BARNSTABLE-610800-135580-A-2.pdf

PDF 5 MB Posted

Attached to
610800 BARNSTABLE FAP No. CRP-003S(984)X Park and Ride Expansion and Improvements at Route 132
Solicitation number
BD-27-1030-0H100-0H002-131511
Issued by
Barnstable County, Massachusetts

About this file

This is Addendum No. 2, issued August 12, 2026, by the Massachusetts Department of Transportation Highway Division for the Barnstable Park and Ride Expansion and Improvements project (FAP No. CRP-003S(984)X, Proposal No. 610800-135580). The addendum transmits revisions to contract documents including six pages of questions and responses, revised specification pages, and revised plan sheets addressing clarifications on materials, pay items, construction staging, and technical specifications. Key project elements include site preparation, drainage infrastructure with 22 catch basins and 9 manholes, approximately 2,160 linear feet of sanitary sewer pipe, pavement work involving fine milling of 11,700 square yards and multiple asphalt courses, 10,620 linear feet of granite curbing, 2,915 square yards of concrete sidewalk, 4 pedestrian bus shelters with 300-watt solar panels, guardrails with curved sections, electrical and lighting infrastructure featuring 38 luminaires and level 2 EV chargers, landscaping including various tree species and seed mixes, and pavement markings. The bid opening remains scheduled for Tuesday, August 18, 2026, at 2:00 p.m., with a performance period of 365 days and full beneficial use required within 1,098 calendar days from Notice to Proceed.

The addendum addresses 28 questions from prospective bidders regarding material specifications, pay item clarifications, and construction methodologies. Notable clarifications include confirmation that aluminum components may substitute for steel in bus shelters if they meet structural requirements, addition of pay items for frames and grates (Items 221 and 222), deletion of Item 804.31 with substitution of Item 804.21 for 2-inch liquid-tight conduit, addition of Item 620.32 for curved guardrail, and addition of Item 986 for modified rockfill totaling 120 tons. The contract includes price adjustments for hot mix asphalt ($712.50 per ton base), Portland cement ($452.13 per ton), diesel fuel ($4.372 per gallon), gasoline ($3.335 per gallon), and structural steel (base price index 370.1). Several questions remain pending responses in subsequent addenda, including manufacturer specifications for pedestrian bus shelters, locations for proposed trash receptacles, and light standard foundation precast sizing requirements. Bidders must acknowledge Addendum No. 2 in their proposal files before submission.

View the file

Other files

File Type Posted
A00810-610800.pdf PDF
610800 - Plan Holders List 8-17-2026.pdf PDF
A00811-610800.pdf PDF
A00802-610800.pdf PDF
A00871-610800.pdf PDF
BIDS OPENED - Tuesday - August 18-2026.pdf PDF
A00872-610800.pdf PDF
A00820-610800.pdf PDF
BARNSTABLE-610800-135580-A-3.pdf PDF
Link to Bid Opening 8-18-2026.pdf PDF
610800 - Bid Tabulations.pdf PDF
610800 - Plan Holders List 8-4-2026.pdf PDF
BARNSTABLE-610800-135580-A-4.pdf PDF
A00801-610800.pdf PDF
610800 Bid Items List.txt TXT text file
BARNSTABLE-610800-135580-A-1.pdf PDF
A00875-610800.pdf PDF
610800 - Notice to Contractors.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 mass.gov/massdot

August 12, 2026

610800-135580

ADDENDUM NO. 2

To Prospective Bidders and Others on:

BARNSTABLE

FAP NO. CRP-003S(984)X

Park and Ride Expansion and Improvements at Route 132

THIS PROPOSAL TO BE OPENED AND READ: TUESDAY, AUGUST 18, 2026 at 2:00 P.M.

Transmitting revisions to the Contract Documents as follows:

QUESTIONS AND RESPONSES: Six pages.

DOCUMENT 00104: Revised page 3.

DOCUMENT A00801: Revised page 74.

DOCUMENT B00420: Revised pages 5 through 16.

PLANS: Revised sheets 49, 50 and 58 of 87.

Take note of the above, substitute the revised pages and plan sheets for the originals, and acknowledge Addendum No. 2 in your Expedite Proposal file before submitting your bid.

Very truly yours, Eric M. Cardone, P.E.

Construction Contracts Engineer

HA

cc: Herrio Lamothe, Project Manager

THIS PAGE IS INTENTIONALLY LEFT BLANK

Park and Ride Expansion and Improvements at Route 132

(610800-135580)

Questions and Responses Addendum No. 2, August 12, 2026

Lawrence-Lynch Corp., email dated July 30, 2026

Question 6 Can you please confirm if the proposed/new bus shelters must be constructed with steel or aluminum? On Sheet 58 of 87 Construction Details (attached), the drawings for the proposed/new bus shelters appear to show that they are all made up of structural steel. The existing bus shelters on-site appear to be aluminum construction (see attached photograph identified as Photo No.00).

Response 6

Aluminum components can be substituted for steel given it meets the layout/dimensions, wind loading, and structural requirements according to the manufacturer and as required by the engineer.

See the revised plan sheet 58 of 87.

R M Pacella., email dated July 30, 2026

Question 7 No items provided for frame and grates/covers to support item 201 and 202.

Response 7

See attached revised proposal, page B00420 – 5. Items 221. and 222. have been added.

R M Pacella., email dated July 30, 2026 (Continued)

Question 8 What is the intention 804.31- 3 Inch Conduit- Liquid Tight? Only mentioned on the utility plans sheet #44, nothing on the lighting plans sheets 46-47. Also shown coming from a handhole to light pole foundation, conflicting with note #3 on sheet 48.

Response 8 Due to the proximity of the leeching fields, the conduit called out on sheet 44 shall be liquid tight to prevent any possible seepage from the fields. The Item 804.31 has been deleted and Item 804.21 2 Inch Conduit – Liquid Tight have been added and the quantity will reflect one run of conduit.

See attached revised proposal, page B00420 – 12.

Question 9 Please confirm items 707.8- Steel Bollard and 812.3- Standard Signal Foundation are to be used in conjunction with item 825.1- Level 2 Charger Removed and Reset. Additionally, there is only one handhole item provided for the SD2.022 types. On sheet 50, detail for “typical EV charging handhold” appears to show polymer concrete. Please advise if an item will be provided for the polymer concrete and if the necessary conduit needed for item 825.1 will be compensated under the respective conduit items.

Response 9

Handholes are to be SD2.022 type. Reference to polymer concrete on detail has been removed.

See the revised plan sheet 50 of 87.

Question 10 A few locations for existing pipe to be removed are outside the limits of trench excavation for new RCP. Will item 272.12 be added or shall we assume this to be captured under the earth excavation item.

Response 10 Removal of existing pipe shall be paid for under Item 120. – Earth Excavation

Question 11 Only one item provided for TL-2 guardrail, will item 620.32 be added to capture the portions of curved guardrail at stations 206+72 and 209+69 RT.

