A04 Statement of Work.pdf
PDF 4 MB Posted
- Attached to
- Replace Water System Components, Mojave National P Federal contract opportunity
- Solicitation number
- 140P8121R0007
About this file
This statement of work outlines the requirements for a construction project to replace water system components at Mojave National Preserve in California. The contractor will replace approximately 3,600 feet of water pipeline, 11 gate valves, air release valves, hydrants, and flow meters. Additional optional work includes replacing 5,000 feet of pipeline connecting wells to storage tanks. The work must be completed within 120 days of notice to proceed. Deliverables include submittals, a warranty, inspection and testing documentation, and as-built records. Materials must meet specifications including NSF 61 certification. The contractor will follow safety and security procedures. The National Park Service is the contracting agency, with a period of performance through 2022.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8121R0007_Amd_0004.pdf | ||
| B09_Daylight_Drain_Detail_amendment_04_0004.pdf | ||
| B09_Contract_Price_Schedule_revision_02_June_14_2021_0003.pdf | ||
| B09_Statement_of_Work_Amendment_03_0003.pdf | ||
| Sol_140P8121R0007_Amd_0003.pdf | ||
| B09_Contract_Price_Schedule_revised_0002.pdf | ||
| B09_Statement_of_Work_revision_Section_E_0002.pdf | ||
| Sol_140P8121R0007_Amd_0002.pdf | ||
| B09_Concrete_Collar_with_Curb_0001.pdf | ||
| B09_Questions_and_Answers_0001.pdf | ||
| B11_Site_Visit_0001.pdf | ||
| Sol_140P8121R0007_Amd_0001.pdf | ||
| B09_Concrete_Collar_Detail_0001.pdf | ||
| 52_204-8_Annual_Representations_and_Certifications_0001.docx | DOCX document | |
| Sol_140P8121R0007.pdf | ||
| B08 Transmittal.pdf | ||
| B08 Release of Claims.pdf | ||
| B03 General Decision.pdf | ||
| B08 MOJA Map.pdf | ||
| B08 Invoice Payment Request.docx | DOCX document | |
| B08 Contract Price Schedule.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mojave National Preserve
San Bernardino County, California
STATEMENT OF WORK:
Replace Components of Public Water System at Hole in the Wall, MOJA 310142
DATED:
November 24, 2020
Prepared By: Debra Hughson
Region Reviewed February 28, 2021
NATIONAL PARK SERVICE
CONTRACT PRICE SCHEDULE
PMIS NO. 310142
Replace Components of Public Water System at Hole in the Wall
Offerors are required to submit an offer that conforms to the Solicitation with pricing for Contract Price Schedule’s Base Line Items - failure to do so may render the offer non-responsive. On lump-sum price items, provide total cost only; on unit price items, provide the unit price and the extended amount of total price for the item. If no price item exists for a portion of the work, include the costs in a related price item. In case of error in extension of prices, unit price governs. In case of error in summation, the total of the corrected price item amount governs. Round totals and extend prices to whole dollars. Pricing will be evaluated based on what is determined to be the best value to the Government.
Price award will be made based upon the following equation.
Equation 1: Base Price
Base Price and Adjustments to Base Price:
Base Price: Price Items 1 through 16.
CONTRACT CONTRACT
LINE ITEM LINE ITEM TITLE
NUMBER
(CLIN)
QUANTITY AND
UNIT OF
MEASURE
UNIT PRICE TOTAL PRICE
BASE LINE ITEMS
1.
Mobilization/Demobilization 1 LS @$________ =$_________
2.
2-inch HDPE DR 9 IPS 3600 LF *NTE @$________ =$_________
3.
1-inch Combination Air Valve 2 EA @$________ =$_________
4.
2-inch Blow-off Hydrant 1 EA @$________ =$_________
5.
2-inch Daylight Drain 1 EA @$________ =$_________
6.
¾-inch Water Meter w/PRV 4 EA @$________ =$_________
7.
¾-inch Water Meter 1 EA @$________ =$_________
8.
¾-inch Frost Free Hydrant 11 EA @$________ =$_________
9.
½-inch Water Meter on Storage Tank’s Inlet Line
1 EA @$________ =$_________
10.
4-inch Water Meter on Storage Tank’s Outlet Line
1 EA @$________ =$_________
11.
6-inch Gate Valve in Tank Valve Vault
2 LS @$________ =$_________
12.
2-inch Ball Valve in Tank Valve
13.
1-inch Ball Valve in Tank Valve
14.
1-inch Pressure Reducing Valve 1 LS @$________ =$_________
15.
Removal & Salvage or Disposal of Water System Appurtenances
1 LS @$________ =$_________
16.
