Bid Tabulation Summary - Project 610800 Barnstable Park and Ride Expansion

This is a bid tabulation document from the Massachusetts Department of Transportation for sealed bids on park and ride expansion and improvements at Route 132 in Barnstable (Project 610800, Contract 135580, District 5). The project encompasses site preparation including clearing and grubbing of 3.4 acres, excavation of 31,700 cubic yards of earth material, and installation of comprehensive drainage infrastructure with 22 catch basins, 9 manholes, and approximately 2,160 linear feet of sanitary sewer pipe. Additional scope includes pavement work involving fine milling of 11,700 square yards and placement of multiple asphalt courses totaling approximately 4,430 tons, site amenities such as 10,620 linear feet of granite curbing, 2,915 square yards of concrete sidewalks, 4 pedestrian bus shelters, electrical and lighting infrastructure with 38 luminaires and level 2 EV chargers, landscaping with trees and grasses, signage, and pavement markings. Bids opened on August 18, 2026, with a 365-day performance period and full beneficial use required within 1,098 calendar days from Notice to Proceed.

Eleven contractors submitted bids ranging from $6,223,503.00 (Lawrence Lynch Corp, lowest bid) to $9,050,825.50 (I W Harding Const Co Inc, highest bid). The office estimate totaled $8,007,441.66. Other significant bids included K R Rezendes Inc at $6,697,085.00, C C Construction Inc at $6,723,708.15, E T & L Corp at $6,737,890.00, Northern Construction Service LLC at $6,929,995.00, R M Pacella Inc at $7,350,226.00, Robert B Our Co Inc at $7,372,538.30, Dig It Construction LLC at $7,896,470.00, and S&R Corporation at $7,950,294.79. The project is subject to prevailing wage requirements and the Build America, Buy America Act, with labor participation goals of 15.3% minority and 6.9% women for each job category. Price adjustments apply for hot mix asphalt, Portland cement, diesel fuel, gasoline, and structural and reinforcing steel based on established indices. Contractors must provide a 5% proposal guaranty, and all work must coordinate with concurrent adjacent service plaza work without additional compensation or time extensions for delays.

View the file

Other files

File Type Posted
A00810-610800.pdf PDF
610800 - Plan Holders List 8-17-2026.pdf PDF
A00811-610800.pdf PDF
A00802-610800.pdf PDF
A00871-610800.pdf PDF
BIDS OPENED - Tuesday - August 18-2026.pdf PDF
A00872-610800.pdf PDF
A00820-610800.pdf PDF
BARNSTABLE-610800-135580-A-3.pdf PDF
Link to Bid Opening 8-18-2026.pdf PDF
610800 - Plan Holders List 8-4-2026.pdf PDF
BARNSTABLE-610800-135580-A-2.pdf PDF
BARNSTABLE-610800-135580-A-4.pdf PDF
A00801-610800.pdf PDF
610800 Bid Items List.txt TXT text file
BARNSTABLE-610800-135580-A-1.pdf PDF
A00875-610800.pdf PDF
610800 - Notice to Contractors.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prelims Unit

Bid Tabulations

Project # : 610800 Bids Open Date : 18 Aug 2026 Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

Office Estimate LAWRENCE LYNCH CORP

Item # Quantity Units Description Unit Price Amount Unit Price Amount

101. 3.400 A CLEARING AND GRUBBING $40,250.00 $136,850.00 $13,550.00 $46,070.00

102.3 16.000 HR HERBICIDE TREATMENT OF INVASIVE PLANTS $850.00 $13,600.00 $950.00 $15,200.00

102.33 16.000 HR INVASIVE PLANT MANAGEMENT STRATEGY $750.00 $12,000.00 $450.00 $7,200.00

120. 31,700.000 CY EARTH EXCAVATION $50.00 $1,585,000.00 $23.00 $729,100.00

121. 20.000 CY CLASS A ROCK EXCAVATION $162.50 $3,250.00 $300.00 $6,000.00

141.1 10.000 CY TEST PIT FOR EXPLORATION $50.00 $500.00 $600.00 $6,000.00

142. 20.000 CY CLASS B TRENCH EXCAVATION $56.00 $1,120.00 $130.00 $2,600.00

146. 6.000 EA DRAINAGE STRUCTURE REMOVED $939.00 $5,634.00 $4,000.00 $24,000.00

150. 1,900.000 CY ORDINARY BORROW $40.00 $76,000.00 $30.00 $57,000.00

151. 5,540.000 CY GRAVEL BORROW $47.50 $263,150.00 $50.00 $277,000.00

170. 11,800.000 SY FINE GRADING AND COMPACTING - SUBGRADE

AREA

$7.00 $82,600.00 $12.00 $141,600.00

180.01 1.000 LS ENVIRONMENTAL HEALTH AND SAFETY PROGRAM $10,000.00 $10,000.00 $32,000.00 $32,000.00

180.02 24.000 HR PERSONAL PROTECTION LEVEL C UPGRADE $18.00 $432.00 $15.00 $360.00

180.03 24.000 HR LICENSED SITE PROFESSIONAL SERVICES $215.00 $5,160.00 $175.00 $4,200.00

181.11 3,850.000 TON DISPOSAL OF UNREGULATED SOIL $46.14 $177,639.00 $20.00 $77,000.00

181.12 5.000 TON DISPOSAL OF REGULATED SOIL - IN-STATE

FACILITY

$69.50 $347.50 $50.00 $250.00

181.13 5.000 TON DISPOSAL OF REGULATED SOIL - OUT-OF-STATE

FACILITY

$120.00 $600.00 $98.00 $490.00

181.14 5.000 TON DISPOSAL OF HAZARDOUS WASTE $543.00 $2,715.00 $660.00 $3,300.00

201. 22.000 EA CATCH BASIN $8,600.00 $189,200.00 $4,430.00 $97,460.00

202. 9.000 EA MANHOLE $9,350.00 $84,150.00 $8,200.00 $73,800.00

220. 17.000 EA DRAINAGE STRUCTURE ADJUSTED $805.00 $13,685.00 $480.00 $8,160.00

220.2 5.000 FT DRAINAGE STRUCTURE REBUILT $500.00 $2,500.00 $1,075.00 $5,375.00

220.3 3.000 EA DRAINAGE STRUCTURE CHANGE IN TYPE $1,325.00 $3,975.00 $500.00 $1,500.00

220.5 3.000 EA DRAINAGE STRUCTURE REMODELED $985.00 $2,955.00 $950.00 $2,850.00

221. 12.000 EA FRAME AND COVER $1,500.00 $18,000.00 $1,362.00 $16,344.00

222. 22.000 EA FRAME AND GRATE - MASSDOT BAR TYPE $1,500.00 $33,000.00 $1,573.00 $34,606.00

CMS105 - Report Date: 8/18/2026 2:41 PM Page 1 of 36

Project # : 610800 Bids Open Date : 18 Aug 2026 Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

Office Estimate LAWRENCE LYNCH CORP

Item # Quantity Units Description Unit Price Amount Unit Price Amount

227.3 60.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $401.50 $24,090.00 $300.00 $18,000.00

227.31 1,500.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $8.50 $12,750.00 $5.00 $7,500.00

227.4 20.000 SF MASONRY PLUG $325.00 $6,500.00 $280.00 $5,600.00

228. 16.000 HR DRAINAGE PIPE VIDEO INSPECTION $375.00 $6,000.00 $625.00 $10,000.00

242.18 2.000 EA 18 INCH REINFORCED CONCRETE PIPE FLARED

END

$1,850.00 $3,700.00 $2,000.00 $4,000.00

243.12 1,160.000 FT 12 INCH REINFORCED CONCRETE PIPE CLASS IV $162.00 $187,920.00 $78.00 $90,480.00

243.18 190.000 FT 18 INCH REINFORCED CONCRETE PIPE CLASS IV $180.00 $34,200.00 $160.00 $30,400.00

250.04 710.000 FT 4 INCH POLYVINYL CHLORIDE SANITARY SEWER

PIPE

$145.00 $102,950.00 $41.00 $29,110.00

258. 10.000 SY STONE FOR PIPE ENDS $175.00 $1,750.00 $175.00 $1,750.00

402. 120.000 CY DENSE GRADED CRUSHED STONE FOR SUB-BASE $100.00 $12,000.00 $140.00 $16,800.00

415.2 11,700.000 SY PAVEMENT FINE MILLING $17.00 $198,900.00 $5.50 $64,350.00

431. 870.000 SY HIGH EARLY STRENGTH CEMENT CONCRETE BASE

COURSE

$67.50 $58,725.00 $33.00 $28,710.00

443. 20.000 MGL WATER FOR ROADWAY DUST CONTROL $87.50 $1,750.00 $59.00 $1,180.00

450.22 10.000 TON SUPERPAVE SURFACE COURSE - 9.5 (SSC - 9.5) $332.00 $3,320.00 $331.00 $3,310.00

450.231 2,790.000 TON SUPERPAVE SURFACE COURSE - 12.5 POLYMER

(SSC - 12.5 - P)

$229.00 $638,910.00 $204.00 $569,160.00

450.31 1,440.000 TON SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC -

12.5)

$250.00 $360,000.00 $160.00 $230,400.00

450.42 2,140.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $184.50 $394,830.00 $150.00 $321,000.00

