Text version
DD Form 1423-1, SEP 97 (EG) (Computer Generated) Page 1 of 6 Pages PREVIOUS EDITIONS ARE OBSOLETE
CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson D avis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and
Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Gover nment Issuing Contracting Officer for the
Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: Data & Reports CLIN D. SYSTEM/ITEM........: Space Env Particles & Sensors (SPartEnS)
B. EXHIBIT....................................: A E. CONTRACT/PR NO.: TBD
C. CATEGORY..............................: TDP – Technical Data Package F. CONTRACTOR.........: TBD Contractor
1. DATA ITEM NO........................: A001
2. TITLE OF DATA ITEM............: Status Report
3. SUBTITLE..................................: Quarterly Status Report
4. AUTHORITY.............................: DI-MGMT-80368A
5. CONTRACT REFERENCE......: BAA-RV-10-01 Call 19
6. REQUIRING OFFICE..............: AFRL/RVBX 9. DIST. STATEMENT REQUIRED......: D 12. DATE OF FIRST SUBMISSION: Blk 16
7. DD250 REQ................................: LT 10. FREQUENCY......................................: Quarterly 13. DATE OF SUBSEQUENT SUBM.: Blk 16
8. APP CODE.................................: N 11. AS OF DATE........................................: Blk 16
14. DISTRIBUTION
A. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL/RVBX 1
AFRL/RVKVB Letter
ACO Letter
15. TOTAL: 0 1
16. REMARKS
Blk 4: Tailoring of DID Requirements:
This report shall describe the current project status and the accomplishments from the previous quarter. This document must include technical progress, description/designs/drawings of any hardware or algorithms produced, financial status(in a format to be provided by the program manager), and address any issues currently affecting or expected to affect the program (liens, waivers, material, personnel, schedule, and/or software issues, etc). Reports shall include a listing of all individual personnel and item charges to the project by CLIN, month, and quarterly summary, in a tabular format provided by the Program Manager. Electronic submission in Microspft Word (version 2003 or later) or Adobe PDF is required. Versions must be submitted in a manner consistent with protecting export control and limited information. Submission via unencrypted or unsecure email is not permitted.
If the deliverable contains export controlled technical data pertaining to critical technologies, then the export control warning and distribution statement referencing “critical technology” below will be applied:
Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement D: “Distribution authorized to DoD and U.S. DoD contractors only;
Critical Technology; 11 Oct 2013. Other requests for this document shall be referred to Air Force Research Laboratory/RVBX, 3550 Aberdeen Ave SE, Kirtland AFB, NM 87117-5776.”
EXPORT CONTROL WARNING: All technical data shall be marked as follows: “WARNING — This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
If the deliverable does not contain export controlled technical data pertaining to critical technologies, then the distribution statement below will be applied, and no export control warning is required:
Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement D: “Distribution authorized to DoD and U.S. DoD contractors only;
Administrative Use; 11 Oct 2013. Other requests for this document shall be referred to Air Force Research Laboratory/RVBX, 3550 Aberdeen Ave SE, Kirtland AFB, All technical data shall be marked with the following statement: “DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
Blks 10-13: The contractor shall deliver the first Quarterly Status Report within 10 calendar days after the first government fiscal year quarter (31 March 2014, etc) following contract award. This first quarterly report will likely encompass less time than subsequent quarterly reports. Subsequent reports shall be delivered within
10 calendar days of every quarter thereafter through completion of the contract.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: S. Quigley I. APPROVED BY: K. Kinifick H. DATE: 11 Oct 2013 J. DATE: 30 Oct 2013
DD Form 1423-1, SEP 97 (EG) (Computer Generated) Page 2 of 6 Pages PREVIOUS EDITIONS ARE OBSOLETE
CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and
Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the
A. CONTRACT LINE ITEM NO.: Data & Reports CLIN D. SYSTEM/ITEM........: Space Env Particles & Sensors (SPartEnS)
B. EXHIBIT....................................: A E. CONTRACT/PR NO.: TBD
C. CATEGORY..............................: TDP – Technical Data Package F. CONTRACTOR.........: TBD Contractor
1. DATA ITEM NO........................: A002
2. TITLE OF DATA ITEM............: Contract Funds Status Report (CFSR)
3. SUBTITLE..................................: Quarterly CSFR
4. AUTHORITY.............................: DI-MGMT-81468
5. CONTRACT REFERENCE......: BAA-RV-10-01 Call 19
6. REQUIRING OFFICE..............: AFRL/RVBX 9. DIST. STATEMENT REQUIRED......: D 12. DATE OF FIRST SUBMISSION: Blk 16
7. DD250 REQ................................: LT 10. FREQUENCY......................................: Quarterly 13. DATE OF SUBSEQUENT SUBM.: Blk 16
8. APP CODE.................................: Blk 16 11. AS OF DATE........................................: Blk 16
14. DISTRIBUTION
A. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL/RVBX 1
AFRL/RVKV Letter
a. Electronic versions must be submitted in a manner consistent with protecting export control and limited information. Submission via unencrypted or unsecure email is not permitted. CD-Rs to be delivered by regular mail.
