This document is a set of 100% Final Construction Documents for the "Install New Park Facility Access and Monitoring System" project at Lowell National Historical Park, developed under Contract #140P2021D003 and Task Order #140P8223F0021.
The project encompasses installation of a comprehensive security and access control system across four distinct facilities: Boott Mill (multiple floors), Mogan Cultural Center (multiple floors), Kirk Street Agent's House (multiple floors), and Facilities Maintenance building. The scope includes implementation of video surveillance cameras (fixed, wide-angle, panoramic, and fish-eye types mounted on walls, ceilings, and parapets), access control readers and panels, door monitoring systems, electrified locking hardware, intercom stations, emergency communication devices, and fiber optic backbone infrastructure. The system architecture utilizes dedicated network switches with 20% future capacity reserves, security workstations, network video recorders, and access control management systems. All cabling must be routed through existing telecommunications rooms, with CAT 6A data connections required for camera installations. The documents detail architectural demolition requirements (removal of existing storefront systems, hollow metal frames, doors, and hardware), construction specifications for fastening to historic timber beams and masonry walls with compliance controls, and coordination requirements with the Park's 106 compliance coordinator for any latent conditions discovered during work. Design firms include VHB (Prime/Architecture, Williamsburg, VA), GWWO (Architecture, Hartford, CT), and AEI (Mechanical/Electrical, Madison, WI). The documents comprise 47 sheets of architectural, electrical, and construction detail drawings with schedules for all cameras, card readers, and door hardware installations.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTALL NEW PARK FACILITY ACCESS
AND MONITORING SYSTEM
LOWELL NATIONAL HISTORICAL PARK
314055
VARIOUS LOCATIONS
INSTALL NEW PARK FACILITY ACCESS
AND MONITORING PLAN
1 47
100% FINAL CONSTRUCTION
DOCUMENTS
100% FINAL CONSTRUCTION DOCUMENTS
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
STRUCTURAL:
N/A
CIVIL:
N/A
PRIME/ARCH:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO WEST
HARTFORD, CT
Sheet # Sub Sheet Number Sheet Name Contract Line Item Number (CLIN) Refer to Spec Section 01 27 00
GENERAL SHEETS
1 G0.00 COVER SHEET
2 G0.01 SHEET INDEX
ARCHITECTURAL
3 A1.00 ABBREVIATIONS, SYMBOLS, AND MATERIALS ALL
4 AD1.01 BOOTT MILL - FIRST FLOOR PLAN AREA 2 DEMO CLIN #1 - BASE BID #1
5 AD1.02 BOOTT MILL - THIRD FLOOR PLAN AREA 1 DEMO CLIN #1 - BASE BID #1
6 AD1.03 BOOTT MILL - FOURTH FLOOR PLAN AREA 2 DEMO CLIN #1 - BASE BID #1