Response 11

See attached revised proposal, page B00420 – 8. Item 620.32 has been added for curved guardrail.

R M Pacella., email dated July 30, 2026 (Continued)

Question 12 Item 258 provided for stone for pipe ends does not appear on plans. Item provided for compost blanket but no modified rock fill to support the “Proposed Compost and Seed over Modified Rock Fill” as mentioned on sheet 15 and detailed on sheet 57. Confirm the stone treatment within the sediment forebays and if 986 will be added or assumed under 258.

Response 12

See attached revised proposal, page B00420 – 16. Item 986. Modified Rockfill has been added.

The stone treatment within the sediment forebays shall be paid under Item 258.

Question 13 Request that the surface course between full depth and mill and overlay areas match to achieve a uniform mat thickness

Response 13

The 2.5” for mill and overlay is to mill out the entirety of the existing surface course. Pavement will be according to the plan.

Question 14 Will the district object to an approximate 4-5 day to night parking restriction/shutdown for the entire lotto achieve the milling and paving of surface course project wide. Or will we be required top each area within the staging plan.

Response 14

Response will be provided in a later addendum.

E.T.& L. Corp., email dated August 5, 2026

Question 15 Please provide pay items for Frames and Grates and Frames and Covers.

Response 15

See response 7.

Question 16 There is no Item 451. Please clarify what item permanent pavement trench patch is to paid?

Response 16

See attached revised proposal, page B00420-7. Item 451. has been added

Question 17 Please clarify where the modified Rockfill Slope located in the Southern corner near STA 210+00 is paid?

Response 17 See attached revised proposal, page B00420 – 16. Item 986. has been added.

Question 18 Please clarify which pavement marking item is to be used for the gore striping?

Response 18

Item 866.106 shall be used for all gore striping.

Question 19 Please inform if the work areas that are highlighted in the Construction Staging Plans as Stage 1 & Stage 3 can be worked on concurrently.

Response 19

Stage 1 and State 3 should be able to be worked on concurrently.

E.T.& L. Corp., email dated August 5, 2026 (Continued)

Question 20 Lighting Plan Sheet 47 shows two 3” conduit ductbanks from existing panel enclosure DP2 to the relocated EV charging stations. There is a note associated with these ductbanks stating that concrete encasement is required when passing under roadways/ parking areas. Please inform under what pay item the concrete encasement will be compensated.

Response 20 The concrete encasement will be considered incidental to the Conduit bid Item without additional compensation, as described in Subsection 801.81 of the standard Specifications.

Question 21 Per the “Conduit Crossing Roadway” detail on Lighting Plans & Details Sheet 47, excavatable controlled density fill is required for in-roadway conduit runs. Please inform under what pay item the controlled density fill will be compensated.

Response 21

See the revised plan sheet 49 of 87. The controlled density fill has been replaced with Cement Concrete and will be considered as incidental to the individual conduit item as described in section

801.81 of the standard specifications.

Question 22 Please provide more details on the Pedestrian Bus Shelter, Item # 745, including manufacturer & model numbers.

Response 22

The pedestrian bus shelter shall meet the dimensions and specifications shown on the plans and in the contract documents. A specific manufacturer is not specified.

Question 23 The Pedestrian Bus Shelter on plan sheet 58 shows LED lights, are these solar powered? Or will these bus shelters require electrical hook ups?

Response 23

The Bus Shelter is proposed to be powered with a 300W solar panel affixed to the roof. See the revised plan sheet 58 of 87.

E.T.& L. Corp., email dated August 5, 2026 (Continued)

Question 24 The detail for the Pedestrian Bus Shelter on plan sheet 58 shows a 6” thick concrete pad. Will the concrete pads at the bus shelter area be paid under Item # 701 – Cement Concrete Sidewalk?

Response 24 The concrete pad (foundation) shall be incidental to Item 745. Refer to the special provisions-Basis of Payment on page A00801 54.

Question 25 Please confirm the bid quantity for Item # 904. Is there other work that is included in this pay item beyond the foundations for the trash receptacles and bicycle racks.

Response 25

The Bid quantity in Item 904. is provided to pay for the foundations for trash receptacles and bicycle racks.

R M Pacella., email dated August 11, 2026

Question 26 Please provide manufacturer(s) for item 745- Pedestrian Bus Shelter

Response 26

Question 27 Please provide locations for proposed trash receptacles.

Response 27

Question 28 What is the required size for the Light Standard Foundation Precast (812.09)? Proposed light poles are all 40'. The table provided on sheet #50 notes 30-40' mounting height foundation 3' x7' and 40- 100' mounting height foundation 3' x10'.

Response 28

Massachusetts Department Of Transportation Highway Division Proposal No. 610800-135580

00104 - 3

Addendum No. 2, August 12, 2026 NOTICE TO CONTRACTORS (Continued)

PRICE ADJUSTMENTS

This Contract contains price adjustments for hot mix asphalt and Portland cement mixtures, diesel fuel, and gasoline. For reference the base prices are as follows: liquid asphalt $712.50 per ton, Portland cement $452.13 per ton, diesel fuel $4.372 per gallon, and gasoline $3.335 per gallon, and Steel Base Price Index 370.1. MassDOT posts the Price Adjustments on their Highway Division’s website at https://www.mass.gov/massdot-contract-price-adjustments

This Contract contains Price Adjustments for steel. See Document 00813 - PRICE ADJUSTMENT FOR STRUCTURAL STEEL AND REINFORCING STEEL for their application and base prices.

MassDOT projects are subject to the rules and regulations of the Architectural Access Board (521 CMR 1.00 et seq.)

Prospective bidders and interested parties can access this information and more via the internet at

WWW.COMMBUYS.COM.

BY: Monica G. Tibbits-Nutt, Secretary and CEO, MassDOT Jonathan L. Gulliver, Administrator, MassDOT Highway Division

SATURDAY, JULY 18, 2026

https://www.mass.gov/massdot-contract-price-adjustments http://www.commbuys.com/

Massachusetts Department Of Transportation Highway Division Proposal No. 610800-135580

A00801 - 74

Addendum No. 2, August 12, 2026

ITEM 804.21 2 INCH ELECTRICAL CONDUIT TYPE NM FOOT

- PLASTIC (UL) – (LIQUID TIGHT)

The work under this Item shall conform to the relevant provisions of Subsection 801 of the Standard Specifications and the following:

The work under this Item shall consist of furnishing and installing proposed liquid tight conduit as shown on the plans and/or as directed by the Engineer.

The Contractor shall ensure that the procured conduit is liquid tight and meets the requirements of Underwriters Laboratories (UL) 1600

All electrical work shall be performed by a Commonwealth of Massachusetts licensed electrician and said work shall meet all state and local electrical codes.

METHOD OF MEASUREMENT

Item 804.21 will be measured for payment by the Foot of liquid tight conduit installed, completed in place.

BASIS OF PAYMENT

Item 804.21 will be paid for at the Contract unit bid price per Foot, which price shall include all labor, material, tools, equipment, excavation, connection, backfill, transportation, and all incidental costs required to complete the work described.