b. (Sec 7.3.1) If a contract is funded with a single appropriation, reporting should be at a total contract level separated by CLIN and ACRN (if applicable).
Blk 8: Approval of contractor format is required on initial submittal. All subsequent submittals shall be non-approval items, and re-submittals may be required if contractor submits a delivery item that is unsatisfactory.
Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement D: “Distribution authorized to DoD and U.S. DoD contractors only;
Administrative Use; 11 Oct 2013. Other requests for this document shall be referred to Air Force Research Laboratory/RVBX, 3550 Aberdeen Ave SE, Kirtland AFB, All technical data shall be marked with the following statement: “DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will
Blks 10-13: The contractor shall deliver the first Quarterly CSFR within 10 calendar days after the first government fiscal year quarter (31 March 2014, etc) following contract award. This first quarterly CSFR will likely encompass less time than subsequent quarterly reports. Subsequent reports shall be delivered within 10 calendar days of every quarter thereafter through completion of the contract.
DD Form 1423-1, SEP 97 (EG) (Computer Generated) Page 3 of 6 Pages PREVIOUS EDITIONS ARE OBSOLETE
CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson D avis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and
Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Gover nment Issuing Contracting Officer for the
A. CONTRACT LINE ITEM NO.: Data & Reports CLIN D. SYSTEM/ITEM........: Space Env Particles & Sensors (SPartEnS)
B. EXHIBIT....................................: A E. CONTRACT/PR NO.: TBD
C. CATEGORY..............................: TDP – Technical Data Package F. CONTRACTOR.........: TBD Contractor
1. DATA ITEM NO........................: A003
2. TITLE OF DATA ITEM............: Status Report
3. SUBTITLE..................................: Annual Status Report
4. AUTHORITY.............................: DI-MGMT-80368B
5. CONTRACT REFERENCE......: BAA-RV-10-01 Call 19
6. REQUIRING OFFICE..............: AFRL/RVBX 9. DIST. STATEMENT REQUIRED......: D 12. DATE OF FIRST SUBMISSION: Blk 16
7. DD250 REQ................................: LT 10. FREQUENCY......................................: Annual 13. DATE OF SUBSEQUENT SUBM.: Blk 16
8. APP CODE.................................: N 11. AS OF DATE........................................: Blk 16
14. DISTRIBUTION
A. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL/RVBX 1
AFRL/RVKVB 1
15. TOTAL: 0 2
This report shall describe the current project status and the accomplishments from the previous year. This document must include technical progress, description/designs/drawings of any hardware or algorithms produced, financial status(in a format to be provided by the program manager), and address any issues currently affecting or expected to affect the program (liens, waivers, material, personnel, schedule, and/or software issues, etc). Reports shall include a listing of all individual personnel and item charges to the project by CLIN, month, and summaries (quarterly and annual) in a tabular format provided by the Program Manager.
Electronic submission in Microspft Word (version 2003 or later) or Adobe PDF is required. Versions must be submitted in a manner consistent with protecting export control and limited information. Submission via unencrypted or unsecure email is not permitted.