7 AD1.04 BOOTT MILL - FIFTH FLOOR PLAN AREA 2 DEMO CLIN #1 - BASE BID #1
8 AD1.05 MAINTENANCE FACILITY FIRST FLOOR DEMO PLAN CLIN #4 - OPTION #3
9 A1.01 BOOTT MILL - FIRST FLOOR PLAN AREA 1 CLIN #1 - BASE BID #1
10 A1.02 BOOTT MILL - FIRST FLOOR PLAN AREA 2 CLIN #1 - BASE BID #1
11 A1.03 BOOTT MILL - SECOND FLOOR PLAN AREA 2 CLIN #1 - BASE BID #1
12 A1.04 BOOTT MILL - THIRD FLOOR PLAN AREA 1 CLIN #1 - BASE BID #1
13 A1.05 BOOTT MILL - THIRD FLOOR PLAN AREA 2 CLIN #1 - BASE BID #1
14 A1.06 BOOTT MILL - FOURTH FLOOR PLAN AREA 1 CLIN #1 - BASE BID #1
15 A1.07 BOOTT MILL - FOURTH FLOOR PLAN AREA 2 CLIN #1 - BASE BID #1
16 A2.01 MOGAN CC FIRST FLOOR PLAN CLIN #3 - OPTION #2
17 A2.02 MOGAN CC MEZZANINE FLOOR PLAN CLIN #3 - OPTION #2
18 A2.03 MOGAN CC SECOND FLOOR PLAN CLIN #3 - OPTION #2
19 A3.01 KIRK STREET FIRST FLOOR PLAN CLIN #2 - OPTION #1
20 A4.01 MAINTENANCE FACILITY FIRST FLOOR CLIN #4 - OPTION #3
21 A5.01 STOREFRONT ELEVATION & DOOR SCHEDULE ALL
22 A5.02 STOREFRONT ELEVATION & DETAILS CLIN #1 - BASE BID #1
ELECTRICAL
23 E0.00 ELECTRICAL SYMBOLS AND ABBREVIATIONS ALL
24 E1.01 BOOTT MILL - ELECTRICAL FIRST FLOOR PLAN - AREA 1 CLIN #1 - BASE BID #1
25 E1.02 BOOTT MILL - ELECTRICAL FIRST FLOOR PLAN - AREA 2 CLIN #1 - BASE BID #1
26 E1.03 BOOTT MILL - ELECTRICAL SECOND FLOOR PLAN - AREA 1 CLIN #1 - BASE BID #1
27 E1.04 BOOTT MILL - ELECTRICAL SECOND FLOOR PLAN - AREA 2 CLIN #1 - BASE BID #1
28 E1.05 BOOTT MILL - ELECTRICAL THIRD FLOOR PLAN - AREA 1 CLIN #1 - BASE BID #1
29 E1.06 BOOTT MILL - ELECTRICAL THIRD FLOOR PLAN - AREA 2 CLIN #1 - BASE BID #1
30 E1.07 BOOTT MILL - ELECTRICAL FOURTH FLOOR PLAN - AREA 1 CLIN #1 - BASE BID #1
31 E1.08 BOOTT MILL - ELECTRICAL FOURTH FLOOR PLAN - AREA 2 CLIN #1 - BASE BID #1
32 E1.09 BOOTT MILL - ELECTRICAL FIFTH FLOOR PLAN - AREA 1 CLIN #1 - BASE BID #1
33 E1.10 BOOTT MILL - ELECTRICAL FIFTH FLOOR PLAN - AREA 2 CLIN #1 - BASE BID #1
34 E2.01 MOGAN CC - ELECTRICAL FIRST FLOOR PLAN CLIN #3 - OPTION #2
35 E2.02 MOGAN CC - ELECTRICAL MEZZANINE FLOOR PLAN CLIN #3 - OPTION #2
36 E2.03 MOGAN CC - ELECTRICAL THIRD FLOOR PLAN CLIN #3 - OPTION #2
37 E3.01 KIRK STREET - ELECTRICAL BASEMENT FLOOR PLAN CLIN #2 - OPTION #1
38 E3.02 KIRK STREET - FIRST FLOOR PLAN CLIN #2 - OPTION #1
39 E3.03 KIRK STREET - SECOND FLOOR PLAN CLIN #2 - OPTION #1
40 E3.04 KIRK STREET - THIRD FLOOR PLAN CLIN #2 - OPTION #1
41 E4.01 MAINTENANCE FACILITY - FIRST FLOOR PLAN - AREA 1 CLIN #4 - OPTION #3
42 E4.02 MAINTENANCE FACILITY - ELECTRICAL FIRST FLOOR PLAN - AREA 2 CLIN #4 - OPTION #3
43 E7.00 FIBER OPTIC BACKBONE RISER DIAGRAM CLIN #5 - OPTION #4
44 E8.00 SECURITY DETAILS ALL
45 E8.01 SECURITY DETAILS ALL
46 E8.02 SECURITY DETAILS ALL
47 E9.00 DETAILS AND SCHEDULES ALL
SHEET INDEX
WALL TYPE
WINDOW TYPE
DOOR NUMBER
ROOM IDENTIFICATION