451. 150.000 TON HMA FOR PATCHING $300.00 $45,000.00 $270.00 $40,500.00

452. 1,800.000 GAL ASPHALT EMULSION FOR TACK COAT $12.25 $22,050.00 $15.00 $27,000.00

453. 4,000.000 FT HMA JOINT ADHESIVE $2.00 $8,000.00 $4.00 $16,000.00

482.5 980.000 FT SAWCUTTING ASPHALT PAVEMENT FOR BOX

WIDENING

$3.75 $3,675.00 $8.50 $8,330.00

504. 9,275.000 FT GRANITE CURB TYPE VA4 - STRAIGHT $75.00 $695,625.00 $52.00 $482,300.00

504.1 1,345.000 FT GRANITE CURB TYPE VA4 - CURVED $85.03 $114,365.35 $70.00 $94,150.00

509. 540.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN

CURB RAMPS - STRAIGHT

$85.00 $45,900.00 $105.00 $56,700.00

CMS105 - Report Date: 8/18/2026 2:41 PM Page 2 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

Office Estimate LAWRENCE LYNCH CORP

Item # Quantity Units Description Unit Price Amount Unit Price Amount

509.1 150.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN

CURB RAMPS - CURVED

$93.00 $13,950.00 $105.00 $15,750.00

597. 6,150.000 FT EDGING REMOVED AND DISCARDED $13.00 $79,950.00 $14.00 $86,100.00

620.12 565.000 FT GUARDRAIL, TL-2 (SINGLE FACED) $33.23 $18,774.95 $33.00 $18,645.00

620.32 30.000 FT GUARDRAIL - CURVED, TL-2 (SINGLE FACED) $33.23 $996.90 $37.00 $1,110.00

627.1 3.000 EA TRAILING ANCHORAGE $2,912.50 $8,737.50 $2,500.00 $7,500.00

627.82 1.000 EA GUARDRAIL TANGENT END TREATMENT, TL-2 $5,020.00 $5,020.00 $3,800.00 $3,800.00

630.2 365.000 FT HIGHWAY GUARD REMOVED AND DISCARDED $6.46 $2,357.90 $2.80 $1,022.00

650.036 12.000 FT 36 INCH CHAIN LINK GATE WITH GATE POSTS $160.00 $1,920.00 $218.00 $2,616.00

697.1 42.000 EA SILT SACK $225.00 $9,450.00 $280.00 $11,760.00

701. 2,915.000 SY CEMENT CONCRETE SIDEWALK $62.00 $180,730.00 $85.00 $247,775.00

701.2 340.000 SY CEMENT CONCRETE PEDESTRIAN CURB RAMP $140.00 $47,600.00 $85.00 $28,900.00

707.2 10.000 EA TRASH RECEPTACLE $4,000.00 $40,000.00 $1,300.00 $13,000.00

707.8 10.000 EA STEEL BOLLARD $1,599.00 $15,990.00 $1,600.00 $16,000.00

707.9 10.000 EA BICYCLE RACK $1,500.00 $15,000.00 $850.00 $8,500.00

722.3 1.000 LS SCHEDULE OF OPERATIONS (TYPE C) - FIXED

PRICE $61500

$61,500.00 $61,500.00 $61,500.00 $61,500.00

740. 38.000 MO ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE

A)

$4,150.00 $157,700.00 $1,200.00 $45,600.00

745. 4.000 EA PEDESTRIAN BUS SHELTER $27,500.00 $110,000.00 $45,000.00 $180,000.00

745.2 1.000 LS PEDESTRIAN BUS SHELTER REMOVED AND

STACKED

$2,500.00 $2,500.00 $4,800.00 $4,800.00

748. 1.000 LS MOBILIZATION $229,850.00 $229,850.00 $170,000.00 $170,000.00

751. 570.000 CY LOAM FOR ROADSIDES $77.50 $44,175.00 $90.00 $51,300.00

751.7 640.000 CY COMPOST BLANKET $175.00 $112,000.00 $28.00 $17,920.00

756. 1.000 LS NPDES STORMWATER POLLUTION PREVENTION

PLAN

$12,300.00 $12,300.00 $105,000.00 $105,000.00

765. 2,150.000 SY SEEDING $4.25 $9,137.50 $3.30 $7,095.00

765.412 5,500.000 SY UPLAND SEED MIX - SHORT GRASSLAND MIX-

SANDY SOIL

$5.25 $28,875.00 $1.70 $9,350.00

765.554 450.000 SY WETLAND SEED MIX - SEASONALLY FLOODED MIX $6.05 $2,722.50 $3.30 $1,485.00

CMS105 - Report Date: 8/18/2026 2:41 PM Page 3 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

Office Estimate LAWRENCE LYNCH CORP

Item # Quantity Units Description Unit Price Amount Unit Price Amount

765.664 450.000 SY MOWING FOR NATIVE SEED ESTABLISHMENT $1.00 $450.00 $3.30 $1,485.00

767.121 1,500.000 FT SEDIMENT CONTROL BARRIER $11.00 $16,500.00 $6.00 $9,000.00

773.224 10.000 EA PINE - PITCH 4-5 FEET $385.00 $3,850.00 $470.00 $4,700.00

774.300 13.000 EA ELM - AMERICAN 2-2.5 INCH CALIPER $1,015.00 $13,195.00 $700.00 $9,100.00

775.431 12.000 EA LOCUST - HONEY - SHADEMASTER 2-2.5 INCH

CALIPER

$1,082.50 $12,990.00 $700.00 $8,400.00

776.523 5.000 EA MAPLE - RED 2-2.5 INCH CALIPER $1,009.00 $5,045.00 $700.00 $3,500.00

777.328 12.000 EA OAK - WHITE 2-2.5 INCH CALIPER $985.08 $11,820.96 $700.00 $8,400.00

778.166 15.000 EA BIRCH - GRAY 5-6 FEET MULTI STEM $900.00 $13,500.00 $400.00 $6,000.00

781.284 5.000 EA HAWTHORN - COCKSPUR 1.5-2 INCH CALIPER $925.00 $4,625.00 $700.00 $3,500.00

783.057 11.000 EA SHAD TREE - DOWNY CUMULUS 7-8 FEET CLUMP $900.00 $9,900.00 $740.00 $8,140.00

796.201 150.000 EA BEACH GRASS 1 GALLON $40.50 $6,075.00 $26.00 $3,900.00

796.202 150.000 EA SWITCH GRASS 1 GALLON $40.50 $6,075.00 $26.00 $3,900.00

804.2 205.000 FT 2 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC

(UL)

$65.00 $13,325.00 $22.00 $4,510.00

804.21 150.000 FT 2 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC

(UL) - (LIQUID TIGHT)

$65.00 $9,750.00 $50.00 $7,500.00

804.3 3,080.000 FT 3 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -

(UL)

$75.00 $231,000.00 $34.00 $104,720.00

806.4 20.000 FT 4 INCH ELECTRICAL CONDUIT TYPE RM -

GALVANIZED STEEL

$550.00 $11,000.00 $150.00 $3,000.00

811.01 17.000 EA ELECTRIC HANDHOLE REMOVED AND DISCARDED $670.00 $11,390.00 $800.00 $13,600.00

811.22 32.000 EA ELECTRIC HANDHOLE - SD2.022 $2,325.00 $74,400.00 $2,400.00 $76,800.00

812.09 20.000 EA LIGHT STANDARD FOUNDATION PRECAST $3,000.00 $60,000.00 $15,000.00 $300,000.00

812.30 5.000 EA STANDARD SIGNAL POST FOUNDATION SD3.030 $838.00 $4,190.00 $1,600.00 $8,000.00

813.40 800.000 FT WIRE TYPE 8 NO. 10 DIRECT BURIAL $3.65 $2,920.00 $2.50 $2,000.00

813.41 650.000 FT WIRE TYPE 8 NO. 8 DIRECT BURIAL $4.55 $2,957.50 $4.00 $2,600.00

813.42 11,470.000 FT WIRE TYPE 8 NO. 6 DIRECT BURIAL $3.15 $36,130.50 $5.00 $57,350.00

813.43 2,860.000 FT WIRE TYPE 8 NO. 4 DIRECT BURIAL $3.00 $8,580.00 $7.50 $21,450.00

821.101 2.000 EA HIGHWAY LIGHTING POLE (ANCHOR BASE) 1 FOOT

BRACKET

$4,500.00 $9,000.00 $12,265.00 $24,530.00

CMS105 - Report Date: 8/18/2026 2:41 PM Page 4 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

Office Estimate LAWRENCE LYNCH CORP

Item # Quantity Units Description Unit Price Amount Unit Price Amount

821.201 18.000 EA HIGHWAY LIGHTING POLE (ANCHOR BASE) TWIN 1

FOOT BRACKET

$4,500.00 $81,000.00 $10,160.00 $182,880.00

823.01 38.000 EA AREA LIGHTING LUMINAIRE 105 WATT $1,250.00 $47,500.00 $2,220.00 $84,360.00

823.60 1.000 LS HIGHWAY LIGHTING LOAD CENTER $40,000.00 $40,000.00 $37,000.00 $37,000.00

823.63 1.000 LS STEP DOWN TRANSFORMER $4,988.00 $4,988.00 $36,000.00 $36,000.00

823.72 10.000 EA HIGHWAY LIGHTING POLE AND LUMINAIRE

REMOVED AND DISCARDED

$2,750.00 $27,500.00 $2,000.00 $20,000.00

825.10 5.000 EA LEVEL 2 CHARGER REMOVED AND RESET $1,250.00 $6,250.00 $7,800.00 $39,000.00

829. 75.000 SF ROADSIDE GUIDE SIGN (G) - ALUMINUM PANEL

(TYPE B)

$28.50 $2,137.50 $50.00 $3,750.00

832. 375.000 SF WARNING-REGULATORY AND ROUTE MARKER -

ALUMINUM PANEL (TYPE A)

