRUCTION.
9. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO CONSTRUCTION. IF FIELD CONDITIONS ARE OBSERVED THAT VARY SIGNIFICANTLY FROM THOSE SHOWN ON THE DRAWINGS, IMMEDIATELY NOTIFY THE ENGINEER IN WRITING FOR RESOLUTION OF THE CONFLICTING INFORMATION.
10. PROTECT AND MAINTAIN ALL UTILITIES IN THE AREAS UNDER CONSTRUCTION DURING THE WORK. LEAVE ALL PIPES AND STRUCTURES WITHIN THE LIMITS OF THE CONTRACT IN A CLEAN AND OPERABLE CONDITION AT THE COMPLETION OF THE WORK. TAKE ALL NECESSARY PRECAUTIONS TO
PREVENT SAND AND SILT FROM DISTURBED AREAS FROM ENTERING THE DRAINAGE SYSTEM.
11. NOTIFY THE ENGINEER IN WRITING OF ANY CONFLICT, ERROR, AMBIGUITY, OR DISCREPANCY WITH THE PLANS OR BETWEEN THE PLANS AND ANY APPLICABLE LAW, REGULATION, CODE, STANDARD SPECIFICATION, OR MANUFACTURER'S INSTRUCTIONS.
12. EXCAVATE WITH EQUIPMENT SELECTED TO MINIMIZE DAMAGE TO EXISTING UTILITIES OR OTHER FACILITIES. HAND EXCAVATE AS NECESSARY TO
LOCATE UTILITIES AND AVOID DAMAGE.
13. TAKE NECESSARY MEASURES AND PROVIDE CONTINUOUS BARRIERS OF SUFFICIENT TYPE, SIZE, AND STRENGTH TO PREVENT ACCESS TO ALL WORK
AND STAGING AREAS AT THE COMPLETION OF EACH DAY'S WORK.
14. NO OPEN TRENCHES WILL BE ALLOWED OVERNIGHT. THE USE OF ROAD PLATES TO PROTECT THE EXCAVATION WILL BE CONSIDERED UPON REQUEST, BUT BACKFILLING IS PREFERRED.
15. THE CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY TRAFFIC CONTROL/SAFETY DEVICES TO ENSURE SAFE VEHICULAR AND PEDESTRIAN ACCESS THROUGH THE WORK AREA, OR FOR SAFELY IMPLEMENTING DETOURS AROUND THE WORK AREA. PERFORM TRAFFIC CONTROL IN ACCORDANCE WITH
THE CONTRACTOR'S APPROVED TRAFFIC CONTROL PLAN.
16. MAINTAIN EMERGENCY ACCESS TO ALL PROPERTIES WITHIN THE PROJECT AREA AT ALL TIMES DURING CONSTRUCTION.
17. REMOVE AND DISPOSE OF ALL CONSTRUCTION-RELATED WASTE MATERIALS AND DEBRIS IN STRICT ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND FEDERAL LAWS.
18. THE TERM "DEMOLISH" USED ON THE DRAWINGS MEANS TO REMOVE AND DISPOSE OF IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL
REQUIREMENTS.
19. THE TERM "ABANDON" USED ON THE DRAWINGS MEANS TO LEAVE IN PLACE AND TAKE APPROPRIATE MEASURES TO DECOMMISSION AS SPECIFIED
OR NOTED ON THE DRAWINGS.
20. ALL PROPOSED WORK MAY BE ADJUSTED IN THE FIELD BY THE OWNER'S PROJECT REPRESENTATIVE TO MEET EXISTING CONDITIONS.
21. CONTRACTOR TO ENSURE ALL SOIL AND EROSION PROTOCOLS AS LISTED IN WATER POLLUTION CONTROL FACILITY STRATFORD, CONNECTICUT FLOOD PROTECTION SYSTEM IMPROVEMENTS, 100% DESIGN DRAWINGS, JULY 2024 ARE FOLLOWED DURING LINING WORK.
T.SCHWARTZ
P. EMMANUEL
W W
W W
C-101
PIPE LINING
PLAN
1" = 20'SCALE:
FILE:
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
S1924-053A-C-101-PIPE.dwg
SEPTEMBER 2026
S1924-053A
CHECKED BY:
DRAWN BY:
APPROVED BY:
DESIGNED BY:
Pl ot te d
O n:
S ep
6, 6- 1:
pm
B y:
T Th at ch er La st S av ed
9/
/2
Ti gh e
B on d:
J
S \S
S tr at fo rd \0
W
PC
F
S to rm w at er
S tu dy \D ra w in gs
\A ut oC A D
\P ip e Li ni ng
\S he et \S
-0
A -C
-1
-P
IP
E.
dw g
1000 Bridgeport Avenue Suite 320 Shelton, CT 06484 T 203.712.1100
Stratford, Connecticut
Diversion Chamber C - Inlet Pipe Modifications
M.MOFFATT
ISSUED FOR
BID
Town of Stratford Water Pollution Control Facility
00 20' 40'
SCALE: 1" = 20'
N
NORTH ROAD
PIPE LINING PLAN LEGEND:
PROPERTY LINE -
LINE EXISTING 54" CMP
CONTINUOUSLY FROM
DIV CHAMBER C TO
TYPE "C-L" CATCH BASIN
EXISTING
TYPE "C-L" CB
TOP OF PIPE=1.6
INV=-2.9
PIPE LINING PLAN NOTES:
1. THE 1974 DRAWING SHOWS THE DIVERSION C INLET PIPE AS 54-INCH CMP.
2. LINING WORK FOR THIS PROJECT WILL BE FROM CATCH BASIN TO DIVERSION CHAMBER C STRUCTURE.
3. CONTRACTOR TO USE EXISTING ACCESS POINTS (DIVERSION CHAMBER C AND CATCH BASIN) FOR INSERTION AND
TERMINATION OF THE LINER.
