A00802-610800.pdf

PDF 231 KB Posted

Attached to
610800 BARNSTABLE FAP No. CRP-003S(984)X Park and Ride Expansion and Improvements at Route 132
Solicitation number
BD-27-1030-0H100-0H002-131511
Issued by
Barnstable County, Massachusetts

About this file

This is a project description and scope of work document for the Massachusetts Department of Transportation (MassDOT) Park and Ride Expansion and Improvements project at Route 132 in Barnstable, FAP No. CRP-003S(984)X. The project encompasses the expansion and improvement of an existing park and ride facility, including site preparation, construction of additional parking areas, drainage improvements, utility installations, and associated site work. The scope requires coordination with existing transportation infrastructure and adherence to state and federal design standards. Bidders are instructed not to use COMMBUYS to submit bids for this project, indicating an alternative bidding process or portal will be utilized. Specific response dates, site visit requirements, pre-bid conferences, and contract award timelines should be verified through the official project advertisement and bid documents issued by MassDOT.

The project is funded through Massachusetts state transportation capital funds and federal transportation grants administered by MassDOT. Pricing terms will be established through competitive sealed bidding procedures, with payment typically made upon completion of work phases and inspection certification. Bidders must demonstrate qualifications, bonding capacity, and insurance coverage appropriate for transportation infrastructure projects. The contract will include standard MassDOT contract terms, prevailing wage requirements consistent with Massachusetts law, and compliance with environmental and accessibility standards. Incumbent contractor information and specific funding amounts should be referenced in the official bid documents and project specifications available through MassDOT's procurement channels.

View the file

Other files

File Type Posted
A00810-610800.pdf PDF
610800 - Plan Holders List 8-17-2026.pdf PDF
A00811-610800.pdf PDF
A00871-610800.pdf PDF
BIDS OPENED - Tuesday - August 18-2026.pdf PDF
A00872-610800.pdf PDF
A00820-610800.pdf PDF
BARNSTABLE-610800-135580-A-3.pdf PDF
Link to Bid Opening 8-18-2026.pdf PDF
610800 - Bid Tabulations.pdf PDF
610800 - Plan Holders List 8-4-2026.pdf PDF
BARNSTABLE-610800-135580-A-2.pdf PDF
BARNSTABLE-610800-135580-A-4.pdf PDF
A00801-610800.pdf PDF
610800 Bid Items List.txt TXT text file
BARNSTABLE-610800-135580-A-1.pdf PDF
A00875-610800.pdf PDF
610800 - Notice to Contractors.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Massachusetts Department Of Transportation Highway Division Proposal No. 610800-135580

A00802 - 1

DOCUMENT A00802

DETAIL SHEETS

A00802 - 2

THIS PAGE IS INTENTIONALLY LEFT BLANK

A00802 - 3

THE COMMONWEALTH OF MASSACHUSETTS

MassDOT - HIGHWAY DIVISION

TEN PARK PLAZA, BOSTON, MA

PRELIMINARY ESTIMATE OF QUANTITIES - DETAIL SHEETS

City/Town: Barnstable Road: ROUTE 132

Station: 305+59.87 to 300+02.17 Class: Park and ride expansion

Date: June 5, 2026

Earth Excavation 31,700 SY Ordinary Borrow 1,900 CY

Class A Rock Excavation 20 CY Loam for Roadsides 570 CY

Class B Trench Excavation 20 CY Pavement Fine Milling 11,700 SY

Gravel Borrow 5,540 CY

PAVEMENT NOTES

SURFACE AREAS

PROPOSED FULL DEPTH PAVEMENT = 11,800 SY

PROPOSED MILLING AND OVERLAY = 11,648 SY

PROPOSED FULL DEPTH CONSTRUCTION (PARKING LOT)

SURFACE: 1 ¾" SUPERPAVE SURFACE COURSE - 12.5 POLYMER (SSC - 12.5-P) OVER

0.06-0.08 GAL/SY TACK COAT OVER

INTERMEDIATE: 2" SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC – 12.5) OVER

0.06-0.08 GAL/SY TACK COAT OVER

BASE: 3 ½” SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) OVER

SUB-BASE: 12" GRAVEL BORROW (M1.03.0 TYPE b)

