CALL Announcement.docx

DOCX document 66 KB Posted

Attached to
CALL 019 Spacecraft Particle Environment and Sensors (SPartEnS)
Solicitation number
BAA-RV-10-01
Issued by

About this file

BAA-RV-10-01 CALL 013 Solicitation

View the file

Other files

File Type Posted
BAA_Proposal_Content_Checklist.pdf PDF
SPartEnS_-_GFP_-_GFE_ _GFI_ _CAP_Lists.pdf PDF
BAA-RV-10-01_CALL_019_CALL_ANNOUNCEMENT-.pdf PDF
Exhibits_1_ _2.pdf PDF
Cost_Proposal_Instructions_Non-APC(Apr_13).pdf PDF
SPartEnS_-_CDRLs.pdf PDF
BAA-RV-10-01_CALL_018_Rev_D_Final_ANNOUNCEMENT_dtd_6_Aug_13.docx DOCX document
BAA-RV-10-01_CALL_018_Atch_6_Final_GFP_List_dtd_6_Aug_13.docx DOCX document
BAA-RV-10-01_CALL_018_Atch_2_CDRLs_dtd_6_Aug_13.pdf PDF
BAA-RV-10-01_CALL_018_Atch_4_Final_Section_K_dtd_6_Aug_13.doc DOC document
BAA-RV-10-01_CALL_018_Atch_5_Final_Proposal_Content_Checklist_dtd_6_Aug_13.doc DOC document
BAA-RV-10-01_CALL_018_Atch_1_Final_Cost_Proposal_Instructions_APC_BAAs-SBIRs(Apr_13)_dtd_6_Aug_13.docx DOCX document
BAA-RV-10-01_CALL_018_Atch_3_Final_DD_Form_254_dtd_16_Apr_12_Approved_20_May_13.pdf PDF
Checklist_Air_Force_Proposal_Adequacy_Checklist_REV_dtd_1_Aug_13.docx DOCX document
Final_Call_020_Amend___1_dtd_29_July_13_to_Announcement_Document_BAA_RV10-01_dated_25_July_2013.docx DOCX document
Final_Call_020_Atch_2_Cost_Proposal_Instructions_with_AF_Adequacy_Checklist_Call_020_dtd_25_July_13.pdf PDF
Final_Data_Assertions_Call_020_Atch_1_dtd_25_July_2013.doc DOC document
Final_Call_020_Announcement_Document_BAA_RV10-01_25_July_2013.docx DOCX document
Final_Reps_and_Certs_Call_020_Atch_4_BAA_RV10-01_dtd_25_Jul_13.docx DOCX document
Final_CDRLs_Call_020_Atch_3_BAA_RV10-01_25_July_2013.docx DOCX document
BAA-RV-10-01_Full_Text_10_Nov_09_Space_Vehicles_Directorate_Battlespace_Environment_Division.docx DOCX document
BAA-RV-10-01_CALL021_CDRLs_DMSP_SESS_dtd_15_July_13.doc DOC document
Section_K_Reps_and_Certs_BAA-RV-10-01_CALL_21_dtd_14_Feb_12.docx DOCX document
Cost_Proposal_Instructions_Det_8_AFRL_APC_BAAs-SBIRs_dated_8_Apr_13.docx DOCX document
BAA-RV-10-01_CALL_021_DMSP_SESS_Program_R2_Final_ANNOUNCEMENT_dtd_15_July_13.doc DOC document
CALL 014 Responses to Questions 2.docx DOCX document
Updated CALL 014 Announcement.docx DOCX document
Software CDRL.docx DOCX document
CALL 014 Responses to Questions.docx DOCX document
Attach 2 Sec K.pdf PDF
CALL 014.pdf PDF
Attach 3 CDRLs.pdf PDF
Attach 1 Cost Prop Instrc.pdf PDF
CALL 013.pdf PDF
Attach 2 Sec K.pdf PDF
Attach 3 CDRLs.pdf PDF
Attach 1 Cost Prop Instrc.pdf PDF
Amendment No. 2 date extension.doc DOC document
Amendment No. 1 date extension.doc DOC document
Attachment 1 Cost Proposal Instructions.doc DOC document
Attachment 3 CDRLs.docx DOCX document
Attachment 2 - Reps and Certs.docx DOCX document
BAA-RV-10-01 CALL 012 ANNOUNCEMENT.doc DOC document
EDA 70501 Grant FA9453-11-1-0276 dtd 28 Apr 11 Signed UNM Monte Carlo.pdf PDF
Section K - Reps Certs.docx DOCX document
CDRLs Final Rev.docx DOCX document
BAA RV-10-01 CALL 010 Announcement.doc DOC document
Attachment 1 Cost Proposal Instructions.doc DOC document
Attachment 3 CDRLs.doc DOC document
Attachment 2 Reps Certs.DOC DOC document
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BROAD AGENCY ANNOUNCEMENT

BAA-RV-10-01

Air Force Research Laboratory/Space Vehicles Directorate

PROPOSAL CALL ANNOUNCEMENT (CALL) 013

NOTE: THIS IS A RESOLICITATION OF BAA-RV-10-01, CALL 007 THAT WAS CANCELLED ON 28 OCTOBER 2010.

