BAA_Proposal_Content_Checklist.pdf
PDF 67 KB Posted
- Solicitation number
- BAA-RV-10-01
About this file
BAA-RV-10-01 CALL 019 Attachment 4 Proposal Content Checklist
View the file
Other files
Show 40 more
Latest 50 of 77 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4
AIR FORCE RESEARCH LABORATORY
DIRECTED ENERGY AND SPACE VEHICLES DIRECTORATES
BAA RV-10-01, CALL 019
30 October 2013
Proposal Content Checklist
You may be ineligible for award if all requirements of this announcement are not met on the proposal due date. At a minimum, incomplete proposals will be given lower priority and, although technically acceptable, may not be awarded because of funding limitations. Offerors are required to complete the following checklist and submit with your proposal.
Proposal Checklist – BAA No.
Item Description
BAA
Page Ref
Prop Page Ref
1. Business Section
a. ORCA FAR and DFARS Certifications completed
b. Section K Certifications and Representations have been fully completed and included.
c. Subcontracting plan (as applicable) IAW FAR 19.704.
2. Cost Proposal
a. All proposed cost/price elements are fully supported
b. Strictly complies with proposal preparation instructions
c. Subcontractor cost/price analysis performed IAW FAR 15.404-3(b)
d. FPRA or FPRR (if applicable)
3. Technical Proposal
a. Non-proprietary Contractor Statement of Work (CSOW)
b. Approach consistent with costs identified in cost proposal
c. Includes Program Plan
d. Does not exceed page limit
4. Cover letter
File details come from the government source that posted it. Updated .