B08.02_Solicitation W912HZ25R0002 Communication Infrastructure.pdf

PDF 842 KB Posted

Attached to
ERDC Communications Infrastructure Contract Federal contract opportunity
Solicitation number
W912HZ25R0002
Issued by
Department of the Army Corps of Engineers Engineer Research and Development Center

About this file

This is a Request for Proposals (RFP) solicitation document for an Indefinite Delivery/Indefinite Quantity (IDIQ) contract to provide communications infrastructure services for the U.S. Army Corps of Engineers Engineer Research and Development Center (ERDC). The contractor will provide voice, video and data communications networks operating over fiber-optic, copper, coaxial, Ethernet, and security system infrastructure at multiple ERDC locations including Vicksburg MS, Hanover NH, Champaign IL, Alexandria VA, Lorton VA, and Duck NC.

The solicitation (W912HZ25R0002) is a 100% small business set-aside with NAICS code 811210 and a size standard of $34 million. The contract will have a 5-year ordering period with a maximum value of $22.95 million and minimum guarantee of $2,500. Proposals are due by January 10, 2025. Key requirements include outside cable plant activities, inside wiring, data/telephone circuits, specialized equipment/systems including Electronic Security Systems (ESS), and PBX telephone system support. The technical evaluation factors in order of importance are: 1) Technical Approach, 2) Management Plan, 3) Past Performance, and 4) Price. Award will be made using a best value tradeoff process, with non-price factors significantly more important than price.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912HZ25R0002 20-Dec-2024

b. TELEPHONE NUMBER

601-634-3063

8. OFFER DUE DATE/LOCAL TIME

12:00 AM 10 Jan 2025

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912HZ9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

TRINECIYA C MARTIN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ERDC CONTRACTING OFFICE

3909 HALLS FERRY ROAD

VICKSBURG MS 39180-6199

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W81EWF 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

PR W2R2 USA ENGR R AND D CTR

HAL MONCRIEF

3909 HALLS FERRY RD

VICKSBURG MS 39180-6133

TEL: 601-634-2806 FAX:

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$34,000,000

NAICS:

811210

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF64

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912HZ25R0002

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job Comm Infra Services-Labor

FFP

The contractor shall provide all labor, equipment and materials to support the ERDC Communication Infrastructure Service, Maintenance, and Repair requirements in accordance with the Performance Work Statement (PWS). Specific requirements shall be identified in a PWS extract provided for each individual Task Order.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

PSC CD: J059

NET AMT

0002 Job Comm Infra Services-Other Direct Costs

COST

Other allowable Direct Costs (ODC’s) incurred to fulfill the Task Order requirements IAW the PWS.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

ESTIMATED COST

0003 Job Comm Infra Services-Travel

COST

All Travel shall be pre-approved by the Contracting Officer's Representative (COR) and will be compensated on a Cost Reimbursable basis only. Contractor travel required in the performance of ERDC Communications Infrastructure services must comply with para 2.7. of the PWS, FAR 31.205-46(a), Federal Travel Regulations, and Joint Travel Regulation, Volume 2. Established Federal Government per diem rates shall apply to all contractor travel.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

ESTIMATED COST

0004 1 Each Contractor Manpower Reporting

FFP

The contractor shall report ALL contractor labor hours (including subcontractor (labor hours) required for performance of services provided under this contract for US Army Corps of Engineers Engineering Research & Development Center via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2024.

Contractors may direct questions to the help desk at help desk at:

http://www.https://sam.gov/.

NET AMT

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

2,500.00 $2,500.00 22,950,000.00 $22,950,000.00

DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE

The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

2,500.00 22,950,000.00

CLIN MINIMUM/MAXIMUM QUANTITY AND CLIN VALUE

The minimum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not be less than the minimum quantity(s) and CLIN value(s) stated in the following table. The maximum quantity(s) and CLIN value(s) for all orders issued against the CLIN(s) on this contract shall not exceed the maximum quantity(s) and CLIN value(s) stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

0001 1.00 $1.00 10,500,000.00 $10,500,000.00 0002 1.00 $1.00 10,950,000.00 $10,950,000.00 0003 1.00 $1.00 1,500,000.00 $1,500,000.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

0001 1.00

$1.00

10,500,000.00

$10,500,000.00

0002 1.00

10,950,000.00

$10,950,000.00

0003 1.00

1,500,000.00

$1,500,000.00

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

Performance Work Statement (PWS) ERDC Communications Infrastructure Contract

1. Overview The U.S. Army Corps of Engineers (USACE) Engineer Research and Development Center (ERDC) helps solve our Nation’s most challenging problems in civil and military engineering, geospatial sciences, water resources, and environmental sciences for the Army, Department of Defense, civilian agencies, and our Nation’s public good.

