B08_Attachment_5_Price_Schedule.xlsx
XLSX spreadsheet 11 KB Posted
- Solicitation number
- 140P3026R0002
About this file
This is a Price Schedule template for the C&O Canal National Historical Park Repair to Inlet Lock 2 construction project. The pricing structure is organized into a base contract line item (CLIN 00010) for total work on repairing Inlet Lock 2, valued as a lump sum (LS) with required cost breakdowns for labor, equipment, materials, and other costs including bonds, overhead, and fee. Four optional contract line items follow: CLIN 00020 for Dry Stack Wall Repairs (LS), CLIN 00030 for Additional Repointing and Dutchman Repairs (LS), CLIN 00040 for Lower Gate Removal (LS), and CLIN 00050 for Additional Repointing of 25 feet of Bridge (LS). The template requires bidders to provide unit prices and total prices for each line item, with summary rows for total option pricing and combined base plus all options pricing.
This pricing template corresponds to Solicitation 140P3026R0002, a firm-fixed price construction services solicitation issued by the Department of Interior National Park Service for repair work at C&O Canal National Historical Park in Potomac, Maryland. The requirement is a 100% small business set-aside (NAICS 237990, $45M size standard) with an estimated magnitude between $500,000 and $1,000,000. Proposals are due September 18, 2026, at 12:00 PM EDT, with a mandatory pre-proposal site visit scheduled for September 1, 2026, at 9:00 AM EDT. Work scope includes replacing deteriorated lock gates and miter sill, repairing stone masonry, removing sediment and debris, and conducting repairs to berms upstream of Violette's Lock.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Price Schedule
| C&O Canal National Historical Park (CHOH) |
| Repair to Inlet Lock 2 |
| Item No. | Item Description | Qty | Unit | Total Unit Price |
| CLIN 00010 | Base: Total Work Repair Inlet Lock 2 | 1 | LS | |
| Cost Breakdown: | ||||
| Labor | ||||
| Equipment | ||||
| Materials | ||||
| Other Costs (Bonds, O/H and Fee) |
| CLIN 00020 | Option Item A: Dry Stack Wall Repairs | 1 | LS |
| CLIN 00030 | Option Item B: Additional Repointing and Dutchman Repairs | 1 | LS |
| CLIN 00040 | Option Item C: Lower Gate Removal | 1 | LS |
| CLIN 00050 | Option Item D: Additional Repointing of 25' of Bridge | 1 | LS |
| Total Price for All Options (CLIN 00020 through 00050) | |||
| Total Price for Base Plus All Options (CLIN 00010 through 00050) |