THIS CALL EXCLUDES THE REQUIREMENTS FOR OPTIONS. REFERENCE THIS CALL NUMBER 013 WHEN SUBMITTING A PROPOSAL.

BROAD AGENCY ANNOUNCEMENT TITLE: AFRL Space Vehicles Directorate, Battlespace Environment Division – BAA-RV-10-01.

BROAD AGENCY ANNOUNCEMENT NUMBER: BAA-RV-10-01 (Full Text, 10 Nov 09 attached) Topic 1: Space Weather

PROPOSAL CALL ANNOUCEMENT (CALL) TITLE: Wave Particle Interactions Program

PROPOSAL CALL ANNOUNCEMENT (CALL) NUMBER: 013

NOTE! This CALL supersedes CALL 007 posted on 20 July 2010.

TECHNICAL POINT OF CONTACT: The technical point of contact for this CALL is Dr. Michael J Starks, PE, AFRL/RVBXR, Bldg 570, 3550 Aberdeen Ave SE, Kirtland AFB, NM, Phone 505-846-5881, email michael.starks@us.af.mil

CONTRACTING POINTS OF CONTACT: The contracting points of contact for this CALL are:

Contract Specialist: Brittany Blevins, Det 8 AFRL/RVKB, Kirtland AFB, NM, Phone 505-846-9391, Fax 505-846-0945, Email brittany.blevins@kirtland.af.mil

Contracting Officer: Jean A Barnes, Det 8 AFRL/RVKB, Kirtland AFB, NM, Phone 505-846-4695, Fax 505-846-0945, Email jean.barnes@kirtland.af.mil

REQUIREMENT DESCRIPTION:

Recent model validation efforts have uncovered the need for a better understanding of the trapping and loss processes controlling the Earth’s inner radiation belt. Previous reconciliations of observed lifetimes with known loss mechanisms have come into question. Specifically, the primacy which current radiation belt dynamics models give to terrestrial very low frequency (VLF) transmitters as a loss driver at L < 2.0 must now be reevaluated and an additional (or underestimated existing) loss term identified. The influence of lightning on the inner radiation belt and slot region electrons via the generation of VLF radio waves is likely underestimated. Currently available models of this important contributor lack the required detail and validation; particularly regarding spectral content and average wave intensity in space. In addition, the VLF source function and the ionospheric attenuation incurred in the first 500 km of upward propagation are not well-characterized. This region is especially important because the wave normal distribution of the VLF radiation with respect to the geomagnetic field is a critical parameter in determining its effectiveness at pitch-angle scattering of electrons.

AFRL/RVBX requires research and development efforts targeted at increasing the fidelity of existing models of lightning effects on the Earth’s radiation belts. The research of interest combines full-wave modeling of known lightning source events with the exploitation of unique, newly-obtained or previously underutilized ground-, rocket- and satellite-based VLF measurement data sets. A successful effort shall produce, within two years, a validated model of VLF attenuation incurred from ground level to approximately 500 km altitude for frequencies between 1 and 20 kHz, inclusive, or some useful subset thereof. It shall also consider, at least in a statistical sense, the role of ducting in producing observed VLF wave normal distributions in space. This representation must be suitable for incorporation into a model of the flux of lightning-generated VLF radio waves into the inner magnetosphere.

ANTICIPATED FUNDING: Anticipated funding for this CALL (not per contract or award) is: FY 11: $85K; FY 12: $85K. This funding profile is an estimate only. All funding is subject to change due to government discretion and availability. Funding for this effort is uncertain at this time and will be largely dependent on the next government fiscal year budget that has yet to be established. In view of the foregoing budgetary considerations and possible impact to this effort, the Government reserves the right to award none, some or all of the contract instruments set forth in this solicitation.

PERIOD OF PERFORMANCE: The anticipated period of performance for individual awards resulting from this CALL is 27 months in duration. There will be no options anticipated.

PROPOSAL DUE DATE AND TIME: The due date for proposals submitted in response to this CALL is no later than 12:00, Noon MDT on 13 September 2011. Proposals for any other technology area identified in the baseline BAA will not be accepted at this time unless a CALL for proposals in that specific area is open. Proposals received after the due dates and times shall be governed by the provisions of FAR 52.215-1(c)(3).