$24.50 $9,187.50 $20.00 $7,500.00

841.6 4.000 EA SUPPORTS FOR GUIDE SIGN (I-2A-5 INCH TUBULAR

POST) STEEL

$1,450.00 $5,800.00 $4,100.00 $16,400.00

847.1 70.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST

ASSEMBLY - STEEL

$275.00 $19,250.00 $300.00 $21,000.00

850.41 120.000 HR ROADWAY FLAGGER $90.00 $10,800.00 $120.00 $14,400.00

852. 120.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $10.00 $1,200.00 $65.00 $7,800.00

856.12 365.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $25.00 $9,125.00 $25.00 $9,125.00

859. 39,600.000 DAY REFLECTORIZED DRUM $0.30 $11,880.00 $0.20 $7,920.00

864.04 900.000 SF PAVEMENT ARROWS AND LEGENDS

REFLECTORIZED WHITE (THERMOPLASTIC)

$15.00 $13,500.00 $18.00 $16,200.00

866.106 16,000.000 FT 6 INCH REFLECTORIZED WHITE LINE

(THERMOPLASTIC)

$1.73 $27,680.00 $1.50 $24,000.00

866.112 1,770.000 FT 12 INCH REFLECTORIZED WHITE LINE

(THERMOPLASTIC)

$6.00 $10,620.00 $5.00 $8,850.00

867.106 3,270.000 FT 6 INCH REFLECTORIZED YELLOW LINE

(THERMOPLASTIC)

$1.73 $5,657.10 $2.00 $6,540.00

874.2 9.000 EA TRAFFIC SIGN REMOVED AND RESET $157.50 $1,417.50 $250.00 $2,250.00

874.41 28.000 EA TRAFFIC SIGN ASSEMBLY REMOVED AND

DISCARDED

$57.50 $1,610.00 $90.00 $2,520.00

904. 60.000 CY 4000 PSI, 3/4 INCH, 610 CEMENT CONCRETE $2,601.00 $156,060.00 $280.00 $16,800.00

CMS105 - Report Date: 8/18/2026 2:41 PM Page 5 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

Office Estimate LAWRENCE LYNCH CORP

Item # Quantity Units Description Unit Price Amount Unit Price Amount

986. 120.000 TON MODIFIED ROCKFILL $145.00 $17,400.00 $170.00 $20,400.00

Total : $8,007,441.66 Total : $6,223,503.00

CMS105 - Report Date: 8/18/2026 2:41 PM Page 6 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

K R REZENDES INC C C CONSTRUCTION INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

101. 3.400 A CLEARING AND GRUBBING $34,400.00 $116,960.00 $25,000.00 $85,000.00

102.3 16.000 HR HERBICIDE TREATMENT OF INVASIVE PLANTS $825.00 $13,200.00 $390.00 $6,240.00

102.33 16.000 HR INVASIVE PLANT MANAGEMENT STRATEGY $450.00 $7,200.00 $390.00 $6,240.00

120. 31,700.000 CY EARTH EXCAVATION $32.00 $1,014,400.00 $17.00 $538,900.00

121. 20.000 CY CLASS A ROCK EXCAVATION $200.00 $4,000.00 $300.00 $6,000.00

141.1 10.000 CY TEST PIT FOR EXPLORATION $200.00 $2,000.00 $225.00 $2,250.00

142. 20.000 CY CLASS B TRENCH EXCAVATION $60.00 $1,200.00 $0.01 $0.20

146. 6.000 EA DRAINAGE STRUCTURE REMOVED $1,500.00 $9,000.00 $1,900.00 $11,400.00

150. 1,900.000 CY ORDINARY BORROW $40.00 $76,000.00 $34.00 $64,600.00

151. 5,540.000 CY GRAVEL BORROW $62.00 $343,480.00 $79.00 $437,660.00

170. 11,800.000 SY FINE GRADING AND COMPACTING - SUBGRADE

AREA

$15.00 $177,000.00 $4.00 $47,200.00

180.01 1.000 LS ENVIRONMENTAL HEALTH AND SAFETY PROGRAM $7,000.00 $7,000.00 $12,500.00 $12,500.00

180.02 24.000 HR PERSONAL PROTECTION LEVEL C UPGRADE $18.00 $432.00 $24.00 $576.00

180.03 24.000 HR LICENSED SITE PROFESSIONAL SERVICES $350.00 $8,400.00 $125.00 $3,000.00

181.11 3,850.000 TON DISPOSAL OF UNREGULATED SOIL $17.00 $65,450.00 $13.00 $50,050.00

181.12 5.000 TON DISPOSAL OF REGULATED SOIL - IN-STATE

FACILITY

$85.00 $425.00 $79.00 $395.00

181.13 5.000 TON DISPOSAL OF REGULATED SOIL - OUT-OF-STATE

FACILITY

$125.00 $625.00 $150.00 $750.00

181.14 5.000 TON DISPOSAL OF HAZARDOUS WASTE $600.00 $3,000.00 $330.00 $1,650.00

201. 22.000 EA CATCH BASIN $6,000.00 $132,000.00 $4,500.00 $99,000.00

202. 9.000 EA MANHOLE $7,000.00 $63,000.00 $4,250.00 $38,250.00

220. 17.000 EA DRAINAGE STRUCTURE ADJUSTED $650.00 $11,050.00 $580.00 $9,860.00

220.2 5.000 FT DRAINAGE STRUCTURE REBUILT $500.00 $2,500.00 $1,745.00 $8,725.00

220.3 3.000 EA DRAINAGE STRUCTURE CHANGE IN TYPE $2,600.00 $7,800.00 $1,615.00 $4,845.00

220.5 3.000 EA DRAINAGE STRUCTURE REMODELED $1,800.00 $5,400.00 $1,805.00 $5,415.00

221. 12.000 EA FRAME AND COVER $1,300.00 $15,600.00 $1,239.00 $14,868.00

222. 22.000 EA FRAME AND GRATE - MASSDOT BAR TYPE $1,350.00 $29,700.00 $1,274.00 $28,028.00

CMS105 - Report Date: 8/18/2026 2:41 PM Page 7 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

K R REZENDES INC C C CONSTRUCTION INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

227.3 60.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $450.00 $27,000.00 $64.00 $3,840.00

227.31 1,500.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $4.50 $6,750.00 $0.01 $15.00

227.4 20.000 SF MASONRY PLUG $370.00 $7,400.00 $37.00 $740.00

228. 16.000 HR DRAINAGE PIPE VIDEO INSPECTION $400.00 $6,400.00 $390.00 $6,240.00

242.18 2.000 EA 18 INCH REINFORCED CONCRETE PIPE FLARED

END

$1,100.00 $2,200.00 $3,100.00 $6,200.00

243.12 1,160.000 FT 12 INCH REINFORCED CONCRETE PIPE CLASS IV $110.00 $127,600.00 $100.00 $116,000.00

243.18 190.000 FT 18 INCH REINFORCED CONCRETE PIPE CLASS IV $125.00 $23,750.00 $125.00 $23,750.00

250.04 710.000 FT 4 INCH POLYVINYL CHLORIDE SANITARY SEWER

PIPE

$65.00 $46,150.00 $69.00 $48,990.00

258. 10.000 SY STONE FOR PIPE ENDS $155.00 $1,550.00 $365.00 $3,650.00

402. 120.000 CY DENSE GRADED CRUSHED STONE FOR SUB-BASE $91.00 $10,920.00 $81.00 $9,720.00

415.2 11,700.000 SY PAVEMENT FINE MILLING $9.00 $105,300.00 $7.00 $81,900.00

431. 870.000 SY HIGH EARLY STRENGTH CEMENT CONCRETE BASE

COURSE

$82.00 $71,340.00 $85.00 $73,950.00

443. 20.000 MGL WATER FOR ROADWAY DUST CONTROL $625.00 $12,500.00 $0.01 $0.20

450.22 10.000 TON SUPERPAVE SURFACE COURSE - 9.5 (SSC - 9.5) $295.00 $2,950.00 $245.00 $2,450.00

450.231 2,790.000 TON SUPERPAVE SURFACE COURSE - 12.5 POLYMER

(SSC - 12.5 - P)

$163.00 $454,770.00 $219.00 $611,010.00

450.31 1,440.000 TON SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC -

12.5)

$175.00 $252,000.00 $190.00 $273,600.00

450.42 2,140.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $133.00 $284,620.00 $179.00 $383,060.00

451. 150.000 TON HMA FOR PATCHING $250.00 $37,500.00 $295.00 $44,250.00

452. 1,800.000 GAL ASPHALT EMULSION FOR TACK COAT $10.00 $18,000.00 $12.00 $21,600.00

453. 4,000.000 FT HMA JOINT ADHESIVE $3.50 $14,000.00 $3.00 $12,000.00

482.5 980.000 FT SAWCUTTING ASPHALT PAVEMENT FOR BOX

WIDENING

$3.00 $2,940.00 $5.00 $4,900.00

504. 9,275.000 FT GRANITE CURB TYPE VA4 - STRAIGHT $57.00 $528,675.00 $72.00 $667,800.00

504.1 1,345.000 FT GRANITE CURB TYPE VA4 - CURVED $75.00 $100,875.00 $79.00 $106,255.00

509. 540.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN

CURB RAMPS - STRAIGHT

$75.00 $40,500.00 $90.00 $48,600.00

CMS105 - Report Date: 8/18/2026 2:41 PM Page 8 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

K R REZENDES INC C C CONSTRUCTION INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