Project # 610800 Contract # 135580

Location : BARNSTABLE

Description : Park and Ride Expansion and Improvements at Route 132

ITEM # QUANTITY ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE AMOUNT

201. 22 CATCH BASIN

AT _________________________

EACH

202. 9 MANHOLE

AT _________________________

EACH

220. 17 DRAINAGE STRUCTURE ADJUSTED

AT _________________________

EACH

220.2 5 DRAINAGE STRUCTURE REBUILT

AT _________________________

PER FOOT

220.3 3 DRAINAGE STRUCTURE CHANGE IN TYPE

AT _________________________

EACH

220.5 3 DRAINAGE STRUCTURE REMODELED

AT _________________________

EACH

221. 12 FRAME AND COVER

AT _________________________

EACH

222. 22 FRAME AND GRATE - MASSDOT BAR TYPE

AT _________________________

EACH

227.3 60 REMOVAL OF DRAINAGE STRUCTURE SEDIMENT

AT _________________________

PER CUBIC YARD

CMS104 - Report Run Date: 8/11/2026 9:29 AM Page 4

Proposal No. 610800-135580 Addendum No. 2, August 12, 2026

B00420 - 5

Description : Park and Ride Expansion and Improvements at Route 132

ITEM # QUANTITY ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE AMOUNT

227.31 1,500 REMOVAL OF DRAINAGE PIPE SEDIMENT

AT _________________________

PER FOOT

227.4 20 MASONRY PLUG

AT _________________________

PER SQUARE FOOT

228. 16 DRAINAGE PIPE VIDEO INSPECTION

AT _________________________

PER HOUR

242.18 2 18 INCH REINFORCED CONCRETE PIPE FLARED END

AT _________________________

EACH

243.12 1,160 12 INCH REINFORCED CONCRETE PIPE CLASS IV

AT _________________________

PER FOOT

243.18 190 18 INCH REINFORCED CONCRETE PIPE CLASS IV

AT _________________________

PER FOOT

250.04 710 4 INCH POLYVINYL CHLORIDE SANITARY SEWER PIPE

AT _________________________

PER FOOT

258. 10 STONE FOR PIPE ENDS

AT _________________________

PER SQUARE YARD

402. 120 DENSE GRADED CRUSHED STONE FOR SUB-BASE

AT _________________________

PER CUBIC YARD

CMS104 - Report Run Date: 8/11/2026 9:29 AM Page 5

B00420 - 6

Description : Park and Ride Expansion and Improvements at Route 132

ITEM # QUANTITY ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE AMOUNT

415.2 11,700 PAVEMENT FINE MILLING

AT _________________________

PER SQUARE YARD

431. 870 HIGH EARLY STRENGTH CEMENT CONCRETE BASE

COURSE

AT _________________________

PER SQUARE YARD

443. 20 WATER FOR ROADWAY DUST CONTROL

AT _________________________

PER 1000 GALLONS

450.22 10 SUPERPAVE SURFACE COURSE - 9.5 (SSC - 9.5)

AT _________________________

PER TON

450.231 2,790 SUPERPAVE SURFACE COURSE - 12.5 POLYMER (SSC -

12.5 - P)

AT _________________________

PER TON

450.31 1,440 SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC -12.5)

AT _________________________

PER TON

450.42 2,140 SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5)

AT _________________________

PER TON

451. 150 HMA FOR PATCHING

AT _________________________

PER TON

452. 1,800 ASPHALT EMULSION FOR TACK COAT

AT _________________________

PER GALLON

CMS104 - Report Run Date: 8/11/2026 9:29 AM Page 6

B00420 - 7

Description : Park and Ride Expansion and Improvements at Route 132

ITEM # QUANTITY ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE AMOUNT

453. 4,000 HMA JOINT ADHESIVE

AT _________________________

PER FOOT

482.5 980 SAWCUTTING ASPHALT PAVEMENT FOR BOX WIDENING

AT _________________________

PER FOOT

504. 9,275 GRANITE CURB TYPE VA4 - STRAIGHT

AT _________________________

PER FOOT

504.1 1,345 GRANITE CURB TYPE VA4 - CURVED

AT _________________________

PER FOOT

509. 540 GRANITE TRANSITION CURB FOR PEDESTRIAN CURB

RAMPS - STRAIGHT

AT _________________________

PER FOOT

509.1 150 GRANITE TRANSITION CURB FOR PEDESTRIAN CURB

RAMPS - CURVED

AT _________________________

PER FOOT

597. 6,150 EDGING REMOVED AND DISCARDED

AT _________________________

PER FOOT

620.12 565 GUARDRAIL, TL-2 (SINGLE FACED)

AT _________________________

PER FOOT

620.32 30 GUARDRAIL - CURVED, TL-2 (SINGLE FACED)

AT _________________________

PER FOOT

CMS104 - Report Run Date: 8/11/2026 9:29 AM Page 7

B00420 - 8

Description : Park and Ride Expansion and Improvements at Route 132

ITEM # QUANTITY ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE AMOUNT

627.1 3 TRAILING ANCHORAGE

AT _________________________

EACH

627.82 1 GUARDRAIL TANGENT END TREATMENT, TL-2

AT _________________________

EACH

630.2 365 HIGHWAY GUARD REMOVED AND DISCARDED

AT _________________________

PER FOOT

650.036 12 36 INCH CHAIN LINK GATE WITH GATE POSTS

AT _________________________

PER FOOT

697.1 42 SILT SACK

AT _________________________

EACH

701. 2,915 CEMENT CONCRETE SIDEWALK

AT _________________________

PER SQUARE YARD

701.2 340 CEMENT CONCRETE PEDESTRIAN CURB RAMP

AT _________________________

PER SQUARE YARD

707.2 10 TRASH RECEPTACLE

AT _________________________

EACH

707.8 10 STEEL BOLLARD

AT _________________________

EACH

CMS104 - Report Run Date: 8/11/2026 9:29 AM Page 8

B00420 - 9

Description : Park and Ride Expansion and Improvements at Route 132

ITEM # QUANTITY ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE AMOUNT

707.9 10 BICYCLE RACK

AT _________________________

EACH

722.3 1 SCHEDULE OF OPERATIONS (TYPE C) - FIXED PRICE

$61500

AT Sixty One Thousand Five Hundred Dollars

LUMP SUM

$61,500.00 $61,500.00

740. 38 ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE A)