CALL AMENDMENTS: Offerors should monitor FedBizOps/EPS http://www.fbo.gov for any additional notices to this CALL that may permit extensions to the proposal submission date or otherwise modify this announcement.

ANTICIPATED TYPE OF CONTRACTS/INSTRUMENTS: The Air Force anticipates awarding a Cost Plus Fixed Fee as a result of this CALL but reserves the right to award the instrument best suited to the nature of research proposed.

ANTICIPATED NUMBER OF AWARDS: The Air Force anticipates awarding one or two contracts. However, the Air Force does reserve the right to make multiple awards or no awards pursuant to this CALL.

ANTICIPATED AWARD DATE: 28 October 2011

INTENT TO PROPOSE: Potential offerors are requested to advise the contracting point of contact if they intend to submit a proposal in response to this CALL. Such notification is merely a courtesy and is not a commitment by the offeror to submit a proposal.

DELIVERABLES ITEMS: Reports

OTHER RELEVANT INFORMATION:

1. Program security classification for this CALL is non-classified.

2. ITAR Information produced during this effort will not be restricted by International Traffic in Arms Regulations (ITAR)

3. Government Furnished Property will not be provided for this effort.

4. Base Support: The Government will NOT be providing the contractor base support throughout the course of this contractual effort.

5. Proprietary Information: Administrative access to proprietary information may be necessary throughout completion of this effort. The Government may exercise the use of non-Government advisors and administrators in service roles. Service contracts contain an organizational conflict of interest clause that requires the service Contractors to protect the data and prohibits the service Contractors from using the data for any purpose other than for which the data was presented. Offerors will be required to sign and submit the provision consent form associated with this CALL; objections may also be indicated on the consent form. Describe any anticipated contracts between the Air Force and contractors that will require administrative access to proprietary information.

6. Foreign participation will be permitted on behalf of the contractor.

7. The government requests UNLIMITED data rights.

8. Other: Please see Attachment #1 for Cost Proposal Instructions

APPLICABILITY OF BASELINE BAA: All requirements of BAA-RV-10-01 apply unless specifically amended and addressed in this CALL. For complete information regarding BAA-RV-10-01, refer to the initial opened-ended BAA. It contains information applicable to all CALLS issued under the BAA and provides information on the overall program, proposal preparation and submission requirements, proposal review and evaluation criteria, award administration, agency contacts, etc. Direct questions to the points of contact identified above.

PROPOSAL SUBMISSION:

(1) Please prepare your proposals in accordance with (IAW) the Det 8 Air Force Research Laboratory AFRL/PK dated 2 Nov 10, which are incorporated in this CALL Announcement below pursuant to FAR 15.408 in the Table format outlined in the instructions. Please submit Management (Business), Technical, and Cost Proposals.

(2) Two copies and an original of your proposal is requested. In addition, include an electronic copy of your proposal on a compact disk (CD-R), this shall also include a Microsoft Excel 2007 or earlier compatible cost proposal. Proposals are due to this office no later than 12:00, Noon MST, 13 September 2011. Please note, allow enough time to mail handler’s to get through security. Also, it is the offeror’s responsibility to ensure that their proposal’s arrive by the due date and time.

Submit your proposal to the following address:

Air Force Research Laboratory Det 8 AFRL/RVKB ATTN: (Contracting Officer) or (Contract Specialist) 2251 Maxwell St., SE, Bldg. 424 Kirtland AFB NM 87117-5773

(3) Submission of proposal(s) are not an authorization to commence work or to incur any costs to perform the work described above. Work is not to be implemented until appropriate contractual action is taken to add the work to the contract. Any work performed or expense incurred prior to that time (including bid and proposal costs) will be at your own risk.

3 Attachments:

1. Proposal Instructions, 2 Nov 2010

2. BAA-RV-10-01, Full Text, 10 Nov 2009

3. Section K

Det 8, AIR FORCE RESEARCH LABORATORY AFRL/PK

(FAR CONTRACTS)

1. Offerors shall:

a. Ensure the attached DET 8 AFRL Air Force Adequacy Checklist (AFPAC) be completed and submitted as part of your proposal. In addition, it is highly recommended that you flow this checklist to your subcontractors/affiliates where certified cost and pricing data is required and that you use the elements of the AFPAC to evaluate the adequacy of a subcontractor/affiliate proposal.

