B08 Transmittal.pdf

PDF 175 KB Posted

Attached to
Replace Water System Components, Mojave National P
Solicitation number
140P8121R0007
Issued by

About this file

This transmittal document is for a federal contract to replace water system components at Mojave National Preserve. The contract is solicitation number 140P8121R0007 issued by the National Park Service Pacific West Region within the Department of the Interior. The transmittal outlines the process for the contractor to submit items for government review and approval, including specification sections and descriptions of items to be reviewed. It also provides instructions for signing, dating and distributing the transmittal forms between the contractor and contracting officer's representative. The related documents attached include specifications for lagoon liners and closeout/operations and maintenance requirements.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRANSMITTAL - NATIONAL PARK SERVICE Transmittal No.:

Sheet: 1 of:

Park: Project: Contract No.: Pkg. No.: Date:

Contractor: Subcontractor/Supplier:

NPS ACTION

Ite m

N o.

Specification Section No. P ar ag ra ph

Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

Contractor Signature Recommended By

Title Date Title Date I hereby certify that this submittal has been reviewed for accuracy, completeness, and compliance with contract requirements (FAR 52.236-21)

Review Comments Action By Date Contracting Officer's Representative

Approval of this submittal is subject to the provisions of the contract drawings and specifications. This action is for general concurrence only and the Government is not responsible for errors or omission.

SUBMITTAL LOG DATES: From Contractor [__________], To Reviewer [__________], From Reviewer [__________], To Contractor [__________] Distribution: ( ) Contractor ( ) DSC File ( ) COR ( ) A/E ( ) DSC Interim ( ) COR Interim ( ) Contractor Interim

CM-16Rev. 4/00 (Formerly DSC-1)

TRANSMITTAL CONTINUATION - NATIONAL PARK SERVICE Transmittal No.:

Sheet: 2 of:

Park: Project: Contract No.: Pkg. No.: Date:

Contractor: Subcontractor/Supplier:

NPS ACTION

Ite m

Specification Section No. P ar ag ra ph

Description of Item (Size, Type, Name, Manufacturer, Use, Etc.)

Review Comments

CM-16Rev. 4/00 (Formerly DSC-1)

BB Lagoon Liners - Geomembrane Specs.pdf
Closeout and O&M Requirements.pdf
Template

File details come from the government source that posted it. Updated .