PROPOSED FULL DEPTH CONSTRUCTION (BUS LANE)

SURFACE: 1 ¾" SUPERPAVE SURFACE COURSE - 12.5 POLYMER (SSC - 12.5-P) OVER

0.06-0.08 GAL/SY TACK COAT OVER

INTERMEDIATE: 2" SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC – 12.5) OVER

0.06-0.08 GAL/SY TACK COAT OVER

BASE: 3 ½” SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) OVER

SUB-BASE: 4" DENSE GRADED CRUSHED STONE FOR SUB-BASED PLACED OVER

8" GRAVEL BORROW (M1.03.0 TYPE b)

A00802 - 4

PAVEMENT NOTES (Continued)

PROPOSED FULL DEPTH CONSTRUCTION (PARKING LOT) – WIDENING (LESS THAN 4.0’)

SURFACE: 1 ¾" SUPERPAVE SURFACE COURSE - 12.5 POLYMER (SSC - 12.5-P) OVER

0.06-0.08 GAL/SY TACK COAT OVER

INTERMEDIATE: 4" SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC – 12.5) OVER

0.06-0.08 GAL/SY TACK COAT OVER

BASE: 6” HIGH EARLY STRENGTH CEMENT CONCRETE BASE COURSE OVER

SUB-BASE: 6" GRAVEL BORROW (M1.03.0 TYPE b)

MILL AND OVERLAY PAVEMENT CONSTRUCTION

SURFACE: 2 ½” SUPERPAVE SURFACE COURSE - 12.5 POLYMER (SSC - 12.5-P) OVER

0.07-0.09 GAL/SY TACK COAT OVER

2 ½” PAVEMENT FINE MILLING

PROPOSED SHARED USE PATH

SURFACE: 1 ½” SUPERPAVE SURFACE COURSE - 9.5 (SSC - 9.5) OVER

0.06-0.08 GAL/SY TACK COAT OVER

INTERMEDIATE: 2 ½” SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC – 12.5) OVER

0.06-0.08 GAL/SY TACK COAT OVER

FOUNDATION: 12" GRAVEL BORROW (M1.03.0 TYPE b)

PROPOSED CONCRETE SIDEWALK AND PEDESTRIAN CURB RAMPS

SURFACE: 4” CEMENT CONCRETE SIDEWALK (AIR ENTRAINED, 4000 PSI, ¾”, 610)

OVER

SUBBASE: 8" GRAVEL BORROW (M1.03.0 TYPE b)

PROPOSED DRAINAGE BASIN GRAVEL ACCESS ROAD

SURFACE: 12" GRAVEL BORROW (M1.03.0 TYPE b)

A00802 - 5

Item 146. DRAINAGE STRUCTURE REMOVED

STR NO STATION OFFSET

520 503+41.8 104.6' L 601 208+18.3 42.0' R 602 600+04.3 16.1' L 605 600+19.1 143.9' L 629 603+65.4 107.3' R 638 604+72.6 27.5' L

Item 170. FINE GRADING AND COMPACTING – SUBGRADE AREA

For Full Depth Pavement and Cement Concrete Sidewalk.

Item 201. CATCH BASIN

451 604+72.6 24.3 L 452 208+49.2 11.0 R 453 600+11.0 17.9 L 454 600+12.4 144.4 L 455 500+74.9 111.5 L 480 500+92.7 32.3 R 481 502+42.5 32.3 R 483 500+98.1 89.9 L 484 501+86.2 56 L 486 501+86.2 103.1 L 488 503+02.2 56 L 490 503+02.2 103.1 L 625 603+08.6 145.6 R 632 604+26.3 145.6 R 642 604+77.2 32.3 L 643 207+60.0 28.3 R 644 602+78.0 89 R 645 503+47.8 32.3 R 646 503+39.5 14.9 L 647 212+49.8 24.3 R

And as required by the engineer

A00802 - 6

Item 202. MANHOLE

STRUCTURE STATION OFFSET/SIDE

482 500+93.4, 15.3’ RT

485 501+86.2, 74.5’ LT

487 502+38.7, 15.3’ RT

489 503+02.2, 74.5’ LT

623 602+02.6, 163.0’ LT

628 603+58.5, 113.3’ RT

640 207+35.9, 0’