ERDC consist of seven laboratories at four main geographical sites located in Champaign, IL; Hanover, NH;

Alexandria, VA; and Vicksburg, MS. The ERDC Information Technology Laboratory (ITL) is responsible for building, staffing and maintaining the communications networks in support of the Research & Development activities of ERDC.

2.0 General Requirements

This section describes the general requirements the contractor needs to accomplish.

2.1 Non-Personal Services

The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Procuring Contracting Officer (PCO) immediately.

2.2 Business Relations

The contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The contractor shall manage the timeliness, completeness, and quality of problem identification. The contractor shall provide corrective action plans, proposal submittals, timely identification and remediation of issues, and effective management of subcontractors. The contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel.

2.3 Contract Administration and Management

The contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement. The contractor shall establish processes and assign appropriate resources to effectively administer the requirement. The contractor shall assign work effort and maintain proper and accurate timekeeping records of personnel assigned to work on the requirement. The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. The contractor shall respond to Government requests for contractual actions in a timely fashion.

Typically, task order RFP’s will have a one-week turnaround. Some instances will call for longer or shorter lead times.

The contractor shall maintain continuity between ongoing activities across multiple geographic locations. Historically, there are approximately thirty-eight (38) task orders annually: Vicksburg, MS at twenty-three (23); CERL at six (8);

CRREL at six (6); and Duck, NC at one (1).

2.4 Personnel Administration

The contractor shall provide experienced and qualified personnel with all the skills necessary to perform the work identified. The contractor shall maintain the currency of their employees by providing initial and refresher training as required to meet the PWS requirements. All contractor personnel shall be able to read, write, speak, and understand English, shall possess good written and verbal communications skills, and shall have sufficient knowledge of proper English grammar, spelling, capitalization, and punctuation rules to identify errors and make corrections. The contractor shall make necessary travel arrangements for employees. The contractor shall provide administrative support to employees in a timely fashion (time keeping, leave processing, pay, emergency needs).

Conflict of Interest. Neither the contractor nor its on-site employees shall utilize their knowledge of access to information, sensitive or otherwise, for individual or company gain.

2.5 Employee Conduct

The contractor’s employees shall observe and comply with all applicable departmental and agency regulations, policies, and procedures (e.g., fire, safety, sanitation, environmental protection, security, etc.). The contractor shall ensure that all contractor employees represent a professional appearance at all times, and that their conduct does not reflect discredit on the United States Government. When contractor employees are working on Government facilities or participating at Government meetings, they shall wear identification badges distinguishing themselves as such.

The badges at a minimum must have the employee name and word "contractor” displayed. Ideally, the company name will appear on the badge. Additionally, not withstanding any other provisions in the PWS, the contractor shall identify themselves as a contractor in meetings, telephone conversations, all written communications and work situations so that their actions cannot be construed as acts of a Government official. The contractor shall take no actions that bind the government to a final decision or results in the exercise of governmental discretion. The Government may, at its sole discretion, direct the contractor to remove any contractor employee from Government facilities for misconduct or security reasons. Such removal does not relieve the contractor of the responsibility to provide sufficient qualified personnel for adequate and timely service. The Contracting Officer will provide the contractor with an immediate rationale for removal of contractor employee.

2.6 Contractor Personnel, Disciplines, and Specialties

The contractor shall accomplish the assigned work by employing and utilizing qualified personnel with appropriate combinations of education, training, and experience. The contractor shall match personnel skills to the work or task with a minimum of under/over employment of resources. The Contractor shall provide the necessary resources and infrastructure to manage, perform, and administer the contract.

Specific standard and certification requirements are identified in section 4 of the PWS.

