CDRLs Final Rev.docx
DOCX document 30 KB Posted
- Solicitation number
- BAA-RV-10-01
About this file
Contract Data Requirements List (CDRLs)
View the file
Other files
Show 40 more
Latest 50 of 77 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0002
B. EXHIBIT....................................: A
C. CATEGORY..............................:
D. SYSTEM/ITEM........: N/A
E. CONTRACT/PR NO. TBD
F. CONTRACTOR.........: TBD
1. DATA ITEM NO........................:
| 2. TITLE OF DATA ITEM............: |
| Scientific and Technical Report and Checklist |
| 3. SUBTITLE..................................: |
| Final Report |
| 4. AUTHORITY.............................: |
| DI-MISC-80711A |
5. CONTRACT REFERENCE......:
| 6. REQUIRING OFFICE..............: AFRL/RVBX | ||
| 7. DD250 REQ................................: | DD | |
| 8. APP CODE.................................: | A | |
| 9. DIST. STATEMENT REQUIRED......: | See Block 16 | |
| 10. FREQUENCY......................................: | ONE/P | |
| 11. AS OF DATE........................................: | 21 MAC | |
| 12. DATE OF FIRST SUBMISSION: 22 MAC |
13. DATE OF SUBSEQUENT SUBM.: N/A
14. DISTRIBUTION
| A. ADDRESSEES |
| B. COPIES |
| FINAL |
| CRC |
| AFRL/RVOP |
| 1 |
| ACO |
| Lt |
| Lt |
| PCO |
| Lt |
| Lt |
| PM |
| 1 |
| 1 |
| 15. TOTAL: |
| 2 |
| 1 |
16. REMARKS
THE REPORT WILL BE PUBLISHED WITH THE DEFENSE TECHNICAL INFORMATION CENTER (DTIC) BY AFRL STINFO OFFICE. Under no circumstances shall the contractor submit either the final report or the camera-ready technical report to DTIC.
Blk 4: GUIDANCE FOR PREPARATION OF THE REPORT: The Scientific and Technical Report shall be prepared I.A.W. AFRL ANSI-Based Format Guidelines located at:
http://www.kirtland.af.mil/shared/media/document/AFD-100907-025.doc. If the Final Report contains data that is being delivered with less-than-unlimited rights, the data with less-than-unlimited rights shall be delivered as a separate, appropriately-marked Volume* to the Final Report. Incomplete final reports will be immediately returned to the contractor.
The contractor shall complete and submit an SF 298 Report Documentation Page, with the final report. The SF 298 is available at: http://www.kirtland.af.mil/shared/media/document/AFD-070425-037.doc. The contractor shall complete the following blocks of the SF298: Blocks 2-5a, 6, 7, 8 and 13 (if applicable), 14-16c.
The contractor shall complete and sign the AFRL Form 25, AFRL Quality Final Technical Report Checklist, and submit it with the final report. The checklist is available at: http://www.kirtland.af.mil/shared/media/document/AFD-100907-027.doc. If the completed and signed AFRL Form 25 does not accompany the final report, the deliverable is considered incomplete. Following AFRL technical and STINFO reviews, any revisions required will be returned to the contractor.
The contractor shall deliver editable electronic copies of the final report. The electronic copies shall be an editable .pdf file and the most current version of Microsoft Word. A CD-ROM (CD-R) is the acceptable media for submittal. (CD-RWs are not acceptable.) Electronic media shall be marked IAW the AFRL ANSI-Based Format Guidelines. Submission via unencrypted or unsecure email is not permitted.
Blk 7: Submit Final Report with letter of transmittal and the DD 250 to the designated project manager. In preparing the final DD 250 for the contract, code the shipment number with a “Z”.
Blk 9: All technical data containing unlimited rights data (including electronic media) shall be marked I.A.W. DoDD 5230.24 with Distribution Statement: Distribution authorized to Department of Defense and U.S. DoD contractors only; Administrative or Operational Use, 26 Aug 2010. Other requests for this document shall be referred to Air Force Research Laboratory/RVBX, 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.
*Any Volume containing less-than-unlimited rights material (including electronic media) shall be marked I.A.W. DoDD 5230.24 with Distribution Statement [enter B or E here]: Distribution authorized to [fill in statement]; Proprietary Information: DFARS [insert type] Data Rights; [fill in date of report (dd mmm yy)]. Other requests for this document shall be referred to Air Force Research Laboratory/RVBX, 3550 Aberdeen Avenue, SE, Kirtland AFB, NM 87117-5776.
EXPORT CONTROL WARNING: All technical data (including electronic media) shall be marked as follows:
“WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751, et seq.) or the Export Administration Action of 1979, as amended. Title 50 U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate I.A.W. the provisions of the DoD Directive 5230.25.”
All technical data (including electronic media) shall be marked with the following statement: “DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
Blks 10 - 13: The contractor shall deliver the Scientific and Technical Report, in final format, no later than the date specified in the Schedule, CLIN 0002. The USAF will review and, if necessary, return the final report with comments no later than the date specified in the Schedule, CLIN 0002. If the report is returned to the contractor with comments, the contractor shall deliver the camera-ready copy of the report no later than the date specified in the Schedule, CLIN 0002.
NOTE: Headings in Block 14B, Copies, have been changed. “Draft” is changed to “Final” and “Final” (in second column) is changed to “CRC” (camera-ready copy).