And as required by the engineer

Item 220. DRAINAGE STRUCTURE ADJUSTED

505 500+75.0 123 L 517 502+79.4 113.3 L 518 503+35.7 118.3 L 600 208+70.5 5 L 603 600+11.3 139 L 606 600+36.4 24.5 L 616 600+83.9 72.8 L 618 601+29.3 138.6 L 619 601+41.1 84.8 L 621 601+83.5 32.1 L 622 601+94.0 42.2 L 626 603+08.6 33.3 R 627 603+58.5 77.8 R 630 604+21.4 33.5 R 635 604+54.2 136.3 L 637 604+54.4 45.5 L 639 604+89.3 45.2 L

Item 220.3 DRAINAGE STRUCTURE CHANGE IN TYPE

507 500+76.2 114.3' L 521 503+48.9 1.8' L 607 600+37.6 145.7' L

A00802 - 7

Item 220.5 DRAINAGE STRUCTURE REMODELED

510 501+25.7, 106.7 LT

513 502+02.3, 112.4’ LT

620 601+82.7, 23.6’ LT

Item 227.4 MASONRY PLUG

627 603+58.52, 77.71’ RT

629 603+65.30, 106.65’ RT

Item 228. DRAINAGE PIPE VIDEO INSPECTION

For existing pipes and structures downstream of DMH 505.

Item 242.18 18 INCH REINFORCED CONCRETE PIPE FLARED END

631 208+56.7, 54.7’ RT

641 208+70.5, 49.1’ RT

Item 243.12 12 INCH REINFORCED CONCRETE PIPE CLASS IV

FROM STR TO STR FROM STR TO STR

632 628 646 521 625 628 486 485 644 628 484 485 627 628 488 489 452 600 490 489 451 600 485 489 639 600 483 507 480 482 455 507 481 487 489 603 482 487 628 640 645 521 643 640 487 521 620 622 647 623

A00802 - 8

Item 243.18 18 INCH REINFORCED CONCRETE PIPE CLASS IV

FROM STR TO STR

640 631 600 641

Item 250.04 4 INCH POLYVINYL CHLORIDE SANITARY SEWER PIPE

STATION FROM OFFSET TO OFFSET

500+11.97 12.83’ RT 86.96’ RT

500+34.93 15.25’ RT 86.96’ RT

500+61.03 12.16’ RT 86.96’ RT

500+81.99 9.95’ RT 86.96’ RT

501+07.31 9.68’ RT 86.96’ RT

501+32.53 8.02’ RT 86.96’ RT

501+56.20 6.42’ RT 86.96’ RT

501+76.05 5.77’ RT 86.96’ RT

Item 258. STONE FOR PIPE ENDS

To be used for Reinforced Concrete pipe Flared Ends.

Item 402. DENSE GRADED CRUSHED STONE FOR SUB-BASE

Use for full depth pavement at the bus lane.

A00802 - 9

Item 509. GRANITE TRANSITION CURB FOR PEDESTRIAN CURB RAMPS - STRAIGHT

For pedestrian curb ramps.

RAMP LENGTH RAMP LENGTH

1 3 29 18 2 4 30 10 3 3 31 10 4 4 32 12 5 3 33 18 6 4 35 9 7 3 36 20 8 3 37 8 9 4 38 9

10 3 39 7 11 11 40 8 12 3 41 15 13 4 42 16.5 14 4 43 14 15 7 44 14 16 3 45 16.5 17 8 46 19 18 3 47 13 19 22 48 16.5 20 12 49 14 21 14 50 14 22 4 51 16.5 24 4 52 16 25 3 53 10 26 16 55 23 27 16 56 13

57 6

A00802 - 10

Item 509.1 GRANITE TRANSITION CURB FOR PEDESTRIAN CURB RAMPS - CURVED

For pedestrian curb ramps.

RAMP LENGTH

1 4 2 4 3 4 4 4 5 4 6 4 7 4 8 4 9 4

10 4 12 4 13 4 14 4 16 4 18 4 22 12 24 4 25 4 30 3 31 3 32 4 34 16 35 4 54 24 57 10

Item 597. EDGING REMOVED AND DISCARDED

For use at all existing median islands with edging.