If the deliverable contains export controlled technical data pertaining to critical technologies, then the export control warning and distribution statement
Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement D: “Distribution authorized to DoD and U.S. DoD contractors only;
Critical Technology; 11 Oct 2013. Other requests for this document shall be referred to Air Force Research Laboratory/RVBX, 3550 Aberdeen Ave SE, Kirtland AFB, EXPORT CONTROL WARNING: All technical data shall be marked as follows: “WARNING — This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
If the deliverable does not contain export controlled technical data pertaining to critical technologies, then the distribution statement below will be applied, Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement D: “Distribution authorized to DoD and U.S. DoD contractors only;
Administrative Use; 11 Oct 2013. Other requests for this document shall be referred to Air Force Research Laboratory/RVBX, 3550 Aberdeen Ave SE, Kirtland AFB, All technical data shall be marked with the following statement: “DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will
Blks 10-13: The contractor shall deliver the first Annual Status Report within 10 calendar days of the 12MAA date (MAA = months after award) . Subsequent reports shall be delivered every 12 months thereafter through completion of the contract.
DD Form 1423-1, SEP 97 (EG) (Computer Generated) Page 4 of 6 Pages PREVIOUS EDITIONS ARE OBSOLETE
CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and
Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the
A. CONTRACT LINE ITEM NO.: Data & Reports LCIN D. SYSTEM/ITEM.........: Space Env Particles & Sensors (SPartEnS)
B. EXHIBIT....................................: A E. CONTRACT/PR NO.: TBD
C. CATEGORY..............................: TDP – Technical Data Package F. CONTRACTOR.........: TBD Contractor
1. DATA ITEM NO........................: A004
2. TITLE OF DATA ITEM............: Technical Report Study/Services
3. SUBTITLE..................................: Tech Report
4. AUTHORITY.............................: DI-MISC-80508B
5. CONTRACT REFERENCE......: BAA-RV-10-01 Call 19
6. REQUIRING OFFICE..............: AFRL/RVBX 9. DIST. STATEMENT REQUIRED......: D 12. DATE OF FIRST SUBMISSION: Blk 16
7. DD250 REQ................................: LT 10. FREQUENCY......................................: ASREQ 13. DATE OF SUBSEQUENT SUBM.: Blk 16
8. APP CODE.................................: N 11. AS OF DATE........................................: Blk 16
14. DISTRIBUTION
A. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL/RVBX 1
This report shall include detailed and summarized descriptions and documentation of a completed technical task or applicable portion thereof
(analysis/study/experiment/model/validation completion, hardware designed/built, algorithm package application complete, etc), on an as-required basis.
If the deliverable contains export controlled technical data pertaining to critical technologies, then the export control warning and distribution statement
Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement D: “Distribution authorized to DoD and U.S. DoD contractors only;
Critical Technology; 11 Oct 2013. Other requests for this document shall be referred to Air Force Research Laboratory/RVBX, 3550 Aberdeen Ave SE, Kirtland AFB, EXPORT CONTROL WARNING: All technical data shall be marked as follows: “WARNING — This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
If the deliverable does not contain export controlled technical data pertaining to critical technologies, then the distribution statement below will be applied, Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement D: “Distribution authorized to DoD and U.S. DoD contractors only;
Operational Use; 11 Oct 2013. Other requests for this document shall be referred to Air Force Research Laboratory/RVBX, 3550 Aberdeen Ave SE, Kirtland AFB, All technical data shall be marked with the following statement: “DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will
Blk 10-13: Reports shall be delivered on an as-required basis, as determined by individual research/technical task/project completion, and coordinated with the Program Manager or government project leads and applicable contract personnel.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
DD Form 1423-1, SEP 97 (EG) (Computer Generated) Page 5 of 6 Pages PREVIOUS EDITIONS ARE OBSOLETE
CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson D avis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and
Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Gover nment Issuing Contracting Officer for the
A. CONTRACT LINE ITEM NO.: Data & Reports CLIN D. SYSTEM/ITEM........: Space Env Particles & Sensors (SPartEnS)