509.1 150.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN

CURB RAMPS - CURVED

$90.00 $13,500.00 $96.00 $14,400.00

597. 6,150.000 FT EDGING REMOVED AND DISCARDED $9.00 $55,350.00 $7.00 $43,050.00

620.12 565.000 FT GUARDRAIL, TL-2 (SINGLE FACED) $28.50 $16,102.50 $32.95 $18,616.75

620.32 30.000 FT GUARDRAIL - CURVED, TL-2 (SINGLE FACED) $33.00 $990.00 $39.00 $1,170.00

627.1 3.000 EA TRAILING ANCHORAGE $2,225.00 $6,675.00 $2,400.00 $7,200.00

627.82 1.000 EA GUARDRAIL TANGENT END TREATMENT, TL-2 $4,300.00 $4,300.00 $3,900.00 $3,900.00

630.2 365.000 FT HIGHWAY GUARD REMOVED AND DISCARDED $5.50 $2,007.50 $5.00 $1,825.00

650.036 12.000 FT 36 INCH CHAIN LINK GATE WITH GATE POSTS $175.00 $2,100.00 $250.00 $3,000.00

697.1 42.000 EA SILT SACK $240.00 $10,080.00 $179.00 $7,518.00

701. 2,915.000 SY CEMENT CONCRETE SIDEWALK $67.00 $195,305.00 $90.00 $262,350.00

701.2 340.000 SY CEMENT CONCRETE PEDESTRIAN CURB RAMP $100.00 $34,000.00 $137.95 $46,903.00

707.2 10.000 EA TRASH RECEPTACLE $650.00 $6,500.00 $1,795.00 $17,950.00

707.8 10.000 EA STEEL BOLLARD $1,000.00 $10,000.00 $1,750.00 $17,500.00

707.9 10.000 EA BICYCLE RACK $750.00 $7,500.00 $1,900.00 $19,000.00

722.3 1.000 LS SCHEDULE OF OPERATIONS (TYPE C) - FIXED

PRICE $61500

$61,500.00 $61,500.00 $61,500.00 $61,500.00

740. 38.000 MO ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE

A)

$10,000.00 $380,000.00 $6,000.00 $228,000.00

745. 4.000 EA PEDESTRIAN BUS SHELTER $32,000.00 $128,000.00 $54,000.00 $216,000.00

745.2 1.000 LS PEDESTRIAN BUS SHELTER REMOVED AND

STACKED

$7,000.00 $7,000.00 $7,500.00 $7,500.00

748. 1.000 LS MOBILIZATION $195,000.00 $195,000.00 $225,000.00 $225,000.00

751. 570.000 CY LOAM FOR ROADSIDES $80.00 $45,600.00 $67.00 $38,190.00

751.7 640.000 CY COMPOST BLANKET $100.00 $64,000.00 $120.00 $76,800.00

756. 1.000 LS NPDES STORMWATER POLLUTION PREVENTION

PLAN

$5,000.00 $5,000.00 $7,800.00 $7,800.00

765. 2,150.000 SY SEEDING $3.75 $8,062.50 $4.50 $9,675.00

765.412 5,500.000 SY UPLAND SEED MIX - SHORT GRASSLAND MIX-

SANDY SOIL

$3.75 $20,625.00 $4.50 $24,750.00

765.554 450.000 SY WETLAND SEED MIX - SEASONALLY FLOODED MIX $3.75 $1,687.50 $4.50 $2,025.00

CMS105 - Report Date: 8/18/2026 2:41 PM Page 9 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

K R REZENDES INC C C CONSTRUCTION INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

765.664 450.000 SY MOWING FOR NATIVE SEED ESTABLISHMENT $2.50 $1,125.00 $3.00 $1,350.00

767.121 1,500.000 FT SEDIMENT CONTROL BARRIER $5.25 $7,875.00 $13.30 $19,950.00

773.224 10.000 EA PINE - PITCH 4-5 FEET $540.00 $5,400.00 $640.00 $6,400.00

774.300 13.000 EA ELM - AMERICAN 2-2.5 INCH CALIPER $800.00 $10,400.00 $950.00 $12,350.00

775.431 12.000 EA LOCUST - HONEY - SHADEMASTER 2-2.5 INCH

CALIPER

$800.00 $9,600.00 $950.00 $11,400.00

776.523 5.000 EA MAPLE - RED 2-2.5 INCH CALIPER $800.00 $4,000.00 $950.00 $4,750.00

777.328 12.000 EA OAK - WHITE 2-2.5 INCH CALIPER $875.00 $10,500.00 $1,040.00 $12,480.00

778.166 15.000 EA BIRCH - GRAY 5-6 FEET MULTI STEM $200.00 $3,000.00 $240.00 $3,600.00

781.284 5.000 EA HAWTHORN - COCKSPUR 1.5-2 INCH CALIPER $925.00 $4,625.00 $1,100.00 $5,500.00

783.057 11.000 EA SHAD TREE - DOWNY CUMULUS 7-8 FEET CLUMP $1,025.00 $11,275.00 $1,220.00 $13,420.00

796.201 150.000 EA BEACH GRASS 1 GALLON $56.00 $8,400.00 $67.00 $10,050.00

796.202 150.000 EA SWITCH GRASS 1 GALLON $56.00 $8,400.00 $67.00 $10,050.00

804.2 205.000 FT 2 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC

(UL)

$105.00 $21,525.00 $21.00 $4,305.00

804.21 150.000 FT 2 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC

(UL) - (LIQUID TIGHT)

$114.00 $17,100.00 $48.00 $7,200.00

804.3 3,080.000 FT 3 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -

(UL)

$80.00 $246,400.00 $33.00 $101,640.00

806.4 20.000 FT 4 INCH ELECTRICAL CONDUIT TYPE RM -

GALVANIZED STEEL

$680.00 $13,600.00 $150.00 $3,000.00

811.01 17.000 EA ELECTRIC HANDHOLE REMOVED AND DISCARDED $300.00 $5,100.00 $400.00 $6,800.00

811.22 32.000 EA ELECTRIC HANDHOLE - SD2.022 $1,750.00 $56,000.00 $2,300.00 $73,600.00

812.09 20.000 EA LIGHT STANDARD FOUNDATION PRECAST $4,700.00 $94,000.00 $6,400.00 $128,000.00

812.30 5.000 EA STANDARD SIGNAL POST FOUNDATION SD3.030 $1,400.00 $7,000.00 $1,500.00 $7,500.00

813.40 800.000 FT WIRE TYPE 8 NO. 10 DIRECT BURIAL $4.00 $3,200.00 $2.50 $2,000.00

813.41 650.000 FT WIRE TYPE 8 NO. 8 DIRECT BURIAL $4.00 $2,600.00 $4.00 $2,600.00

813.42 11,470.000 FT WIRE TYPE 8 NO. 6 DIRECT BURIAL $4.50 $51,615.00 $5.00 $57,350.00

813.43 2,860.000 FT WIRE TYPE 8 NO. 4 DIRECT BURIAL $5.00 $14,300.00 $7.50 $21,450.00

821.101 2.000 EA HIGHWAY LIGHTING POLE (ANCHOR BASE) 1 FOOT

BRACKET

$7,600.00 $15,200.00 $9,500.00 $19,000.00

CMS105 - Report Date: 8/18/2026 2:41 PM Page 10 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

K R REZENDES INC C C CONSTRUCTION INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

821.201 18.000 EA HIGHWAY LIGHTING POLE (ANCHOR BASE) TWIN 1

FOOT BRACKET

$7,900.00 $142,200.00 $9,800.00 $176,400.00

823.01 38.000 EA AREA LIGHTING LUMINAIRE 105 WATT $1,600.00 $60,800.00 $2,100.00 $79,800.00

823.60 1.000 LS HIGHWAY LIGHTING LOAD CENTER $37,000.00 $37,000.00 $35,000.00 $35,000.00

823.63 1.000 LS STEP DOWN TRANSFORMER $14,500.00 $14,500.00 $34,000.00 $34,000.00

823.72 10.000 EA HIGHWAY LIGHTING POLE AND LUMINAIRE

REMOVED AND DISCARDED

$500.00 $5,000.00 $1,800.00 $18,000.00

825.10 5.000 EA LEVEL 2 CHARGER REMOVED AND RESET $2,300.00 $11,500.00 $7,500.00 $37,500.00

829. 75.000 SF ROADSIDE GUIDE SIGN (G) - ALUMINUM PANEL

(TYPE B)

$23.00 $1,725.00 $10.00 $750.00

832. 375.000 SF WARNING-REGULATORY AND ROUTE MARKER -

ALUMINUM PANEL (TYPE A)

$23.00 $8,625.00 $19.00 $7,125.00

841.6 4.000 EA SUPPORTS FOR GUIDE SIGN (I-2A-5 INCH TUBULAR

POST) STEEL

$1,300.00 $5,200.00 $4,327.00 $17,308.00

847.1 70.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST

ASSEMBLY - STEEL

$275.00 $19,250.00 $354.00 $24,780.00

850.41 120.000 HR ROADWAY FLAGGER $95.00 $11,400.00 $95.00 $11,400.00

852. 120.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $45.00 $5,400.00 $21.00 $2,520.00

856.12 365.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $33.00 $12,045.00 $139.00 $50,735.00

859. 39,600.000 DAY REFLECTORIZED DRUM $1.00 $39,600.00 $2.50 $99,000.00

864.04 900.000 SF PAVEMENT ARROWS AND LEGENDS

REFLECTORIZED WHITE (THERMOPLASTIC)