You are advised that the contracting officer may determine costs associated with revising/reworking inadequate cost proposals as unreasonable, and must consider the nature and extend of any proposal inadequacies when assessing/negotiating profit.

b. Prepare and submit cost or pricing data and supporting attachments in accordance with Table 15-2 of FAR 15.408. Further, the offeror shall (1) include the attached Air Force Proposal Adequacy checklist (AFPAC) in pre-submission proposal quality reviews, and (2) furnish the completed checklist as part of their proposal submission.

c. Provide these Cost Proposal Instructions to all subcontractors. Proprietary subcontractor data may be submitted directly to the Government in accordance with Proposal Preparation Instructions in this announcement.

d. Furnish Tables 1 thru 4 (examples attached) for the entire performance period (supported by rationale required by paragraph 2) in hard copy and on CD as IBM PC compatible, Microsoft Excel, to include all cell formulas. Include a separate Cost Element Summary by Offeror Fiscal Year (OFY) for the basic and each option or task order as proposed. Identify when the OFY begins and ends.

e. Ensure that all rate data and estimating factors used in the proposal have been submitted for review to the cognizant Defense Contract Audit Agency (DCAA) and Defense Contract Management Agency (DCMA) prior to cost proposal submission.

f. Provide copies of recent audits or Forward Pricing Rate Recommendations (FPRRs), Forward Pricing Rate Agreements (FPRAs) etc. to support proposed rates and factors and evidence to support the adequacy of accounting, estimating, and purchasing systems as applicable.

g. Provide the following information as the first page of the proposal for the Prime and Each Subcontractor.
i.Name, title, telephone and fax numbers and e-mail address of offeror’s point of contactii.Amount proposed for basic effort and each option
iii.Name, address and telephone number of the cognizant DCMA and DCAA officesiv.Name, title, signature of authorized representative
v.Date offer is submitted and expiration date of offer
vi. DUNS Number
vii. CAGE Code

2. Using the format in Table 1, submit a cost element summary by major cost element by OFY for each contract line item (CLIN) (i.e. basic period of performance and each option (if applicable) and/or Task, etc.). The detail required for each major cost element is described below. Address all cost elements applicable to the proposed effort and provide a narrative to support the basis of estimate.

a. Direct Labor. As part of Table 1, list the proposed hours, rates, and calculated amounts for each direct labor category by OFY, by CLIN. As part of the basis of estimate narrative, provide rationale for proposed hours and labor mix, and provide the base labor rates for each category. Identify the source of the base rates and explain the methodology used to project each rate for subsequent years. If applicable, identify the proposed escalation factors applied to future estimates and rationale for the proposed factors.
Note: If temporary or part-time labor is proposed, explain the differences between the pay rates for full-time and temporary or part-time workers, and the impact of those differences on the direct rates proposed. Identify all uncompensated labor (straight time and/or overtime) included in this cost element, and explain the impact of uncompensated time on direct rates proposed.

b. Indirect Cost Rates and/or Factors. As part of Table 1, list the proposed base, rate/factor and calculated amount for each indirect cost by OFY, by CLIN. As part of the basis of estimate narrative, identify all indirect cost rates/factors (such as fringe benefits, labor overhead, material overhead, G&A, Cost of Money (COM), etc.) and applicable allocation bases by OFY. If composite rates are used, provide the calculations used in deriving the composite rates. Identify the basis of proposed rates (e.g., FPRA and date of agreement, bidding rates and submission date, actual rates and effective date, billing rates and approval date, etc.).

c. Subcontracts/Interorganizational Transfers (IOTs). As part of Table 1, list each subcontractor/IOT cost separately by OFY by CLIN. Obtain fully disclosed cost proposals from each subcontractor and IOT (those actually performing labor hours) using the same cost element breakout required for Table 1 by OFY for each CLIN. Provide a list of anticipated subcontractors/IOTs using Table 2. As part of the basis of estimate narrative, IAW FAR 15.404-3(b) perform and provide evaluation results of cost/price analysis for each subcontract proposal. If subcontractors were selected on a sole-source basis, provide the rationale for this decision. Differences between the subcontractor/IOT proposed amounts and the prime contractor proposed amounts must be fully explained. If decrement factors are used, explain their development and application. If the proposed subcontractor’s fee rate is higher than the Prime’s fee, provide rationale as to why the subcontractor’s risk is greater than the Prime’s. NOTE: Fully disclosed Subcontractor/IOT proposals (including Tables 1 thru 4) are due by the closing date identified in this announcement.