4. CONTRACTOR TO NOTE THAT GROUND WATER WAS OBSERVED 5-FEET BELOW GRADE. THE CONTRACTOR SHALL IDENTIFY AND CONTROL GROUNDWATER INFILTRATION THAT MAY INTERFERE WITH INSTALLATION OR CURING OF THE CIPP WORK.
5. LINING WORK WILL NEED TO OCCUR DURING DRY WEATHER AND LOW RIVER CONDITIONS. CONTRACTOR SHALL MONITOR RAINFALL, RIVER LEVELS FOR THE DURATION OF THE LINING WORK (INSTALL, CURING AND TESTING) TO MINIMIZE THE
NEED FOR DIVERTING THE INLAND WETLAND FLOW INTO THE EFFLUENT PUMP STATION.
6. CONTRACTOR SHALL PLUG PIPE TO ENSURE RIVER WATER OR WETLAND FLOW WILL NOT ENTER THE CHAMBER C PIPE
DURING THE CIPP WORK.
7. EXISTING DRAWINGS SHOW A SLUICE GATE ON THE CHAMBER C STRUCTURE. THIS GATE IS NOT OPERATIONAL AND
CONTRACTOR SHALL NOT RELY ON THIS FOR CIPP WORK.
8. REFER TO SHEET C-201 FOR ADDITIONAL VIEWS OF DIVERSION CHAMBER C, CATCH BASIN & MANHOLE STRUCTURE
9. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION
10. THE 54" LINE IS ANTICIPATED TO HAVE APPROXIMATELY 12- 24 INCHES OF SEDIMENT. CONTRACTOR TO REMOVE AND
DISPOSE SEDIMENT ACCORDINGLY PRIOR TO CIPP WORK.
11. THE 12" RCP INLET HEADWALL IS BURIED AND CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING AND EXCAVATING THE
INLET PRIOR TO CLEANING, CCTV AND LINING WORK.
M.SANSONE
R. RICHARDSON
P. EMMANUEL
91.5'
DIVERSION CHAMBER "C'
54 INCH CMP PIPE
INV=-3.85
EXISTING MANHOLE
TF = 9.33 (APPROX)
120.5'
LINE EXISTING 54" CMP
SEE NOTE "6"
SEE NOTE "6"
LOCATE ENTRANCE DURING CLEANING
AND EXCAVATE AND MARK-OUT
LINE EXISTING 12" RCP
2'±
70'±
BASED ON TIDAL RIVER LEVELS,
RIVER WATER ENTERS DIV.CHAMBER C.
(SEE NOTE 6)
WETLAND FLOW
(SEE NOTE 6)
TOWN'S JETTER IS STUCK APPROXIMATELY 70 FEET
FROM DIV CHAMBER C INLET.
CONTRACTOR TO RETRIEVE JETTER/CABLE
AND HAND OVER TO TOWN
C-201
MISCELLANEOUS
EXISTING STRUCTURES
AS SHOWNSCALE:
FILE:
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
S1924-053A-C-201-DETL.dwg
SEPTEMBER 2026
S1924-053A
CHECKED BY:
DRAWN BY:
APPROVED BY:
DESIGNED BY:
Pl ot te d
O n:
S ep
6, 6- 1:
pm
B y:
T Th at ch er La st S av ed
9/
/2
Ti gh e
B on d:
J
S \S
S tr at fo rd \0
W
PC
F
S to rm w at er
S tu dy \D ra w in gs
\A ut oC A D
\P ip e Li ni ng
\S he et \S
-0
A -C
-2
-D
ET
L.
dw g
1000 Bridgeport Avenue Suite 320 Shelton, CT 06484 T 203.712.1100
Stratford, Connecticut
Diversion Chamber C - Inlet Pipe Modifications
M.MOFFATT
ISSUED FOR
BID
Town of Stratford Water Pollution Control Facility
NOTES
1. THE EXISTING STRUCTURES WERE OBTAINED FROM THE 1974 DWGS. CONTRACTOR TO
CONFIRM OPENINGS OF THE EXISITING STRUCTURES MATCH ACTUAL CONDITION AND
MODIFICTIONS OF THESE STRUCTURES ARE NOT ANTICIPATED FOR THE CIPP WORK.
DETAIL-
- NO SCALE
FRAME AND GRATE FOR TIDAL STRUCTURE
DETAIL-
- NO SCALE
MANHOLE
DETAIL-
- NO SCALE
MANHOLE FRAME AND COVER
M.SANSONE
R. RICHARDSON
P. EMMANUEL
DETAIL-
- NO SCALE
TYPE "C-L" CATCH BASIN
DETAIL-
- NO SCALE
DIVERSION CHAMBER C