BID 2025-83 Clarifying Questions-3.pdf

PDF 547 KB Posted

Attached to
BID #2025-83 Kellogg Creek WRRF Administration Building Remodel
Solicitation number
S-C01010-00015482
Issued by
Clackamas County, Oregon

About this file

This is a clarifying questions response document from Clackamas County Water Environment Services regarding BID #2025-83 for the Kellogg Creek Water Resource Recovery Facility (WRRF) Administration Building Remodel project. The document addresses a technical question submitted by interested bidders regarding corrupted PDF files in the solicitation plans, specifically sheets P000 and M000. The Owner and Architect confirmed that corrected copies of these sheets were attached to the clarifying questions response and are identical to those in the current bid set. The rendering issues with sheets P000 and M000 appear to stem from software compatibility problems, as the documents display correctly in Bluebeam (the primary software used by the Owner and Architect) but may not render properly in Adobe Acrobat. The clarifying questions response was issued on January 12, 2026, providing bidders with access to the necessary plan documents ahead of the sealed bid deadline.

The document is primarily composed of the general notes, symbols, and specification details from the mechanical and plumbing drawing sheets (M000 and P000). These sheets contain comprehensive abbreviations, symbols, demolition notes, and general installation requirements for HVAC and plumbing systems, including coordination requirements with all trades, penetration and firestopping standards, and field verification protocols. The mechanical section outlines a complete list of plumbing and HVAC drawing sheets organized by location and system type, while both sections emphasize contractor responsibility for coordinating work, verifying existing conditions, complying with state and local codes, and ensuring proper installation per manufacturer recommendations. No pricing information, funding sources, or award details are contained within this clarifying questions response document.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID #2025-83

Kellogg Creek WRRF Administration Building Remodel (“BID”)

RESPONSE TO CLARIFYING QUESTIONS

January 12, 2026

Note that these are questions submitted by interested firms to the above referenced solicitation.

The below answers are for clarification purposes only and in no way alter or amend the BID as published.

1. We have downloaded the Plans and specifications, however there are two pages in the solicitation plans that seem to be corrupted and cannot be printed. Could you please send over plan pages POOO (72) and MOOO (87)?

Answer: Copies of sheets P000 and M000 are attached to this Clarifying Questions #2.

These sheets are identical to those in the current bid set. The issues reported may be due to software compatibility. While PDF is a standard format, different programs can render files differently. The Owner and Architect primarily use Bluebeam and have not encountered issues. However, we have confirmed that these specific sheets may not display correctly when using Adobe Acrobat.

End of Clarifying Questions

CONTACT 811 BEFORE YOU DIG:

UNDERGROUND FACILITIES, STRUCTURES, AND UTILITIES HAVE BEEN SHOWN BASED UPON INFORMATION OBTAINED FROM FIELD LOCATIONS BY UTILITY COMPANIES, AVAILABLE SURVEYS AND RECORDS. THEIR LOCATIONS MUST BE CONSIDERED APPROXIMATE ONLY. IT IS ALSO POSSIBLE THAT THERE MAY BE OTHER UNDERGROUND FACILITIES, STRUCTURES, AND UTILITIES IN EXISTENCE THAT ARE NOT SHOWN. IT IS THE RESPONSIBILITY OF EACH INDIVIDUAL PARTY REFERENCING THIS PLAN TO DETERMINE THE EXACT LOCATION AND TYPE OF UNDERGROUND FACILITIES ON THE SITE. HAND EXCAVATE AT CRITICAL POINTS AS NECESSARY TO VERIFY LOCATIONS, SIZES, ELEVATIONS, FLOW LINES, ETC. IF A PROBLEM OR INTERFERENCE EXISTS, NOTIFY ARCHITECT/ENGINEER BEFORE PROCEEDING.

HVAC ABBREVIATIONS

ABSORP ABSORPTION FPS FEET PER SECOND

ACU AIR CONDITIONING UNIT FSEC FOOD SERVICE EQUIP. CONSULT.

