BID 2027-08_Nov_20_26_solicitation_doc.pdf

PDF 15 KB Posted

Attached to
Diversion Chamber C Inlet Pipe Modifications -WPCF
Solicitation number
BID 2027-08
Issued by
Fairfield County, Connecticut

About this file

This Invitation to Bid (ITB) is issued by the Town of Stratford, Connecticut for infrastructure improvements at the Water Pollution Control Facility (WPCF). The project scope encompasses dewatering, cleaning, groundwater control, Closed-Circuit Television (CCTV) inspection, and Cured-in-Place Pipe (CIPP) lining services for stormwater piping systems at Diversion Chamber C, specifically addressing approximately 225 linear feet of 54-inch corrugated metal pipe (CMP) and approximately 105 linear feet of 12-inch reinforced concrete pipe (RCP). All vendors are eligible to respond to this solicitation. The bid period runs from September 17, 2026 at 1:00 p.m. EDT through October 16, 2026 at 10:00 a.m. EDT, with a mandatory prebid meeting scheduled for September 29, 2026 at 10:00 a.m. Vendors may submit written questions through October 7, 2026 at 12:00 p.m. EDT to Phillip Ryan, Purchasing Agent at pryan@townofstratford.com. Physical bid submission is required; electronic submission is prohibited. Supporting documents include technical drawings, specifications, a prebid sign-in sheet, and Addendum 1.

Payment terms are Net 30 Days, contingent upon approval by all Town boards. No estimated contract value is disclosed in the solicitation. The contractor assumes responsibility for all site safety, utility protection, traffic control, erosion control, and regulatory compliance. The work requires careful coordination with environmental conditions, as CIPP lining must occur during dry weather and low river conditions, necessitating contractor monitoring of rainfall and river levels throughout installation, curing, and testing. Groundwater infiltration has been observed at five feet below grade and must be identified and controlled. The contractor must retrieve equipment (jetter and cable) stuck approximately 70 feet from the inlet, excavate a buried 12-inch RCP inlet headwall, and plug the pipe to prevent river water or wetland intrusion during construction. Access to the site utilizes existing points at Diversion Chamber C and the catch basin; a non-operational sluice gate on the Chamber C structure should not be relied upon.

View the file

Other files

File Type Posted
BID 2027-08_Nov_11_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_12_26_solicitation_doc.pdf PDF
2027-08 Inlet Pipe Modifications - WPCF - Specifications.pdf PDF
BID 2027-08_Oct_27_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_13_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_3_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_10_26_solicitation_doc.pdf PDF
BID 2027-08_Sep_23_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_6_26_solicitation_doc.pdf PDF
2027-08 Addendum 1.pdf PDF
BID 2027-08_Nov_5_26_solicitation_doc.pdf PDF
BID 2027-08_Sep_30_26_solicitation_doc.pdf PDF
BID 2027-08_Oct_23_26_solicitation_doc.pdf PDF
BID 2027-08_Oct_6_26_solicitation_doc.pdf PDF
2027-08 Inlet Pipe Modifications - WPCF - Drawings.pdf PDF
BID 2027-08_Nov_24_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_19_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_4_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_18_26_solicitation_doc.pdf PDF
BID 2027-08_Sep_18_26_solicitation_doc.pdf PDF
BID 2027-08_Oct_15_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_17_26_solicitation_doc.pdf PDF
BID 2027-08_Oct_19_26_solicitation_doc.pdf PDF
BID 2027-08_Sep_22_26_solicitation_doc.pdf PDF
BID 2027-08_Sep_29_26_solicitation_doc.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: BID 2027-08

Diversion Chamber C Inlet Pipe Modifications -WPCF

Invitation to Bid (ITB)

Stratford, Town of

September 17, 2026 - October 16, 2026

Page:2

General Header Information

This bid has no questions defined.

BID 2027-08

No. BID 2027-08 Title: Diversion Chamber C Inlet Pipe Modifications -WPCF Start Date: September 17, 2026 at 1:00:00 PM EDT End Date: October 16, 2026 at 10:00:00 AM EDT Vendor Q&A Start Date: September 17, 2026 at 1:15:00 PM EDT Vendor Q&A End Date: October 07, 2026 at 12:00:00 PM EDT Estimated Total Value:

Who can respond to this bid? : All Vendors Description: Dewatering, cleaning, ground water control, CCTV, Cured-in-Place

(CIPP) lining of located on the Water Pollution Control Facility (WPCF).

Approximately 225 linear feet of 54-inch corrugated metal pipe (CMP) stormwater pipe. Approximately 105 linear feet of 12-inch reinforced concrete pipe (RCP) stormwater pipe. PREBID MEETING: 09/29/2026 -

10:00AM. ***DO NOT SUBMIT BIDS ELECTRONICALLY***

Delivery Terms: N/A: Not Applicable Payment Terms: Net 30 Days Payment Notes: Upon approval by all Town boards.

Contact Information: Stratford, Town of

Phillip Ryan, Purchasing Agent Email: pryan@townofstratford.com Submit all requests for information (RFI) to email address above.

Verbal communication will NOT be accepted.

Contact Details: If you have any questions, please contact:

Phillip Ryan, Purchasing Agent Email: pryan@townofstratford.com Submit all requests for information (RFI) to email address above.

Verbal communication will NOT be accepted.

Selected Categories:

Page:3

Documents:

2027-08 Inlet Pipe Modifications - WPCF - Drawings.pdf

2027-08 Inlet Pipe Modifications - WPCF - Specifications.pdf

2027-08 Sign-in Sheet.pdf

2027-08 Addendum 1.pdf

Page:4

Item Specifications Solicitation has been designated as having no line items.