B. EXHIBIT....................................: A E. CONTRACT/PR NO.: TBD
C. CATEGORY..............................: TDP – Technical Data Package F. CONTRACTOR.........: TBD Contractor
1. DATA ITEM NO........................: A005
2. TITLE OF DATA ITEM............: Computer Program End Item Documentation
3. SUBTITLE..................................: Model & Algorithm Deliverables
4. AUTHORITY.............................: DI-IPSC-80590B
5. CONTRACT REFERENCE......: BAA-RV-10-01 Call 19
6. REQUIRING OFFICE..............: AFRL/RVBX 9. DIST. STATEMENT REQUIRED......: D 12. DATE OF FIRST SUBMISSION: Blk 16
7. DD250 REQ................................: LT 10. FREQUENCY......................................: ASREQ 13. DATE OF SUBSEQUENT SUBM.: N/A
8. APP CODE.................................: N 11. AS OF DATE........................................: Blk 16
14. DISTRIBUTION
A. ADDRESSEES
B. COPIES
DRAFT FINAL
AFRL/RVBX 0 1
This CDRL shall include reporting/delivery of models, algorithms or code developed for any of the research projects or technical tasks within the contract, in agreed-upon compiler language(s), on an as-required basis. This deliverable shall include a summary text document and programs listing, source codes with applicable detailed comments, object codes, executable codes and databases, and applicable user guides. Contractor format is preferred. Electronic versions must be submitted in a manner consistent with protecting export control and limited information. Submission via unencrypted or unsecure email is not permitted.
If the deliverable contains export controlled technical data pertaining to critical technologies, then the export control warning and distribution statement
Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement D: “Distribution authorized to DoD and U.S. DoD contractors only;
Critical Technology; 11 Oct 2013. Other requests for this document shall be referred to Air Force Research Laboratory/RVBX, 3550 Aberdeen Ave SE, Kirtland AFB, EXPORT CONTROL WARNING: All technical data shall be marked as follows: “WARNING — This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
If the deliverable does not contain export controlled technical data pertaining to critical technologies, then the distribution statement below will be applied, Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement D: “Distribution authorized to DoD and U.S. DoD contractors only;
Software Documentation; 11 Oct 2013. Other requests for this document shall be referred to Air Force Research Laboratory/RVBX, 3550 Aberdeen Ave SE, Kirtland
AFB, NM 87117-5776.”
All technical data shall be marked with the following statement: “DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will
Blk 10-13: Reports shall be delivered on an as-required basis, as determined by completion of models/algorithm/code for individual research/technical tasks/projects, and coordinated with the Program Manager or government project leads and applicable contract personnel.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
DD Form 1423-1, SEP 97 (EG) (Computer Generated) Page 6 of 6 Pages PREVIOUS EDITIONS ARE OBSOLETE
CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and
Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the
A. CONTRACT LINE ITEM NO.: Data & Reports CLIN D. SYSTEM/ITEM........: Space Env Particles & Sensors (SPartEnS)
B. EXHIBIT....................................: A E. CONTRACT/PR NO.: TBD
C. CATEGORY..............................: TDP – Technical Data Package F. CONTRACTOR.........: TBD Contractor
1. DATA ITEM NO........................: A006
2. TITLE OF DATA ITEM............: Scientific & Technical Report and Checklist
3. SUBTITLE..................................: Final Report
4. AUTHORITY.............................: DI-MISC-80711A
5. CONTRACT REFERENCE......: BAA-RV-10-01 Call 19
6. REQUIRING OFFICE..............: AFRL/RVBX 9. DIST. STATEMENT REQUIRED......: Blk 16 12. DATE OF FIRST SUBMISSION: Blk 16
7. DD250 REQ................................: DD 10. FREQUENCY......................................: Blk 16 13. DATE OF SUBSEQUENT SUBM.: Blk 16
8. APP CODE.................................: A 11. AS OF DATE........................................: Blk 16
14. DISTRIBUTION
A. ADDRESSEES
B. COPIES
FINAL CRC
AFRL/RVBX 1 soft 1 soft
AFRL/RVKVB Letter Letter
ACO Letter Letter
15. TOTAL: 1 1
Blk 4: GUIDANCE FOR PREPARATION OF THE REPORT: The Scientific and Technical Report shall be prepared I.A.W. the most current AFRL ANSI/NISO
Standard Z39.18-2005, or other most current report preparation guidance, located at: http://www.kirtland.af.mil/prs. The contractor shall complete and submit an SF
298 Report Documentation Page, with the final report. The SF 298 is available at: http://www.kirtland.af.mil/shared/media/document/AFD-070425-037.doc.