2.7 Government Furnished Equipment/Materials

The contractor shall provide all materials unless otherwise specifically instructed in individual Task Orders, in which case government furnished materials will be specified accordingly in the Task Order. The contractor shall provide sufficient vehicles to perform the services. The contractor may use Privately Owned Vehicles with proper markings in the performance of this contract. These vehicles will be furnished at no additional costs to the government. The contractor shall furnish sufficient hand tools, safety items, and equipment to fully comply with the terms of the contract. The contractor shall provide all Test, Measurement and Diagnostic (TMD) equipment and other test equipment required to install and maintain all ESS, cable plant, and other systems.

2.8 Clearance

There are no clearance requirements for this contract. However, some performance will be required within secure spaces. In those cases, the contractor will be escorted by an appropriately cleared government official.

2.9 AT/OPSEC Requirements

2.9.1 General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures --this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

2.9.2 AT Level I Training: All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:

http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.

2.9.3 Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.

2.9.4 Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

2.9.5 Training requirements for the protection of sensitive information: All contract personnel with access to critical information (as identified in the RA's OPSEC Program) shall complete initial and annual refresher OPSEC Level I Awareness training, which is available at the following websites: https://www.iad.gov/ioss/, or http://www.cdse.edu/catalog/operations-security.html (websites subject to change). All contract personnel with access to Controlled Unclassified Information (CUI) shall complete initial and annual refresher CUI training in accordance with applicable Army policy.

2.9.6 Escorting in classified and/or sensitive areas: In accordance with applicable regulations, all contract personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas.

2.9.7 Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

2.10 Transition

The contractor may be required to conduct transition activities for any existing tasks and keep the Government fully informed of status throughout the transition period. It is essential that attention be given to minimize interruptions or delays to work in progress that would impact the mission. The contractor must plan for the transfer of work control, delineating the method for processing and assigning tasks during the transition period. The contractor shall include the status of the transitioning of control of work as a deliverable in the monthly status report. Transition activities will be at no cost to the government.

2.11 Contractor Program Management

The contractor shall provide a Contractor Program Manager who serves as the contract manager along with other duties and who shall be responsible for overall contract performance. The name of this person shall be designated in writing to the contracting officer's representative (COR). The contractor shall be responsible for all expenses associated with task management. The Contractors Program Manager will be available for meetings at the ITL, Vicksburg, MS ERDC site given a 48 hour notice. Contract administration and management functions shall not be billed as a direct cost. Contractor PM shall be accessible and responsive to requests, emails, phone calls, and other communications within one business day of communication.

2.12 Place of Performance

Performance for this contract will be on-site at various government facilities.

The headquarters site of the U.S. Army Corps of Engineers, ERDC is 3909 Halls Ferry Road, Vicksburg, MS 39180-6199 and will be the largest worksite for this contract, as it hosts 4 ERDC Laboratories along with the HQ.

Satellite sites with significant requirements are the Cold Regions Research and Engineering Laboratory (CRREL) in Hanover NH and the Construction Engineering Research Laboratory (CERL) in Champaign IL. There are additional smaller satellite sites located in Alexandria, VA, Lorton, VA, Duck, NC, Fairbanks, AK, and other smaller sites within the CONUS.

Government core working hours are from 0700 to 1730 local time Monday through Friday except US Federal Holidays. Government workers typically work eight (8) hours per day, 40 hours per week. The contractor is not required to provide services on recognized federal holidays. There are occasions where work will be performed outside of Government core working hours to prevent major disruptions on the installation.

2.13 Travel

Travel to satellite government facilities may be required. All travel requirements (including plans, agenda, itinerary, or dates) shall be pre-approved by the government (subject to local policy procedures) and is on a strictly cost reimbursable basis. Costs for travel shall be billed in accordance with the regulatory implementation of Public Law 99-234 and FAR 31.205-46 Travel Costs (subject to local policy and procedures; may reference FAR).

2.14 Other Direct Costs (ODCs)

ODCs are expected to be provided by the contractor during the performance of this contract. ODCs include cost items such as Supplies, Materials, etc.

3.0 Performance Requirements

General: The contractor shall furnish labor services, equipment, and materials for the voice, video and data communications networks which operate over fiber-optic, copper, coaxial, Ethernet, Security system products and video cabling infrastructure at the United States Army Corps of Engineers, Engineer Research and Development Center locations, with primary locations at 3909 Halls Ferry Road, Vicksburg MS; 72 Lyme Road, Hanover, NH; 2902 Newmark Drive, Champaign, IL; 7701 Telegraph Road, Alexandria, VA; 10501 Furnace Rd.