AD ACCESS DOOR OR AREA DRAIN FT FINTUBE

AFF ABOVE FINISHED FLOOR FTG FOOTING

AFG ABOVE FINISHED GRADE GA GAGE

AHU AIR HANDLING UNIT GAL GALLON

AV AIR VENT GALV GALVANAIZED

BOP BOTTOM OF PIPE GC GENERAL CONTRACTOR

BOT BOTTOM GPH GALLONS PER HOUR

BTU BRITISH THERMAL UNIT GPM GALLONS PER MINUTE

BTUH BUT PER HOUR HR HOUR

BV BALL VALVE HTG HEATING

CA COMPRESSED AIR ISP INTERNAL STATIC PRESSURE

CENT CENTRIFUGAL JR JANITOR RECEPTOR

CFM CUBIC FEET PER MINUTE LDBT LEAVING DRY BULB TEMP.

CL CENTER LINE LWBT LEAVING WET BULB TEMP.

CONC CONCRETE LWT LEAVING WATER TEMPERATURE

COND CONDENSATE MBH 1000 BTUH

CONTR CONTRACTOR MC MECHANICAL CONTRACTOR

CP CONDENSATE PUMP MECH MECHANICAL

CU COPPER MH MANHOLE

CUH CABINET UNIT HEATER NTS NOT TO SCALE

DDC DIRECT DIGITAL CONTROLS OA OUTSIDE AIR

DN DOWN PC PLUMBING CONTRACTOR

EA EXHAUST AIR PRV PRESSURE REDUCING VALVE

EAT EXHAUST AIR TEMPERATURE PRV POWER ROOF VENTILATOR

EC ELECTRICAL CONTRACTOR PSI POUNDS PER SQUARE INCH

EDBT ENTERING DRY BULB TEMP. PV PRESSURE VENT

EF EXHAUST FAN PVC POLYVINYL CHLORIDE

EJ EXPANSION JOINT RA RETURN AIR

EQUIP EQUIPMENT RH RELATIVE HUMIDITY

EST EXTERNAL STATIC PRESSURE RTU ROOF TOP UNIT

EWBT ENTERING WET BULB TEMP. RV RELIEF VALVE

EWT ENTERING WATER TEMPERATURE RVT ROOF VENT TERMINATION

EX EXISTING SA SUPPLY AIR

EXH EXHAUST

TCC TEMP. CONTROL CONTRACTOREXP EXPANSION

TYP TYPICALFAI FRESH AIR INTAKE

UH UNIT HEATERFCU FAN COIL UNIT

UV UNIT VENTILATORFDC FIRE DEPRARTMENT CONNECTION

VA VENTILATION AIRFLEX FLEXIBLE

WB WALL BOX - CONDENSATEFPM FEET PER MINUTE

ELEMENT PHASE ABBREVIATIONS

(E) EXISTING ITEM TO REMAIN

(ER) NEW LOCATION OF EXISTING ITEM

(N) NEW ITEM IN EXISTING LOCATION

(R) EXISTING ITEM TO BE REMOVED, PATCH AND/OR COVER

(RN) REPLACE EXISTING ITEM WITH NEW

(RR) EXISTING ITEM TO BE REMOVED AND RELOCATED

TA TRANSFER AIR

HVAC DEMOLITION NOTES:

1. MECHANICAL DEMOLITION DRAWINGS SHOWING EXISTING CONDITIONS HAVE BEEN PREPARED BASED ON NON- DESTRUCTIVE SITE OBSERVATIONS AND AS-BUILT DOCUMENTS PROVIDED BY THE OWNER. CONTRACTOR TO FIELD VERIFY EXISTING SYSTEMS PRIOR TO BEGINNING WORK. NOTIFY ARCHITECT/ENGINEER IF EXISTING CONDITIONS

ARE MATERIALLY DIFFERENT THAN THOSE SHOWN ON THE DRAWINGS.

2. BE FAMILIAR WITH EXISTING MECHANICAL SYSTEMS THAT WILL BE AFFECTED BY THE DEMOLITION WORK. OBTAIN PERMISSION FROM THE OWNER'S REPRESENTATIVE TO SHUT OFF SERVICES OR SYSTEMS THAT AFFECT AREAS BEYOND THE LIMITS OF THE IMMEDIATE DEMOLITION AREA. INFORM THE OWNER'S REPRESENTATIVE OF THE REASON FOR AND DURATION OF THE SHUTDOWN. MINIMIZE IMPACT TO OTHER AREAS. PROCEED WITH THE

SHUTDOWN AFTER PERMISSION FROM THE OWNER IS GRANTED.