DEMOLITION NOTE
CONSTRUCTION NOTE
DETAIL/ PARTIAL
SECTION
REFERENCE
NEW WORK
KEY TO SYMBOLS
SEE MECHANICAL, ELECTRICAL, AND PLUMBING
DRAWINGS AS APPLICABLE FOR SYMBOLS RELATING TO M.E.P. WORK
(ARCHITECTURAL DRAWINGS ONLY)
EXISTING
WORK
8.1
8.1
X
X
X
NAME
XXX
A A1
A A1
SIM
A1
SIM
X
ELEVATION
REFERENCE
SECTION
REFERENCE
A/E ARCHITECTURE/ENGINEERING
ABA ARCHITECTURAL BARRIERS ACT
ABAAS ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS
ADA AMERICANS WITH DISABILITIES ACT
ADD ADDITION
ADMIN ADMINISTRATION
AFF ABOVE FINISHED FLOOR
AL ALUMINUM
APPROX APPROXIMATELY
AW AWNING
BLDG BUILDING
BLTS BOLTS
BO BOTTOM OF
CL CENTERLINE
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
DH DOUBLE-HUNG
DIA/ø DIAMETER
DWGS DRAWINGS
EL/ELEV ELEVATION
EQ EQUAL
ETR EXISTING TO REMAIN
EX/EXT EXISTING
FCU FAN COIL UNIT
F FIXED
FF FINISHED FLOOR
GL GLASS, GLAZING
GWB GYPSUM WALL BOARD
HABS HISTORIC AMERICAN BUILDING SURVEY
HM HOLLOW METAL
HSR HISTORIC STRUCTURE REPORT
IBC INTERNATIONAL BUILDING CODE
IEBC INTERNATIONAL EXISTING BUILDING CODE
INT INTERIOR
LARPM LIQUID-APPLIED REINFORCED POLYMER MEMBRANE
LG LARGE
MAL MATERIAL
MIN MINIMUM
MAX MAXIMUM
MEP MECHANICAL/ELECTRICAL/PLUMBING
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NPS NATIONAL PARK SERVICE
OC ON CENTER
OH OPPOSITE HAND
OZ OUNCE
PART PARTIAL
PT PRESSURE-TREATED
REF REFRIGERATOR
REQ'D REQUIRED
RM ROOM
SF SQUARE FEET
SH SINGLE-HUNG
SI SQUARE INCH
SIM SIMILAR
SM SMALL
SS STAINLESS STEEL
TECH TECHNICAL
TYP TYPICAL
USPP UNITED STATES PARK POLICE
VENT VENTILATION
VIF VERIFY IN FIELD
W/ WITH
WD WOOD
KEY TO ABBREVIATIONS
ARCHITECTURAL DRAWINGS ONLY DEMOLITION SYMBOLS & NOTES
SEE MECHANICAL, ELECTRICAL, AND PLUMBING
DRAWINGS AS APPLICABLE FOR SYMBOLS RELATING TO M.E.P. WORK
SCOPE OF WORK
APPLIES TO THE
ITEM SHOWN
WITH DASHED
LINES. SEE
DEMOLITION
DRAWINGS AND
NOTES FOR
EXTENT.
SCOPE OF
WORK APPLIES
TO THE ENTIRE
ROOM FOR THE
ITEM OF WORK
IDENTIFIED
EITHER IN THE
NOTE OR AT
THE SYMBOL.
THE FOLLOWING NOTES APPLY TO ALL DEMOLITION WORK WHETHER INDICATED ON THE
DEMOLITION DRAWINGS OR REQUIRED ELSEWHERE IN THE CONTRACT DOCUMENTS.
1.1 GENERAL REQUIREMENTS: THE FOLLOWING GENERAL REQUIREMENTS NOTES APPLY TO ALL
DEMOLITION WORK. THE NOTES ARE NOT SYMBOLICALLY REFERENCED ELSEWHERE IN THE
DRAWINGS.
1.2 THE SCOPE OF THE ARCHITECTURAL DEMOLITION FOR THIS PROJECT, APART FROM
SPECIFIED UNDER SECTION "SELECTIVE DEMOLITION," IS SHOWN IN SHEETS NUMBERED AD1.01
THROUGH AD1.05.
1.3 THE DEMOLITION AS INDICATED ON THE DRAWINGS APPLIES TO THE DEFINED SCOPE OF
WORK. THE DRAWINGS, IN GENERAL, DO NO SPECIFICALLY ADDRESS DEMOLITION THAT IS
DEPENDENT ON THE CONTRACTOR'S INDIVIDUAL "MEANS AND METHODS" OF EXECUTING THE
WORK. THE REQUIREMENT FOR THIS DEMOLITION IS UNDER SPECIFICATION SECTION
"SELECTIVE DEMOLITION."
