B09_Contract_Price_Schedule_revised_0002.pdf

PDF 105 KB Posted

Attached to
Replace Water System Components, Mojave National P Federal contract opportunity
Solicitation number
140P8121R0007
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This document contains a price schedule for a federal contract to replace water system components at Mojave National Preserve. The price schedule includes 16 line items with quantities and unit prices required for mobilization, installation of HDPE piping, valves, hydrants, meters, and other water system appurtenances. It also lists a statement of work that will provide background on the project objectives and site, performance period, detailed scope divided into tasks, required deliverables, government-furnished property and information, safety and security requirements, travel terms, material specifications, quality assurance, and necessary project personnel. The related federal contract opportunity is solicitation number 140P8121R0007 issued by the National Park Service Pacific West Region to replace components for the water system at Mojave National Preserve.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Water System Components, Mojave National P, newest first.
File Type Posted
B09_Daylight_Drain_Detail_amendment_04_0004.pdf PDF
Sol_140P8121R0007_Amd_0004.pdf PDF
Sol_140P8121R0007_Amd_0003.pdf PDF
B09_Contract_Price_Schedule_revision_02_June_14_2021_0003.pdf PDF
B09_Statement_of_Work_Amendment_03_0003.pdf PDF
B09_Statement_of_Work_revision_Section_E_0002.pdf PDF
Sol_140P8121R0007_Amd_0002.pdf PDF
B11_Site_Visit_0001.pdf PDF
Sol_140P8121R0007_Amd_0001.pdf PDF
B09_Concrete_Collar_with_Curb_0001.pdf PDF
B09_Questions_and_Answers_0001.pdf PDF
B09_Concrete_Collar_Detail_0001.pdf PDF
52_204-8_Annual_Representations_and_Certifications_0001.docx DOCX document
B08 MOJA Map.pdf PDF
B08 Invoice Payment Request.docx DOCX document
B08 Contract Price Schedule.pdf PDF
A04 Statement of Work.pdf PDF
B08 Transmittal.pdf PDF
Sol_140P8121R0007.pdf PDF
B08 Release of Claims.pdf PDF
B03 General Decision.pdf PDF
Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT CONTRACT

LINE ITEM LINE ITEM TITLE

NUMBER

(CLIN)

QUANTITY AND

UNIT OF

MEASURE

UNIT PRICE TOTAL PRICE

BASE LINE ITEMS

1 LS @$________ =$_________

3600 LF *NTE @$________ =$_________

2 EA @$________ =$_________

1 EA @$________ =$_________

1 EA @$________ =$_________

4 EA @$________ =$_________

1 EA @$________ =$_________

11 EA @$________ =$_________

1 EA @$________ =$_________

1 EA @$________ =$_________

2 LS @$________ =$_________

3 LS @$________ =$_________

1. Mobilization/Demobilization

2. 2-inch HDPE DR 9 IPS

3. 1-inch Combination Air Valve

4. 2-inch Blow-off Hydrant

5. 2-inch Daylight Drain

6. ¾-inch Water Meter w/PRV

7. ¾-inch Water Meter

8. ¾-inch Frost Free Hydrant

9. ½-inch Water Meter on Storage Tank’s Inlet Line

10. 4-inch Water Meter on Storage Tank’s Outlet Line

11. 6-inch Gate Valve in Tank Valve Vault

12. 2-inch Ball Valve in Tank Valve Vault (revised 04 June 2021)

13. 1-inch Ball Valve in Tank Valve Vault

2 LS @$________ =$_________

14.

1-inch Pressure Reducing Valve 1 LS @$________ =$_________

15.

Removal & Salvage or Disposal of Water System Appurtenances

1 LS @$________ =$_________

16.

Vehicle Protection Bollard 33 EA @$________ =$_________

TOTAL BASE PRICE – (Items 1 to 16) -------------------------------------------------------- =$_________

*NTE: Not-To-Exceed quantity

END OF SECTION

Statement of Work (SOW)
35. Background
2. Objectives:
3. Place of Performance:
4. Period of Performance:
5. Scope:
6. Tasks:
7. Deliverables:
8. Government-Furnished Property, Material, Equipment, or Information (GFP, GFM, GFE, or GFI):
9. SAFETY:
10. Security:
11. Travel:
12. Material Requirements:
13. Other Requirements:
14. Quality ASSURANCE Requirement:
15. Project Personnel:

File details come from the government source that posted it. Updated .