A00872-610800.pdf
PDF 835 KB Posted
- Attached to
- 610800 BARNSTABLE FAP No. CRP-003S(984)X Park and Ride Expansion and Improvements at Route 132
- Solicitation number
- BD-27-1030-0H100-0H002-131511
- Issued by
- Barnstable County, Massachusetts
About this file
Summary
This is a project description document for the Massachusetts Department of Transportation (MassDOT) regarding FAP No. CRP-003S(984)X, a Park and Ride Expansion and Improvements project at Route 132 in Barnstable. The project involves the expansion and improvement of an existing park and ride facility to enhance transportation infrastructure and capacity. The document specifies that bidders must not use the COMMBUYS system to submit bids for this project, indicating an alternative bidding process or platform is required. Specific details regarding project scope, timeline, quantities, site visit requirements, bidders' conferences, response deadlines, and award timelines should be referenced within the full project documentation and related solicitation materials.
The file indicates this is a state-level contract opportunity managed by the Commonwealth of Massachusetts. Pricing terms, funding sources, set-asides, and other financial particulars are not detailed in the available document excerpt. Interested bidders should consult the complete project specifications, bid documents, and any addenda or amendments issued by MassDOT to obtain comprehensive information regarding contract terms, payment structure, eligibility requirements, and submission procedures for this Barnstable park and ride expansion initiative.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Massachusetts Department Of Transportation Highway Division Proposal No. 610800-135580
A00872 - 1
DOCUMENT A00872
Massachusetts Office of Coastal Zone Management
(CZM)
Massachusetts Department Of Transportation Highway Division
A00872 - 2
THIS PAGE IS INTENTIONALLY LEFT BLANK
October 3, 2023
Massachusetts Department of Transportation c/o Ms. Sara Kreisel, PWS Ecological Project Manager, Associate BSC Group 1 Mercantile Street Suite 610 Worcester, MA 01608
RE: Federal Consistency Certification: Expansion and Improvements at The Route 132 Park And Ride Lot Barnstable (MassDOT Project 610800); Barnstable
Dear Ms. Kreisel:
The Massachusetts Office of Coastal Zone Management (CZM) has completed its review of the proposed project which consists of expanding the existing Park-and-Ride facility located off Route 132 in Barnstable, which will add approximately 297 new parking spaces for a total of 665 parking spaces. The project will also include updates to lighting and drainage. These activities include the following:
- The project consists of new pavement construction, replacement of existing sloped granite edging with vertical granite curbing, overlaying existing pavement, new concrete sidewalks and wheelchair ramps, reconfiguring the access to provide a separate bus drop-off/pick-up lane, a new passenger car drop-off area, and pedestrian access to the parking area from Route 132.
Although the activities associated with this project are located within the defined
Massachusetts Coastal Zone, they fall below the thresholds that CZM generally uses to require review under our federal consistency provisions. Consequently, a formal decision from this office regarding consistency with our enforceable program policies is not necessary. Any federal licenses or permits for the work performed may be subject to CZM’s federal consistency review. It is incumbent upon the proponent to notify CZM, submit an explanation of the nature of the work under 15 CFR 930, and submit necessary data and information. CZM will use this information to determine if further federal consistency review is required.
Thank you for submitting the information to CZM. If you have any questions regarding our review process, feel free to contact me at sean.duffey@mass.gov.
Sincerely, Sean Duffey CZM Project Review and Dredging Coordinator
A00872 - 3
Page | 2
Cc: Steve McKenna, CZM Lisa Berry Engler, CZM
A00872 - 4
File details come from the government source that posted it. Updated .