$16.50 $14,850.00 $21.00 $18,900.00

866.106 16,000.000 FT 6 INCH REFLECTORIZED WHITE LINE

(THERMOPLASTIC)

$1.50 $24,000.00 $2.50 $40,000.00

866.112 1,770.000 FT 12 INCH REFLECTORIZED WHITE LINE

(THERMOPLASTIC)

$4.40 $7,788.00 $7.50 $13,275.00

867.106 3,270.000 FT 6 INCH REFLECTORIZED YELLOW LINE

(THERMOPLASTIC)

$1.50 $4,905.00 $2.50 $8,175.00

874.2 9.000 EA TRAFFIC SIGN REMOVED AND RESET $140.00 $1,260.00 $750.00 $6,750.00

874.41 28.000 EA TRAFFIC SIGN ASSEMBLY REMOVED AND

DISCARDED

$100.00 $2,800.00 $500.00 $14,000.00

904. 60.000 CY 4000 PSI, 3/4 INCH, 610 CEMENT CONCRETE $600.00 $36,000.00 $250.00 $15,000.00

CMS105 - Report Date: 8/18/2026 2:41 PM Page 11 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

K R REZENDES INC C C CONSTRUCTION INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

986. 120.000 TON MODIFIED ROCKFILL $130.00 $15,600.00 $600.00 $72,000.00

Total : $6,697,085.00 Total : $6,723,708.15

CMS105 - Report Date: 8/18/2026 2:41 PM Page 12 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

E T & L CORP NORTHERN CONSTRUCTION SERVICE LLC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

101. 3.400 A CLEARING AND GRUBBING $25,000.00 $85,000.00 $25,000.00 $85,000.00

102.3 16.000 HR HERBICIDE TREATMENT OF INVASIVE PLANTS $970.00 $15,520.00 $650.00 $10,400.00

102.33 16.000 HR INVASIVE PLANT MANAGEMENT STRATEGY $460.00 $7,360.00 $700.00 $11,200.00

120. 31,700.000 CY EARTH EXCAVATION $35.00 $1,109,500.00 $23.96 $759,532.00

121. 20.000 CY CLASS A ROCK EXCAVATION $220.00 $4,400.00 $180.00 $3,600.00

141.1 10.000 CY TEST PIT FOR EXPLORATION $250.00 $2,500.00 $250.00 $2,500.00

142. 20.000 CY CLASS B TRENCH EXCAVATION $52.00 $1,040.00 $75.00 $1,500.00

146. 6.000 EA DRAINAGE STRUCTURE REMOVED $900.00 $5,400.00 $1,500.00 $9,000.00

150. 1,900.000 CY ORDINARY BORROW $40.00 $76,000.00 $51.00 $96,900.00

151. 5,540.000 CY GRAVEL BORROW $70.00 $387,800.00 $65.00 $360,100.00

170. 11,800.000 SY FINE GRADING AND COMPACTING - SUBGRADE

AREA

$5.00 $59,000.00 $6.00 $70,800.00

180.01 1.000 LS ENVIRONMENTAL HEALTH AND SAFETY PROGRAM $25,000.00 $25,000.00 $10,000.00 $10,000.00

180.02 24.000 HR PERSONAL PROTECTION LEVEL C UPGRADE $5.00 $120.00 $10.00 $240.00

180.03 24.000 HR LICENSED SITE PROFESSIONAL SERVICES $130.00 $3,120.00 $165.00 $3,960.00

181.11 3,850.000 TON DISPOSAL OF UNREGULATED SOIL $62.00 $238,700.00 $50.00 $192,500.00

181.12 5.000 TON DISPOSAL OF REGULATED SOIL - IN-STATE

FACILITY

$400.00 $2,000.00 $150.00 $750.00

181.13 5.000 TON DISPOSAL OF REGULATED SOIL - OUT-OF-STATE

FACILITY

$450.00 $2,250.00 $200.00 $1,000.00

181.14 5.000 TON DISPOSAL OF HAZARDOUS WASTE $550.00 $2,750.00 $750.00 $3,750.00

201. 22.000 EA CATCH BASIN $5,000.00 $110,000.00 $7,500.00 $165,000.00

202. 9.000 EA MANHOLE $4,000.00 $36,000.00 $8,500.00 $76,500.00

220. 17.000 EA DRAINAGE STRUCTURE ADJUSTED $800.00 $13,600.00 $550.00 $9,350.00

220.2 5.000 FT DRAINAGE STRUCTURE REBUILT $950.00 $4,750.00 $650.00 $3,250.00

220.3 3.000 EA DRAINAGE STRUCTURE CHANGE IN TYPE $1,750.00 $5,250.00 $900.00 $2,700.00

220.5 3.000 EA DRAINAGE STRUCTURE REMODELED $950.00 $2,850.00 $975.00 $2,925.00

221. 12.000 EA FRAME AND COVER $1,500.00 $18,000.00 $1,250.00 $15,000.00

222. 22.000 EA FRAME AND GRATE - MASSDOT BAR TYPE $1,550.00 $34,100.00 $1,300.00 $28,600.00

CMS105 - Report Date: 8/18/2026 2:41 PM Page 13 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

E T & L CORP NORTHERN CONSTRUCTION SERVICE LLC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

227.3 60.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $320.00 $19,200.00 $450.00 $27,000.00

227.31 1,500.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $12.50 $18,750.00 $3.50 $5,250.00

227.4 20.000 SF MASONRY PLUG $120.00 $2,400.00 $210.00 $4,200.00

228. 16.000 HR DRAINAGE PIPE VIDEO INSPECTION $625.00 $10,000.00 $300.00 $4,800.00

242.18 2.000 EA 18 INCH REINFORCED CONCRETE PIPE FLARED

END

$2,500.00 $5,000.00 $1,950.00 $3,900.00

243.12 1,160.000 FT 12 INCH REINFORCED CONCRETE PIPE CLASS IV $115.00 $133,400.00 $135.00 $156,600.00

243.18 190.000 FT 18 INCH REINFORCED CONCRETE PIPE CLASS IV $155.00 $29,450.00 $140.00 $26,600.00

250.04 710.000 FT 4 INCH POLYVINYL CHLORIDE SANITARY SEWER

PIPE

$65.00 $46,150.00 $75.00 $53,250.00

258. 10.000 SY STONE FOR PIPE ENDS $110.00 $1,100.00 $125.00 $1,250.00

402. 120.000 CY DENSE GRADED CRUSHED STONE FOR SUB-BASE $135.00 $16,200.00 $150.00 $18,000.00

415.2 11,700.000 SY PAVEMENT FINE MILLING $8.00 $93,600.00 $6.50 $76,050.00

431. 870.000 SY HIGH EARLY STRENGTH CEMENT CONCRETE BASE

COURSE

$54.00 $46,980.00 $75.00 $65,250.00

443. 20.000 MGL WATER FOR ROADWAY DUST CONTROL $75.00 $1,500.00 $105.00 $2,100.00

450.22 10.000 TON SUPERPAVE SURFACE COURSE - 9.5 (SSC - 9.5) $330.00 $3,300.00 $390.00 $3,900.00

450.231 2,790.000 TON SUPERPAVE SURFACE COURSE - 12.5 POLYMER

(SSC - 12.5 - P)

$195.00 $544,050.00 $225.00 $627,750.00

450.31 1,440.000 TON SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC -

12.5)

$200.00 $288,000.00 $235.00 $338,400.00

450.42 2,140.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $160.00 $342,400.00 $175.00 $374,500.00

451. 150.000 TON HMA FOR PATCHING $300.00 $45,000.00 $315.00 $47,250.00

452. 1,800.000 GAL ASPHALT EMULSION FOR TACK COAT $12.50 $22,500.00 $12.00 $21,600.00

453. 4,000.000 FT HMA JOINT ADHESIVE $4.00 $16,000.00 $3.50 $14,000.00

482.5 980.000 FT SAWCUTTING ASPHALT PAVEMENT FOR BOX

WIDENING

$5.00 $4,900.00 $3.50 $3,430.00

504. 9,275.000 FT GRANITE CURB TYPE VA4 - STRAIGHT $53.00 $491,575.00 $55.00 $510,125.00

504.1 1,345.000 FT GRANITE CURB TYPE VA4 - CURVED $67.00 $90,115.00 $70.00 $94,150.00

509. 540.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN

CURB RAMPS - STRAIGHT

$62.00 $33,480.00 $70.00 $37,800.00

CMS105 - Report Date: 8/18/2026 2:41 PM Page 14 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