Vehicle Protection Bollard 33 EA @$________ =$_________
TOTAL BASE PRICE – (Items 1 to 16) -------------------------------------------------------- =$_________
*NTE: Not-To-Exceed quantity
END OF SECTION
MOJA – Hole in the Wall well and water system
STATEMENT OF WORK (SOW)
35. BACKGROUND
Mojave National Preserve is located in Eastern San Bernardino County 2 hours east of Barstow, CA. The work site is 30 miles north of Essex, CA on Black Canyon Road at the Hole in the Wall Interagency Fire Center.
2. OBJECTIVES:
This project his project will replace a leaking pipeline, gate valves, stand pipes, Pressure Reducing Valves (PRV), Air Release Valves (ARV), and flow meters, and remove unnecessary hydrants, ARV valves, and stand pipes that are non-functional.
3. PLACE OF PERFORMANCE:
Well 8K1, Section 8, Township 11 N, Range 15 E, San Bernardino County, CA
Permitted Work Hours: Monday through Friday, 7:00am – 5:00pm
4. PERIOD OF PERFORMANCE:
All tasks and deliverables for this contract must be completed within 120 days after Notice to proceed. Days listed herein refer to calendar days.
5. SCOPE:
Approximately 3600 linear feet of potable water pipe will be replaced along with gate valves, standpipes, Pressure Reducing Valves (PRV), Air Release Valves (ARV), and water flow meters. Unnecessary hydrants, ARV valves, and standpipes that are non-functional will be removed. Valve boxes will be reset to grade and enclosed in concrete aprons. Some portions of the water distribution pipe have never been replaced or have had so many repairs they are a nuisance to the park and need replacement. Many of the valves are legacy from a water system upgrade in 2003. Many valves have become below grade over time as the grade shifted over the years from erosion. Several flow meters do not work and make it difficult to identify unusual usage patterns that indicate leaks in the system. Many of the components such as blow off valves and air release valves have not functioned in years and are now a liability to the system.
The original design had an overabundance of yard hydrants very close together and created a large amount of maintenance to keep them operating. This project will reduce the number to a minimum level that will achieve the desired visitor experience. As a Contract Option, exercised at the discretion of the government per the Solicitation, is the installation of approximately 5,000 linear feet of potable water pipe to replace the legacy water line connecting the production water well (existing Well 8K1 & new Well 8K2) to the chlorination building and the existing 30,000 gallon water storage tank’s inlet line.
6. TASKS:
Under this contract, the contractor shall complete the following tasks and requirements given below. (Note: The letter-number designations given are in reference to locations that are shown on the included figures 1, 2, & 3 and in Table 1.)
A. Install approximately 3,600 feet of 2-inch DR 9 IPS HDPE potable water pipe tying into existing at the Fire Center to hydrants at the group and equestrian sites (Figure 1 and Table 1).
1. The top of pipe must be at least 30-inches below ground surface (within roadway) and backfilled with appropriate backfill material (see materials specifications).
2. Install new combination air valve at the location of A-V_58 on new water line.
3. Remove existing failed air vacuum release valve A-V_58, cap, and abandon in place existing pipe with plug.
4. Replace hydrant H_61.
5. Install new curb stop and can at H_68.
6. Install new daylight drain at PDD_63.
7. Remove existing water meter M_37 and install a new ¾-inch water meter with integral pressure reducing valve at the tie-in of the (N) 2-inch HDPE DR 9 IPS water line to the existing water line in the road just to the north of the Fire Center.
B. Visitor Center
1. Replace gate valve (supply to Visitor Center V_17), supply to Fire Center (V_18), and daylight drain (V_19).
2. Replace gate valve V_46 and Air Release Valve ARV_43.
3. Remove blow-off hydrant at H_55 and cap stem.
4. Replace hydrant H_36 with new frost free hydrant.
5. Replace the existing ¾-inch water meter M_44 (picnic area) with a new ¾-inch water meter with integral pressure reducing valve.
6. Replace the existing ¾-inch water meter M_45 (visitor center) with a new ¾-inch water meter with integral pressure reducing valve.
C. Fire Center
1. Replace hydrant H_57 and valve V_39 with new frost free hydrant and 2-inch gate valve.
2. Replace valve V_19, along with V_17 and V_18 with new 2-inch gate valves.
3. Remove blow off hydrant H_60 and cap stem.
4. Replace the existing ¾-inch water meter M_38 with a new ¾-inch water meter with integral pressure reducing valve.
D. Campground (Figure 3 and Table 1)
1. Remove valve D_51 and legacy valve can.
2. Replace existing ¾-inch water meter M_49 with a new ¾-inch water meter with integral pressure reducing valve.
3. Replace existing ¾-inch water meter M_41 with a new ¾-inch water meter.
4. Remove and cap hydrants H_9, H_10, H_11, H_30 and H_34.
5. Replace all other campground hydrants (H_4, H_12, H_14, H_16, H_28, H_29, H_31, H_32, and H_34) with new frost free hydrants.