AT _________________________

PER MONTH

745. 4 PEDESTRIAN BUS SHELTER

AT _________________________

EACH

745.2 1 PEDESTRIAN BUS SHELTER REMOVED AND STACKED

AT _________________________

LUMP SUM

748. 1 MOBILIZATION

AT _________________________

LUMP SUM

751. 570 LOAM FOR ROADSIDES

AT _________________________

PER CUBIC YARD

751.7 640 COMPOST BLANKET

AT _________________________

PER CUBIC YARD

756. 1 NPDES STORMWATER POLLUTION PREVENTION PLAN

AT _________________________

LUMP SUM

CMS104 - Report Run Date: 8/11/2026 9:29 AM Page 9

B00420 - 10

Description : Park and Ride Expansion and Improvements at Route 132

ITEM # QUANTITY ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE AMOUNT

765. 2,150 SEEDING

AT _________________________

PER SQUARE YARD

765.412 5,500 UPLAND SEED MIX - SHORT GRASSLAND MIX-SANDY SOIL

AT _________________________

PER SQUARE YARD

765.554 450 WETLAND SEED MIX - SEASONALLY FLOODED MIX

AT _________________________

PER SQUARE YARD

765.664 450 MOWING FOR NATIVE SEED ESTABLISHMENT

AT _________________________

PER SQUARE YARD

767.121 1,500 SEDIMENT CONTROL BARRIER

AT _________________________

PER FOOT

773.224 10 PINE - PITCH 4-5 FEET

AT _________________________

EACH

774.300 13 ELM - AMERICAN 2-2.5 INCH CALIPER

AT _________________________

EACH

775.431 12 LOCUST - HONEY - SHADEMASTER 2-2.5 INCH CALIPER

AT _________________________

EACH

776.523 5 MAPLE - RED 2-2.5 INCH CALIPER

AT _________________________

EACH

CMS104 - Report Run Date: 8/11/2026 9:29 AM Page 10

B00420 - 11

Description : Park and Ride Expansion and Improvements at Route 132

ITEM # QUANTITY ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE AMOUNT

777.328 12 OAK - WHITE 2-2.5 INCH CALIPER

AT _________________________

EACH

778.166 15 BIRCH - GRAY 5-6 FEET MULTI STEM

AT _________________________

EACH

781.284 5 HAWTHORN - COCKSPUR 1.5-2 INCH CALIPER

AT _________________________

EACH

783.057 11 SHAD TREE - DOWNY CUMULUS 7-8 FEET CLUMP

AT _________________________

EACH

796.201 150 BEACH GRASS 1 GALLON

AT _________________________

EACH

796.202 150 SWITCH GRASS 1 GALLON

AT _________________________

EACH

804.2 205 2 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC (UL)

AT _________________________

PER FOOT

804.21 150 2 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC (UL) -

(LIQUID TIGHT)

AT _________________________

PER FOOT

804.3 3,080 3 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -(UL)

AT _________________________

PER FOOT

CMS104 - Report Run Date: 8/11/2026 9:29 AM Page 11

B00420 - 12

Item 804.31 has been deleted.

Description : Park and Ride Expansion and Improvements at Route 132

ITEM # QUANTITY ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE AMOUNT

806.4 20 4 INCH ELECTRICAL CONDUIT TYPE RM - GALVANIZED

STEEL

AT _________________________

PER FOOT

811.01 17 ELECTRIC HANDHOLE REMOVED AND DISCARDED

AT _________________________

EACH

811.22 32 ELECTRIC HANDHOLE - SD2.022

AT _________________________

EACH

812.09 20 LIGHT STANDARD FOUNDATION PRECAST

AT _________________________

EACH

812.30 5 STANDARD SIGNAL POST FOUNDATION SD3.030

AT _________________________

EACH

813.40 800 WIRE TYPE 8 NO. 10 DIRECT BURIAL

AT _________________________

PER FOOT

813.41 650 WIRE TYPE 8 NO. 8 DIRECT BURIAL

AT _________________________

PER FOOT

813.42 11,470 WIRE TYPE 8 NO. 6 DIRECT BURIAL

AT _________________________

PER FOOT

813.43 2,860 WIRE TYPE 8 NO. 4 DIRECT BURIAL

AT _________________________

PER FOOT

CMS104 - Report Run Date: 8/11/2026 9:29 AM Page 12

B00420 - 13

Description : Park and Ride Expansion and Improvements at Route 132

ITEM # QUANTITY ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE AMOUNT

821.101 2 HIGHWAY LIGHTING POLE (ANCHOR BASE) 1 FOOT

BRACKET

AT _________________________

EACH

821.201 18 HIGHWAY LIGHTING POLE (ANCHOR BASE) TWIN 1 FOOT

BRACKET

AT _________________________

EACH

823.01 38 AREA LIGHTING LUMINAIRE 105 WATT

AT _________________________

EACH

823.60 1 HIGHWAY LIGHTING LOAD CENTER

AT _________________________

LUMP SUM

823.63 1 STEP DOWN TRANSFORMER

AT _________________________

LUMP SUM

823.72 10 HIGHWAY LIGHTING POLE AND LUMINAIRE REMOVED AND

DISCARDED

AT _________________________

EACH

825.10 5 LEVEL 2 CHARGER REMOVED AND RESET

AT _________________________

EACH

829. 75 ROADSIDE GUIDE SIGN (G) - ALUMINUM PANEL (TYPE B)

AT _________________________

PER SQUARE FOOT

832. 375 WARNING-REGULATORY AND ROUTE MARKER - ALUMINUM

PANEL (TYPE A)

AT _________________________

PER SQUARE FOOT

CMS104 - Report Run Date: 8/11/2026 9:29 AM Page 13

B00420 - 14

Description : Park and Ride Expansion and Improvements at Route 132

ITEM # QUANTITY ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE AMOUNT

841.6 4 SUPPORTS FOR GUIDE SIGN (I-2A-5 INCH TUBULAR POST)

STEEL

AT _________________________

EACH

847.1 70 SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST

ASSEMBLY - STEEL

AT _________________________

EACH

850.41 120 ROADWAY FLAGGER

AT _________________________

PER HOUR

852. 120 SAFETY SIGNING FOR TRAFFIC MANAGEMENT

AT _________________________

PER SQUARE FOOT

856.12 365 PORTABLE CHANGEABLE MESSAGE SIGN

AT _________________________

PER DAY

859. 39,600 REFLECTORIZED DRUM

AT _________________________

PER DAY

864.04 900 PAVEMENT ARROWS AND LEGENDS REFLECTORIZED

WHITE (THERMOPLASTIC)

AT _________________________

PER SQUARE FOOT

866.106 16,000 6 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)

AT _________________________

PER FOOT

866.112 1,770 12 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)

AT _________________________

PER FOOT

CMS104 - Report Run Date: 8/11/2026 9:29 AM Page 14

B00420 - 15

Description : Park and Ride Expansion and Improvements at Route 132

ITEM # QUANTITY ITEM WITH UNIT BID PRICE

WRITTEN IN WORDS

UNIT PRICE AMOUNT

867.106 3,270 6 INCH REFLECTORIZED YELLOW LINE (THERMOPLASTIC)