E T & L CORP NORTHERN CONSTRUCTION SERVICE LLC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

509.1 150.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN

CURB RAMPS - CURVED

$71.00 $10,650.00 $85.00 $12,750.00

597. 6,150.000 FT EDGING REMOVED AND DISCARDED $8.00 $49,200.00 $7.00 $43,050.00

620.12 565.000 FT GUARDRAIL, TL-2 (SINGLE FACED) $30.00 $16,950.00 $37.00 $20,905.00

620.32 30.000 FT GUARDRAIL - CURVED, TL-2 (SINGLE FACED) $35.00 $1,050.00 $43.00 $1,290.00

627.1 3.000 EA TRAILING ANCHORAGE $2,400.00 $7,200.00 $3,000.00 $9,000.00

627.82 1.000 EA GUARDRAIL TANGENT END TREATMENT, TL-2 $4,600.00 $4,600.00 $6,000.00 $6,000.00

630.2 365.000 FT HIGHWAY GUARD REMOVED AND DISCARDED $6.00 $2,190.00 $7.00 $2,555.00

650.036 12.000 FT 36 INCH CHAIN LINK GATE WITH GATE POSTS $190.00 $2,280.00 $230.00 $2,760.00

697.1 42.000 EA SILT SACK $300.00 $12,600.00 $450.00 $18,900.00

701. 2,915.000 SY CEMENT CONCRETE SIDEWALK $75.00 $218,625.00 $75.00 $218,625.00

701.2 340.000 SY CEMENT CONCRETE PEDESTRIAN CURB RAMP $130.00 $44,200.00 $120.00 $40,800.00

707.2 10.000 EA TRASH RECEPTACLE $2,800.00 $28,000.00 $1,600.00 $16,000.00

707.8 10.000 EA STEEL BOLLARD $1,400.00 $14,000.00 $2,400.00 $24,000.00

707.9 10.000 EA BICYCLE RACK $1,150.00 $11,500.00 $850.00 $8,500.00

722.3 1.000 LS SCHEDULE OF OPERATIONS (TYPE C) - FIXED

PRICE $61500

$61,500.00 $61,500.00 $61,500.00 $61,500.00

740. 38.000 MO ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE

A)

$3,400.00 $129,200.00 $4,800.00 $182,400.00

745. 4.000 EA PEDESTRIAN BUS SHELTER $40,000.00 $160,000.00 $42,500.00 $170,000.00

745.2 1.000 LS PEDESTRIAN BUS SHELTER REMOVED AND

STACKED

$10,000.00 $10,000.00 $5,000.00 $5,000.00

748. 1.000 LS MOBILIZATION $196,000.00 $196,000.00 $200,000.00 $200,000.00

751. 570.000 CY LOAM FOR ROADSIDES $92.00 $52,440.00 $95.00 $54,150.00

751.7 640.000 CY COMPOST BLANKET $105.00 $67,200.00 $129.00 $82,560.00

756. 1.000 LS NPDES STORMWATER POLLUTION PREVENTION

PLAN

$10,000.00 $10,000.00 $10,000.00 $10,000.00

765. 2,150.000 SY SEEDING $2.20 $4,730.00 $4.50 $9,675.00

765.412 5,500.000 SY UPLAND SEED MIX - SHORT GRASSLAND MIX-

SANDY SOIL

$4.10 $22,550.00 $4.50 $24,750.00

765.554 450.000 SY WETLAND SEED MIX - SEASONALLY FLOODED MIX $4.10 $1,845.00 $4.50 $2,025.00

CMS105 - Report Date: 8/18/2026 2:41 PM Page 15 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

E T & L CORP NORTHERN CONSTRUCTION SERVICE LLC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

765.664 450.000 SY MOWING FOR NATIVE SEED ESTABLISHMENT $5.20 $2,340.00 $3.00 $1,350.00

767.121 1,500.000 FT SEDIMENT CONTROL BARRIER $10.00 $15,000.00 $7.50 $11,250.00

773.224 10.000 EA PINE - PITCH 4-5 FEET $570.00 $5,700.00 $600.00 $6,000.00

774.300 13.000 EA ELM - AMERICAN 2-2.5 INCH CALIPER $850.00 $11,050.00 $900.00 $11,700.00

775.431 12.000 EA LOCUST - HONEY - SHADEMASTER 2-2.5 INCH

CALIPER

$850.00 $10,200.00 $900.00 $10,800.00

776.523 5.000 EA MAPLE - RED 2-2.5 INCH CALIPER $850.00 $4,250.00 $900.00 $4,500.00

777.328 12.000 EA OAK - WHITE 2-2.5 INCH CALIPER $925.00 $11,100.00 $900.00 $10,800.00

778.166 15.000 EA BIRCH - GRAY 5-6 FEET MULTI STEM $210.00 $3,150.00 $225.00 $3,375.00

781.284 5.000 EA HAWTHORN - COCKSPUR 1.5-2 INCH CALIPER $975.00 $4,875.00 $1,000.00 $5,000.00

783.057 11.000 EA SHAD TREE - DOWNY CUMULUS 7-8 FEET CLUMP $1,100.00 $12,100.00 $1,050.00 $11,550.00

796.201 150.000 EA BEACH GRASS 1 GALLON $60.00 $9,000.00 $60.00 $9,000.00

796.202 150.000 EA SWITCH GRASS 1 GALLON $60.00 $9,000.00 $60.00 $9,000.00

804.2 205.000 FT 2 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC

(UL)

$50.00 $10,250.00 $65.00 $13,325.00

804.21 150.000 FT 2 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC

(UL) - (LIQUID TIGHT)

$200.00 $30,000.00 $89.00 $13,350.00

804.3 3,080.000 FT 3 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -

(UL)

$55.00 $169,400.00 $69.00 $212,520.00

806.4 20.000 FT 4 INCH ELECTRICAL CONDUIT TYPE RM -

GALVANIZED STEEL

$320.00 $6,400.00 $335.00 $6,700.00

811.01 17.000 EA ELECTRIC HANDHOLE REMOVED AND DISCARDED $425.00 $7,225.00 $500.00 $8,500.00

811.22 32.000 EA ELECTRIC HANDHOLE - SD2.022 $1,600.00 $51,200.00 $2,300.00 $73,600.00

812.09 20.000 EA LIGHT STANDARD FOUNDATION PRECAST $5,900.00 $118,000.00 $7,900.00 $158,000.00

812.30 5.000 EA STANDARD SIGNAL POST FOUNDATION SD3.030 $2,500.00 $12,500.00 $2,250.00 $11,250.00

813.40 800.000 FT WIRE TYPE 8 NO. 10 DIRECT BURIAL $3.70 $2,960.00 $4.50 $3,600.00

813.41 650.000 FT WIRE TYPE 8 NO. 8 DIRECT BURIAL $4.00 $2,600.00 $4.95 $3,217.50

813.42 11,470.000 FT WIRE TYPE 8 NO. 6 DIRECT BURIAL $4.50 $51,615.00 $5.60 $64,232.00

813.43 2,860.000 FT WIRE TYPE 8 NO. 4 DIRECT BURIAL $5.00 $14,300.00 $6.00 $17,160.00

821.101 2.000 EA HIGHWAY LIGHTING POLE (ANCHOR BASE) 1 FOOT

BRACKET

$7,500.00 $15,000.00 $8,600.00 $17,200.00

CMS105 - Report Date: 8/18/2026 2:41 PM Page 16 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

E T & L CORP NORTHERN CONSTRUCTION SERVICE LLC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

821.201 18.000 EA HIGHWAY LIGHTING POLE (ANCHOR BASE) TWIN 1

FOOT BRACKET

$7,700.00 $138,600.00 $9,000.00 $162,000.00

823.01 38.000 EA AREA LIGHTING LUMINAIRE 105 WATT $1,650.00 $62,700.00 $2,000.00 $76,000.00

823.60 1.000 LS HIGHWAY LIGHTING LOAD CENTER $45,000.00 $45,000.00 $55,000.00 $55,000.00

823.63 1.000 LS STEP DOWN TRANSFORMER $10,000.00 $10,000.00 $11,000.00 $11,000.00

823.72 10.000 EA HIGHWAY LIGHTING POLE AND LUMINAIRE

REMOVED AND DISCARDED

$950.00 $9,500.00 $1,250.00 $12,500.00

825.10 5.000 EA LEVEL 2 CHARGER REMOVED AND RESET $4,000.00 $20,000.00 $3,000.00 $15,000.00

829. 75.000 SF ROADSIDE GUIDE SIGN (G) - ALUMINUM PANEL

(TYPE B)

$52.00 $3,900.00 $62.00 $4,650.00

832. 375.000 SF WARNING-REGULATORY AND ROUTE MARKER -

ALUMINUM PANEL (TYPE A)

$22.00 $8,250.00 $26.00 $9,750.00

841.6 4.000 EA SUPPORTS FOR GUIDE SIGN (I-2A-5 INCH TUBULAR

POST) STEEL

$3,500.00 $14,000.00 $4,500.00 $18,000.00

847.1 70.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST

ASSEMBLY - STEEL

$260.00 $18,200.00 $325.00 $22,750.00

850.41 120.000 HR ROADWAY FLAGGER $73.00 $8,760.00 $80.00 $9,600.00

852. 120.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $30.00 $3,600.00 $49.00 $5,880.00

856.12 365.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $27.00 $9,855.00 $34.00 $12,410.00

859. 39,600.000 DAY REFLECTORIZED DRUM $0.30 $11,880.00 $0.35 $13,860.00

864.04 900.000 SF PAVEMENT ARROWS AND LEGENDS

REFLECTORIZED WHITE (THERMOPLASTIC)

$16.50 $14,850.00 $19.00 $17,100.00

866.106 16,000.000 FT 6 INCH REFLECTORIZED WHITE LINE

(THERMOPLASTIC)

$1.50 $24,000.00 $1.75 $28,000.00

866.112 1,770.000 FT 12 INCH REFLECTORIZED WHITE LINE

(THERMOPLASTIC)

$4.50 $7,965.00 $5.00 $8,850.00

867.106 3,270.000 FT 6 INCH REFLECTORIZED YELLOW LINE

(THERMOPLASTIC)

$1.50 $4,905.00 $1.75 $5,722.50

874.2 9.000 EA TRAFFIC SIGN REMOVED AND RESET $140.00 $1,260.00 $168.00 $1,512.00

874.41 28.000 EA TRAFFIC SIGN ASSEMBLY REMOVED AND

DISCARDED

$210.00 $5,880.00 $58.00 $1,624.00

904. 60.000 CY 4000 PSI, 3/4 INCH, 610 CEMENT CONCRETE $300.00 $18,000.00 $950.00 $57,000.00

CMS105 - Report Date: 8/18/2026 2:41 PM Page 17 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

