Attch-2-B622 Drawings Repair Flooring-Paint Interior Walls.pptx
PPTX presentation 263 KB Posted
- Attached to
- Amend-05-Bldg 622 Interior Paint Federal contract opportunity
- Solicitation number
- W91QF425BA008
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Repair Flooring on the 1st floor, 2nd floor, and 3rd floor. Contractor shall remove existing carpets, baseboards and VCTs in the bedrooms, hallways, dayrooms and administration rooms. Contractor shall install new rubber flooring and baseboards in the bedrooms, hallways, dayrooms and administration rooms on the 1st, 2nd, 3rd floors. Contractor shall conduct hazmat test two sections on each floor. Contractor shall field verify dimensions.
Interior Painting on the basement, 1st floor, 2nd floor, and 3rd floor. Contractor shall conduct interior paint on the walls of 1st, 2nd and 3rd floors. Contractor shall conduct lead paint test two sections on each floor. Contractor shall field verify dimensions.