Suite 1001 Lorton, VA; and 1261 Duck Road at Kitty Hawk, NC.

The ERDC headquarters campus in Vicksburg, MS is located on an 830-acre government- owned campus with approximately 100 buildings consisting of single and multi-story commercial grade office buildings, hangers, sheds, support buildings and facilities, supporting approximately 1800 USACE and contractor personnel. This campus has migrated to a new fiber ring and in the process of migrating individual building to the ring. The older fiber configuration consists of sequential fiber runs through multiple buildings. The new configuration is composed of 8 communications huts connected in a ring with fiber runs directly from the main ring to each building.

Satellite laboratory sites include government owned facilities consisting of (1) a 30 acre campus with approximately 7 buildings supporting approximately 450 USACE and contractor personnel in Champaign, IL; (2) a 50 acre campus with approximately 15 buildings supporting approximately 400 USACE and contractor personnel in Hanover, NH; (3) a 30 acre campus with approximately 7 buildings supporting approximately 40 USACE and contractor personnel in Duck, NC; (4) a group of 3 buildings co-located on a government installation supporting approximately 300 USACE and contractor personnel in Alexandria, VA; and (5) a building supporting the HPCMP (High Performance Computing and Modernization Program) in Lorton, VA.

All sites contain copper, fiber, and coaxial construction cabling typically ranging from small # of pairs or strands to large construction cables of 1800 pair copper and/or 144 strand single mode (SM) and multimode (MM) fiber cables and single feed RG-6 to 500 coaxial cabling. Each building contains one or more communications closets and offices/workspaces are typically wired for multiple distinct networks with a minimum of two drops per workspace and numerous special case situations.

Network cabling varies depending on age with the current standard being CAT6.

Specialized Electronic Security Systems (ESS) are in use at all campuses including Philips/Bosch matrix switchers, digital technologies, CCTV installations, and DVR systems; Pelco Enterprise CCTV systems; Monitor Dynamics (MD) Intrusion Detection System (IDS) hardware and software with multiple media transport capabilities; and access control systems including the old system being phased out which is TAC Continuum software, Andover controls hardware and various makes and models of card access readers; and the new access control system which is Galaxy software and hardware and HID FIPS201 compliant card readers. ERDC Vicksburg currently has approximately 130 cameras, 100 electronic access control system (EACS) card readers, and 14 Intrusion Detection System (IDS) panels. ERDC Hanover currently has approximately 25 cameras, 20 EACS card readers and 3 IDS panels. ERDC Champaign currently has approximately 32 cameras, 18 EACS card readers and 10 IDS panels. The HPCMP Office (Lorton, VA) currently has approximately 16 cameras, 15 EACS card readers and 4 IDS panels.

3.1 Outside cable plant activities

Provide labor, equipment, and materials for aerial cable installation/maintenance/troubleshooting/ repair/testing/removal of fiber/copper/coaxial cables including communication huts and associated power/HVAC/lighting/UPS/, junction boxes/enclosures, conduit, connection components, coaxial active/passive support devices, aerial support components. Any activity resulting in changes to the outside cable plant configuration must be documented with updated electronic drawings in MicroStation-compatible format and provided back to the government.

3.2 Inside wiring activities

Provide labor, equipment, and materials for installation/maintenance/troubleshooting/ repair/testing/removal of fiber/copper/coaxial/Ethernet/video cabling/wiring inside buildings/trailers/hangars including junction/terminal components required to provide full connectivity from outside cable plant to and including jacks for endpoint equipment connectivity. Any activity resulting in changes to the internal wiring plant between outside cable plant and the communications closets must be documented with updated electronic drawings in MicroStation- compatible format and provided back to the government.

3.3 Data and telephone circuit activities

Provide labor, equipment, and materials for installation/maintenance/troubleshooting/ repair/testing/removal of data and telephone circuits utilizing existing or new external/internal wiring and including peripheral/trunking/circuit conditioning equipment, management of Main Distribution Frame jumper connections, and connectivity verification.

