B08_Attachment_8_-_Fire_Pump_Test_Form.pdf

PDF 348 KB Posted

Attached to
Fire Protection Sys Inspect/Test - 12 AK Parks Federal contract opportunity
Solicitation number
140P9725Q0013
Issued by
Department of the Interior National Park Service Alaska Region

About this file

This document is a National Park Service Fire Pump System Inspection and Test Report form designed for comprehensive evaluation of fire pump systems. The three-page form provides a detailed checklist for inspecting various components including water storage tanks, electric and diesel-driven pumps, pump controllers, flow testing, transfer switches, and system monitoring, in accordance with NFPA 20 and NFPA 25 standards. The form requires technicians to systematically assess each element by marking "Yes", "No", or "N/A" and includes sections for documenting specific measurements like pressure readings, flow rates, and fuel/oil levels. A dedicated section allows for recording any deficiencies discovered during the inspection, with space to note the location, specific deficiency, recommended resolution, and applicable NFPA reference standards.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fire Pump System Page 1 of 3 Revised 12/16/15

National Park Service / AKRO

Inspection and Test Report (complete a separate form for each system)

FIRE PUMP SYSTEM – RESIDENTIAL PUMP COMMERCIAL PUMP

Park Alpha Code: ________

Location Description: ______________________

Date of Test:_________________________

Time:_________________

Pump Make: ______________________ Pump Model / SN: _____________________________

Controller Make ______________________ Controller Model / SN _____________________________

DEFICIENCIES FOUND? Yes No List items that were not corrected. Use the Deficiencies section or attach itemized sheet

REPAIRS: All deficiencies have been corrected N/A Yes No

This certifies that the fire and life safety system has been inspected and tested for functional operation in accordance with applicable NFPA 20 and NFPA 25 standards, and has been properly tagged and/or labeled. Any discrepancies found are noted in this report with code references for corrective action by the Owner/Responsible Person.

Technician Name (printed): ______________________ Company: ______________________________

Signature: ___________________________________ Phone #: _______________________________

State Certification No.: _________________________

National/NICET No.: ___________________________

WATER STORAGE TANK

1. Water level is within normal range Yes No

2. Heating system is functional N/A Yes No

3. Exterior inspection of tank structure, supports, vents, and outlets, shows no evidence of accelerated corrosion or damage.

Yes No

4. Interior inspection was performed and shows no evidence accelerated corrosion, pitting, debris, or biological growth. (required at 5 year intervals)

N/A Yes No

5. Supply valve to fire pump is open Yes No

6. Automatic fill piping valves are open and operational N/A Yes No

ELECTRIC DRIVEN PUMP

7. The pump was started automatically by inducing a drop in pressure Yes No

8. Pressure readings during a no-flow (churn) condition.

Suction PSI: ______ Discharge PSI: _______

Yes No

9. Adjust pump packing glands as necessary for slight discharge Yes No

10. The pump casing relief valve operates properly Yes No

11. Check packing boxes, bearing, or pump casing for overheating Yes No

12. The electric pump ran properly for a minimum 10 minutes. Yes No

Karma Torres Text Box Asset No.:

Karma Torres Line

Karma Torres Snapshot

Karma Torres Line

Karma Torres Line

Fire Pump System Page 2 of 3 Revised 12/16/15

DIESEL DRIVEN PUMP

13. The pump was started automatically by inducing a drop in pressure Yes No

14. Pressure readings during a no-flow (churn) condition.

Suction PSI: ______ Discharge PSI: _______

Yes No

15. Adjust pump packing glands as necessary for slight discharge Yes No

16. The pump casing relief valve operates properly Yes No

17. Check packing boxes, bearing, or pump casing for overheating Yes No

18. Fuel level is at least 2/3 full. Yes No

19. Oil level is within acceptable range. Yes No

20. Batteries voltage reading are within acceptable range Yes No

21. The fuel filter/strainer has been serviced. Yes No

22. The diesel pump ran properly for a minimum 30 minutes. Yes No

PUMP CONTROLLERS

23. A pump controller regulates a commercial fire pump and is UL listed and operates per NFPA 20

N/A Yes No

24. A pump controller regulates a jockey pump and operates as required by

NFPA 20

N/A Yes No

25. A pump controller regulates a residential-type pump and operates as required by NFPA 20

N/A Yes No

FLOW TEST - RATED CAPACITY (GPM) ________ RATED SPEED (RPM) ________ RATED PRESSURE (PSI) _________

26. An annual flow test was performed per NFPA 20 at minimum, rated, and peak flows through approved test devices

N/A Yes No

27. The pump runs smoothly without unusual noise or vibration throughout the test. Yes No

28. The gauges passed a 5-year pressure gauge comparison test with a calibrated gauge.

Date for next test:______________

Yes No

29. Defective gauges have been replaced or recalibrated. N/A Yes No

30. The pump performs at its rated capacity and at 150% of its rated capacity (or the maximum capacity the water supply will accommodate)