The contractor shall complete the following blocks of the SF298: Blocks 2-5a, 6, 7, 8 and 13 (if applicable), 14-16c.
The contractor shall complete and sign the most current AFRL Form 25, AFRL Quality Final Technical Report Checklist, and submit it with the final report. The checklist is available at: http://www.kirtland.af.mil/prs. If the completed and signed AFRL Form 25 does not accompany the final report, the deliverable is considered incomplete. Incomplete final reports will be immediately returned to the contractor. Following AFRL technical and STINFO reviews, any revision s required will be returned to the contractor.
The contractor shall deliver editable electronic copies of the final report. The electronic copies shall be an editable .pdf file and the most current version of Microsoft
Word. A CD-ROM (CD-R) is the acceptable media for submittal. (CD-RWs are not acceptable.) Electronic media shall be marked IAW the AFRL ANSI/NISO
Standard Z39.18-2005 guidelines, or other most current report preparation guidance. Submission via unencrypted or unsecure email is not permitted.
Blk 7: Submit Final Report with letter of transmittal and the DD 250 to the designated project manager. In preparing the final DD 250 for the contract, code the shipment number with a “Z”.
Blk 9: All technical data, including electronic media (CD-R), shall contain only fundamental research, and be marked I.A.W. DoDD 5230.24 with Distribution
Statement A: APPROVED FOR PUBLIC RELEASE; DISTRIBUTION IS UNLIMITED. ADD THIS ENTIRE DISTRIBUTION STATEMENT TO THE
BOTTOM OF EVERY PAGE OF THE REPORT, WHICH CONTAINS ONLY FUNDAMENTAL RESEARCH INFORMATION, EXCEPT THE SF298.
or, Blk 9: All technical data, including electronic media (CD-R), shall contain both fundamental research and export controlled aspects, and be marked I.A.W. DoDD
5230.24 with Distribution Statement D: “Distribution authorized to DoD and U.S. DoD contractors only; Critical Technology; [author fill in date of report (ddmmmyy)].
Other requests for this document shall be referred to Air Force Research Laboratory/RVBX, 3550 Aberdeen Ave SE, Kirtland AFB, NM 87117-5776.” ADD THIS
ENTIRE DISTRIBUTION STATEMENT TO THE BOTTOM OF EVERY PAGE OF THE REPORT EXCEPT THE SF298.
EXPORT CONTROL WARNING: All technical data (including electronic media) shall be marked as follows: “WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended. Title 50 U.S.C.
App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate I.A.W. the provisions of the DoD Directive 5230.25.”
All technical data shall be marked with the following statement: “DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will
Blks 10 - 13: The contractor shall deliver the Scientific and Technical Report, in final format, no later than the date specified in the Schedule specified in the Data and Reports CLIN. The USAF will review and, if necessary, return the final report with comments no later than the date specified in the Schedule specified in the Data and
Reports CLIN. If the report is returned to the contractor with comments, the contractor shall deliver the camera-ready copy of the report no later than the date specified in the Schedule specified in the Data and Reports CLIN.
THE REPORT WILL BE PUBLISHED WITH THE DEFENSE TECHNICAL INFORMATION CENTER (DTIC) BY AFRL STINFO OFFICE. Under no circumstances shall the contractor submit either the final report or the camera-ready technical report to DTIC.
NOTE: Headings in Block 14B, Copies, have been changed. "Draft" is changed to "Final" and "Final" (in second column) is changed to "CRC"(camera-ready copy.)
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE :
G. PREPARED BY: S. Quigley I. APPROVED BY: K. Kinifick
H. DATE: 11 Oct 2013 J. DATE: 30 Oct 2013 http://www.kirtland.af.mil/prs http://www.kirtland.af.mil/shared/media/document/AFD-070425-037.doc http://www.kirtland.af.mil/