3. REMOVE DUCTWORK, PIPING, HANGERS, GRILLES, REGISTERS, DIFFUSERS, ETC. THAT ARE INDICATED TO BE REMOVED. PERFORM WORK IN A TIMELY MANNER AND IN ACCORDANCE WITH THE GENERAL DEMOLITION

SPECIFICATIONS. COORDINATE WITH THE OWNER AND OTHER CONTRACTORS.

4. UNLESS EQUIPMENT NOTED AS OWNER'S SALVAGE, DISPOSE OF REMOVED EQUIPMENT AND MATERIALS PROMPTLY.

5. REMOVE ALL ABONDONED PIPING AND DUCTWORK THAT IS EXPOSED OR ACCESSIBLE WITHOUT WALL OR CEILING

DEMOLITION. REFER TO ARCHITECTURAL PLANS FOR CEILINGS TO BE REMOVED.

HVAC GENERAL NOTES:

1. COORDINATE HVAC WORK WITH ALL OTHER TRADES. BEGIN INSTALLATION AND ROUGH-IN AFTER COORDINATION WITH ALL TRADES ASSOCIATED WITH PROJECT SCOPE. COORDINATE HVAC SYSTEMS INSTALLATION WITH BUILDING STRUCTURE, ARCHITECTURAL ASSEMBLIES, SHEET METAL, PIPING SYSTEMS, LIGHTING FIXTURES, CONDUITS, CABLE TRAYS, ETC. REFER TO ALL GENERAL, MECHANICAL, AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR REWORK ASSOCIATED WITH FAILURE TO COORDINATE.

2. PROVIDE A COMPLETE HVAC SYSTEM INCLUDING SUPPLY, RETURN, EXHAUST, AND VENTILATION DUCTWORK;

MECHANICAL EQUIPMENT, SUPPORTS, HANGERS, DIFFUSERS, GRILLES, REGISTERS AND ALL APPURTENANCES.

INSTALL ALL EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS. SIZING AND INSTALLATION OF HVAC

SYSTEMS TO MEET ALL STATE AND LOCAL CODES AND PROJECT REQUIREMENTS.

3. DRAWING PLANS, SCHEMATICS AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF DUCT SYSTEM. INDICATED DUCT LOCATIONS, CONFIGURATIONS AND ARRANGEMENTS WERE USED FOR DUCT SIZING, CALCULATING FRICTION LOSS AND FOR OTHER DESIGN CONSIDERATIONS. INSTALL DUCT SYSTEMS AS INDICATED

UNLESS DEVIATIONS TO LAYOUT ARE APPROVED BY ARCHITECT/ENGINEER.

4. INCORPORATE MECHANICAL DRAWINGS, SPECIFICATIONS, STATE AND LOCAL CODES, AND PROJECT STANDARDS

INTO WORK.

5. ALL DUCT DIMENSIONS INDICATED ARE INTERIOR FREE AREA DUCT DIMENSIONS AND DO NOT INCLUDE INSULATION

REQUIREMENTS.

6. CONTRACTOR IS RESPONSIBLE FOR MAKING PENETRATIONS WHERE REQUIRED IN EXISTING WALLS, FLOORS, CEILINGS AND ROOFS. MAKE PENETRATIONS NEAT. PATCH, CONCEAL OR CAULK ALL OVERCUT TO PREVENT NOISE TRANSFER BETWEEN SPACES. COVER EXPOSED WALL PENETRATIONS WITH ESCUTCHEONS OR SHEET METAL AS

APPROPRIATE. SEAL ALL WALL AND FLOOR DUCT PENETRATIONS.

7. REFER TO ARCHITECTURAL SPECIFICATIONS FOR THROUGH-PENETRATION FIRESTOPPING AND TO ARCHITECTURAL CODE PLAN FOR FIRE RATED WALLS, FLOORS AND CEILINGS. CONTRACTOR IS RESPONSIBLE TO FIRESTOP PENETRATIONS THROUGH RATED ASSEMBLIES. PROVIDE FIRE CAULKING FOR PENETRATIONS OF FIRE RATED

ASSEMBLIES.

