B08_Attachment_4__-_Backflow_Prevention_Device_Test_Form.pdf

PDF 367 KB Posted

Attached to
Fire Protection Sys Inspect/Test - 12 AK Parks Federal contract opportunity
Solicitation number
140P9725Q0013
Issued by
Department of the Interior National Park Service Alaska Region

About this file

This document is a National Park Service (NPS) / AKRO Backflow Prevention Device Inspection and Test Report form for documenting detailed technical assessments of backflow preventer devices. The two-page form is designed to comprehensively record specific details about a backflow prevention device, including location, device type, manufacturer, orientation, and critical performance testing parameters such as pressure drops, valve performance, and forward flow tests.

The form requires extensive technical documentation, including checks on reduced pressure principal assemblies and double check valve assemblies, with specific sections for initial measurements, repairs made, and final test results. A critical component is the forward flow test section, which mandates testing for fire sprinkler systems downstream of the backflow preventer, with options for flow rate measurement and potential alternative testing methods if standard procedures cannot be performed. The document is part of a solicitation (140P9625Q0013) for Fire Protection Systems Inspection & Testing across 12 National Parks in Alaska, indicating its use in maintaining critical infrastructure safety systems for the Department of the Interior National Park Service Alaska Region.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Backflow Preventer Device Page 1 of 2 Revised 5/14/2019

National Park Service / AKRO Inspection and Test Report (complete a separate form for each system)

BACKFLOW PREVENTION DEVICE

Park Alpha Code:___________ FMSS Location No.: _______ FMSS Asset No: _________

Location Description: _________________________________________________________

Date of Test: _________________________________ Time: _____________________

Location: Inside Outside Above Ground Pit

Usage: Fire Domestic Irrigation

Type of Device: RP DC DCDA RPDA

Manufacturer: ___________________________ Model No.: ______________________________

Size: ___________________________________ Serial No.: _______________________________

Orientation: Vert Up Vert Down Horizontal Height off Floor: ___________( in/ft)

REDUCED PRESSURE PRINCIPAL ASSEMBLE

*Relief ports on RPZ free of continuous discharge? Yes No

Date Installed:

DOUBLE CHECK VALVE ASSEMBLY

Apparent Pressure Drop

Across First Check

Valve________

Date Rebuilt:

Check Valve #1 Check Valve #2 Relief Valve PVB / SVB

Held at _______PSID

Leaked

Held at _______PSID

Closed Tight

Leaked

Opened at _______PSID

Did not open

AIR INLET

Opened at _______PSID

Did not open

Cleaned

Replaced

Cleaned

Replaced

Cleaned

Replaced

Cleaned

Replaced

________ PSID

Closed Tight

________ PSID Air Inlet _______PSID

Check Valve _______PSID

Leaked

________ PSID

F

IN

A L

R

E P

A

IR

S M

A D

E

IN

IT

IA

L

PASS FAIL No. 2 Shutoff Valve

Closed Tight

Supply Pressure ___________

Backflow Preventer Device Page 2 of 2 Revised 5/14/2019

Test Kit Manufacturer: __________________ Model: ______________________________

Serial No.: _______________________________ Last Calibration Date: _________________

Certified Tester: _________________________ Certified Tester No.: __________________

Signature: ______________________________________________________________________

FORWARD FLOW TEST—Required by NPS for all backflow preventers where fire sprinkler systems are located downstream of the backflow preventer. The test shall include forward flow test of the system at the designed flow rate, including hose stream demand. For back-flow preventers sized 2 inches and less, forward flow test shall be acceptable to conduct without measuring flow, where the test outlet is a size to flow the system demand.

Forward Flow Test Performed: Yes No

Main Drain Test Performed: Yes No

Design Flow Rate: __________________ GPM Actual Flow Rate: ______________ GPM

If Flow Rate based on Main Drain Test, use Estimated in place of Actual.

For cases where neither Forward Flow nor Main Drain could be performed, or Main Drain flow does not meet intent of System Design, note this as a Deficiency below.

For these cases, note which of the options listed below may be applicable:

1) Reverse FDC check valve and flow out the FDC check valve

2) Dismantle riser and install temporary test header

3) Modification of riser for installation of permanent test header

Location: _____________________________________________________________________

Deficiency: ___________________________________________________________________

Recommended Resolution: _____________________________________________________

DEFICIENCIES FOUND? Yes No List items that were not corrected. Use this section or attach itemized sheet.

REPAIRS: All deficiencies have been corrected: N/A Yes No

DEFICIENCIES

File details come from the government source that posted it. Updated .