AT _________________________

PER FOOT

874.2 9 TRAFFIC SIGN REMOVED AND RESET

AT _________________________

EACH

874.41 28 TRAFFIC SIGN ASSEMBLY REMOVED AND DISCARDED

AT _________________________

EACH

904. 60 4000 PSI, 3/4 INCH, 610 CEMENT CONCRETE

AT _________________________

PER CUBIC YARD

986. 120 MODIFIED ROCKFILL

AT _________________________

PER TON

Total Qty: 200,448.4

CMS104 - Report Run Date: 8/11/2026 9:29 AM Page 15

B00420 - 16

1'

0"

SC

AL

E:

N

TS

BR

EA

K

AW

AY

F

O U

N D

AT

IO

N

SC

C O

N D

U

IT

U N

D

ER

G R

AS

S

SC

C O

N D

U

IT

C R

O

SS

IN

G

R O

AD

W

AY

SC

C O

N D

U

IT

U N

D

ER

S

ID

EW

AL

K

SC

IN

X

IN

X

IN

E

LE

C

TR

IC

H

AN

D

H O

LE

(S

D 2-

2)

C C O

O A

OD

D

BO

N

D

IN

G W

IR

E

(S

EE

N O

TE

SC

EL

EC

TR

IC

H

AN

D H

O

LE

F R

AM

E

AN

D

C O

VE

R

D

ET

AI

L m as sD O

T D

EP

AR

TM

EN

T

SC

M

AS

SD

O

T

LO

G O

F O

R E

LE

C

TR

IC

AL

H

AN

D

H O

LE

LI

G

H

TI

N G

F

IX

TU

R

E

SC

H

ED

U

LE

D

ES

IG

M A

N U

FA

C

TU

R

ER

C A

TA

LO

G N

O

TY

PE

O F

LA

M

PS

VT

G

M

TG

R

EM

A

R K

S

A

H

EA

D P

O

LE

M

TD

S

IT

E

LI

G H

T H

O

LO

PH

AN

E M

G

LE

D M

P

0K

M

VO

LT

Z

T

AR

VH

G

R

SD

N

BR

P R

SH

B R

-1

5W

L

ED

PE

R

H

EA

D

8V 1Ø

PO

LE

FI

XT

U

R E

C

AT

AL

O

G N

U M

BE

R

IS

F

O R

ST

AN

D

AR

D G

R

AY

F

IN

IS

H

. P R

O

VI

D E

'-0

PO

LE

W

IT

H

D U

AL

T

EN

O

N M

O U

N T

TO

AC

C O

M M

O D

AT

E

H

EA

D

S

SP

AC

ED

N O

M O

R E

TH

AN

8"

A

PA

R T

A-

AL

T1

H

EA

D P

O

LE

M

TD

S

IT

E

LI

G H

T

LE

O

TE

K

VT

O R

A M

V

K7 T

G

Y P1

S F

LL

PC

P S3

T B

SP

W

L

ED

PE

R

H

EA

D

8V 1Ø

PO

LE

AL

TE

R

N

AT

E

FI

XT

U

R E

FO

R

T

YP

E 'A

C

AT

AL

O G

N U

M

BE

R

IS

F O

R S

TA

N

D

AR

D G

R

AY

F

IN

IS

H

PR

O

VI

D E

'-0

" P O

LE

W

IT

H

D U

AL

H

EA

D

M O

U N

T

TO

A C

C O

M M

O D

AT

E

H

EA

D

S

SP

AC

ED

N O

M O

R E

TH

AN

8"

A

PA

R T

A-

AL

T2

H

EA

D P

O

LE

M

TD

S

IT

E

LI

G H

T

LU

M

EC

O N

LD

S

SA

L

G R

T

S F

7P P

C

6W

L

ED

PE

R

H

EA

D

8V 1Ø

PO

LE

AL

TE

R

N

AT

E

FI

XT

U

R E

FO

R

T

YP

E 'A

C

AT

AL

O G

N U

M

BE

R

IS

F O

R S

TA

N

D

AR

D G

R

AY

F

IN

IS

H

PR

O

VI

D E

'-0

" P O

LE

W

IT

H

D U

AL

H

EA

D

M O

U N

T

TO

A C

C O

M M

O D

AT

E

H

EA

D

S

SP

AC

ED

N O

M O

R E

TH

AN

8"

A

PA

R T

B

SI

N G

LE

H

EA

D

P O

LE

M

TD

S

IT

E

LI

G

H T

H O

LO

PH

AN

E

M G

LE

D

M P

0K M

VO

LT

Z T

M R

VH

G

R

SD

N

BR

P R

SH

5W

L

ED

PE

R

H

EA

D

8V 1Ø

PO

LE

FI

XT

U

R E

C

AT

AL

O

G N

U M

BE

R

IS

F

O R

ST

AN

D

AR

D G

R

AY

F

IN

IS

H

. P R

O

VI

D E

'-0

PO

LE

W

IT

H

S

IN

G

LE

T

EN

O N

M O

U N

T

FA

C

IN

G

LU

M

IN

AI

R

E

TO

W

AR

D T

R

AF

FI

C

A R

EA

S.

B-

AL

T1

SI

N G

LE

H

EA

D

P O

LE

M

TD

S

IT

E

LI

G

H T

LE

O

TE

K

VT

O

R

A

M V

K7

T 3R

G Y

P1 S

F

LL

PC

P

S3 T

B

SP

W

L

ED

PE

R

H

EA

D

8V 1Ø

PO

LE

AL

TE

R

N

AT

E

FI

XT

U

R E

FO

R

T

YP

E 'B

C

AT

AL

O G

N U

M

BE

R

IS

F O

R S

TA

N

D

AR

D G

R

AY

F

IN

IS

H

PR

O

VI

D E

'-0

" P O

LE

W

IT

H

S

IN

G

LE

H

EA

D M

O U

N T

FA

C

IN

G

L U

M

IN

AI

R

E

TO

W

AR

D S

TR

AF

FI

C

A R

EA

S

B-

AL

T2

SI

N G

LE

H

EA

D

P O

LE

M

TD

S

IT

E

LI

G

H T

LU

M

EC

O

N

LD

S

SA

L

G

R T

S

F 7P

P C

6W

L

ED

PE

R

H

EA

D

8V 1Ø

PO

LE

AL

TE

R

N

AT

E

FI

XT

U

R E

FO

R

T

YP

E 'B

C

AT

AL

O G

N U

M

BE

R

IS

F O

R S

TA

N

D

AR

D G

R

AY

F

IN

IS

H

PR

O

VI

D E

'-0

" P O

LE

W

IT

H

S

IN

G

LE

H

EA

D M

O U

N T

FA

C

IN

G

L U

M

IN

AI

R

E

TO

W

AR

D S

TR

AF

FI

C

A R

EA

S

N O

TE

S:

1.

PR

O

VI

D E

SI

N

G

LE

P O

LE

W

IT

H

D U

AL

H

EA

D

S

0° A

PA

R

T

FO

R T

YP

E

'A ' F

IX

TU

R

ES

A N

D S

IN

G

LE

H

EA

D

PO

LE

F O

R T

YP

E

'B ' F

IX

TU

R

ES

W H

ER

E

SH

O

W N

IN

P

LA

N

2.