8. CONTINUE DUCT AND PIPE INSULATION UNBROKEN THROUGH WALLS, FLOORS AND CEILING PENETRATIONS, EXCEPT WHERE FIRE OR FIRE/SMOKE DAMPERS ARE INSTALLED IN DUCTWORK. SEAL AROUND DUCT INSULATION

AT WALL PENETRATIONS.

9. CREATE OPENINGS IN BUILDING AS REQUIRED TO REMOVE EXISTING BUILDING COMPONENTS AND BRING IN NEW EQUIPMENT. PATCH ALL OPENINGS CREATED. PATCH FINISH TO MATCH EXISTING CONDITIONS. INCLUDE THIS

WORK IN BID.

XXX

GENERAL SYMBOLS

EQUIPMENT IDENTIFICATION

KEYNOTE

POINT OF DISCONNECT

NEW POINT OF CONNECTION

DEMOLITION LINEWORK TO BE SHOWN AS BOLD DASHED AND BLACK

NEW LINEWORK TO BE SHOWN AS BOLD AND BLACK

EXISTING LINEWORK TO BE SHOWN AS "HALFTONE"

HIDDEN LINEWORK TO BE SHOWN AS THIN DASHED AND BLACK

HVAC SYMBOLS

RECT. RND. OVAL

10x6 SA

10ø SA

10/6 SA

RECTANGULAR DUCT

ROUND DUCT

OVAL DUCT

FLEX DUCT

SUPPLY DIFFUSER

RETURN GRILLE

EXHAUST GRILLE

LINEAR SLOT DIFFUSER

EXHAUST DUCT (UP/DOWN/SECTION)

RETURN DUCT (UP/DOWN/SECTION)

SUPPLY DUCT (UP/DOWN/SECTION)

SIDEWALL GRILLE

ROUND DIFFUSER

EXTERIOR LOUVER

VOLUME DAMPER

FIRE DAMPER

SMOKE DAMPER

FIRE/SMOKE DAMPER

M MOTORIZED ACTUATOR

THERMOSTAT

CARBON MONOXIDE SENSOR

HUMIDISTAT

OPPOSED BLADE DAMPER

PARALLEL BLADE DAMPER

T

H

CO

R E

G I S T E R E D P R O F E S S

I O N

A L

E

NG I NE E

R

87183PE

OREGONM

A Y 1 1 , 2 0 2

EXPIRES: JUN. 30, 2026

G U

S

T A V O V E L A M O R

E N

O

Scale

Date

Sheet No.

935 SE Alder Street : Portland Oregon 97214 tel 503 239 1987

312 NW 10th Ave, Suite 100

Portland, OR 97209 503-212-4612

As Noted

M000

GENERAL NOTES &

SYMBOLS

ADMIN BUILDING REMODEL

10/1/2025

WES KELLOGG WRRF

11525 SE MCLOUGHLIN BLVD

MILWAUKIE, OR 97222

PERMIT 10/1/2025

MECHANICAL SHEET LIST

M000 GENERAL NOTES & SYMBOLS

M011 DEMOLITION PLAN - LEVEL 1 - EAST

M012 DEMOLITION PLAN - LEVEL 1 - WEST

M013 DEMOLITION ROOF PLAN

M101 FLOOR PLAN - LEVEL 1 - EAST

M102 FLOOR PLAN - LEVEL 1 - WEST

M103 ROOF PLAN

M401 DETAILS

M501 SCHEDULES

M502 SCHEDULES

M601 CONTROLS

MP102 FLOOR PLAN - LEVEL 1 - WEST MECH PIPING

Issue Revision Date

CONTACT 811 BEFORE YOU DIG:

UNDERGROUND FACILITIES, STRUCTURES, AND UTILITIES HAVE BEEN SHOWN BASED UPON INFORMATION OBTAINED FROM FIELD LOCATIONS BY UTILITY COMPANIES, AVAILABLE SURVEYS AND RECORDS. THEIR LOCATIONS MUST BE CONSIDERED APPROXIMATE ONLY. IT IS ALSO POSSIBLE THAT THERE MAY BE OTHER UNDERGROUND FACILITIES, STRUCTURES, AND UTILITIES IN EXISTENCE THAT ARE NOT SHOWN. IT IS THE RESPONSIBILITY OF EACH INDIVIDUAL PARTY REFERENCING THIS PLAN TO DETERMINE THE EXACT LOCATION AND TYPE OF UNDERGROUND FACILITIES ON THE SITE. HAND EXCAVATE AT CRITICAL POINTS AS NECESSARY TO VERIFY LOCATIONS, SIZES, ELEVATIONS, FLOW LINES, ETC. IF A PROBLEM OR INTERFERENCE EXISTS, NOTIFY ARCHITECT/ENGINEER BEFORE PROCEEDING.

