BAA_Proposal_Content_Checklist.pdf

PDF 67 KB Posted

Attached to
CALL 019 Spacecraft Particle Environment and Sensors (SPartEnS)
Solicitation number
BAA-RV-10-01
Issued by

About this file

BAA-RV-10-01 CALL 019 Attachment 4 Proposal Content Checklist

View the file

Other files

File Type Posted
SPartEnS_-_GFP_-_GFE_ _GFI_ _CAP_Lists.pdf PDF
BAA-RV-10-01_CALL_019_CALL_ANNOUNCEMENT-.pdf PDF
Exhibits_1_ _2.pdf PDF
Cost_Proposal_Instructions_Non-APC(Apr_13).pdf PDF
SPartEnS_-_CDRLs.pdf PDF
BAA-RV-10-01_CALL_018_Rev_D_Final_ANNOUNCEMENT_dtd_6_Aug_13.docx DOCX document
BAA-RV-10-01_CALL_018_Atch_6_Final_GFP_List_dtd_6_Aug_13.docx DOCX document
BAA-RV-10-01_CALL_018_Atch_2_CDRLs_dtd_6_Aug_13.pdf PDF
BAA-RV-10-01_CALL_018_Atch_4_Final_Section_K_dtd_6_Aug_13.doc DOC document
BAA-RV-10-01_CALL_018_Atch_5_Final_Proposal_Content_Checklist_dtd_6_Aug_13.doc DOC document
BAA-RV-10-01_CALL_018_Atch_1_Final_Cost_Proposal_Instructions_APC_BAAs-SBIRs(Apr_13)_dtd_6_Aug_13.docx DOCX document
BAA-RV-10-01_CALL_018_Atch_3_Final_DD_Form_254_dtd_16_Apr_12_Approved_20_May_13.pdf PDF
Checklist_Air_Force_Proposal_Adequacy_Checklist_REV_dtd_1_Aug_13.docx DOCX document
Final_Call_020_Amend___1_dtd_29_July_13_to_Announcement_Document_BAA_RV10-01_dated_25_July_2013.docx DOCX document
Final_Call_020_Atch_2_Cost_Proposal_Instructions_with_AF_Adequacy_Checklist_Call_020_dtd_25_July_13.pdf PDF
Final_Data_Assertions_Call_020_Atch_1_dtd_25_July_2013.doc DOC document
Final_Call_020_Announcement_Document_BAA_RV10-01_25_July_2013.docx DOCX document
Final_Reps_and_Certs_Call_020_Atch_4_BAA_RV10-01_dtd_25_Jul_13.docx DOCX document
Final_CDRLs_Call_020_Atch_3_BAA_RV10-01_25_July_2013.docx DOCX document
BAA-RV-10-01_Full_Text_10_Nov_09_Space_Vehicles_Directorate_Battlespace_Environment_Division.docx DOCX document
BAA-RV-10-01_CALL021_CDRLs_DMSP_SESS_dtd_15_July_13.doc DOC document
Section_K_Reps_and_Certs_BAA-RV-10-01_CALL_21_dtd_14_Feb_12.docx DOCX document
Cost_Proposal_Instructions_Det_8_AFRL_APC_BAAs-SBIRs_dated_8_Apr_13.docx DOCX document
BAA-RV-10-01_CALL_021_DMSP_SESS_Program_R2_Final_ANNOUNCEMENT_dtd_15_July_13.doc DOC document
CALL 014 Responses to Questions 2.docx DOCX document
Updated CALL 014 Announcement.docx DOCX document
Software CDRL.docx DOCX document
CALL 014 Responses to Questions.docx DOCX document
Attach 2 Sec K.pdf PDF
CALL 014.pdf PDF
Attach 3 CDRLs.pdf PDF
Attach 1 Cost Prop Instrc.pdf PDF
CALL 013.pdf PDF
Attach 2 Sec K.pdf PDF
Attach 3 CDRLs.pdf PDF
Attach 1 Cost Prop Instrc.pdf PDF
CALL Announcement.docx DOCX document
Amendment No. 2 date extension.doc DOC document
Amendment No. 1 date extension.doc DOC document
Attachment 1 Cost Proposal Instructions.doc DOC document
Attachment 3 CDRLs.docx DOCX document
Attachment 2 - Reps and Certs.docx DOCX document
BAA-RV-10-01 CALL 012 ANNOUNCEMENT.doc DOC document
EDA 70501 Grant FA9453-11-1-0276 dtd 28 Apr 11 Signed UNM Monte Carlo.pdf PDF
Section K - Reps Certs.docx DOCX document
CDRLs Final Rev.docx DOCX document
BAA RV-10-01 CALL 010 Announcement.doc DOC document
Attachment 1 Cost Proposal Instructions.doc DOC document
Attachment 3 CDRLs.doc DOC document
Attachment 2 Reps Certs.DOC DOC document
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4

AIR FORCE RESEARCH LABORATORY

DIRECTED ENERGY AND SPACE VEHICLES DIRECTORATES

BAA RV-10-01, CALL 019

30 October 2013

Proposal Content Checklist

You may be ineligible for award if all requirements of this announcement are not met on the proposal due date. At a minimum, incomplete proposals will be given lower priority and, although technically acceptable, may not be awarded because of funding limitations. Offerors are required to complete the following checklist and submit with your proposal.

Proposal Checklist – BAA No.

Item Description

BAA

Page Ref

Prop Page Ref

1. Business Section

a. ORCA FAR and DFARS Certifications completed

b. Section K Certifications and Representations have been fully completed and included.

c. Subcontracting plan (as applicable) IAW FAR 19.704.

2. Cost Proposal

a. All proposed cost/price elements are fully supported

b. Strictly complies with proposal preparation instructions

c. Subcontractor cost/price analysis performed IAW FAR 15.404-3(b)

d. FPRA or FPRR (if applicable)

3. Technical Proposal

a. Non-proprietary Contractor Statement of Work (CSOW)

b. Approach consistent with costs identified in cost proposal

c. Includes Program Plan

d. Does not exceed page limit

4. Cover letter

File details come from the government source that posted it. Updated .