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE :
G. PREPARED BY:
I. APPROVED BY:
H. DATE:
J. DATE:
| DD Form 1423-1, SEP 97 (EG) (Computer Generated) | PREVIOUS EDITIONS ARE OBSOLETE | Page _ of _ Pages |
| CONTRACT DATA REQUIREMENTS LIST (1 Data Item) | Form Approval OMB No. 0704-0188 |
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0002
B. EXHIBIT....................................: A
C. CATEGORY..............................:
D. SYSTEM/ITEM........: N/A
E. CONTRACT/PR NO. TBD
F. CONTRACTOR.........: TBD
| 1. DATA ITEM NO........................: |
| A003 |
| 2. TITLE OF DATA ITEM............: |
| Computer software product end items |
| 3. SUBTITLE..................................: |
| Documentation |
| 4. AUTHORITY.............................: |
| DI-MISC-80711A |
5. CONTRACT REFERENCE......:
| 6. REQUIRING OFFICE..............: AFRL/RVBX | ||
| 7. DD250 REQ................................: | DD | |
| 8. APP CODE.................................: | A | |
| 9. DIST. STATEMENT REQUIRED......: | No | |
| 10. FREQUENCY......................................: | See Blk 16 | |
| 11. AS OF DATE........................................: | See Blk 16 | |
| 12. DATE OF FIRST SUBMISSION: See Blk 16 |
13. DATE OF SUBSEQUENT SUBM.: See Blk 16
14. DISTRIBUTION
| A. ADDRESSEES |
| B. COPIES |
Dr. David Cooke, AFRL/RVBX, Kirtland AFB NM 87117
| FINAL |
| CRC |
| ACO |
| Lt |
| PCO |
| Lt |
| PM |
| 1 |
| 15. TOTAL: |
| 1 |
16. REMARKS
Blk 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement: “Distribution authorized to Department of Defense and U.S. DoD contractors only; Administrative or Operational Use; 26 Aug 2010. Other requests for this document shall be referred to Air Force Research Laboratory/RVBX, 3550 Aberdeen Ave. SE, Kirtland AFB NM 87117-5776.”
EXPORT CONTROL WARNING: All technical data shall be marked as follows:
“WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec. 2751, et seq.) or the Export Administration Action of 1979, as amended. Title 50 U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate I.A.W. the provisions of the DoD Directive 5230.25.”
All technical data shall be marked with the following statement: “DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
Blocks 10, 11, 12, 13 IAW contractor’s proposal [cite pages as necessary]. Electronic submission of software products is requested. CD-R submittal only.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE :
G. PREPARED BY:
I. APPROVED BY: Scott Brown
H. DATE:
J. DATE:
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 3 of 3 Pages
CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.: 0002
B. EXHIBIT....................................: A
C. CATEGORY..............................: OTHER
D. SYSTEM/ITEM........: N/A
E. CONTRACT/PR NO. TBD
F. CONTRACTOR.........: TBD
| 1. DATA ITEM NO........................: |
| A001 |
| 2. TITLE OF DATA ITEM............: |
| Status Report |
| 3. SUBTITLE..................................: |
| Quarterly Status Report |
| 4. AUTHORITY.............................: |
| DI-MGMT-80368A (Tailored, see Block 16) |
5. CONTRACT REFERENCE......:
| 6. REQUIRING OFFICE..............: AFRL/RVBX | ||
| 7. DD250 REQ................................: | Lt | |
| 8. APP CODE.................................: | No | |
| 9. DIST. STATEMENT REQUIRED.....: | D (See Blk 16) | |
| 10. FREQUENCY......................................: | Quarterly | |
| 11. AS OF DATE........................................: | See Block 16 | |
| 12. DATE OF FIRST SUBMISSION: See Block 16 |
13. DATE OF SUBSEQUENT SUBM.: See Block 16
14. DISTRIBUTION
| A. ADDRESSEES |
| B. COPIES |
See Block 16.
| FINAL |
| CRC |
| ACO |
| Lt |
| PCO |
| 1 |
| PM |
| 1 |
| 15. TOTAL: |
| 2 |
16. REMARKS
Block 4: Report shall utilize template provided by AFRL/RVBX.
Block 9: All technical data shall be marked I.A.W. DoDD 5230.24 with Distribution Statement “Distribution authorized to Department of Defense and U.S. DoD contractors only; Administrative or Operational Use; 26 Aug 2010. Other requests for this document shall be referred to Air Force Research Laboratory/RVBX, 3550 Aberdeen Ave. SE, Kirtland AFB NM 87117-5776.”
Block 12: Reports shall be submitted no later than 15 days after the end of the 3-month period to which they pertain.
Block 13: Reports shall be submitted according to the following schedule (MAA = months after award):
3 MAA
6 MAA
9 MAA
12 MAA
15 MAA
18 MAA
21 MAA
Block 14: Electronic submission in Microsoft Word (version 2003 or later) or Adobe PDF is required. Submittal via CD-R only.
17. PRICE GROUP:
18. ESTIMATED TOTAL PRICE :
G. PREPARED BY:
I. APPROVED BY: Scott Brown
H. DATE:
J. DATE:
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 3 Pages
File details come from the government source that posted it. Updated .