PLUMBING PIPING LEGEND

DCW

DHW

DHWR

SAN

V

G

ST

SO

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RETURN

SANITARY

VENT

NATURAL GAS

STORM DRAIN

STORM OVERFLOW

PLUMBING ABBREVIATIONS

AD ACCESS DOOR OR AREA DRAIN GAL GALLON

AFF ABOVE FINISHED FLOOR GALV GALVANAIZED

AFG ABOVE FINISHED GRADE GC GENERAL CONTRACTOR

BOP BOTTOM OF PIPE GPH GALLONS PER HOUR

BOT BOTTOM GPM GALLONS PER MINUTE

BV BALL VALVE GW GREASE WASTE

CB CATCH BASIN

HB HOSE BIBB

CI CAST IRON

HR HOUR

CL CENTER LINE

IMB ICE MAKER BOX

CO CLEAN OUT

JR JANITOR RECEPTOR

CONC CONCRETE

L LAVATORY

COND CONDENSATE MB MOP BASIN

CONTR CONTRACTOR MC MECHANICAL CONTRACTOR

CP CIRCULATION PUMP MECH MECHANICAL

CT COW'S TONQUE MH MANHOLE

CWP CIRCULATING WATER PUMP NTS NOT TO SCALE

DN DOWN OD OVERFLOW DRAIN

DR DRAIN PC PLUMBING CONTRACTOR

DS DOWNSPOUT PRV PRESSURE REDUCING VALVE

DWV DRAIN, WASTE & VENT PSI POUNDS PER SQUARE INCH

EC ELECTRICAL CONTRACTOR PVC POLYVINYL CHLORIDE

EEW EMERGENCY EYE WASH RD ROOF DRAIN

ESH EMERGENCY SHOWER RV RELIEF VALVE

EQUIP EQUIPMENT S SINK

ESE EMERGENCY SHOWER/EYEWASH ST STORM

EWC ELECTRIC WATER COOLER SH SHOWER

EWT ENTERING WATER TEMPERATURE SO STORM OVERFLOW

EX EXISTING TCC TEMP. CONTROL CONTRACTOR

EXP EXPANSION TP TRAP PRIMER

FCO FLOOR CLEAN OUT TYP TYPICAL

FD FLOOR DRAIN UR URINAL

FLEX FLEXIBLE

VTR VENT THROUGH ROOFFLR FLOOR DRAIN

WB WALL BOX - CONDENSATEFPM FEET PER MINUTE

WC WATER CLOSETFPS FEET PER SECOND

WCO WALL CLEANOUTFS FLOOR SINK

WH WATER HEATERFSEC FOOD SERVICE EQUIP. CONSULT.

WHA WATER HAMMER ARRESTORFTG FOOTING

WMF WASHING MACHINE FIXTUREGA GAGE

ELEMENT PHASE ABBREVIATIONS

(E) EXISTING ITEM TO REMAIN

(ER) NEW LOCATION OF EXISTING ITEM

(N) NEW ITEM IN EXISTING LOCATION

(R) EXISTING ITEM TO BE REMOVED, PATCH AND/OR COVER

(RN) REPLACE EXISTING ITEM WITH NEW

(RR) EXISTING ITEM TO BE REMOVED AND RELOCATED

VAC VACUUM

CA COMPRESSED AIR

LF LABRATORY FIXTURE

PLUMBING AND PIPING SYMBOLS

SINGLE LINE DOUBLE LINE

90° ELBOW

90° ELBOW - SHORT SWEEP

90° ELBOW - LONG SWEEP

90° ELBOW - OUTLET DOWN

90° ELBOW - OUTLET UP

45° ELBOW

22° ELBOW

TEE

TEE - OUTLET DOWN

TEE - OUTLET UP

WYE

COMBINATION WYE & 1/8 BEND

DOUBLE COMBO

COUPLING

CAP

REDUCER

BALL VALVE

TEE - SANITARY

P-TRAP - PLAN VIEW

P-TRAP - SECTION

REDUCED PRESSURE BACKFLOW PREVENTER

PLUMBING GENERAL NOTES:

1. COORDINATE PLUMBING WORK WITH ALL OTHER TRADES. BEGIN INSTALLATION AND ROUGH-IN AFTER COORDINATION WITH ALL TRADES ASSOCIATED WITH PROJECT SCOPE. COORDINATE PLUMBING SYSTEMS INSTALLATION WITH BUILDING STRUCTURE, ARCHITECTURAL ASSEMBLIES, SHEET METAL, DUCTWORK, LIGHTING FIXTURES, CONDUITS, CABLE TRAYS, ETC. REFER TO ALL GENERAL, MECHANICAL, AND ELECTRICAL DRAWINGS AND SPECIFICATIONS FOR THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR REWORK ASSOCIATED WITH FAILURE TO

COORDINATE.

2. PROVIDE A COMPLETE PLUMBING SYSTEM INCLUDING PIPE, INSULATION, HANGERS, SUPPORTS, EQUIPMENT, WATER HEATERS, FIXTURES, MIXING VALVES, VALVES, ACCESSORIES AND SPECIALTIES. INSTALL ALL EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS. SIZING AND INSTALLATION OF PLUMBING SYSTEMS TO COMPLY WITH ALL

STATE AND LOCAL CODES AND PROJECT REQUIRMENTS.

3. DRAWING PLANS, SCHEMATICS AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF PLUMBING

SYSTEM.

4. INCORPORATE PLUMBING DRAWINGS, SPECIFICATIONS, STATE AND LOCAL CODES, AND PROJECT STANDARDS INTO

WORK.

5. EXISTING PLUMBING PIPING AND EQUIPMENT SHOWN ARE BASED ON NON-DESTRUCTIVE SITE OBSERVATION AND AS-BUILT DOCUMENTS PROVIDED BY THE OWNER. FIELD VERIFY ALL EXISTING CONDITIONS INCLUDING LOCATION

OF ALL PIPING CONCEALED IN BUILDING ASSEMBLIES WHERE WORK IS REQUIRED.

6. CONTRACTOR IS RESPONSIBLE FOR MAKING PENETRATIONS WHERE REQUIRED IN EXISTING WALLS, FLOORS, CEILINGS AND ROOFS. MAKE PENETRATIONS NEAT. PATCH, CONCEAL OR CAULK ALL OVERCUT TO PREVENT NOISE TRANSFER BETWEEN SPACES. COVER EXPOSED WALL PENETRATIONS WITH ESCUTCHEONS OR SHEET METAL AS

APPROPRIATE.

7. REFER TO ARCHITECTURAL SPECIFICATIONS FOR THROUGH-PENETRATION FIRESTOPPING AND TO ARCHITECTURAL CODE PLAN FOR FIRE RATED WALLS, FLOORS AND CEILINGS. CONTRACTOR IS RESPONSIBLE TO FIRESTOP PENETRATIONS THROUGH RATED ASSEMBLIES. PROVIDE FIRE CAULKING FOR PENETRATIONS OF FIRE RATED

ASSEMBLIES.

8. CONTINUE PIPE INSULATION UNBROKEN THROUGH WALL, FLOOR AND CEILING PENETRATIONS. SEAL AROUND PIPE

INSULATION AT PENETRATIONS.

9. CREATE OPENINGS IN BUILDING AS REQUIRED TO REMOVE EXISTING BUILDING COMPONENTS AND BRING IN NEW EQUIPMENT. PATCH ALL OPENINGS CREATED. PATCH FINISH TO MATCH EXISTING CONDITIONS. INCLUDE THIS

WORK IN BID.

10. VERIFY WITH ENGINEER ANY FIXTURES NOT TAGGED OR PIPED PRIOR TO ANY WORK. UNLESS SPECIFICALLY NOTED AS EXCLUDED FROM SCOPE CONTRACTOR IS RESPONSIBLE FOR ALL PLUMBING FIXTURES SHOWN ON

ARCHITECTURAL DRAWINGS; TAGGED OR NOT TAGGED ON PLUMBING DRAWINGS.