E T & L CORP NORTHERN CONSTRUCTION SERVICE LLC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

986. 120.000 TON MODIFIED ROCKFILL $100.00 $12,000.00 $120.00 $14,400.00

Total : $6,737,890.00 Total : $6,929,995.00

CMS105 - Report Date: 8/18/2026 2:41 PM Page 18 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

R M PACELLA INC ROBERT B OUR CO INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

101. 3.400 A CLEARING AND GRUBBING $77,700.00 $264,180.00 $12,209.30 $41,511.62

102.3 16.000 HR HERBICIDE TREATMENT OF INVASIVE PLANTS $950.00 $15,200.00 $476.44 $7,623.04

102.33 16.000 HR INVASIVE PLANT MANAGEMENT STRATEGY $450.00 $7,200.00 $238.22 $3,811.52

120. 31,700.000 CY EARTH EXCAVATION $33.00 $1,046,100.00 $27.18 $861,606.00

121. 20.000 CY CLASS A ROCK EXCAVATION $265.00 $5,300.00 $46.99 $939.80

141.1 10.000 CY TEST PIT FOR EXPLORATION $189.00 $1,890.00 $102.09 $1,020.90

142. 20.000 CY CLASS B TRENCH EXCAVATION $1.00 $20.00 $47.64 $952.80

146. 6.000 EA DRAINAGE STRUCTURE REMOVED $581.00 $3,486.00 $1,168.87 $7,013.22

150. 1,900.000 CY ORDINARY BORROW $7.50 $14,250.00 $24.98 $47,462.00

151. 5,540.000 CY GRAVEL BORROW $39.00 $216,060.00 $82.48 $456,939.20

170. 11,800.000 SY FINE GRADING AND COMPACTING - SUBGRADE

AREA

$7.50 $88,500.00 $4.58 $54,044.00

180.01 1.000 LS ENVIRONMENTAL HEALTH AND SAFETY PROGRAM $99,950.00 $99,950.00 $6,125.67 $6,125.67

180.02 24.000 HR PERSONAL PROTECTION LEVEL C UPGRADE $10.00 $240.00 $16.34 $392.16

180.03 24.000 HR LICENSED SITE PROFESSIONAL SERVICES $215.00 $5,160.00 $272.25 $6,534.00

181.11 3,850.000 TON DISPOSAL OF UNREGULATED SOIL $12.50 $48,125.00 $73.91 $284,553.50

181.12 5.000 TON DISPOSAL OF REGULATED SOIL - IN-STATE

FACILITY

$97.00 $485.00 $183.77 $918.85

181.13 5.000 TON DISPOSAL OF REGULATED SOIL - OUT-OF-STATE

FACILITY

$156.00 $780.00 $245.03 $1,225.15

181.14 5.000 TON DISPOSAL OF HAZARDOUS WASTE $1,950.00 $9,750.00 $1,361.26 $6,806.30

201. 22.000 EA CATCH BASIN $4,950.00 $108,900.00 $6,678.88 $146,935.36

202. 9.000 EA MANHOLE $5,595.00 $50,355.00 $6,423.52 $57,811.68

220. 17.000 EA DRAINAGE STRUCTURE ADJUSTED $440.00 $7,480.00 $917.54 $15,598.18

220.2 5.000 FT DRAINAGE STRUCTURE REBUILT $440.00 $2,200.00 $479.74 $2,398.70

220.3 3.000 EA DRAINAGE STRUCTURE CHANGE IN TYPE $1,450.00 $4,350.00 $1,492.94 $4,478.82

220.5 3.000 EA DRAINAGE STRUCTURE REMODELED $629.00 $1,887.00 $1,047.05 $3,141.15

221. 12.000 EA FRAME AND COVER $1,275.00 $15,300.00 $1,344.31 $16,131.72

222. 22.000 EA FRAME AND GRATE - MASSDOT BAR TYPE $1,450.00 $31,900.00 $1,344.31 $29,574.82

CMS105 - Report Date: 8/18/2026 2:41 PM Page 19 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

R M PACELLA INC ROBERT B OUR CO INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

227.3 60.000 CY REMOVAL OF DRAINAGE STRUCTURE SEDIMENT $163.00 $9,780.00 $64.66 $3,879.60

227.31 1,500.000 FT REMOVAL OF DRAINAGE PIPE SEDIMENT $12.50 $18,750.00 $5.20 $7,800.00

227.4 20.000 SF MASONRY PLUG $99.00 $1,980.00 $234.98 $4,699.60

228. 16.000 HR DRAINAGE PIPE VIDEO INSPECTION $409.00 $6,544.00 $170.16 $2,722.56

242.18 2.000 EA 18 INCH REINFORCED CONCRETE PIPE FLARED

END

$7,010.00 $14,020.00 $2,231.86 $4,463.72

243.12 1,160.000 FT 12 INCH REINFORCED CONCRETE PIPE CLASS IV $159.00 $184,440.00 $100.13 $116,150.80

243.18 190.000 FT 18 INCH REINFORCED CONCRETE PIPE CLASS IV $243.00 $46,170.00 $132.25 $25,127.50

250.04 710.000 FT 4 INCH POLYVINYL CHLORIDE SANITARY SEWER

PIPE

$69.00 $48,990.00 $53.05 $37,665.50

258. 10.000 SY STONE FOR PIPE ENDS $199.00 $1,990.00 $186.41 $1,864.10

402. 120.000 CY DENSE GRADED CRUSHED STONE FOR SUB-BASE $145.00 $17,400.00 $132.19 $15,862.80

415.2 11,700.000 SY PAVEMENT FINE MILLING $10.50 $122,850.00 $4.83 $56,511.00

431. 870.000 SY HIGH EARLY STRENGTH CEMENT CONCRETE BASE

COURSE

$66.00 $57,420.00 $84.39 $73,419.30

443. 20.000 MGL WATER FOR ROADWAY DUST CONTROL $7.50 $150.00 $149.74 $2,994.80

450.22 10.000 TON SUPERPAVE SURFACE COURSE - 9.5 (SSC - 9.5) $296.00 $2,960.00 $401.58 $4,015.80

450.231 2,790.000 TON SUPERPAVE SURFACE COURSE - 12.5 POLYMER

(SSC - 12.5 - P)

$210.00 $585,900.00 $230.06 $641,867.40

450.31 1,440.000 TON SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC -

12.5)

$178.00 $256,320.00 $472.11 $679,838.40

450.42 2,140.000 TON SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5) $160.00 $342,400.00 $191.94 $410,751.60

451. 150.000 TON HMA FOR PATCHING $309.00 $46,350.00 $321.25 $48,187.50

452. 1,800.000 GAL ASPHALT EMULSION FOR TACK COAT $11.00 $19,800.00 $13.62 $24,516.00

453. 4,000.000 FT HMA JOINT ADHESIVE $1.50 $6,000.00 $4.76 $19,040.00

482.5 980.000 FT SAWCUTTING ASPHALT PAVEMENT FOR BOX

WIDENING

$10.50 $10,290.00 $4.76 $4,664.80

504. 9,275.000 FT GRANITE CURB TYPE VA4 - STRAIGHT $63.00 $584,325.00 $62.31 $577,925.25

504.1 1,345.000 FT GRANITE CURB TYPE VA4 - CURVED $83.00 $111,635.00 $84.90 $114,190.50

509. 540.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN

CURB RAMPS - STRAIGHT

$63.00 $34,020.00 $73.60 $39,744.00

CMS105 - Report Date: 8/18/2026 2:41 PM Page 20 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

R M PACELLA INC ROBERT B OUR CO INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

509.1 150.000 FT GRANITE TRANSITION CURB FOR PEDESTRIAN

CURB RAMPS - CURVED

$83.00 $12,450.00 $107.44 $16,116.00

597. 6,150.000 FT EDGING REMOVED AND DISCARDED $3.50 $21,525.00 $0.01 $61.50

620.12 565.000 FT GUARDRAIL, TL-2 (SINGLE FACED) $36.00 $20,340.00 $42.54 $24,035.10

620.32 30.000 FT GUARDRAIL - CURVED, TL-2 (SINGLE FACED) $41.00 $1,230.00 $49.01 $1,470.30

627.1 3.000 EA TRAILING ANCHORAGE $2,445.00 $7,335.00 $2,892.68 $8,678.04

627.82 1.000 EA GUARDRAIL TANGENT END TREATMENT, TL-2 $5,175.00 $5,175.00 $6,125.67 $6,125.67

630.2 365.000 FT HIGHWAY GUARD REMOVED AND DISCARDED $2.60 $949.00 $3.06 $1,116.90

650.036 12.000 FT 36 INCH CHAIN LINK GATE WITH GATE POSTS $403.00 $4,836.00 $476.44 $5,717.28

697.1 42.000 EA SILT SACK $75.00 $3,150.00 $168.26 $7,066.92

701. 2,915.000 SY CEMENT CONCRETE SIDEWALK $103.00 $300,245.00 $90.12 $262,699.80

701.2 340.000 SY CEMENT CONCRETE PEDESTRIAN CURB RAMP $130.00 $44,200.00 $129.95 $44,183.00

707.2 10.000 EA TRASH RECEPTACLE $4,015.00 $40,150.00 $2,714.72 $27,147.20

707.8 10.000 EA STEEL BOLLARD $1,950.00 $19,500.00 $641.52 $6,415.20

707.9 10.000 EA BICYCLE RACK $1,540.00 $15,400.00 $1,259.40 $12,594.00

722.3 1.000 LS SCHEDULE OF OPERATIONS (TYPE C) - FIXED

PRICE $61500

$61,500.00 $61,500.00 $61,500.00 $61,500.00

740. 38.000 MO ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE

A)