Yes No

31. Flow readings measured:

Churn (no flow): ______ gpm Rated Capacity: _____ gpm 150% Rated Capacity: _____ gpm

32. Pressure readings - Discharge Gauge Churn (no flow): _______ psi Rated Capacity: _____ psi 150% Rated Capacity: _____ psi

33. Pressure readings – Suction Gauge:

Churn (no flow): _______ psi Rated Capacity: _____ psi 150% Rated Capacity: _____ psi

34. Flow Test device used: Hoses and Pitot Tube FM flowmeter Diffuser/Hosemonster

TRANSFER SWITCH

35. A simulated power failure during peak flow automatically activated the transfer switch within 10 seconds.

N/A Yes No

36. After the automatic connection was made to an alternate power source;

peak flow was redelivered within 30 seconds.

N/A Yes No

37. The manual emergency transfer equipment operated properly during peak flow and peak flow was redelivered within 30 seconds.

N/A Yes No

SYSTEM MONITORING

38. The pump controller panel sends the proper signals to the building

FACP.

N/A Yes No

39. The suppression control panel operates on standby power N/A Yes No

40. Signals were received at the monitoring company. N/A Yes No

Fire Pump System Page 3 of 3 Revised 12/16/15

Deficiencies

Resolved

Location:

Deficiency:

Recommended Resolution:

NFPA 20 or NFPA 25 reference:

AKRO Test Reports
Clean Agent or CO2 Test Report
Dry Chemical Test Report
Fire Alarm Test Report
Fire Pump Test Report
Fire Sprinkler - Test Report-rev1
Kitchen Suppression Test Report
Check Box8: Off
Check Box9: Off
Text173:
Text174:
Text175:
Text176:
Text177:
Text178:
Text179:
Text180:
Text181:
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Text182:
Text183:
Text184:
Text185:
Text186:
Text187:
Text188:
Text189:
Text190:
Text191:
Text192:
Text193:
Text194:
Text195:
Text196:
Text197:
Text198:
Text199:
Text200:
Text201:
Text202:
Text203:
Text204:
Text205:
Text206:
Text207:
Text208:
Text209:
Text210:
Text211:
Text212:
Text213:
Text214:
Text215:
Text216:
Text217:
Text218:
Text219:
Text220:
Text221:
Text222:
Text223:
Text224:
Check Box253: Off
Check Box254: Off
Check Box255: Off
Check Box256: Off
Check Box257: Off
Check Box258: Off
Check Box259: Off
Check Box260: Off
Check Box261: Off
Check Box262: Off
Check Box263: Off
Check Box264: Off
Check Box265: Off
Check Box266: Off
Check Box267: Off
Check Box268: Off
Check Box269: Off
Check Box270: Off
Check Box271: Off
Check Box272: Off
Check Box273: Off
Check Box274: Off
Check Box275: Off
Check Box276: Off
Check Box277: Off
Check Box278: Off
Check Box279: Off
Check Box280: Off
Check Box281: Off
Check Box282: Off
Check Box283: Off
Check Box284: Off
Check Box285: Off
Check Box286: Off
Check Box287: Off
Check Box288: Off
Check Box289: Off
Check Box290: Off
Check Box291: Off
Check Box292: Off
Check Box293: Off
Check Box294: Off
Check Box295: Off
Check Box296: Off
Check Box297: Off
Check Box298: Off
Check Box299: Off
Check Box300: Off
Check Box301: Off
Check Box302: Off
Check Box303: Off
Check Box304: Off
Check Box305: Off
Check Box306: Off
Check Box307: Off
Check Box308: Off
Check Box309: Off
Check Box310: Off
Check Box311: Off
Check Box312: Off
Check Box313: Off
Check Box314: Off
Check Box315: Off
Check Box316: Off
Check Box317: Off
Check Box318: Off
Check Box319: Off
Check Box320: Off
Check Box321: Off
Check Box322: Off
Check Box323: Off
Check Box324: Off
Check Box325: Off
Check Box326: Off
Check Box327: Off
Check Box328: Off
Check Box329: Off
Check Box330: Off
Check Box331: Off
Check Box332: Off
Check Box333: Off
Check Box334: Off
Check Box335: Off
Check Box336: Off
Check Box337: Off
Check Box338: Off
Check Box339: Off
Check Box340: Off
Check Box341: Off
Check Box342: Off
Check Box343: Off
Check Box344: Off
Check Box345: Off
Check Box346: Off
Check Box347: Off
Check Box348: Off
Check Box349: Off
Check Box350: Off
Text320:

File details come from the government source that posted it. Updated .