1.4 THE EXTENT OF DEMOLITION SHALL BE COORDINATED WITH THE NEW AND REBUILT WORK.
1.5 "EXTENT OF WORK" SYMBOLS ARE DEFINED AS FOLLOWS:
1.6 THE TERM "REMOVE" IS DEFINED IN THE SPECIFICATION SECTION "SELECTIVE DEMOLITION."
1.7 DURING DEMOLITION, PROVIDE TEMPORARY SUPPORT TO ADJACENT EXISTING
CONSTRUCTION AND STRUCTURE TO HOLD IN PLACE WITHOUT ANY MOVEMENT UNTIL NEW
SUPPORTING WORK IS IN PLACE.
1.8 TEMPORARY DUST PARTITIONS AND HEPA DUST COLLECTION TO BE PROVIDED IN PARK
OFFICE AREAS AND VISITOR SERVICE AREAS.
8.1
8.1 8.1
SCOPE OF
WORK
APPLIES TO
THE ENTIRE
OPENING FOR
THE ITEM OF
WORK
IDENTIFIED
A/E FIRM - XXXXXXXXXX
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SEAL:
100% FINAL CONSTRUCTION DOCUMENTS
PRIME:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO, INC.
BALTIMORE, MD
CIVIL:
N/A
STRUCTURAL:
N/A
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
:3 :0
A M
A u to d e sk
D o c s:
N P S
LO
W E In s ta ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B N P S
LO
W E In st a ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B rv t
ABBREVIATIONS, SYMBOLS, AND
MATERIALS
LOWELL NATIONAL HISTORICAL PARK
187676
LOWE 314055
3 47
A0.01
MJG
MJG
MJG
SEPTEMBER 2024
INSTALL NEW PARK FACILITY ACCESS &
MONITORING SYSTEM
DEMOLITION NOTES
Demo Note # Description
8.1 CONTRACTOR SHALL CAREFULLY REMOVE STOREFRONT SYSTEM - INCLUDING FRAME, DOORS, AND ASSOCIATED HARDWARE - IN ACCORDANCE WITH SPEC. SECTION 02 41 00, SELECTIVE DEMOLITION. IF ANY UNKNOWN OR LATENT CONDITIONS WHERE SYSTEM MEETS EXISTING CEILING, WALLS, JAMBS, AND SILL CONDITIONS ARE DISCOVERED NOTIFY THE PARK'S 106 COMPLIANCE COORDINATOR AND DOCUMENT PHOTOGRAPHICALLY. PROTECT AND STORE EXISTING AUTO OPERATOR FOR FUTURE USE AND INSTALLATION IN
NEW STOREFRONT SYSTEM.
8.2 CONTRACTOR SHALL CAREFULLY REMOVE HOLLOW METAL FRAMES, SILLS THAT ARE ANCHORED TO EXISTING WOOD FLOOR, PAIR OF WOOD DOORS, AND ASSOCIATED HARDWARE IN ACCORDANCE WITH SPEC. SECTION 02 41 00, SELECTIVE DEMOLITION. IF ANY UNKNOWN OR LATENT CONDITIONS WHERE SYSTEMS MEET EXISTING SILL OR THRESHOLD CONDITIONS ARE DISCOVERED NOTIFY THE PARK'S 106 COMPLIANCE
COORDINATOR AND DOCUMENT PHOTOGRAPHICALLY.
8.3 CONTRACTOR SHALL CAREFULLY REMOVE PAIR OF DOORS & ASSOCIATED HARDWARE IN ACCORDANCE WITH SPEC. SECTION 02 41 00, SELECTIVE DEMOLITION. EXISTING HOLLOW METAL FRAME TO REMAIN. IF ANY UNKNOWN OR LATENT CONDITIONS WHERE SYSTEMS MEET EXISTING FRAME OR THRESHOLD CONDITIONS ARE DISCOVERED NOTIFY THE PARK'S 106 COMPLIANCE COORDINATOR AND DOCUMENT PHOTOGRAPHICALLY.
