B08 Contract Price Schedule.pdf
PDF 74 KB Posted
- Attached to
- Replace Water System Components, Mojave National P Federal contract opportunity
- Solicitation number
- 140P8121R0007
About this file
This document contains a price schedule for a federal contract to replace water system components at Mojave National Preserve. The price schedule includes 16 line items with descriptions of products and services required and blank fields for contractors to provide unit prices and total proposed prices. Items include mobilization, installation of HDPE piping and valves of various sizes, air valves, hydrants, water meters, pressure reducing valves, and removal of existing appurtenances. The related federal contract opportunity is solicitation number 140P8121R0007 issued by the National Park Service Pacific West Region to replace the water system at Mojave National Preserve. Review of the price schedule and statement of work will allow contractors to develop competitive proposals for this opportunity to improve infrastructure at the national park.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8121R0007_Amd_0004.pdf | ||
| B09_Daylight_Drain_Detail_amendment_04_0004.pdf | ||
| B09_Contract_Price_Schedule_revision_02_June_14_2021_0003.pdf | ||
| B09_Statement_of_Work_Amendment_03_0003.pdf | ||
| Sol_140P8121R0007_Amd_0003.pdf | ||
| B09_Contract_Price_Schedule_revised_0002.pdf | ||
| B09_Statement_of_Work_revision_Section_E_0002.pdf | ||
| Sol_140P8121R0007_Amd_0002.pdf | ||
| B09_Concrete_Collar_Detail_0001.pdf | ||
| 52_204-8_Annual_Representations_and_Certifications_0001.docx | DOCX document | |
| B09_Concrete_Collar_with_Curb_0001.pdf | ||
| B09_Questions_and_Answers_0001.pdf | ||
| B11_Site_Visit_0001.pdf | ||
| Sol_140P8121R0007_Amd_0001.pdf | ||
| B08 Release of Claims.pdf | ||
| B03 General Decision.pdf | ||
| B08 MOJA Map.pdf | ||
| B08 Invoice Payment Request.docx | DOCX document | |
| A04 Statement of Work.pdf | ||
| Sol_140P8121R0007.pdf | ||
| B08 Transmittal.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT CONTRACT
LINE ITEM LINE ITEM TITLE
NUMBER
(CLIN)
QUANTITY AND
UNIT OF
MEASURE
UNIT PRICE TOTAL PRICE
BASE LINE ITEMS
1.
Mobilization/Demobilization 1 LS @$________ =$_________
2.
2-inch HDPE DR 9 IPS 3600 LF *NTE @$________ =$_________
3.
1-inch Combination Air Valve 2 EA @$________ =$_________
4.
2-inch Blow-off Hydrant 1 EA @$________ =$_________
5.
2-inch Daylight Drain 1 EA @$________ =$_________
6.
¾-inch Water Meter w/PRV 4 EA @$________ =$_________
7.
¾-inch Water Meter 1 EA @$________ =$_________
8.
¾-inch Frost Free Hydrant 11 EA @$________ =$_________
9.
½-inch Water Meter on Storage Tank’s Inlet Line
1 EA @$________ =$_________
10.
4-inch Water Meter on Storage Tank’s Outlet Line
1 EA @$________ =$_________
11.
6-inch Gate Valve in Tank Valve Vault
2 LS @$________ =$_________
12.
2-inch Ball Valve in Tank Valve
13.
1-inch Ball Valve in Tank Valve
14.
1-inch Pressure Reducing Valve 1 LS @$________ =$_________
15.
Removal & Salvage or Disposal of Water System Appurtenances
1 LS @$________ =$_________
16.
Vehicle Protection Bollard 33 EA @$________ =$_________
TOTAL BASE PRICE – (Items 1 to 16) -------------------------------------------------------- =$_________
*NTE: Not-To-Exceed quantity
END OF SECTION
| Statement of Work (SOW) |
| 35. Background |
| 2. Objectives: |
| 3. Place of Performance: |
| 4. Period of Performance: |
| 5. Scope: |
| 6. Tasks: |
| 7. Deliverables: |
| 8. Government-Furnished Property, Material, Equipment, or Information (GFP, GFM, GFE, or GFI): |
| 9. SAFETY: |
| 10. Security: |
| 11. Travel: |
| 12. Material Requirements: |
| 13. Other Requirements: |
| 14. Quality ASSURANCE Requirement: |
| 15. Project Personnel: |