About this file
This is Addendum No. 4 to the contract documents for the Massachusetts Department of Transportation's park and ride expansion and improvements project at Route 132 in Barnstable (FAP No. CRP-003S(984)X), issued on August 17, 2026. The addendum addresses a contractor question regarding parking restrictions during surface paving operations. The project scope includes site preparation, drainage infrastructure, pavement work, site amenities, electrical and lighting infrastructure, landscaping, signage, and pavement markings with a total project value of $8.007 million and a 365-day performance period. Full Beneficial Use is due within 1,098 calendar days from Notice to Proceed. Sealed bids are due on Tuesday, August 18, 2026 at 2:00 P.M. through www.bidx.com.
The key clarification in this addendum specifies that a full site closure for surface paving operations will not be permitted. Instead, paving must be conducted in sections as shown in the construction staging plans on sheets 37-41 to maintain parking availability on site throughout the construction period. Bidders are required to acknowledge Addendum No. 4 before submitting their bids. Pre-qualified bidders in the HIGHWAY-CONSTRUCTION category must submit their Request Proposal Form (R109) to prequal.r109@dot.state.ma.us at least 14 days before bid opening. The project is subject to prevailing wage requirements, labor participation goals of 15.3% minority and 6.9% women, Build America Buy America Act compliance, and price adjustments for hot mix asphalt, Portland cement, diesel fuel, gasoline, and structural and reinforcing steel.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 mass.gov/massdot
August 17, 2026
610800-135580
ADDENDUM NO. 4
To Prospective Bidders and Others on:
BARNSTABLE
Federal Aid Project No. CRP-003S(984)X
Park and Ride Expansion and Improvements at Route 132
THIS PROPOSAL TO BE OPENED AND READ: TUESDAY, AUGUST 18, 2026 at 2:00 P.M.
Transmitting revisions to the Contract Documents as follows:
QUESTION AND RESPONSE: One page.
Take note of the above and acknowledge Addendum No. 4 in your Expedite Proposal file before submitting your bid.
Very truly yours, Eric M. Cardone, P.E.
Construction Contracts Engineer
HA
cc: Herrio Lamothe, Project Manager
THIS PAGE IS INTENTIONALLY LEFT BLANK
BARNSTABLE
FAP NO. CRP-003S(984)X
Park and Ride Expansion and Improvements at Route 132 (610800-135580)
Question and Response Addendum No. 4, August 17, 2026
R M Pacella., email dated July 30, 2026 (From Addendums No. 2 and 3)
Question 14 Will the district object to an approximate 4-5 day to night parking restriction/shutdown for the entire lotto achieve the milling and paving of surface course project wide. Or will we be required top each area within the staging plan.
Response 14 A full closure will not be permitted for surface paving the entire site at once. The paving shall be done in sections as shown in construction staging plans shown on sheets 37-41 to maintain parking on site through construction.
THIS PAGE IS INTENTIONALLY LEFT BLANK
| 610800 Addendum Letter-A4 |
| 610800 Questions and Responses-A4 |
| 2026-08-17T11:13:10-0400 | |
| Eric M. Cardone |
File details come from the government source that posted it. Updated .