BID 2027-08_Nov_24_26_solicitation_doc.pdf

PDF 15 KB Posted

Attached to
Diversion Chamber C Inlet Pipe Modifications -WPCF
Solicitation number
BID 2027-08
Issued by
Fairfield County, Connecticut

About this file

This is an Invitation to Bid (ITB) solicitation document issued by the Town of Stratford, Connecticut for Diversion Chamber C Inlet Pipe Modifications at the Water Pollution Control Facility (WPCF). The scope of work includes dewatering, cleaning, groundwater control, closed-circuit television (CCTV) inspection, and Cured-in-Place (CIPP) lining services. The project encompasses approximately 225 linear feet of 54-inch corrugated metal pipe (CMP) stormwater pipe and approximately 105 linear feet of 12-inch reinforced concrete pipe (RCP) stormwater pipe. The bid solicitation opened September 17, 2026 at 1:00 p.m. EDT and closes October 16, 2026 at 10:00 a.m. EDT. A mandatory prebid meeting is scheduled for September 29, 2026 at 10:00 a.m. All vendors are eligible to respond. Physical bid submission only is permitted; electronic submission is prohibited. Vendor questions may be submitted in writing through October 7, 2026 at 12:00 p.m. EDT to Phillip Ryan, Purchasing Agent.

Payment terms are Net 30 Days upon approval by all Town boards. No estimated contract value is disclosed in the solicitation. The contract documents include drawings, specifications, and an addendum. All costs related to site safety, utility protection, traffic control, erosion control, and regulatory compliance are the contractor's responsibility. The contractor must monitor rainfall and river levels throughout the CIPP installation, curing, and testing phases, which must occur during dry weather and low river conditions. Groundwater control is required, as groundwater was observed at five feet below grade during preliminary assessment.

View the file

Other files

File Type Posted
BID 2027-08_Nov_11_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_12_26_solicitation_doc.pdf PDF
2027-08 Inlet Pipe Modifications - WPCF - Specifications.pdf PDF
BID 2027-08_Nov_20_26_solicitation_doc.pdf PDF
BID 2027-08_Oct_27_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_13_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_3_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_10_26_solicitation_doc.pdf PDF
BID 2027-08_Sep_23_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_6_26_solicitation_doc.pdf PDF
2027-08 Addendum 1.pdf PDF
BID 2027-08_Nov_5_26_solicitation_doc.pdf PDF
BID 2027-08_Sep_30_26_solicitation_doc.pdf PDF
BID 2027-08_Oct_23_26_solicitation_doc.pdf PDF
BID 2027-08_Oct_6_26_solicitation_doc.pdf PDF
2027-08 Inlet Pipe Modifications - WPCF - Drawings.pdf PDF
BID 2027-08_Nov_19_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_4_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_18_26_solicitation_doc.pdf PDF
BID 2027-08_Sep_18_26_solicitation_doc.pdf PDF
BID 2027-08_Oct_15_26_solicitation_doc.pdf PDF
BID 2027-08_Nov_17_26_solicitation_doc.pdf PDF
BID 2027-08_Oct_19_26_solicitation_doc.pdf PDF
BID 2027-08_Sep_22_26_solicitation_doc.pdf PDF
BID 2027-08_Sep_29_26_solicitation_doc.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: BID 2027-08

Diversion Chamber C Inlet Pipe Modifications -WPCF

Invitation to Bid (ITB)

Stratford, Town of

September 17, 2026 - October 16, 2026

Page:2

General Header Information

This bid has no questions defined.

BID 2027-08

No. BID 2027-08 Title: Diversion Chamber C Inlet Pipe Modifications -WPCF Start Date: September 17, 2026 at 1:00:00 PM EDT End Date: October 16, 2026 at 10:00:00 AM EDT Vendor Q&A Start Date: September 17, 2026 at 1:15:00 PM EDT Vendor Q&A End Date: October 07, 2026 at 12:00:00 PM EDT Estimated Total Value:

Who can respond to this bid? : All Vendors Description: Dewatering, cleaning, ground water control, CCTV, Cured-in-Place

(CIPP) lining of located on the Water Pollution Control Facility (WPCF).

Approximately 225 linear feet of 54-inch corrugated metal pipe (CMP) stormwater pipe. Approximately 105 linear feet of 12-inch reinforced concrete pipe (RCP) stormwater pipe. PREBID MEETING: 09/29/2026 -

10:00AM. ***DO NOT SUBMIT BIDS ELECTRONICALLY***

Delivery Terms: N/A: Not Applicable Payment Terms: Net 30 Days Payment Notes: Upon approval by all Town boards.

Contact Information: Stratford, Town of

Phillip Ryan, Purchasing Agent Email: pryan@townofstratford.com Submit all requests for information (RFI) to email address above.

Verbal communication will NOT be accepted.

Contact Details: If you have any questions, please contact:

Phillip Ryan, Purchasing Agent Email: pryan@townofstratford.com Submit all requests for information (RFI) to email address above.

Verbal communication will NOT be accepted.

Selected Categories:

Page:3

Documents:

2027-08 Inlet Pipe Modifications - WPCF - Drawings.pdf

2027-08 Inlet Pipe Modifications - WPCF - Specifications.pdf

2027-08 Sign-in Sheet.pdf

2027-08 Addendum 1.pdf

Page:4

Item Specifications Solicitation has been designated as having no line items.

Page:5

File details come from the government source that posted it. Updated .