In accordance with FAR 52.215-22, Limitations on Pass-Through Charges - Identification of Subcontract Effort: The contractor shall utilize Table 2 to identify the cost of work to be performed by each subcontractor by contract or task order as applicable. If the offeror subcontracts more than 70 percent of the total cost of work to be performed the contractor must comply with the requirements of the provision.

d. Material/Equipment. As part of Table 1, list material/equipment costs by OFY by CLIN. Using Table 4, provide a consolidated priced summary of individual material/equipment quantities and the basis for pricing (vendor quotes, invoice prices, etc.) by OFY by CLIN. For all items proposed, identify the item and show the source, quantity and price. As part of the basis of estimate narrative, provide information regarding the rationale/methodology used to derive the proposed material/equipment estimate.
e. Travel. As part of Table 1, list travel costs by OFY by CLIN. Using Table 3, separately identify costs for travel including the purpose and number of trips, origin and destination(s), duration, and travelers per trip by OFY by CLIN. Note that Table 3 is a summary format and may be expanded to include more detailed travel rate information and calculations. As part of the basis of estimate narrative, provide a listing of all proposed travel rates (if not already provided as part of Table 3). Provide the basis for the proposed travel rates and rationale for the proposed trips.

f. Other Direct Costs (ODCs). As part of Table 1, list ODC costs by OFY by CLIN. As part of the basis of estimate narrative, separately identify other direct costs to include consultants. Provide rationale for proposed other direct costs. Also, provide the source, quantity, price, and rationale for each of the proposed ODCs. If proposing consultants, provide consultant agreements to validate proposed rates and a determination by the offeror that the rate proposed is comparable to other consultant rates for work of similar nature. Substantiate the need for proposed consultant services.

g. Cost of Money (COM). Reference paragraph 2b above. Also, refer to FAR 52.215-16, Facilities Capital Cost of Money. Provide form CASB-CMF which contains proposed cost of money (COM) factors, if applicable, to include a display of all individual bases for the COM amounts. A DD Form 1861 for each OFY must be submitted if proposing COM.

h. Fee. Reference paragraph 2b above. Identify proposed fee base and rate.

i. New Mexico Gross Receipts Tax (NMGRT). Reference paragraph 2b above. NMGRT may be applicable to the proposed effort. For assistance in determining the extent to which NMGRT may apply and applicable rates, contact the New Mexico Taxation and Revenue Department, 5301 Central Ave., NE, PO Box 8485, Albuquerque, NM 87198, (505) 841-6200, http://www.tax.newmexico.gov/All-Taxes/Pages/Gross-Receipts-Tax.aspx. Identify the cost elements and amounts included in the NMGRT base, if applicable. Demonstrate the method of calculating total tax dollars included in the proposal.

ATCH: Det 8 AFRL AFPAC

TABLE 1

COST ELEMENT SUMMARY

NOTE: THIS IS A SAMPLE TABLE - ALL OFFERORS SHOULD PROPOSE IN ACCORDANCE WITH THEIR APPROVED ACCOUNTING PRACTICES.

COST ELEMENT

OFY 1

BASE

OFY 1

RATE

OFY 1

AMT

OFY 2

BASE

OFY 2

RATE

OFY 2

AMT

TOTAL

BASE

AMOUNT

TOTAL

PROPOSED

AMOUNT

DIRECT LABOR

(List each direct labor category separately.)

XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
TOTAL DIRECT LABOR
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
TOTAL LABOR OVERHEAD
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX

SUBCONTRACTS, IOTS

(List Separately)

XXXX

XXXX
XXXX
XXXX

MATERIAL

XXXX

XXXX
XXXX
XXXX
MATERIAL OVERHEAD
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX

TRAVEL

XXXX

XXXX
XXXX
XXXX

ODCs (List consultants separately)

XXXX

XXXX
XXXX
XXXX
G&A
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX

SUBTOTAL COSTS

XXXX

XXXX
XXXX
XXXX

COST OF MONEY

(See DD Form 1861)

XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
FEE
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX

TOTAL COST & FEE

XXXX

XXXX
XXXX
XXXX
NMGRT (IF APPLICABLE)
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX
XXXX

TOTAL PRICE

XXXX

XXXX
XXXX
XXXX

*Submit a cost element summary by OFY for each CLIN, basic, option and each Task Order, as appropriate, for each year of performance.

TABLE 2

SUBCONTRACT/INTERORGANIZATIONAL TRANSFERS & CONSULTANTS

PRICE SUMMARY

SUBCONTRACTOR NAME
SUBCONTRACTOR TASKS**
SUBCONTRACT TYPE
SUBCONTRACTOR QUOTED PRICE
SUBCONTRACTOR COST AS EVALUATED BY PRIME
DIFFERENCE

TOTALS

**Identify Statement of Work or Work Breakdown Structure or provide a narrative explanation as an addendum.

TABLE 3

TRAVEL SUMMARY

OFY
FROM
TO
PURPOSE
# TRIPS
# TRVLRS
# DAYS
TOTAL $

TABLE 4

BILL OF MATERIALS/EQUIPMENT

Item
OFY
Description
Qty
Unit Price
Total Price
Vendor/Source (Company Name, Website URL, Etc)
Basis of Estimate (Quote, PO, Eng Est, Etc.)
1
0
0
1
0
0
1
0
0
1
0
0
1
0
0
1
0
0
1
0
0
1
0
0
TOTAL
0