XXX

GENERAL SYMBOLS

EQUIPMENT IDENTIFICATION

KEYNOTE

POINT OF DISCONNECT

NEW POINT OF CONNECTION

DEMOLITION LINEWORK TO BE SHOWN AS BOLD DASHED AND BLACK

NEW LINEWORK TO BE SHOWN AS BOLD AND BLACK

EXISTING LINEWORK TO BE SHOWN AS "HALFTONE"

HIDDEN LINEWORK TO BE SHOWN AS THIN DASHED AND BLACK

PLUMBING DEMOLITION NOTES:

1. PLUMBING DEMOLITION DRAWINGS SHOWING EXISTING CONDITIONS HAVE BEEN PREPARED BASED ON NON- DESTRUCTIVE SITE OBSERVATIONS AND AS-BUILT DOCUMENTS PROVIDED BY THE OWNER. CONTRACTOR TO FIELD VERIFY EXISTING SYSTEMS PRIOR TO BEGINNING WORK. NOTIFY ARCHITECT/ENGINEER IF EXISTING CONDITIONS

ARE MATERIALLY DIFFERENT THAN THOSE SHOWN ON THE DRAWINGS.

2. BE FAMILIAR WITH EXISTING PLUMBING SYSTEMS THAT WILL BE AFFECTED BY THE DEMOLITION WORK. OBTAIN PERMISSION FROM THE OWNER'S REPRESENTATIVE TO SHUT OFF SERVICES OR SYSTEMS THAT AFFECT AREAS BEYOND THE LIMITS OF THE IMMEDIATE DEMOLITION AREA. INFORM THE OWNER'S REPRESENTATIVE OF THE REASON FOR AND DURATION OF THE SHUTDOWN. MINIMIZE IMPACT TO OTHER AREAS. PROCEED WITH THE

SHUTDOWN AFTER PERMISSION FROM THE OWNER IS GRANTED.

3. REMOVE PIPING, HANGERS, FIXTURES, EQUIPMENT, APPURTENANCES, ETC. THAT ARE INDICATED TO BE REMOVED.

PERFORM WORK IN A TIMELY MANNER AND IN ACCORDANCE WITH THE GENERAL DEMOLITION SPECIFICATIONS.

COORDINATE WITH THE OWNER AND OTHER CONTRACTORS.

4. UNLESS NOTED AS OWNER'S SALVAGE, DISPOSE OF REMOVED EQUIPMENT AND MATERIALS PROMPTLY.

5. REMOVE ALL ABANDONED PIPING, HANGERS, FIXTURES, EQUIPMENT AND APPURTENANCES THAT ARE EXPOSED OR ACCESSIBLE WITHOUT WALL OR CEILING DEMOLITION. REFER TO ARCHITECTURAL PLANS FOR CEILINGS TO BE

REMOVED.

R E

G I S T E R E D P R O F E S S

I O N

A L

E

NG I NE E

R

87183PE

OREGONM

A Y 1 1 , 2 0 2

EXPIRES: JUN. 30, 2026

G U

S

T A V O V E L A M O R

E N

O

Scale

Date

Sheet No.

935 SE Alder Street : Portland Oregon 97214 tel 503 239 1987

312 NW 10th Ave, Suite 100

Portland, OR 97209 503-212-4612

As Noted

P000

GENERAL NOTES &

SYMBOLS

ADMIN BUILDING REMODEL

10/1/2025

WES KELLOGG WRRF

11525 SE MCLOUGHLIN BLVD

MILWAUKIE, OR 97222

PERMIT 10/1/2025

PLUMBING SHEET LIST

P000 GENERAL NOTES & SYMBOLS

P001 DEMOLITION PLAN - FOUNDATION - EAST

P002 DEMOLITION PLAN - FOUNDATION - WEST

P011 DEMOLITION PLAN - LEVEL 1 - EAST

P012 DEMOLITION PLAN - LEVEL 1 - WEST

P013 DEMOLITION ROOF PLAN

P101 FLOOR PLAN - FOUNDATION - EAST

P102 FLOOR PLAN - FOUNDATION - WEST

P111 FLOOR PLAN - LEVEL 1 - EAST

P112 FLOOR PLAN - LEVEL 1 - WEST

P121 ROOF PLAN

P401 DETAILS

P402 DETAILS

P501 SCHEDULES

P502 SCHEDULES

Issue Revision Date

File details come from the government source that posted it. Updated .