$3,700.00 $140,600.00 $5,172.79 $196,566.02

745. 4.000 EA PEDESTRIAN BUS SHELTER $79,000.00 $316,000.00 $38,267.85 $153,071.40

745.2 1.000 LS PEDESTRIAN BUS SHELTER REMOVED AND

STACKED

$27,350.00 $27,350.00 $14,452.60 $14,452.60

748. 1.000 LS MOBILIZATION $208,000.00 $208,000.00 $169,091.98 $169,091.98

751. 570.000 CY LOAM FOR ROADSIDES $91.00 $51,870.00 $67.63 $38,549.10

751.7 640.000 CY COMPOST BLANKET $25.00 $16,000.00 $39.30 $25,152.00

756. 1.000 LS NPDES STORMWATER POLLUTION PREVENTION

PLAN

$85,550.00 $85,550.00 $6,125.67 $6,125.67

765. 2,150.000 SY SEEDING $4.50 $9,675.00 $10.21 $21,951.50

765.412 5,500.000 SY UPLAND SEED MIX - SHORT GRASSLAND MIX-

SANDY SOIL

$4.50 $24,750.00 $9.39 $51,645.00

765.554 450.000 SY WETLAND SEED MIX - SEASONALLY FLOODED MIX $4.50 $2,025.00 $4.63 $2,083.50

CMS105 - Report Date: 8/18/2026 2:41 PM Page 21 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

R M PACELLA INC ROBERT B OUR CO INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

765.664 450.000 SY MOWING FOR NATIVE SEED ESTABLISHMENT $3.00 $1,350.00 $16.34 $7,353.00

767.121 1,500.000 FT SEDIMENT CONTROL BARRIER $26.00 $39,000.00 $10.89 $16,335.00

773.224 10.000 EA PINE - PITCH 4-5 FEET $649.00 $6,490.00 $816.76 $8,167.60

774.300 13.000 EA ELM - AMERICAN 2-2.5 INCH CALIPER $966.00 $12,558.00 $2,178.01 $28,314.13

775.431 12.000 EA LOCUST - HONEY - SHADEMASTER 2-2.5 INCH

CALIPER

$966.00 $11,592.00 $1,960.21 $23,522.52

776.523 5.000 EA MAPLE - RED 2-2.5 INCH CALIPER $966.00 $4,830.00 $1,633.51 $8,167.55

777.328 12.000 EA OAK - WHITE 2-2.5 INCH CALIPER $1,054.00 $12,648.00 $1,633.51 $19,602.12

778.166 15.000 EA BIRCH - GRAY 5-6 FEET MULTI STEM $242.00 $3,630.00 $1,531.42 $22,971.30

781.284 5.000 EA HAWTHORN - COCKSPUR 1.5-2 INCH CALIPER $1,088.00 $5,440.00 $1,531.42 $7,657.10

783.057 11.000 EA SHAD TREE - DOWNY CUMULUS 7-8 FEET CLUMP $1,202.00 $13,222.00 $1,633.51 $17,968.61

796.201 150.000 EA BEACH GRASS 1 GALLON $67.00 $10,050.00 $54.45 $8,167.50

796.202 150.000 EA SWITCH GRASS 1 GALLON $67.00 $10,050.00 $57.17 $8,575.50

804.2 205.000 FT 2 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC

(UL)

$95.00 $19,475.00 $54.01 $11,072.05

804.21 150.000 FT 2 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC

(UL) - (LIQUID TIGHT)

$255.00 $38,250.00 $97.11 $14,566.50

804.3 3,080.000 FT 3 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -

(UL)

$49.00 $150,920.00 $45.67 $140,663.60

806.4 20.000 FT 4 INCH ELECTRICAL CONDUIT TYPE RM -

GALVANIZED STEEL

$223.00 $4,460.00 $109.65 $2,193.00

811.01 17.000 EA ELECTRIC HANDHOLE REMOVED AND DISCARDED $665.00 $11,305.00 $443.88 $7,545.96

811.22 32.000 EA ELECTRIC HANDHOLE - SD2.022 $3,090.00 $98,880.00 $2,426.93 $77,661.76

812.09 20.000 EA LIGHT STANDARD FOUNDATION PRECAST $4,950.00 $99,000.00 $5,953.94 $119,078.80

812.30 5.000 EA STANDARD SIGNAL POST FOUNDATION SD3.030 $2,215.00 $11,075.00 $1,422.52 $7,112.60

813.40 800.000 FT WIRE TYPE 8 NO. 10 DIRECT BURIAL $4.50 $3,600.00 $2.18 $1,744.00

813.41 650.000 FT WIRE TYPE 8 NO. 8 DIRECT BURIAL $4.75 $3,087.50 $3.16 $2,054.00

813.42 11,470.000 FT WIRE TYPE 8 NO. 6 DIRECT BURIAL $5.50 $63,085.00 $4.05 $46,453.50

813.43 2,860.000 FT WIRE TYPE 8 NO. 4 DIRECT BURIAL $6.00 $17,160.00 $5.67 $16,216.20

821.101 2.000 EA HIGHWAY LIGHTING POLE (ANCHOR BASE) 1 FOOT

BRACKET

$7,525.00 $15,050.00 $6,806.30 $13,612.60

CMS105 - Report Date: 8/18/2026 2:41 PM Page 22 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

R M PACELLA INC ROBERT B OUR CO INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

821.201 18.000 EA HIGHWAY LIGHTING POLE (ANCHOR BASE) TWIN 1

FOOT BRACKET

$7,950.00 $143,100.00 $8,303.69 $149,466.42

823.01 38.000 EA AREA LIGHTING LUMINAIRE 105 WATT $1,668.00 $63,384.00 $1,577.70 $59,952.60

823.60 1.000 LS HIGHWAY LIGHTING LOAD CENTER $91,490.00 $91,490.00 $61,256.73 $61,256.73

823.63 1.000 LS STEP DOWN TRANSFORMER $37,187.00 $37,187.00 $8,848.19 $8,848.19

823.72 10.000 EA HIGHWAY LIGHTING POLE AND LUMINAIRE

REMOVED AND DISCARDED

$555.00 $5,550.00 $488.58 $4,885.80

825.10 5.000 EA LEVEL 2 CHARGER REMOVED AND RESET $23,632.00 $118,160.00 $5,785.36 $28,926.80

829. 75.000 SF ROADSIDE GUIDE SIGN (G) - ALUMINUM PANEL

(TYPE B)

$58.00 $4,350.00 $85.76 $6,432.00

832. 375.000 SF WARNING-REGULATORY AND ROUTE MARKER -

ALUMINUM PANEL (TYPE A)

$25.00 $9,375.00 $23.14 $8,677.50

841.6 4.000 EA SUPPORTS FOR GUIDE SIGN (I-2A-5 INCH TUBULAR

POST) STEEL

$3,925.00 $15,700.00 $5,078.89 $20,315.56

847.1 70.000 EA SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST

ASSEMBLY - STEEL

$290.00 $20,300.00 $367.54 $25,727.80

850.41 120.000 HR ROADWAY FLAGGER $76.00 $9,120.00 $113.16 $13,579.20

852. 120.000 SF SAFETY SIGNING FOR TRAFFIC MANAGEMENT $96.00 $11,520.00 $24.79 $2,974.80

856.12 365.000 DAY PORTABLE CHANGEABLE MESSAGE SIGN $30.00 $10,950.00 $25.86 $9,438.90

859. 39,600.000 DAY REFLECTORIZED DRUM $0.35 $13,860.00 $0.20 $7,920.00

864.04 900.000 SF PAVEMENT ARROWS AND LEGENDS

REFLECTORIZED WHITE (THERMOPLASTIC)

$18.50 $16,650.00 $9.66 $8,694.00

866.106 16,000.000 FT 6 INCH REFLECTORIZED WHITE LINE

(THERMOPLASTIC)

$2.00 $32,000.00 $2.08 $33,280.00

866.112 1,770.000 FT 12 INCH REFLECTORIZED WHITE LINE

(THERMOPLASTIC)

$5.25 $9,292.50 $8.23 $14,567.10

867.106 3,270.000 FT 6 INCH REFLECTORIZED YELLOW LINE

(THERMOPLASTIC)

$2.00 $6,540.00 $2.38 $7,782.60

874.2 9.000 EA TRAFFIC SIGN REMOVED AND RESET $157.00 $1,413.00 $139.35 $1,254.15

874.41 28.000 EA TRAFFIC SIGN ASSEMBLY REMOVED AND

DISCARDED

$55.00 $1,540.00 $77.31 $2,164.68

904. 60.000 CY 4000 PSI, 3/4 INCH, 610 CEMENT CONCRETE $262.00 $15,720.00 $1,633.51 $98,010.60

CMS105 - Report Date: 8/18/2026 2:41 PM Page 23 of 36

Location : BARNSTABLE Contract # : 135580 District : 5 Description : BARNSTABLE- PARK AND RIDE EXPANSION AND IMPROVEMENTS AT ROUTE 132

R M PACELLA INC ROBERT B OUR CO INC

Item # Quantity Units Description Unit Price Amount Unit Price Amount

986. 120.000 TON MODIFIED ROCKFILL $229.00…