8.4 CONTRACTOR SHALL CAREFULLY REMOVE EXTERIOR DOORS IN ACCORDANCE WITH SPEC. SECTION 02 41 00, SELECTIVE DEMOLITION. IF ANY UNKNOWN OR LATENT CONDITIONS WHERE SYSTEM MEETS EXISTING CEILING, WALLS, JAMBS, AND SILL CONDITIONS ARE DISCOVERED NOTIFY THE PARK'S 106 COMPLIANCE
COORDINATOR AND DOCUMENT PHOTOGRAPHICALLY. EXISTING FRAME TO REMAIN.
8.5 EXISTING SECURITY ALARM CONTACTS AND WIRING TO BE TEMPORARILY DISCONNECTED AND ALARM
DE-ARMED DURING CONSTRUCTION.
8.6 PROVIDE SECURE, TEMPORARY DUST PARTITION WITH TEMPORARY DOOR TO SECURE CURATORIAL SPACE
DURING CONSTRUCTION. COORDINATE TEMPORARY CONSTRUCTION WITH COR/PARK LE.
CONSTRUCTION NOTES.
Construction Note # Description
8.1 ANCHORING INTO EXISTING BRICK MASONRY BEARING WALLS - WHERE ANCHORING INTO EXISTING
MASONRY BEARING WALLS MAY BE NECESSARY FOR THE INSTALLATION OF HM OR ALUMINUM
STOREFRONT FRAME SYSTEMS, FASTENING IS ALLOWED WITHIN THE FOLLOWING 106 COMPLIANCE
CONTROLS:
A. FASTENERS MAY BE INSTALLED ONLY IN EXISTING MORTAR JOINTS. PRE-DRILLING IS
RECOMMENDED. IF FASTENERS LARGER THAN 3/8� MORTAR JOINT THICKNESS ARE REQUIRED REVIEW WITH PARK 106 COMPLIANCE COORDINATOR / HISTORICAL ARCHITECT IN ADVANCE OF SCHEDULED
ACTIVITY TO INSPECT AND EVALUATE EXISTING CONDITIONS.
B. POWDER ACTUATED FASTENERS ARE PROHIBITED FROM USE INTO EXISTING MASONRY WALLS.
C. USE THE SHORTEST STRUCTURALLY SOUND FASTENERS ABLE TO HOLD NEW DOOR FRAMES.
8.2 FASTENING TO EXISTING VIRGIN HEART TIMBER BEAMS AND PLANK CEILING - FASTENING TO THE UNDERSIDE OF EXISTING 6" X 12" STRUCTURAL TIMBER BEAMS (VIRGIN HEART PINE TIMBER/SOUTHERN YELLOW PINE TIMBER) AND/OR THE UNDERSIDE OF EXPOSED PINE PLANK CEILING BOARDS, (9/16" THICK X 2" PLANKS OVER 2 3/4" THICK PLANKS 8-12" WIDTH) IS ALLOWED WITHIN THE FOLLOWING
106 COMPLIANCE CONTROLS:
A. POWDER ACTUATED FASTENERS ARE PROHIBITED FROM USE INTO THE EXISTING VIRGIN HEART
TIMBER BEAMS AND PLANK CEILING.
B. USE THE SHORTEST STRUCTURALLY SOUND FASTENERS ABLE TO HOLD NEW CONSTRUCTION
(RECOMMEND 3/4" - 1 1/4" DEPTH WOOD SCREWS).
8.3 FASTENING TO EXISTING WOOD PLANK FLOORING - THE EXISTING HISTORICAL FLOOR/CEILING CONSTRUCTION CONSISTS OF 9/16" THICK X 2" WIDTH VIRGIN HEART PINE PLANKS OF VARIOUS
LENGTHS, OVER 2 3/4" THICK PLANKS 8-12" WIDTH OF VARIOUS LENGTHS.
A. POWDER ACTUATED FASTENERS ARE PROHIBITED FROM USE INTO THE EXISTING WOOD
FLOORS.
B. USE THE SHORTEST STRUCTURALLY SOUND FASTENERS ABLE TO SECURE NEW
CONSTRUCTION (RECOMMEND 3/4" - 1 1/4", MAX. 2" DEPTH WOOD SCREWS).
C. WHEREVER POSSIBLE, AVOID FASTENING TO HISTORICAL FLOORS AND FASTEN/ANCHOR TO
EXISTING OR NEW WALL CONSTRUCTION.