3.4 Specialized equipment/system activities

Provide labor, equipment, and materials for installation/maintenance/troubleshooting/ repair/testing/removal of specialized systems and equipment including the ERDC Electronic Security System (ESS) communications networks, which operate over the fiber-optic and copper cabling infrastructure. ESS and other specialized systems supported include fire alarms, audible telephone ringing devices/bells/loudspeakers, Ringdown circuits/equipment, audio/visual/VTC systems/equipment, wireless access points, modem/line/circuit equipment, CCTV camera systems/equipment, intrusion detection systems, access control systems/equipment, cellular telephone signal repeaters and antenna systems, and CATV/satellite/WesNet television distribution systems andequipment.

3.5 Telephone Private Branch Exchange (PBX) activities

Provide labor, equipment, and materials for installation/maintenance/troubleshooting/ repair/testing/removal of PBX systems and components including hardware, programming, cabinets/enclosures, internal boards/cards, cabling, wire connections, and power. While the majority of the phones on the ERDC campuses are now VOIP (Voice Over Internet Protocol), there are still some instances of specialized PBX systems. This includes the support of the Avaya PBX system for the USACE Reachback Operations Center (UROC) on the Vicksburg campus consisting of an Avaya G650 with two Avaya G450s, support of an Avaya Partner systemin Building 3297 on the Vicksburg campus that is used for phone, intercom, and emergency notification; removal of legacy lines and equipment for decommissioned Avaya systems; and support of any new PBX systems which come online. Includes support of other analog systems such as fire alarms, elevator phones, faxes, POTS lines, remote monitoring systems, secure terminal equipment (STE) phones, and intercom systems, all of which use the copper cabling infrastructure.

3.6 Coordination and documentation activities

Provide labor, equipment, and materials for coordination with U.S. government personnel, government contractors, and commercial communications carriers in order to accomplish task orders or to provide documentation/information concerning wiring/cable plant configuration, equipment locations, condition of cabling/wiring/equipment, and operation of equipment.

3.7 Emergency repair activities

Provide labor, equipment, and materials for troubleshooting and repair of wiring, equipment, and systems listed in paragraphs 3.1 – 3.5. The contractor shall acknowledge and/or respond within 1 hour of notification of an emergency repair. When the emergency repair is at the Vicksburg site and within core business hours, the contractor shall have personnel on-site within 2 hours. When the emergency repair is at the Vicksburg site and outside core business hours, the contractor shall have personnel on-site within 24 hours. When the emergency repair is at any satellite site, the contractor shall have personnel on-site within 24 hours, regardless of business hours. Any system loss which occurs and affects services will be treated as priority for restoration. ERDC troubles or failures affecting major security systems (as opposed to individual cameras or door readers) or causing network outages affecting multiple users will be treated as priority for restoration.

4.0 Standards and Certification Requirements

4.2.1 All work performed by the contractor will meet or exceed applicable requirements of the most current standards of the:

BICSI = Building Industry Consulting Service International NARTE = National Association of Radio & Telecommunications Engineers EIA/TIA = Electronics Industries Alliance/ Telecommunications Industry Association

IEEE = Institute of Electrical and Electronics Engineers NEC = National Electrical Code NESC = National Electrical Safety Code FM 11-486-2 = Army Field Manual 11-486-2: Telecommunications Engineering: Traffic

The contractor shall provide any training necessary to ensure that contractor personnel are technically qualified to perform the contract services, at no additional cost to the Government.

4.2.2 A minimum of two years of specialized experience and a working knowledge of PBX systems, peripheral nodes, and controllers. Specialized experience and working knowledge shall include performing moves, ads, and changes and other basic programming, performing maintenance operations including troubleshooting and repairing system issues and replacement of faulty components and boards, and major and minor maintenance and/or replacement operations to keep systems up to date with latest software and hardware revisions.

4.2.3 A minimum of five years of specialized experience and a working knowledge of security systems including Phillips/Bosch and Pelco CCTV cameras, systems, digital technologies, and matrix switchers; CCTV storage arrays and DVR systems; and CCTV control systems and software for enterprise CCTV systems. Specialized experience and working knowledge shall include performing programming of equipment and systems, troubleshooting and replacement of faulty components and boards, installation and provisioning of additional cameras and storage array equipment, and major and minor maintenance and/or replacement operations to keep systems up to date with latest software and hardware revisions. Contractor shall be Pelco certified for Enterprise CCTV systems and certified by Philips/Bosch for matrix switcher, digital technologies, CCTV installation, and DVR systems.