Air Force Proposal Adequacy Checklist (AFPAC)

ITEM #
ITEM DESCRIPTION
FAR

REFERENCE

Y
N

or N/A

PROVIDE EXPLANATION IF EITHER “NO or N/A” (use continuation page if necessary)
PROP REF PG
1
Is there a properly completed first page of the proposal in accordance with Table 15-2 I.A or as specified by the Contracting Officer (CO) in the solicitation?
FAR 15.408, Table 15-2 I.A
2
Is an Index, appropriately referenced, of all cost or pricing data and information accompanying or identified in the proposal, provided?
FAR 15.408, Table 15-2 I.B
3
Are there any exceptions to submission of certified cost or pricing data pursuant to FAR 15.403-1(b)? If so, is supporting documentation included in the proposal? Refer to checklist items 15, 16 and 17.
FAR 15.403-1(b)
4
Does the proposal include EXCEL spreadsheets of all applicable tables, on CD ROM WITH FORMULAS?
5
Is there a TABLE 1 cost element summary by major cost element by Offeror Fiscal Year (OFY) for each contract line item (CLIN) (i.e. basic period of performance and each option (if applicable) and/or Task, etc.). (Breakdowns for each cost element must be consistent with your cost accounting system.)
FAR 15.408, Table 15-2 I.D & E
6
If more than one CLIN (Contract Line Item Number) or sub-CLIN (Sub Line Item is proposed as required by the RFP, are there summary total amounts covering all line items for each element of cost and is it cross-referenced to the supporting cost or pricing data?
FAR 15.408, Table 15-2, I. D & E
7
Is total price by cost element provided by each OFY?
8
Are CLIN prices by cost element provided by each OFY?

Are all cost element breakdowns provided using TABLE 1?

FAR 15.408, Table 15-2

10
Does the proposal reflect all specific requirements established by the CO?
11
If an incentive contract type, is contract geometry included (e.g. contractor proposed target cost, target profit or fee, min/max, ceiling, share ratio)?

MATERIAL

Note
Consolidated Bill of Material (CBOM). A CBOM is a consolidated priced summary of individual material quantities and subcontract items included in the various tasks, orders, or contract line items being proposed and the basis for pricing (negotiated/invoice prices, vendor quotes, average unit pricing, prior purchase history, long term agreements, etc). The offeror’s CBOM shall include estimated raw materials, parts, components, assemblies, subcontracts and services to be produced or performed by others, identifying as a minimum; the item, source, quantity and cost.
12
As part of Table 1 is material/equipment listed by OFY by CLIN?
FAR 15.408, Table 15-2 II A.
12.1
Is there a completed Table 4 priced summary of individual material/equipment quantities and the basis for pricing (vendor quotes, invoice prices, etc.) provided by OFY by CLIN? For all items proposed are the items, sources quantity and prices identified? Is a basis of estimated narrative provided with information regarding the rationale/methodology used to derive the proposed material/equipment estimate?

SUBCONTRACTS (Purchased material or services)

13
Are fully disclosed subcontractor/IOT proposals (Including Tables 1 through 4) submitted to the government by the closing date identified in the RFP?
FAR 15.404-3(c)
13.1
Is Table 2 completed identifying the cost of work to be performed by each subcontractor by contract or task order as applicable
13.2
Does the proposal include the prime contractor’s evaluation and results of cost/price analysis establishing the reasonableness of each subcontract proposals?
FAR 15.404-3(b)
Note
Analyses not provided with the proposal may result in a delay to audit, fact-finding and negotiations. Analyses not included with the proposal shall be provided as soon as possible after the proposal submission date and shall be accomplished in sufficient time to support the definitization/contract award schedule.
13.3
If the subcontractors were selected on a sole-source basis, is the rationale for this decision provided?
13.4
If differences between the subcontractor/IOT proposed amount and prime contractor proposed amounts exist, is the reason for the

difference fully explained?

13.5
Are decrement factors development and application fully explained?
13.6
Does the proposal identify those actions where assist audits have been requested by the prime or sub-tier contractors and identify the request date and scheduled receipt date?
Note
The need for assist audits resulting from proprietary data rights assertions at any tier must be identified to the CO as soon as possible in the proposal build cycle. Notwithstanding assist audits performed by the government, contractors must still perform and provide Price/Cost Analysis.