8.4 CONTRACTOR SHALL REMOVE EXISTING CAMERAS AND INFRASTRUCTURE AS REQUIRED AT KIRK STREET
AGENT'S HOUSE FIRST FLOOR, AND TURN OVER TO THE PARK FOR RE-USE.
8.5 IN ACCORDANCE WITH SPEC. SECTION 01 27 00, PLEASE TURN OVER ALL REMOVED EXISTING DOOR
HARDWARE IN THE BASE AND OPTIONS TO THE PARK FOR RE-USE.
8.6 PROVIDE SECURE, TEMPORARY DUST PARTITION WITH TEMPORARY DOOR TO SECURE CURATORIAL SPACE
DURING CONSTRUCTION. COORDINATE TEMPORARY CONSTRUCTION WITH COR/PARK LE.
8.7 EXISTING SECURITY ALARM CONTACTS AND WIRING TO BE TEMPORARILY DISCONNECTED AND ALARM
DE-ARMED DURING CONSTRUCTION.
GENERAL NOTES
1. THE EXISTING CONDITIONS ARE DRAWN TO OUR BEST
KNOWLEDGE. CONTRACTOR TO VERIFY EXISTING DIMENSIONS IN
THE FIELD.
ELEC.
TROLLEY
MAINTENANCE
FACILITY
TELE. STORAGE
GALLERY
ELEV.
MACHINE
ROOM
CATERING
KITCHEN
WOMEN
MEN
FIRE
PUMP
ELEC.
CLOSET
MAIN
LOBBY
ENTRANCE
LOBBY
JAN.
8.1
A/E FIRM - XXXXXXXXXX
8 0 8 16
SCALE OF FEET
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
SEAL:
100% FINAL CONSTRUCTION DOCUMENTS
PRIME:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO, INC.
BALTIMORE, MD
CIVIL:
N/A
STRUCTURAL:
N/A
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
:3 :1
A M
A u to d e sk
D o c s:
N P S
LO
W E In s ta ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B N P S
LO
W E In st a ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B rv t
BOOTT MILL - FIRST FLOOR
PLAN AREA 2 DEMO
LOWELL NATIONAL HISTORICAL PARK
187676
LOWE 314055
4 47
AD1.01
MJG
MJG
MJG
SEPTEMBER 2024
INSTALL NEW PARK FACILITY ACCESS &
MONITORING SYSTEM
SCALE AAD1.01
BOOTT MILL - FIRST FLOOR PLAN AREA 2
DEMO
DEMO NOTES
8.1 CONTRACTOR SHALL CAREFULLY REMOVE STOREFRONT SYSTEM - INCLUDING FRAME, DOORS, AND
ASSOCIATED HARDWARE - IN ACCORDANCE WITH SPEC. SECTION 02 41 00, SELECTIVE
DEMOLITION. IF ANY UNKNOWN OR LATENT CONDITIONS WHERE SYSTEM MEETS EXISTING CEILING, WALLS, JAMBS, AND SILL CONDITIONS ARE DISCOVERED NOTIFY THE PARK'S 106 COMPLIANCE
COORDINATOR AND DOCUMENT PHOTOGRAPHICALLY. PROTECT AND STORE EXISTING AUTO
OPERATOR FOR FUTURE USE AND INSTALLATION IN NEW STOREFRONT SYSTEM.
EL. 50.30'
OFFICES
324A
BECKY
WARREN
PARK
RANGER
MICHELE
TUROCY
MARY BETH
CLARK
WILLIAM
MORTON
STAFF
WORK
TABLES
I.T. CLOSET
CORRIDOR
CORRIDORWEST STAIR
TOWER
JACK
HERLIHY
CHRISTINE
WIRTH
DAVID
BLACKBURN
ELIZABETH
HOERMANN
CURATORIAL
ARTIFACTS
(LARGE RACKS)
CURATORIAL ARTIFACTS (FLAT FILES)
UTILITY:
BOILER, ACID
TANK,
WATER
HEATER
8.28.2
8.2
8.5 8.5
8.5
8.68.6
8.6
A/E FIRM - XXXXXXXXXX
8 0 8 16
SCALE OF FEET
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
SEAL:
100% FINAL CONSTRUCTION DOCUMENTS
PRIME:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO, INC.