6. Protect meter M_41, valve V_1, and ARV_40 with a concrete collar with integral curb on the uphill side to deflect runoff. To further protect these, Install 3 bollards for visibility and to prevent accidental damage from vehicles.
E. 30,000 Gallon Storage Tank Valving, Water Meters, & Bollards
1. Replace tank valves in tank valve vault:
a. Two (2) 6-inch gate valves,
b. Two (2) 2-inch ball valves,
c. and two (2) 1-inch ball valves.
d. Remove existing valves and salvage for NPS.
2. Inside of tank valve vault, remove the existing DI 6-inch equalization valve along with the associated 6-inch gate valve (NPS will retain this valve) and then cap the remaining associated 6-inch DI pipe with a blind flange.
3. At ground surface, demarcate tank and tank valve vault perimeter with concrete bollards (count: 30 bollards) at a spacing of five (5) to five and a half (5.5) feet intervals to prevent vehicle encroachment onto the ground surface above the tank and tank valve vault.
F. Rocking L Ranch House
1. Remove and cap blow off hydrants H_76 and H_78.
2. Replace gate valves of ARV_75 and ARV_77 with new 2-inch gate valves.
G. Valves (Table 1)
1. Replace existing valves with new 2-inch gate valves (V_2, V_3, V_7, V_8, V_17, V_18, V_19, V_22, V_39, V_50, V_51 & V_52).
H. Concrete Collars
1. Concrete collar dimensions 18-inches by 18-inches by 6-inches thick for a single can and 18-inches by 36-inches by 6-inches thick for side by side cans.
2. For all below ground new water meters, install concrete collar to protect meter can with curb formed to prevent filling with sediment.
3. Set new valve cans at grade and install protective concrete collars.
4. For existing valve cans not to be replaced, re-set valve can top at grade and install protective concrete collars.
5. For new hydrants, combination air valves, pressure relief valves, install protective concrete collars.
I. Curb Stop
1. Provide curb stops as needed for the installation of frost free hydrants, combination air valves, pressure reducing valves, water meters, and other appurtenances.
7. DELIVERABLES:
A. Provide product submittals and design of all parts and new equipment to be installed for
NPS review and approval.
B. Any work done or orders for materials or services placed before approval shall be at the
Contractor’s own risk.
C. Provide a one-year warranty for all parts and labor to replace any work that leaks or fails.
Provide safety plan.
D. Provide for quality control plan including inspections of repair work, quality of materials, compaction testing.
E. Provide pressure test data demonstrating that all installed components hold pressure and do not leak.
F. As-built record information (annotated photographs, annotated Google Earth imagery, detailed sketches, swing-tie tables, latitude & longitude coordinates from survey-grade GPS equipment, etc.) submittals that detail the locations and configurations of the water system components installed.
G. O&M Binder submittal organized with tabs and containing the record information (manufacturer’s cutsheets, O&M requirements, warrantees, etc.) that detail the materials, manufacturers, models, and related data/information needed to carry out the operation and maintenance requirements of the water system components installed.
8. GOVERNMENT-FURNISHED PROPERTY, MATERIAL, EQUIPMENT, OR INFORMATION
(GFP, GFM, GFE, OR GFI):
N/A
9. SAFETY:
This contractor is to follow at a minimum all OHSA rules and procedures. A required safety plan must be submitted and approved before any work is to begin. This plan shall identify any hazards related to the work and provide measures to follow to mitigate risk.
10. SECURITY:
Work sites will be secure at the end of the day. Open pits will not be allowed overnight. The contractor will be responsible for the hazmat clean-up of any equipment fluid leaks or spills.
11. TRAVEL:
Contractor shall be responsible for all travel related expenses for this project, including mobilization of equipment, tools, materials, manpower, lodging, meals, and per diem.
12. MATERIAL REQUIREMENTS:
A. All potable water system components must be NSF 61 Certified.
B. All material items listed require submittal to the Contracting Officer for approval prior to procurement.
C. 2-inch HDPE Pipe (DR 9 IPS) – This item includes furnishing all materials, equipment, and labor for installation of a 2-inch waterline as specified. The work includes, but is not limited to clearing, grubbing, excavation, dewatering, bedding, backfill, compaction, piping, fittings, thrust restraint, pressure testing, disinfection & water quality testing, pipe identification, tracer wire, and all other work necessary to complete the installation.