AN

A

PP

R

O

VE

D E

Q U

AL

M

AY

B

E U

SE

D

F O

R A

N Y

O F

TH

E

LU

M

IN

AI

R

ES

L

IS

TE

D

A

BO

VE

SP

LI

T

BO

LT

B

O N

D

IN

G C

O N

N

EC

TO

R

(C O

PP

ER

) 1 /4

"Ø x

1/ 2"

S

TU

D T

H R

EA

D

ED

IN

TO

M

ET

AL

F R

AM

E

SP

LI

T

BO

LT

B

O N

D

IN

G C

O N

N

EC

TO

R

(C O

PP

ER

) 3 /8

"Ø x

1/

8" S

TU

D

TH

R

EA

D

ED

IN

TO

C

O

VE

R A

N D

G R

IN

D

F

LU

SH

3'-0" MIN.

2'-6" MIN.

2' -0

4"

(T

YP

)BR

IC

KS

M

AY

B

E U

SE

D

F O

R G

R

AD

E

AD

JU

ST

M

EN

TS

FR

AM

E

TO

B

E

SE

T

IN

F U

LL

BE

D O

F M

O R

TA

R

KN

O

C K

O U

T O

PE

N

IN

G

F O

R 3"

C O

N D

U

IT

(T

YP

6" L

AY

ER

O F

3/ 4"

C R

U

SH

ED

S

TO

N

E (M

2.

.4

BE

LL

E N

D (T

YP

3/ 4"

X

' C O

PP

ER

G R

O U

N D

R O

D 3/

4" X

' C

O

PP

ER

G

R O

U N

D R

O D

1' -1

" 1' -6

1' -0

1'

-0

EX

IS

TI

N

G G

R

AS

S

SU

R

FA

C E

4" L

O

AM

S

EE

D

6" D

ET

EC

TA

BL

E M

ET

AL

LI

C

T

AP

E

G R

AV

EL

B O

R R

O W

TY

PE

B

(2 )3

" C O

N D

U

IT

S 6"

S

AN

D B

ED

D

IN

G

N O

TE

S:

1.

C

O N

D U

IT

S

H

AL

L

BE

S C

H

ED

U

LE

EL

EC

TR

IC

AL

C

O N

D U

IT

T

YP

E

N M

-P

LA

ST

IC

(U L)

, W

IT

H P

U

LL

R O

PE

2.

W

AR

N

IN

G

T

AP

E C

O

LO

R S

H

AL

L

BE

P

ER

A

PW

A

ST

AN

D

AR

D

S.

3.

W H

EN

-3 " C

O N

D U

IT

S

AR

E

SP

EC

IF

IE

D U

SE

P

LA

ST

IC

SP

AC

ER

S 4'

O .C

. T O

M

AI

N

TA

IN

A

" C

O N

D U

IT

S

PA

C

IN

G

1' -6

1'-0"

2'-6" 3'-0"

6" D

ET

EC

TA

BL

E M

ET

AL

LI

C

T

AP

E

G R

AV

EL

B O

R R

O W

TY

PE

B

(2 )3

" C O

N D

U

IT

S 6"

S

AN

D B

ED

D

IN

G

1'-0"

2'-6" 3'-0"

1' -6

AD

D

M

AT

ER

IA

L

TO

M

AT

C H

EX

IS

TI

N

G S

ID

EW

AL

K

(H M

A O

R C

EM

. C

O N

C

EX

IS

TI

N

G S

ID

EW

AL

K

SU

R

FA

C

E

EX

IS

TI

N

G S

ID

EW

AL

K

SU

R

FA

C

E

N O

TE

S:

1.

C

O N

D U

IT

S

H

AL

L

BE

S C

H

ED

U

LE

EL

EC

TR

IC

AL

C

O N

D U

IT

TY

PE

N

M -P

LA

ST

IC

(U

L) , W

IT

H

P U

LL

R

O

PE

2.

W

AR

N

IN

G T

AP

E

C O

LO

R

S H

AL

L

BE

P

ER

A

PW

A

ST

AN

D

AR

D S.

3.

W

H

EN

-3

" C O

N D

U

IT

S

AR

E

SP

EC

IF

IE

D

U

SE

P

LA

ST

IC

SP

AC

ER

S

4' O

.C . T

O M

AI

N

TA

IN

A

" C O

N D

U

IT

S

PA

C

IN

G

1' -6

G R

AV

EL

B O

R R

O W

T

YP

E B

6" D

ET

EC

TA

BL

E M

ET

AL

LI

C

T

AP

E

C

EM

EN

T

C O

N C

R

ET

E

(2 )3

" C O

N D

U

IT

S 6"

S

AN

D B

ED

D

IN

G

3"

2'-6" 3'-0"

M

AT

C H

E

XI

ST

R O

AD

P

AV

EM

EN

T

EX

IS

TI

N

G R

O

AD

W

AY

S U

R

FA

C E

N O

TE

S:

1.

C

O N

D U

IT

S

H

AL

L

BE

S C

H

ED

U

LE

EL

EC

TR

IC

AL

C

O N

D U

IT

T

YP

E

N M

-P

LA

ST

IC

(U L)

, W

IT

H P

U

LL

R O

PE

2.

W

AR

N

IN

G

T

AP

E C

O

LO

R S

H

AL

L

BE

P

ER

A

PW

A

ST

AN

D

AR

D

S.

3.

W H

EN

-3 " C

O N

D U

IT

S

AR

E

SP

EC

IF

IE

D U

SE

P

LA

ST

IC

S

PA

C

ER

S

4' O

.C . T

O M

AI

N

TA

IN

A

" C O

N D

U

IT

S

PA

C

IN

G

C O

N D

U

IT

C R

O

SS

IN

G

N O

TE

S

N O

TE

S:

1.

A

M

IN

IM

U

M O

F

IN

C

H

ES

O F

SE

PA

R

AT

IO

N

IS

R

EQ

U

IR

ED

F O

R C

R O

SS

IN

G S

W

IT

H G

AS

, W

AT

ER

SE

W

ER

A N

D D

R

AI

N

AG

E.

2.

C O

N D

U

IT

S

SH

AL

L

BE

B

LO

W

N C

LE

AN

U

SI

N G

C O

M

PR

ES

SE

D A

IR

. R

U N

M

AN

D R

EL

T

H R

U E

AC

H

C O

N D

U

IT

T O

C O

N

FI

R M

V

IA

BL

E

PA

TH

W

AY

3.