Item 620.12 GUARDRAIL, TL-2 (SINGLE FACED)

To be installed around perimeter of new section of parking lot; see Construction Plan.

Item 630.2 HIGHWAY GUARD REMOVED AND DISCARDED

Remove and discard existing highway guard around extant parking lot perimeter; see Construction plan.

A00802 - 11

Item 650.036 36 INCH CHAIN LINK GATE WITH GATE POSTS

Proposed gate at drainage basin access road.

Item 707.8 STEEL BOLLARD

For use at relocated EV charging stations.

Item 804.2 2 INCH ELECTRICAL CONDUIT TYPE NM – PLASTIC (UL)

For highway lighting and EV charging stations.

Item 804.31 3 INCH ELECTRICAL CONDUIT TYPE NM – PLASTIC (UL) – (LIQUID TIGHT)

For use in the area of the existing leaching basins.

Item 811.01 ELECTRIC HANDHOLE REMOVED AND DISCARDED

STATION OFFSET SIDE

100+77.31 7 RT

101+32.51 11 RT

201+40.06 33 LT

211+11.88 29 LT

212+58.35 28 LT

214+24.87 27 LT

215+10.36 31 RT

301+81.61 17 RT

302+81.57 26 RT

304+09.33 24 RT

304+19.42 42 RT

501+99.20 46 LT

503+26.63 45 LT

600+97.68 29 LT

602+12.36 28 LT

602+83.37 28 LT

603+59.84 27 LT

A00802 - 12

Item 811.22 ELECTRIC HANDHOLE – SD2.022

For highway lighting and EV charging stations.

STATION OFFSET SIDE STATION OFFSET SIDE

101+65.93 14.0 RT 209+34.99 27.0 LT

102+24.27 22.6 LT 211+04.11 27.3 LT

103+34.31 27.3 LT 212+47.47 27.3 LT

104+22.18 27.3 LT 214+14.52 29.3 LT

105+39.07 27.3 LT 215+20.99 28.8 RT

105+60.17 27.3 LT 301+01.58 30.9 RT

200+36.99 15.5 LT 301+19.58 30.8 RT

200+95.14 14.5 LT 301+37.58 30.7 RT

201+35.75 14.5 LT 301+55.58 30.6 RT

201+77.05 15.0 RT 301+73.58 30.5 RT

202+06.42 14.5 LT 303+00.62 68.2 RT

202+57.31 14.5 LT 303+73.87 68.2 RT

203+07.28 14.5 LT 303+84.64 68.9 RT

203+86.26 27.3 LT 602+24.04 27.3 RT

205+29.49 27.3 LT 603+67.47 27.3 RT

207+06.41 27.3 LT 604+85.70 27.3 RT

Item 812.09 LIGHT STANDARD FOUNDATION PRECAST

To be used for street lighting base of light pole, for both removed and reset and new light poles.

STATION OFFSET

101+52.16 49.4’ LT

102+32.22 13.0’ LT

104+16.11 16.8’ LT

105+53.96 16.6’ LT

201+35.72 17.9’ LT

202+54.16 35.3’ LT

203+79.14 39.7’ LT

205+34.80 18.1’ LT

206+61.88 19.4’ LT

209+26.23 21.8’ LT

211+97.64 38.5’ LT

302+95.61 66.5’ RT

303+88.41 68.9’ RT

602+18.72 18.1’ RT

603+74.36 39.3’ RT

604+91.62 37.6’ RT

And as required by the Engineer

A00802 - 13

Item 812.30 STANDARD SIGNAL POST FOUNDATION SD3.030

To be used for EV charging station base.

301+01.60 33.4’ RT

301+19.60 33.3’ RT

301+37.60 33.2’ RT

301+55.60 33.1’ RT

301+73.60 33.0’ RT

Item 813.40 WIRE TYPE 8 NO. 10 DIRECT BURIAL

Wire from luminaire to handhole.

Item 813.41 WIRE TYPE 8 NO. 8 DIRECT BURIAL

Wire from charging stations to handholes.

Item 813.42 WIRE TYPE 8 NO. 6 DIRECT BURIAL

General wire between handholes.

Item 813.43 WIRE TYPE 8 NO. 4 DIRECT BURIAL

Wire from charging stations to handholes.