4.2.4 A minimum of five years of specialized experience and a working knowledge of Andover Controls Continuum hardware and software systems; Galaxy hardware and software systems; and HID card access readers. Specialized experience and working knowledge shall include performing programming of equipment and systems, replacement of faulty components and boards, installation and provisioning of additional controllers and card readers, and major and minor maintenance and/or replacement operations to keep systems up to date with latest software and hardware revisions. Personnel providing maintenance and/or replacement operations and non-routine programming of systems and components shall have and continue to maintain certifications from Schneider Andover Controls, Continuum software applications, and Galaxy systems.

4.2.5 The contractor shall be manufacturer trained and authorized distributor to install and maintain Monitor Dynamics (MD) IDS equipment, including but not limited to head-end equipment, motion sensors, software and firewall upgrades, and workstation hardware.

4.2.6 Certification as an RCDD (Registered Communications Distribution Designer) with a minimum of five years of ICT design experience or an equivalent combination of experience, approved education and industry certifications.

4.2.7 Significant experience in installation and maintenance of centralized command and control security systems, of the above listed systems, of similar or larger size and footprint as the ERDC security systems which span the five locations listed in paragraph 3.0.

4.2.8 Certified and calibrated testing equipment necessary to test fiber optic and copper cabling, connections, and equipment for continuity and acceptable data transmission rates.

4.2.9 Access to specialized vehicles and equipment required to maintain, repair, replace, and install fiber optic and copper cable infrastructure within buildings and hangers and in exterior overhead and underground locations.

5.0 Deliverables

The contractor shall provide deliverables as described below and in subsequent task orders. Deliverables shall be specified by the government at the task order level.

Government Acceptance Period. The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor shall correct the rejected deliverable within agreed upon time frame and return it per delivery instructions.

Kickoff Meeting: Within 20 days of execution of the contract, the Contractor shall schedule a kickoff meeting. The meeting must occur within 30 days of contract execution.

The Contractor shall provide a monthly activity report to the COR, no later than five (5) working days after the end of the month. At a minimum, the report shall contain a description of all major activities completed during the month, any problems encountered including follow-on mitigation or escalation actions taken, products and services delivered during the month, and a brief synopsis of the projects to be worked in the upcoming month.

Timely invoicing at the task order level.

Typical task order deliverables include: Weekly updates for all open Work Orders and Task Orders, Monthly Status Reports, Cabling Test Results, Drawings, Schematics, Task Completion.

6.0 Quality

This section describes the Quality Control components for this effort. The following sub- sections provide details of various considerations on this effort.

6.1 Quality Control

The Contractor shall develop an Order Quality Control Plan (QCP) for the base and maintain an effective quality control program to ensure services are performed in accordance with the IDIQ contract and this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractors QCP is the means by which he assures himself that his work complies with the requirement of the contract.

The finalized QCP will be accepted by the Government at the time of the award of the contract. The Contracting Officer may notify the Contractor of required modifications to the plan during the period of performance. The Contractor then shall coordinate suggested modifications and obtain acceptance of the plan by the Contracting Officer. Any modifications to the program during the period of performance shall be provided to the Contracting Officer for review no later than 10 working days prior to effective date of the change. The QCP shall be subject to the Governments review and approval. The Government may find the QCP "unacceptable" whenever the Contractors procedures do not accomplish quality control objective(s). The Contractor shall revise the QCP within 10 working days from receipt of notice that QCP is found "unacceptable."

6.2 Quality Assurance Surveillance Plan (QASP)

The Government shall monitor the Contractors performance under this contract in accordance with the Governments QASP. The Government reserves the right to utilize other methods, as necessary, to assure the Contractor's compliance with the terms and conditions of this contract. The Government may inspect services provided by the Contractor both during and/or after performance is complete. If the Government identifies any performance deficiency, the Contractor will be advised of the deficiency as soon as possible. All such notifications will be confirmed in writing with the Contractor by the Government. Such notification will be made only to the Contractor or his/her designated onsite superintendent and not to any other agents, employees, or subcontractors. Upon receipt of such notification, the Contractor shall correct the deficiency within the time specified by the COR. However, in the event that the deficiency represents a hazard to health or safety or it serves to jeopardize operational continuity, then corrective action shall proceed immediately and continue uninterrupted until the correction is affected. In all cases, the correction of performance deficiencies shall not in any way adversely affect other contract performance.