INTERORGANIZATIONAL TRANSFERS

14
For inter-organizational transfers proposed at cost, does the proposal include a complete fully disclosed cost proposal in compliance with Table 15-2 and this checklist?
FAR 15.408, Table 15-2 II.A.(2)
Note
Inter-organizational work is considered to be part of the certified cost or pricing data submission of the prime. As such, the prime contractor’s responsibility for conducting subcontractor Cost/Price Analysis does not apply to inter-organizational transfers. However, prior to the submission of the proposal, the prime contractor shall (a) ensure that all statement of work tasks are addressed without duplication and are consistent with the overall program performance schedule and, (b) ensure ground rules and assumptions are consistent with the prime proposals.
15
For inter-organizational transfers proposed at price in accordance with FAR 31.205-26(e), does the proposal provide an analysis by the prime that supports the exception from certified cost or pricing data in accordance with FAR 15.403-1 (reference checklist items 15, 16, and 17 below)?
FAR 31.205-26(e), FAR 15.403-1

ADEQUATE PRICE COMPETITION

16
Does the proposal support the degree of competition and the basis for establishing the source and reasonableness of price for each subcontract or purchase order priced on a competitive basis exceeding the threshold for certified cost or pricing data?
FAR 15.408, Table 15-2 II.A.(1)

COMMERCIAL ITEM DETERMINATIONS

17
Is the contractor proposing commercial items either at the prime or subcontractor level that would be exempt from certified cost or pricing data requirements?
FAR 2.101,

FAR 15.403-1 (b)(3) or (b)(5)

Note
If you are modifying a commercial item or are providing a modified commercial item, there may be circumstances that require the submission of certified cost or pricing data (see Note to checklist item 17.3 below).
17.1
Has the contractor provided support for prime contractor assertions of commerciality and any subcontractor Commercial Item Determinations (CIDs) addressing, at a minimum, the following:
Note
A subcontractor CID includes the following information/data in addition to the prime contractor’s independent price analysis and conclusion of the subcontractor’s commerciality assertion. (checklist item 17.5.D)
17.2
Has the contractor provided a description of supplies or services and the basis for which the supply or service meets the Government’s requirements?
17.3
Has the contractor specifically identified the type of commercial item claim (FAR 2.101 commercial item sub-definitions (1) through (8)), and the basis on which the item meets the definition?
FAR 2.101
17.4
For modified commercial items (commercial item sub definition) (3); did the contractor classify the modification(s) as either:

A. Of a type customarily available in the commercial marketplace (FAR 2.101 commercial item sub-definition (3)(i)) or

B. A minor modification (FAR 2.101 commercial item sub-definition (3)(ii)) of a type not customarily available in the commercial marketplace made to meet Federal Government requirements not exceeding the thresholds in FAR 15.403-1(c)(3)(iii)(B)? (see note below)

FAR 2.101

FAR 15.403-1

Note
Modifications that do not qualify as “minor” under FAR 2.101 sub-definition (3) or modifications that qualify as “minor” where the total price of all such modifications exceeds the greater of the threshold for certified cost or pricing data (FAR 15.403-4) or 5% of the total price of the contract at the time of contract award are NOT exempt from the submission of certified cost or pricing data. Where the contractor is proposing a modified commercial item, the CO should, in every case, be consulted as soon as possible before the proposal is submitted.
17.5
Technical Assessment: For proposed commercial items “of a type”, or “evolved” or modified (FAR 2.101 commercial item sub-definitions (1) through (3)), did the contractor provide a technical description of the differences between the proposed item and the comparison item(s)?
FAR 2.101
17.6
Price Reasonableness: Has the contractor provided, or made available, data other than certified cost or pricing data to establish price reasonableness of the proposed commercial item (to include any modifications not subject to certified cost or pricing data (ref. Note under checklist item 17.3 above) by supplying:

A. Information/data related to competition (refer to checklist item 15), B. Information/data related to prices (sales data, market price assessments, etc.), C. cost data (cost elemental breakdown and supporting documentation not subject to certification in accordance with FAR 15.406-2), and D. for subcontractor assertions, the prime contractor’s price analysis/price reasonableness determination?

FAR 15.402(a)(2), FAR 15.403-1(c)(3)(ii), FAR 15.403-3(c), FAR 15.404-3(b) FAR 15.404-3(c)

FAR 15.406-2

Note
The preferred method to establish the price reasonableness of commercial items is to obtain commercial sales data. It is recognized that other methods, such as market price assessments data or cost data not subject to certification, are also acceptable when prior sales data cannot be obtained. Sales data must (1) demonstrate sales to the general public, (2) be current and where possible, (3) in like quantities. Items sold to state, local or foreign governments or items sold with applications only to state, local, foreign government or the US government end items, are not considered to be sales to the general public unless the proposed commercial item meets the commercial item definition FAR 2.101 commercial item sub-definition (8).

