This document is a contract price schedule for replacing components of the public water system at Hole in the Wall in Mojave National Preserve. It includes 18 line items for mobilization, installation of HDPE piping, valves, meters, and hydrants. Pricing will be evaluated based on best value to the government using an equation that considers the base price. The related federal contract opportunity is solicitation number 140P8121R0007 to replace water system components at Mojave National Preserve for the Department of the Interior National Park Service Pacific West Region. Offerors must submit pricing conforming to the solicitation for the 18 base line items or their offer may be deemed non-responsive.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOJA – Hole in the Wall well and water system

CONTRACT PRICE SCHEDULE (Revised 14 June 2021)

Mojave National Preserve

PMIS NO. 310142

Replace Components of Public Water System at Hole in the Wall

Offerors are required to submit an offer that conforms to the Solicitation with pricing for Contract Price Schedule’s Base Line Items - failure to do so may render the offer non-responsive. On lump-sum price items, provide total cost only; on unit price items, provide the unit price and the extended amount of total price for the item. If no price item exists for a portion of the work, include the costs in a related price item. In case of error in extension of prices, unit price governs. In case of error in summation, the total of the corrected price item amount governs. Round totals and extend prices to whole dollars. Pricing will be evaluated based on what is determined to be the best value to the Government.

Price award will be made based upon the following equation.

Equation 1: Base Price

Base Price and Adjustments to Base Price:

Base Price: Price Items 1 through 18.

CONTRACT CONTRACT

LINE ITEM LINE ITEM TITLE

NUMBER

(CLIN)

QUANTITY AND

UNIT OF

MEASURE

UNIT PRICE TOTAL PRICE

BASE LINE ITEMS

1.

Mobilization/Demobilization 1 LS @$________ =$_________

2.

2-inch HDPE DR 9 IPS 3600 LF *NTE @$________ =$_________

3.

1-inch Combination Air Valve 2 EA @$________ =$_________

4.

2-inch Blow-off Hydrant 1 EA @$________ =$_________

5.

2-inch Daylight Drain 1 EA @$________ =$_________

6.

¾-inch Water Meter w/PRV 4 EA @$________ =$_________

7.

¾-inch Water Meter 1 EA @$________ =$_________

8.

¾-inch Frost Free Hydrant 11 EA @$________ =$_________

9.

½-inch Water Meter on Storage Tank’s Inlet Line

1 EA @$________ =$_________

10.

4-inch Water Meter on Storage Tank’s Outlet Line

11.

6-inch Gate Valve in Tank Valve Vault

3 LS @$________ =$_________

12.

2-inch Ball Valve in Tank Valve

2 LS @$________ =$_________

13.

1-inch Ball Valve in Tank Valve

2 LS @$________ =$_________

14.

1-inch Pressure Reducing Valve 1 LS @$________ =$_________

15.

Removal & Salvage or Disposal of Water System Appurtenances

1 LS @$________ =$_________

16.

Vehicle Protection Bollard 33 EA @$________ =$_________

17.

6-inch Gate Valve on Existing 6- Inch water Main

3 EA @$________ =$_________

18.

Fire Hydrant with 6-inch Gate Valve Assembly

TOTAL BASE PRICE – (Items 1 to 18) -------------------------------------------------------- =$_________