6.3 BASE PWS Performance Requirements Summary (PRS)

Information Technology Laboratory Requirement/ Performance

Objectives

Deliverables Performance Standard (PS)

Method of Surveillance

Performance Incentive Positive/Negative

CPARS/CORT

Evaluation; Impact to Future Task Order

Awards PRS #1 Kick Off Meeting

The contractor shall schedule the Kick Off Meeting Within 15 days of execution of the contract. The meeting must occur within 15 days of contract execution.

Provide introductions for key positions.

Recap the technical/management approach, including the scope, the major deliverables, the risks, the assumptions, the estimated effort and budget, and the deadline.

Discuss the important roles and responsibilities of the project team, clients and stakeholders.

Discuss the project management procedures.

Discuss and answer any outstanding questions.

Validated by KO and/or

COR

EXCEPTIONAL – 100%

of the requirements are done within standards

VERY GOOD –

90-99% of the requirements are done within the standards

SATISFACTORY – 80-

89% of the requirements are done within standards

MARGINAL –

65-79% of the requirements are done within standards

UNSATISFACTORY –

Below 65% or failed to complete any requirements

PRS # 2 Activity Report

The Contractor shall provide a monthly activity report to the COR and government PM, no later than five

(5) working days after the end of the month.

At a minimum, the report shall contain a description of all major activities completed during the

No more than 3 (or 5%) of the reports to appropriate government contact may be later than the specified time period.

Validated by KO and/or

COR

EXCEPTIONAL – 100%

of the requirements are done within standards

VERY GOOD –

90-99% of the requirements are done within the standards

SATISFACTORY – 80-

89% of the requirements are done within standards month, any problems encountered including follow-on mitigation or escalation actions taken, products and services delivered during the month, and a brief synopsis of the projects to be worked in the upcoming month.

MARGINAL –

65-79% of the requirements are done within standards

UNSATISFACTORY –

Below 65% or failed to complete any requirements

PRS #3 Monthly Invoices

Task order invoices should be invoiced timely at the task order level.

No more than 3 (or 5%) of the invoices to appropriate government contact may be later than the specified time period.

Validated by KO and/or

COR

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A Destination Government 0002 N/A N/A Destination Government 0003 N/A N/A Destination Government 0004 N/A N/A Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-16 Responsibility For Supplies APR 1984

CLAUSES INCORPORATED BY FULL TEXT

52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)

(a) Definitions. "Services," as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may (1) require the Contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.

(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may (1) by contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service or (2) terminate the contract for default.

(End of clause)

Section F - Deliveries or Performance

DELIVERIES OR PERFORMANCE

F.1. Place(s) of Delivery. The Contracting Officer’s Representative (COR) is responsible for inspection and acceptancve of all deliveries provided under this contract. Originals and copies of all correspondence that require Governement certification and signature shall be delivered to the COR.

F.2. Notice Regarding Late Delivery. The contract shall notify the COR in writing as soon as it becomes apparenet that a scheduled delivery will be late. The contractor shall include the notification the rationale for late delivery, the expected date for the delivery and the project impact. The COR will review the documentation, establish a new delivery schedule and notify the contractor.

F.3 Period of Performance/Funding Limitation. The ordering period for the resulting contract is five years.

Maximum ordering limit is $22,950,000.00 and the minimum guarante is $2,500.00.

F.4 Place of Performance. Performance for this contract will be on-site at various government facilities. The headquarters site of the U.S. Army Corps of Engineers, ERDC is 3909 Halls Ferry Road, Vicksburg, MS 39180- 6199 and will be the largest worksite for this contract, as it hosts 4 ERDC Laboratories along with the HQ. Satellite sites with significant requirements are the Cold Regions Research and Engineering Laboratory (CRREL) in Hanover NH and the Construction Engineering Research Laboratory (CERL) in Champaign IL. There are additional smaller satellite sites located in Alexandria, VA, Lorton, VA, Duck, NC, Fairbanks, AK, and other smaller sites within the

CONUS.

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 02-FEB-2025 TO

01-FEB-2030

N/A PR W2R2 USA ENGR R AND D CTR

HAL MONCRIEF

3909 HALLS FERRY RD

VICKSBURG MS 39180-6133

601-634-2806

W81EWF

0002 POP…