LABOR

18
As part of Table 1, was a list provided of the proposed hours, rates and calculated amounts for each direct labor category by OFY by CLIN?
19
As part of the basis of estimate narrative was rationale provided for the proposed hours and labor mix? Is the source of the base rates and methodology used to project each rate for subsequent years fully explained? Are the proposed escalation factors applied to future estimates identified and rationale for the proposed factors provided?

OTHER DIRECT COSTS

20
Does the proposal include other direct costs and the basis for pricing by OFY by CLIN? Is there a fully completed Table 3 listing all proposed travel, by basic, each option or task order (as applicable) by OFY? If travel is discretely estimated does the proposal include number of trips, number of people, number of days per trip, locations, and rates (e.g. airfare, per diem, hotel, car rental, etc)? Does the proposal identify the basis for the proposed travel rates and rationale for the proposed trips? If consultants are proposed, does the proposal include a copy of the consultant agreements? Are the proposed consultant rates comparable to other consultant rates for work of similar nature? Is the need for the proposed consultant services substantiated?
FAR 15.408, Table 15-2 II.D

NEW CONTRACTS (INCLUDING LETTER CONTRACTS)

21
Does the proposal identify actual hours, and cost incurred as well as hours/cost to complete and the time phasing associated with these hours/costs? This information/data is to be provided consistent with cost element summaries as identified in checklist item 9.
FAR 15.408, Table 15-2, III

CHANGE ORDERS, MODIFICATIONS AND CLAIMS

22
If the proposal is for a modification or change order, have cost of work deleted (credits) and cost of work added (debits) been provided in the format described in FAR 15.408, Table 15-2.III.B?
FAR 15.408, Table 15-2 III.B

PRICE REVISIONS/REDETERMINATIONS

23
For price revisions/redeterminations, does the proposal follow the format in FAR 15.408, Table 15-2.III.C?
FAR 15.408, Table 15-2 III.C

FACILITIES COST OR MONEY

24
If facilities capital cost of money is proposed, does the proposal include a schedule of COM factors? submission of Form CASB-CMF or reference to an FPRP/FPRA and show the calculation of the proposed amount?
FAR 31.205-10 FAR Table 15-2,II.F

RATES AND FACTORS

25
Does the proposal include all rates and factors by year that are utilized in the development of the proposal and the basis of those rates and factors (FPRA/FPRP)? Identify the official submittal of such rate and factor data.

OTHER

26
Does the proposal identify the location and point of contact for any certified cost or pricing data which is referenced, but not included, in the proposal?
27
Does the proposal disclose the judgmental factors applied and the mathematical or other methods used in the estimate, including those used in projecting from known data?
FAR 15.408, Table 15-2, I.C.(2)(i)
28
Does the proposal disclose the nature and amount of any contingencies included in the proposed price?
FAR 15.408, Table 15-2 I.C.(2)(ii)
29
If Royalties exceed $1,500 does the proposal provide the information/data identified in FAR 15.408, Table 15-2 Paragraph II. E.?
FAR 15.408, Table 15-2 II. E.

w

30
If Economic Price Adjustments are being proposed, does the proposal show the rationale and application for the proposed indices?
FAR 16.203-4(a)(1)
31.1
Is the contractor proposing Performance-Based Payments?
FAR 32.10
31.2
If so, has the contractor provided an expenditure profile, proposed events and their projected dates, proposed values for each event, completion criteria, and identification of which events are severable or cumulative?
FAR 32.10
32
Excessive Pass-through Charges – Identification of Subcontract Effort, if the offeror intends to subcontract more than 70% of the total cost of work to be performed, does the proposal identify: (i) the amount of the offeror’s indirect costs and profit applicable to the work to be performed by the subcontractor(s); and (ii) a description of the added value provided by the offeror as related to the work to be performed by the subcontractor(s)?
FAR 15.408(n) DPAP Memo 23 Dec 2009 (DARS Tracking Number 2009-O0015)
33
Does the proposal explain the basis of all cost estimating relationships (CERs) (labor hrs or material) proposed on other than a discrete basis?
Note
Calculations/formulas/logic made to generate “CER” costs should be presented with proposal.
34
Does the proposal identify the need for government furnished material/tooling/test equipment? Include the lending contract number and CO contact information if known.
FAR 15.408, Table15-2, I A. (7)
35
Does the proposal include identification of any CAS non-compliances, or other estimating deficiencies that may impact the proposed price?
FAR Table 15-2.I.A.(8)

image1.gif

File details come from the government source that posted it. Updated .