D. 2-inch Gate Valves with Valve Can – This item includes furnishing all materials, equipment, and labor for installation of gate valves as specified. The work includes, but is not limited to excavation, backfill, compaction, valve, valve can, concrete collar, and all other work necessary to complete the installation.
E. 6-inch Gate Valves – This item includes furnishing all materials, equipment, and labor for installation of gate valves as specified. The work includes, but is not limited to working within the tank’s valve vault, disassembly and re-assembly with required reconfigurations of existing piping & appurtenances along with new valves and appurtenances, and all other work
F. 2-inch Ball Valves – This item includes furnishing all materials, equipment, and labor for installation of ball valves as specified. The work includes, but is not limited to working within the tank’s valve vault, disassembly and re-assembly with required reconfigurations of existing
G. 1-inch Ball Valves – This item includes furnishing all materials, equipment, and labor for installation of ball valves as specified. The work includes, but is not limited to working within the tank’s valve vault, disassembly and re-assembly with required reconfigurations of existing
H. Combination Air Valve with Utility Box – This item includes furnishing all materials, equipment, and labor for installation of combination air valves as specified. The work includes, but is not limited to excavation, backfill, compaction, combination air valve, utility box, and all other work necessary to complete the installation. Valv-Matic 1-inch 201C or approved equal.
I. ¾ -inch Frost Proof Yard Hydrants – This item includes furnishing all materials, equipment, and labor for installation of yard hydrants as specified. The work includes, but is not limited to excavation, backfill, compaction, service connection, service pipe, bedding, curb stop with service box, nonfreezing yard hydrant, gravel, filter fabric, timber, concrete collar, testing, disinfection, and all other work necessary to complete the installation.
J. 1-inch Pressure Reducing Valve with Utility Box – This item includes furnishing all materials, equipment, and labor for installation of pressure reducing valves as specified. The work includes, but is not limited to excavation, backfill, compaction, pressure reducing valve, check valve, utility box, and all other work necessary to complete the installation. Watts LFU5B or approved equal.
K. Curb Stop - This item includes furnishing all materials, equipment, and labor for installation of curb stops where needed. The work includes, but is not limited to excavation, backfill, compaction, curb stop, utility box, and all other work necessary to complete the installation.
L. Water Meters – Multiple sizes of water meters are called for under this project. Below are listed the salient criteria for each required meter size. The overarching salient criteria for the water meters is that all the water meters to be installed under this project must be from one manufacturer to streamline O&M support.
1. Water meter for inlet line (2-inch) to the 30,000 gallon storage tank: This item includes furnishing all materials, equipment, and labor for installation of the water meter as specified. The work includes, but is not limited to working within the tank’s valve vault, disassembly and re-assembly with required reconfigurations of existing piping & appurtenances along with new valves and appurtenances, and all other work necessary to complete the installation. The work includes, but is not limited to working within the tank’s valve vault, disassembly and re-assembly with required reconfigurations of existing piping & appurtenances along with new valves and appurtenances, and all other work necessary to complete the installation. Badger M5000, 1/2-inch diameter with stainless steel electrodes, battery powered remote mounted amplifier, and factory calibrated; or approved equal.
2. Water meter for outlet line (6-inch) from the 30,000 gallon storage tank: This item includes furnishing all materials, equipment, and labor for installation of the water meter as specified. The work includes, but is not limited to working within the tank’s valve vault, disassembly and re-assembly with required reconfigurations of existing piping & appurtenances along with new valves and appurtenances, and all other work necessary to complete the installation. Badger M5000, 2.5-inch diameter with stainless steel electrodes, battery powered remote mounted amplifier, and factory calibrated; or approved equal.
3. Water meters for campground area, visitor center, equestrian/group sites, and Fire Center. The work includes, but is not limited to excavation, backfill, compaction, integral pressure reducing valve (if required), curb stop, utility box, and all other work necessary to complete the installation. Badger Recordall ¾-inch lead-free bronze alloy water meter; or approved equal.
M. Vehicle Protection Bollards - This item includes furnishing all materials, equipment, and labor for installation of vehicle protection bollards. The work includes, but is not limited to excavation, backfill, compaction, 6-inch Schedule 40 galvanized steel pipe, concrete (3,000 PSI @ 28 days), and all other work necessary to complete the installation. Bollards must have a minimum of 42 inches above the ground surface and an embedment depth of 36 inches into the ground. The 6-inch schedule 40 galvanized steel pipe must be centered in a 12-inch diameter concrete anchor having a depth of 40 inches below the ground surface.
The steel bollard must have 3 inches of concrete cover around and below the section embedded in the concrete anchor. The inside annular volume of the 42-inch section of the steel bollard above the ground must be filled with concrete and domed at the top ½ inch above the steel pipe to prevent standing water. The exterior of the section of the steel bollard extending above the ground surface must be painted with AASHTO approved safety white reflective paint for exterior metal surfaces.