W O

VE

N

P O

LY

ES

TE

R

M U

LE

T

AP

E

W

IT

H M

IN

IM

U M

S

TR

EN

G

TH

O

F

L

B

TE

N

SI

LE

S

TR

EN

G

TH

T O

B E

IN

ST

AL

LE

D W

IT

H

IN

E

AC

H

C O

N D

U

IT

G R

O U

N D

L U

G B

O N

D

ED

T O

P O

LE

(B

IM

ET

AL

LI

C C

O N

N

EC

TO

R

S

AN

D

FI

TT

IN

G S

SH

AL

L

BE

U

SE

D F

O R

S

PL

IC

IN

G O

R B

O N

D

IN

G D

IS

SI

M

IL

AR

M

ET

AL

S

TO

LU

G

LI

G

H

TI

N G

P O

LE

R

EI

N

FO

R C

ED

H

AN

D

H O

LE

W

/C O

VE

R

A N

D T

AM

PE

R R

ES

IS

TA

N

T

FA

ST

EN

ER

S

M O

U N

TI

N

G B

O

LT

ST

R

U C

TU

R

ES

N

O T

EX

C

EE

D

IN

G

5'

IN

H

EI

G

H T

SH

AL

L

BE

P R

O

TE

C

TE

D

AC

C O

R D

IN

G

T O

C

LA

SS

I

LI

G

H

TN

IN

G

R

EQ

U

IR

EM

EN

TS

W

IT

H

A #2

C U

C O

N D

U C

TO

R

ST

R

U C

TU

R

ES

E

XC

EE

D

IN

G

5'

IN

H

EI

G H

T

SH

AL

L

BE

P

R O

TE

C

TE

D

AC

C

O R

D

IN

G T

O C

LA

SS

II

LI

G H

TN

IN

G R

EQ

U

IR

EM

EN

TS

W

IT

H A

#2 /0

C U

C O

N D

U C

TO

R

3/ 4"

X1 0'

C O

PP

ER

G R

O U

N D

R O

D

FU

LL

L

EN

G

TH

A

LU

M

IN

U M

B

AS

E

PL

AT

E

C O

VE

R

O R

S

KI

R T

(W

IT

H S

TA

IN

LE

SS

ST

EE

L H

AR

D

W

AR

E)

C O

N C

R

ET

E

FO

U N

D

AT

IO

N

PV

C

T O

R G

S C

O U

PL

IN

G

2" P

VC

(S

C H

0)

2" R

G S

3/ 4"

R G

S C

O N

D U

IT

F

O R

G R

O U

N D

N O

TE

S:

1.

LE

VE

LI

N G

B O

LT

S

TO

B

E

PR

O

VI

D

ED

, A S

R

EQ

U

IR

ED

B

Y M

AN

U

FA

C

TU

R

ER

. C

O N

TR

AC

TO

R

IS

R

ES

PO

N

SI

BL

E

FO

R

C O

O R

D

IN

AT

IN

G P

R O

PE

R

F

IX

TU

R

E O

R

IE

N

TA

TI

O

N

2.

AL

L H

AR

D

W

AR

E

TO

B E

ST

AI

N

LE

SS

S

TE

EL

N O

TE

S:

AT

TA

C H

F

EE

T

O F

#8 C

U B

O N

D

IN

G W

IR

E

FR

O

M S

PL

IT

B O

LT

B

O N

D

IN

G C

O N

N

EC

TO

R

IN

C

O

VE

R A

N D

FR

AM

E.

P

R O

VI

D

E

SU

FF

IC

IE

N

T

LE

N G

TH

O

F #8

C U

B O

N D

IN

G

W

IR

E

FR

O M

S

PL

IT

B

O

LT

B O

N D

IN

G

C O

N N

EC

TO

R

IN

F R

AM

E

TO

T

H E

H

AN

D H

O

LE

G R

O U

N D

R O

D A

N D

E Q

U

IP

M

EN

T G

R O

U N

D

IN

G C

O N

D U

C

TO

R

FO

R L

IG

H

TI

N

G S

YS

TE

M

N O

N -S

KI

D

S U

R

FA

C E

W

IT

H R

AI

SE

D

/1 6"

L

ET

TE

R

S C

AS

T

IN

T

H E

D

EP

R

ES

SI

O

N O

N T

O P

SE

E

LO

G

O A

N D

T

EX

T

SI

ZE

S

BE

LO

W F

O R

VA

R

IO

U

S

SI

ZE

C

O

VE

R

"D

EP

AR

TM

EN

T"

S H

AL

L

BE

R

EP

LA

C

ED

B Y

EI

TH

ER

"T

R

AF

FI

C

" O R

"L

IG

H

TI

N G

D

EP

EN

D

IN

G O

N U

SE

SP

LI

T

BO

LT

B

O N

D

IN

G C

O N

N

EC

TO

R

D R

IL

LE

D

AN

D T

AP

PE

D

IN

TO

C

O

VE

R

N O

TE

S:

1.

LO

G O

A N

D T

EX

T

SH

AL

L

BE

C

EN

TE

R

ED

W

IT

H

IN

T

H E

C O

VE

R

2.

LO

G

O A

N D

T

EX

T

SH

AL

L

BE

R

AI

SE

D

/1 6"

IN

C

H

ES

F R

O M

T H

E C

O

VE

R S

U R

FA

C

E.

3.

LO

G

O A

N D

T

EX

T

SH

AL

L

BE

IT

AL

IC

IZ

ED

A N

D S

H

AL

L U

TI

LI

ZE

T

H E

"E R

AS

D

EM

I"

ST

YL

E

FO

N T.

SI

ZE

O F

C O

VE

R

C O

VE

R

D

EP

TH

O

VE

R

A

LL

D

EP

TH

C

LE

A

R O

PE

N

IN

G

O

VE

R A

LL

A

PP

R

O X.

W

EI

G H

T

ST

A N

D A

R D

D R

A

IN

G

C D

O D

C O

O A

W W

3 4"

X

3 4"

1 2"

3"

"X

3 4" X

3 4"

LB

SD

2-

SI

ZE

O F

C O

VE

R

M A

SS

D

O T

LO

G

O D

EP

A

R

TM

EN

T

TE

XT

S

IZ

E

ST

A N

D A

R D

D R

A W

IN

G

" X

1 2"

W

ID

E X

1 2"

H

IG

H

TR

AF

FI

C : 6

" W

ID

E X

1" H

IG

H

LI

G

H

TI

N G

: 7 " W

ID

E

X 1"

H

IG

H

SD

2-

FE

D

. A

ID

P R

O J.

N O

SH

EE

T

N O

TO

TA

L

SH

EE

TS

ST

AT

E

M A

PR

O

JE

C

T

FI

LE

N

O

610800_HD13(LIGHTING_NOTES_DETAILS).DWG11-Aug-2026 9:41 AM Plotted on

LI

G

H

TI

N G

P

LA

N S

D

ET

A

IL

S

B A

R N

ST

A

B

LE

P A

R K

A N

D R

ID

E

B A

R N

ST

A

B

LE

C R

P-

3S (9

)X

A dd en du m

N o.

, A ug us t 1 2, A dd en du m

N o.

, A ug us t 1 2, SC

LI

G

H T

ST

AN

D

AR

D F

O U

N D

AT

IO

N (S

D 3.

/S

D 3.