A00802 - 14

Item 821.101 HIGHWAY LIGHTING POLE (ANCHOR BASE) 1 FOOT BRACKET

ALIGNMENT STATION OFFSET

DWY_1 101+49.72 10’ RT

DWY_3 301+46.65 47’ RT

Item 821.201 HIGHWAY LIGHTING POLE (ANCHOR BASE) TWIN 1 FOOT BRACKET

ALIGNMENT STATION OFFSET

DWY_2 206+19.44 19’ LT

DWY_2 205+34.80 18’ LT

DWY_2 203+79.14 40’ LT

DWY_2 202+54.16 35’ LT

DWY_2 208+11.49 22’ LT

DWY_2 201+35.75 18’ LT

DWY_2 209+26.23 22’ LT

DWY_2 210+97.64 39’ LT

DWY_2 212+52.81 18’ LT

DWY_2 214+09.34 38’ LT

DWY_2 215+17.44 33’ RT

AISLE_2 603+74.36 39’ RT

AISLE_2 602+18.72 18’ RT

DWY_1 105+53.96 17’ LT

DWY_1 104+16.11 17’ LT

DWY_1 102+32.22 13’ LT

DWY_3 303+88.41 69’ RT

DWY_3 302+95.61 66’ RT

Item 823.01 AREA LIGHTING LUMINAIRE 105 WATT

See item 821.101 and 821.201.

Item 823.60 HIGHWAY LIGHTING LOAD CENTER

Sta 303+92.16; o/s 17.2’ RT

Item 823.63 STEP DOWN TRANSFORMER

Sta 303+92.16; o/s 17.2’ RT

A00802 - 15

Item 823.72 HIGHWAY LIGHTING POLE AND LUMINAIRE REMOVED AND DISCARDED

101+42.26 11.5’ RT

201+56.68 41.2’ LT

211+07.38 28.7’ LT

212+53.72 28.6’ LT

214+98.28 26.9’ LT

215.20.99 28.8’ RT

501+89.22 46.2’ LT

503+37.51 45.4’ LT

602+16.91 27.7’ LT

603+64.25 27.6’ LT

Item 825.10 LEVEL 2 CHARGER REMOVED AND RESET

To be used for EV charging stations.

301+01.60 33.4’ RT

301+19.60 33.3’ RT

301+37.60 33.2’ RT

301+55.60 33.1’ RT

301+73.60 33.0’ RT

Item 874.2 TRAFFIC SIGN REMOVED AND RESET

100+15.38 32.9’ RT

103+93.48 27.0’ RT

104+83.94 26.8’ RT

204+34.77 32.1’ RT

205+69.40 33.3’ RT

207+97.79 13.3’ RT

208+78.40 15.1’ RT

212+43.06 31.8’ RT

213+35.48 31.8’ RT

A00802 - 16

Item 874.41 TRAFFIC SIGN ASSEMBLY REMOVED AND DISCARDED

See Signage and Pavement Marking plan.

100+88.53 14.7’ RT

200+97.70 33.9’ RT

200+99.60 34.0’ LT

201+01.95 34.1’ RT

201+07.10 19.1’ LT

201+34.63 27.5’ RT

201+49.45 31.0’ LT

212+42.81 28.7’ RT

213+38.54 28.4’ RT

214+52.26 26.5’ RT

300+19.03 33.8’ RT

302+76.83 31.5’ RT

302+91.85 17.1’ RT

303+05.65 17.1’ RT

303+14.47 17.1’ RT

303+32.10 17.1’ RT

303+40.70 17.1’ RT

303+54.74 17.9’ RT

303+63.89 17.2’ RT

303+76.37 17.9’ RT

304+22.89 28.7’ RT

304+88.06 35.3’ RT

305+32.71 23.6’ RT

306+27.65 35.6’ RT

501+96.39 2.6’ RT

502+70.46 2.5’ RT

602+36.76 71.5’ RT

603+40.88 70.8’ RT

Item 904. 4000 PSI, ¾ INCH, 610 CEMENT CONCRETE

Use for the foundations of the proposed bicycle racks and trash receptacles.

<<<<<< END OF DOCUMENT >>>>>>