N. Native soil free of rocks, organic material, and debris may be used for backfill. Place backfill materials in horizontal layers not exceeding 8 inches in loose depth. Compact each layer, at optimum moisture content to a density equal to surrounding ground. Above and below the pipe a minimum of 6-inches must be Sieve Size Percent Passing, 1/2-inch 100%, No. 4 50- 80%, No. 40 10- 25%. Note: If the native soil meets these sieve size requirements, then bedding under the water line is not required.
O. Trenching Guidelines: Excavate the trench to the approximate level of the top of the utility line to be installed, using adequate trench width and side slopes to safely accommodate worker access. Continue excavating for the utility line, to a width not greater than is shown on the appropriate trench detail in Chapter 7 Underground Installation of PE piping, Plastic Pipe Institute (plasticpipe.org.) Note: Trenching done by wheel or chain techniques can excavate directly to the required depth to install the water line when their trench width is just slightly wider than the OD of the water line being installed.
1. Rocky Trench Bottom: Where ledge rock, hard pan, boulders, or sharp-edged materials are encountered, over-excavate a minimum depth of 6 inches below the bottom of the utility exterior wall to permit adequate bedding preparation. The installed utility shall have at least 6 inches of clearance from any rock protrusion.
2. Unstable Trench Bottom: Secure approval of depth of over-excavation and stabilization method. For wet trench construction, use approved method of dewatering through diversion, damming and pumping, well points, or underdrain systems. Dispose of removed fluidized materials as approved. Use select backfill material to build a suitable foundation to within 6 inches of finished utility grade, prior to bedding with the specified material. Do not proceed with utility installation until wet trench and unstable conditions are under control.
3. Trench depth for water line installation in the roadway is 30 inches to top of pipe and non-roadway 24 inches to top of pipe.
P. Shoring and sheeting: Construct and maintain all shoring, sheeting, and slope lay-back necessary to protect the excavation, as needed for the safety of the employees and as required by applicable State and Federal laws.
1. For trenches over 5 feet deep, provide suitable barricades for worker protection.
When work area is left open and unattended by Contractor, provide suitable barricades for public safety, regardless of trench depth.
2. For trenches over 4 feet deep, provide suitable exit means in accordance with applicable provisions of OSHA.
3. Do not remove timber or sheeting if it is in a compacted zone. Instead, trim it off at a safe level above that zone.
4. As directed, remove all other sheeting and shoring when safe to do so.
Q. Compaction: Use vibratory compactors for sands and gravels (non-cohesive soils). Use mechanical tampers for sand and gravel containing a significant portion of fine-grained material, such as silt and clay (cohesive soils). Hand tamp around pipe, conduit, or cable to protect the lines until adequate cushion is attained. Puddling or water flooding for consolidation of backfill or compaction by wheel rolling with construction equipment will not be permitted.
R. Utility Installation: Shape the trench bottom to ensure uniform contact with the full length of the installed line and remove any sharp-edged materials that might damage the line.
Compaction shall be maintained beneath the line.
1. Select Backfill: Fill by hand placement around the utility to just over half depth, and compact in a manner to ensure against lateral or vertical displacement. Place select backfill to 12 inches above the utility line by hand placement in not more than 6-inch layers.
2. Vehicular Traffic Areas: Fill and compact in 8-inch maximum layers to 95 percent of maximum density.
3. Nontraffic Areas: Fill and compact in 8-inch maximum layers to 90 percent of maximum density.
4. When chain or wheel trenching techniques are used, the trench width need only be slightly wider than the OD of the water line being installed.
S. Pressure-Test of Pipe System: Hydrostatic pressure leak tests of new PE pressure piping systems (once the water line is installed, and all isolation valves, PRVs, hydrants, combination air valves, and associated appurtenances have also been installed) must be conducted in strict accordance with ASTM International F 2164, Standard Practice for Field Leak Testing of Polyethylene (PE) Pressure Piping Systems Using Hydrostatic Pressure.
1. Pneumatic pressure testing of any water piping system is prohibited in Mojave National Preserve.
2. Where any isolation valves, PRVs, hydrants, combination air valves, and associated appurtenances are installed on the existing water system, a visual leak detection test must be conducted for two (2) hours at the normal working pressure of the water system prior to backfilling. Any detected leakage constitutes a failure of the visual leak test and repairs must be made to eliminate the detected leak.
T. Disinfection of Pipe System: The AWWA C651 (latest edition) Standard for Disinfection of
Water Mains must be adhered to for water system features installed.