4)

2" C

LEARANCE "A

" S

EE

C H

AR

T

1" D

R

AI

N

AG

E

TR

O U

G H

#3 S

PI

R

AL

S

3"

P

TI

C H

(T

YP

"B" S

EE

C

HART

2" R

G S

C O

N D

U

IT

3/ 4"

R G

S C

O N

D U

IT

F

O R

G R

O U

N D

PR

O

PO

SE

D G

R

AD

E

VE

R

TI

C

AL

R

EI

N

FO

R

C

EM

EN

T

"D" SEE CHART

30" MIN.1

2"

3" C

LE

AR

AN

C

E

TO

P

BO

TT

O M

N O

TE

S:

1.

C

EM

EN

T C

O N

C R

ET

E

FO

R

F O

U N

D

AT

IO

N

S

TO

B E

P

SI

, 3 /4

IN

, 6

LB

2.

A M

IN

IM

U M

S

LO

PE

O

F 1/

8" P

ER

F

T

FR

O M

E D

G E

O F

BA

SE

P

LA

TE

T

O F

AC

E

O F

C O

N C

R

ET

E.

3.

TH

E

AC

TU

AL

D

EP

TH

O F

FO

U

N D

AT

IO

N W

IL

L

BE

T

H E

"D " D

IM

EN

SI

O

N A

BO

VE

T H

E 1/

2" R

EV

EA

L.

4.

TH

E

AN

C

H O

R B

O

LT

S

SH

AL

L

BE

S

U

PP

LI

ED

B Y

TH

E

LI

G

H T

ST

AN

D

AR

D M

AN

U

FA

C

TU

R

ER

. T

H E

M

AN

U

FA

C

TU

R

ER

S H

AL

L

AL

SO

S U

PP

LY

A T

EM

PL

AT

E

FO

R

S

ET

TI

N

G T

H E

BO

LT

S

AN

D S

H

AL

L

IN

D

IC

AT

E

TH

E

N

EC

ES

SA

R Y

PR

O

JE

C

TI

O

N

FO

U

N D

A

TI

O N

D

ES

IG

N

C H

A R

T

M O

U N

TI

N

G H

EI

G

H T

D

IA

M

ET

ER

B

D

EP

TH

"D

VE

R

TI

C A

L R

EI

N

FO

R

C

EM

N T

"A

ST

A

N D

A R

D D

ET

A

IL

N

U M

B

ER

'-4

0' 3'

-0

7' -0

8-

#5

SD

3.

'-1

3' -0

'-0

SD

3.

FE

D

. A

ID

P R

O J.

N O

SH

EE

T

N O

TO

TA

L

SH

EE

TS

ST

AT

E

M A

PR

O

JE

C

T

FI

LE

N

O

610800_HD13(LIGHTING_NOTES_DETAILS).DWG12-Aug-2026 10:31 AM Plotted on

LI

G

H

TI

N G

P

LA

N S

D

ET

A

IL

S

B A

R N

ST

A

B

LE

P A

R K

A N

D R

ID

E

B A

R N

ST

A

B

LE

C R

P-

3S (9

)X

SC

TY

PI

C

AL

E V

C H

AR

G

IN

G

H

AN

D H

O

LD

D

ET

AI

L

SC

EV

C

H

AR

G

IN

G U

N

IT

C O

N C

R

ET

E

PA

D E

LE

VA

TI

O

N D

ET

AI

L

SC

EV

C

H

AR

G

IN

G U

N

IT

C O

N C

R

ET

E

PA

D P

LA

N

SC

EV

C

H

AR

G

IN

G U

N

IT

B O

LL

AR

D D

ET

AI

L

SC

EV

C

H

AR

G

IN

G U

N

IT

D

IR

EC

T

BU

R

IE

D

D U

C

TB

AN

K

1X

SC

EV

C

H

AR

G

IN

G U

N

IT

D

IR

EC

T

BU

R

IE

D

D U

C

TB

AN

K

1X

H

AN

D

H O

LE

S

TO

B

E

SD

2.

ST

AN

D

AR

D

D

ET

AI

LS

A dd en du m N o.

, A ug us t 1

2, .0

0'

6.00'

PR

O

P 6"

C O

N C

P

AD

PR

O

P 8"

G R

AV

EL

EX

IS

T

SU

BG

R

AD

E

.0

0' 4.

4.

'-0

" B

EN

C H

W

IT

H B

AC

K

4.

4.

4.

4.

O

PE

N

FR

O N

T W

IN

D

SC

R

EE

N

O

PE

N

7' -2

O

PE

N O

PE

N

1/ 4"

T

EM

PE

R

ED

SA

FE

TY

G

LA

SS

LE

FT

S

ID

E

EL

EV

AT

IO

N

FR

O

N T

EL

EV

AT

IO

N

BE

N

C H

L

AY

O U

T

5" x2

4" x2

2" x3

2" x1

0.

0" A

LU

M

IN

U

M

R O

O F

SH

EE

TS

PO

W D

ER

C

O

AT

ED

B

O

TH

S

ID

ES

0W S

O

LA

R P

AN

EL

3" X3

"X 3 16

" A

ST

EE

L

SQ

U

AR

E

TU

BE

1 2"

X2 1 4"

A

ST

EE

L

SQ

U

AR

E

TU

BE

3 8" X7

"X 7"

A

S

TE

EL

SQ

U

AR

E

BA

SE

P

LA

TE

S

LE

D

LE

D

LE

D

LE

D

N O

TE

S:

1.

ST

EE

L

C

AN

B E

SU

BS

TI

TU

TE

D

F O

R

AL

U M

IN

U

M P

ER

M

AN

U

FA

C

TU

R

ER

S

IN

ST

R U

C

TI

O N

S

AN

D E

N G

IN

EE

R S

AP

PR

O

VA

L

FE

D

. A

ID

P R

O J.

N O

SH

EE

T

N O

TO

TA

L

SH

EE

TS

ST

AT

E

M A

PR

O

JE

C

T

FI

LE

N

O

610800_HD13D(CONST_DETAILS).DWG10-Aug-2026 2:45 PM Plotted on

C O

N

ST

R U

C

TI

O N

D

ET

A

IL

S

B A

R N

ST

A

B

LE

P A

R K

A N

D R

ID

E

B A

R N

ST

A

B

LE

C R

P-

3S (9

)X

A dd en du m N o.

, A ug us t 1

2, A dd en du m

N o.

, A ug us t 1 2, THIS PAGE IS INTENTIONALLY LEFT BLANK

610800 Addendum Letter-A2
610800 Questions and Responses-A2) KL revised 2026 08 11
00104 NTC 11-14-24-A2
NOTICE TO CONTRACTORS
A00801-Specs-610800-2026 07 11-A2-P(74)
B00420-2-Rev Proposal 2026 08 11-A1 - P(5to 16)
Rev Plans-A2-SH (49-50-58)
610800_Sheet 49
Sheets and Views
2
610800_Sheet 58
Sheets and Views
CONST_DETAILS
2026-08-12T11:59:40-0400
Eric M. Cardone

File details come from the government source that posted it. Updated .