U. Plugging of Abandoned Water Line: Legacy water lines that are designated to be abandoned in place once new water lines have been installed (and are in beneficial use where required) must be disconnected from the water system and plugged using non-shrink cement grout.
The plug must fill a minimum of six-inches inside the abandoned pipe from the cut end of the pipe.
13. OTHER REQUIREMENTS:
A. Contractors will receive Desert Tortoise training. Work conducted during active tortoise season will require a monitor.
B. Archeological Monitor shall have access to observe all ground-disturbing site work, including construction of temporary facilities, from a safe location mutually agreed on by Contractor and Monitor. As new ground is broken, Monitor will examine excavated materials, using construction layout centerline and perimeter staking as a reference point to record locations of findings.
C. If Archeological Monitor discovers resources, immediate relocation of the work to another area may be required to allow Monitor to take soil samples and record resources. While Archeological Monitor is documenting resources, Contractor shall relocate work to non-sensitive areas where monitoring is not normally required.
D. If resources are discovered while Archeological Monitor is absent, stop work immediately and report the discovery to the Contracting Officer.
E. Construction Camp: Establishment of a camp within the park will not be permitted.
F. There is no electrical service available at the project site. Contractor shall provide source for power and lighting.
G. No telephone service is available on site for Contractor’s use. Cell service is not available.
H. Up to 500 gallons per day of water is available for the Contractor’s use from the well located at Hole-in-the-Wall. The well can pump approximately 5 gallons per minute. If additional water is required, the Contractor shall furnish water from a source outside the park boundary.
I. Place portable temporary sanitary facilities in approved locations secluded from public observation and convenient to workstations. Relocate as work progress requires. Maintain and clean toilet facilities at least weekly.
J. Completely remove from the Park portable temporary sanitary facilities on completion of work.
K. Dispose of excess excavated material (including rocks and boulders) that cannot be used in construction at a location, as directed by the Contracting Officer, in the Hole in the Wall Area.
Unless otherwise specified, all removed material becomes the property of the Contractor and shall be disposed of outside the park. Immediately remove hazardous rubbish from project site. Place other construction debris in refuse containers at least daily. Dispose of refuse at least weekly, in a legal manner, at public or private dumping areas outside the park. Do not burn or bury refuse inside the park.
L. Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Restore or refinish surfaces that are damaged due to work of this contract to original condition. Remove grease, dirt, stains, foreign materials, and labels from finished surfaces.
Thoroughly clean building interiors. Pick up all construction debris from the site. At time of final inspection, project shall be thoroughly clean and ready for use.
M. Keep dust to a minimum at removal site and on haul roads. Use sprinklers or water trucks as necessary.
N. Contractor shall at all times conduct their operations to ensure the least inconvenience to the public.
O. Work Limits and Equipment Access: The Contractor shall limit all work and storage of materials to the work limits of this project. The work limits are:
1. Along Existing Roadways: The work limit shall be the width of the roadway.
2. The alignment of new water lines will be along the shoulder of existing roadway taking into account the alignments of existing buried utilities. Any variation to aligning the new water line differently must be approved by the Contracting Officer.
P. Construction Operations: For the safety and convenience of the public, the Contractor will conduct his operations in a concise and timely manner. The Contractor will complete and clean up each phase of the work within a reasonable time from starting. No more than 300 feet of trench will be open at any one time, with no more than 100 feet open overnight. If pipe-laying work does not continue daily with significant progress, the Contractor shall completely backfill the open trenches.
Q. Public Traffic: Public traffic will be allowed on all roads during construction. Conditions for maintaining public traffic shall be as follows:
1. Signs shall be provided at all times during in-road activities. All signs and traffic control devices shall conform to the Manual of Uniform Traffic Control Devises, Federal Highway Administration, ANSI D6.1. Work shall not start until signs are in place.
2. One lane of traffic shall be maintained along all roads during daylight operations. At night and during weekends, two lanes shall be open to traffic. Barriers shall be erected around all open excavations and material stockpiles.
R. Preservation of Natural Features: Confine all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.
1. Provide temporary barriers to protect existing trees and plants and root zones.
2. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with Contracting Officer and remove agreed-on roots and branches that interfere with construction.
3. Do not fasten ropes, cables, or guys to existing trees.
4. Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
S. Existing Utilities: Notify Contracting Officer of proposed locations and times for excavation.
Existing water lines shown are approximate. To permit changes in the event of conflict, the Contractor shall expose existing underground utilities to verify size, location, and elevation.
All utility crossings shall be exposed at least 300 feet in advance of water line installation.
The Contractor shall notify the Contracting Officer in case of conflict and, if necessary, changes will be made to the plans to avoid delays in the Contractor’s work schedule. If damage occurs to a known existing utility, repair utility at no additional expense to the Government.
1. If damage occurs to an unknown utility, repair utility. An equitable adjustment will be made in accordance with the Changes clause of the General Provisions.
2. Interruption of Existing Utility Service: The Contracting Officer shall be notified inwriting at least 48 hours in advance of any shutdown of the existing water system.
Such shutdowns shall be planned and scheduled such that the shutdown period is minimized. Shutdowns to make connections to the existing system shall not exceed 4-hours each.
T. Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.
14. QUALITY ASSURANCE REQUIREMENT:
The contractor shall develop and maintain a quality assurance program to ensure services are performed in accordance with commonly accepted standard practices and in compliance with all applicable code. The contractor shall develop and implement procedures to identify and prevent defective workmanship. As a minimum the contractor shall develop quality control procedures addressing the critical areas identified in this statement of work. The government will periodically evaluate the contractor’s performance in accordance with the statement of work.
While performing work, the contractor shall comply with the latest applicable versions of the following:
A. NFPA 101 (National Fire Protection Association’s Life Safety Code) B. MUCTD Standards and Policies C. Occupational Safety and Health Administration (OSHA) requirements D. California Code of Regulations E. AWWA Standards
Additional Requirements:
A. All affected areas must be restored to their original condition from before the work began. Any damages will be fixed and repaired at no cost to the government.
B. All new equipment must conform to the manufacturer’s instructions and guidelines.
15. PROJECT PERSONNEL:
Contracting Officer:
Jim Read NPS Mojave National Preserve Telephone: (760)252-6112 Email: jim_read@nps.gov
Park Facility Manager:
Debra Hughson – Acting NPS Mojave national Preserve Address Telephone: (760)252-6105 Email:
Construction COR:
mailto:jim_read@nps.gov
Steven Bosiljevac Regional Office – San Francisco Telephone: 415-623-2272 office Email: steven_bosiljevac@nps.gov
Project Inspector: TBD
Name Park Address Telephone:
Email:
Figure 1
Figure 2
Figure 3
Table 1 – List of Water System Components
Number Description Notes Action longitude latitude
V_1 Valve GV turns 9 1/2 full lock OK -115.3925741 35.0513637
V_2 Valve 9 1/2 turns buried 9 in closed Replace can and set to grade
-115.3935272 35.04540352
V_3 Valve Can filled in 9 1/2 turns Replace can and set to grade
-115.3936275 35.04619683
H_4 Hydrant CS inop Replace -115.3936265 35.04611929
L_5 Locator wire OK -115.3935527 35.04590568
WB_6 Host water bib OK -115.3938138 35.04603161
V_7 Valve GV 9 1/2 turns Replace can and set to grade
-115.3941542 35.04799864
V_8 Valve GV 9 1/2 turns Replace can and set to grade
-115.3936447 35.04784545
H_9 Hydrant Inop handle not connected Remove and cap -115.3937533 35.0478083
H_10 Hydrant Inop Remove and cap -115.393836 35.04695766
H_11 Hydrant Inop Gone -115.3938362 35.04737311
H_12 Hydrant Inop Replace -115.3937841 35.04858318
H_13 Hydrant Ok bad curb stop Gone -115.3938586 35.04904872
H_14 Hydrant Inop handle not connected Replace -115.3941994 35.04998508
H_15 Hydrant CS inop hydrant leaking Gone -115.3940028 35.05076607
H_16 Hydrant Slow drip CS inop Replace -115.3942297 35.05086963
V_17 Valve Inop to VC Replace -115.3904783 35.04180894
V_18 Valve Daylight D West ok Replace -115.3904686 35.04177231
V_19 Valve To Fire CTR 20 turns East Replace -115.3904602 35.0417727
D_20 Delete Remove and cap -115.3916028 35.04543068
DD_21 Daylight drain Needs new screen Clean and replace screen
-115.390583 35.04146537
V_22 Valve Ok 9.5 turns Replace can and set to grade
-115.3954576 35.04258716
PRV_23 PRV Press relief w ball valve Replace -115.3955941 35.0428256
V_24 Valve Drain GV 9.5 turns ok OK -115.3956349 35.04288961
DD_25 Daylight drain OK -115.3955975 35.0429026
V_26 Valve 9.5 turns ok OK -115.3939624 35.05068819
V_27 Valve 9.5 turns ok OK -115.3939614 35.05069526
H_28 Hydrant Functional CS inop Gone -115.3943853 35.04986906
H_29 Hydrant Functional CS inop Replace -115.3943101 35.04926342
H_30 Hydrant Handle sticks CS inop Gone -115.3944861 35.04848609
H_31 Hydrant Functional CS inop Replace -115.3944338 35.04819381
H_32 Hydrant Inop Replace -115.3941683 35.04701808
H_33 Hydrant Inop handle disconnected Gone -115.3941913 35.04641703
H_34 Hydrant Inop Replace -115.3940786 35.04599429
H_35 Hydrant Ok 42 psi Replace -115.3978822 35.04393468
H_36 Hydrant CS closed Replace -115.3971351 35.04475883
M_37 Meter Horse camp functional Replace -115.3863141 35.04259647
M_38 Meter Cracked housing Remove and cap -115.3863283 35.0425958
V_39 Valve Hydrant shutoff 20 turns Replace -115.3863016 35.04260072
ARV_40 Air Vac Release ARV functional Add concrete apron -115.3925661 35.05136467
M_41 Meter Functional 3/4 in Replace -115.3925657 35.051365
ARV_42 Air Vac Release Inop disconnected w ball v Replace -115.3919247 35.04537806
ARV_43 Air Vac Release ARV leak on BV stem tightened Replace gate valve -115.3916318 35.04183227
M_44 Meter Functional to picnic Replace -115.3955584 35.0424412
M_45 Meter Functional to VC w leak Replace -115.3955631 35.04244509
V_46 Valve 20 turns to hydrant OK -115.3955617 35.04243477
H_47 Hydrant 45 psi no CS Replace -115.3959994 35.04250078
V_48 Valve VC ball valve OK -115.3960634 35.04254559
M_49 Meter 3/4 inch 10pct error Replace -115.3915107 35.04548636
V_50 Valve W loop GV 9.5 t closed Replace can and set to grade
-115.3935268 35.04539743
D_51 Valve Abandoned Replace can and set to grade
-115.3915248 35.04546831
V_52 Valve GV 9.5 turns Replace can and set to grade
-115.3914609 35.04551488
P_53 Buried Pipe Well supply line OK -115.3913805 35.04552712
DD_54 Daylight drain Screen partial clog Clean and replace screen
-115.3944561 35.05592345
H_55 Hydrant Blow off in wash Remove and cap -115.3924649 35.0417396
ARV_56 Air Vac Release ARV functional OK -115.3891215 35.04215308
H_57 Hydrant Fire hyd drain leaks Replace -115.3862757 35.04257558
A-V_58 Air Vac Release Air V inop frozen valve Remove and cap -115.3835023 35.04581288
H_59 Hydrant No CS found leaking vac break OK -115.3832177 35.04918075
H_60 Hydrant Blow off Remove and cap -115.3879009 35.04192315
H_61 Hydrant Inop CS can jammed Replace -115.3824561 35.04824821
H_62 Hydrant Ok OK -115.3823953 35.04792292
PDD_63 Prop daylight drain Install new daylight drain
-115.3824549 35.04754427
ARV_64 Air Vac Release Inop abndn line Leave -115.3885948 35.06545056
ARV_65 Air Vac Release ARV abandon line Leave -115.3834395 35.06807811
H_66 Hydrant Blow off Leave -115.3826012 35.06852307
H_67 Hydrant Blow off Leave -115.3802094 35.07007034
H_68 Hydrant Ok needs new CS Install curb stop and can
-115.3824238 35.04808605
H_69 Hydrant Blow off missing riser Capped -115.3865062 35.06585676
ARV_70 Air Vac Release ARV abandoned Leave -115.3808163 35.06976435
ARV_71 Air Vac Release ARV abandoned Leave -115.3795132 35.07058532
V_72 Valve 2 GV functional OK -115.3784072 35.07139109
ARV_73 Air Vac Release ARV disconnected Remove and cap -115.3819834 35.07273139
H_74 Hydrant Blow off OK -115.377062 35.07221357
ARV_75 Air Vac Release ARV not tested stuck valve Replace valve -115.3765647 35.07262439
H_76 Hydrant Blow off by wash Remove and cap -115.3761234 35.07277816
ARV_77 Air Vac Release ARV untested stuck valve Replace valve -115.3756516 35.07321148
H_78 Hydrant Blow off in wash Remove and cap -115.372752 35.07394021
H_79 Hydrant Blow off OK -115.3787744 35.07096527
END OF STATEMENT OF WORK
| Statement of Work (SOW) |
| 35. Background |
| 2. Objectives: |
| 3. Place of Performance: |
| 4. Period of Performance: |
| 5. Scope: |
| 6. Tasks: |
| 7. Deliverables: |
| 8. Government-Furnished Property, Material, Equipment, or Information (GFP, GFM, GFE, or GFI): |
| 9. SAFETY: |
| 10. Security: |
| 11. Travel: |
| 12. Material Requirements: |
| 13. Other Requirements: |
| 14. Quality ASSURANCE Requirement: |
| 15. Project Personnel: |
File details come from the government source that posted it. Updated .