BALTIMORE, MD
CIVIL:
N/A
STRUCTURAL:
N/A
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
:3 :1
A M
A u to d e sk
D o c s:
N P S
LO
W E In s ta ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B N P S
LO
W E In st a ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B rv t
BOOTT MILL - THIRD FLOOR
PLAN AREA 1 DEMO
LOWELL NATIONAL HISTORICAL PARK
187676
LOWE 314055
5 47
AD1.02
MJG
MJG
MJG
SEPTEMBER 2024
INSTALL NEW PARK FACILITY ACCESS &
MONITORING SYSTEM
SCALE AAD1.02
BOOTT MILL - THIRD FLOOR PLAN AREA 1
DEMO
DEMO NOTES
8.2 CONTRACTOR SHALL CAREFULLY REMOVE HOLLOW METAL FRAMES, SILLS THAT ARE ANCHORED TO
EXISTING WOOD FLOOR, PAIR OF WOOD DOORS, AND ASSOCIATED HARDWARE IN ACCORDANCE
WITH SPEC. SECTION 02 41 00, SELECTIVE DEMOLITION. IF ANY UNKNOWN OR LATENT
CONDITIONS WHERE SYSTEMS MEET EXISTING SILL OR THRESHOLD CONDITIONS ARE DISCOVERED
NOTIFY THE PARK'S 106 COMPLIANCE COORDINATOR AND DOCUMENT PHOTOGRAPHICALLY.
8.5 EXISTING SECURITY ALARM CONTACTS AND WIRING TO BE TEMPORARILY DISCONNECTED AND ALARM
DE-ARMED DURING CONSTRUCTION.
8.6 PROVIDE SECURE, TEMPORARY DUST PARTITION WITH TEMPORARY DOOR TO SECURE CURATORIAL
SPACE DURING CONSTRUCTION. COORDINATE TEMPORARY CONSTRUCTION WITH COR/PARK LE.
CORRIDOR
STAIR
TSONGAS HIST CTR
STORAGE
MECHANICAL
GEN/BOILER
STACKS
LUNCHROOM
LUNCH AREA
CRC RECORDS
481 482
ELEC. JAN.
479WOMEN
MEN
LOWELL HISTORICAL
DIRECTORCONFERENCE ROOMLIBRARIANLIBRARIAN
436 437 438
KITCHEN
TSONGAS HIST
CTR STORAGE
SOCIETY
CORRIDOR
SUPPLIES
LOBBY
CONFERENCE
EAST STAIR
TOWER
LOWELL HISTORIC SOCIETY
LOUVER
LOUVER
ELECT'L
EL. 63.74'
8.3
A/E FIRM - XXXXXXXXXX
8 0 8 16
SCALE OF FEET
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
SEAL:
100% FINAL CONSTRUCTION DOCUMENTS
PRIME:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO, INC.
BALTIMORE, MD
CIVIL:
N/A
STRUCTURAL:
N/A
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
:3 :1
A M
A u to d e sk
D o c s:
N P S
LO
W E In s ta ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B N P S
LO
W E In st a ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B rv t
BOOTT MILL - FOURTH FLOOR
PLAN AREA 2 DEMO
LOWELL NATIONAL HISTORICAL PARK
187676
LOWE 314055
6 47
AD1.03
MJG
MJG
MJG
SEPTEMBER 2024
INSTALL NEW PARK FACILITY ACCESS &
MONITORING SYSTEM
SCALE AAD1.03
BOOTT MILL - FOURTH FLOOR PLAN AREA 2
- DEMO
DEMO NOTES
8.3 CONTRACTOR SHALL CAREFULLY REMOVE PAIR OF DOORS & ASSOCIATED HARDWARE IN
ACCORDANCE WITH SPEC. SECTION 02 41 00, SELECTIVE DEMOLITION. EXISTING HOLLOW METAL
FRAME TO REMAIN. IF ANY UNKNOWN OR LATENT CONDITIONS WHERE SYSTEMS MEET EXISTING
FRAME OR THRESHOLD CONDITIONS ARE DISCOVERED NOTIFY THE PARK'S 106 COMPLIANCE
COORDINATOR AND DOCUMENT PHOTOGRAPHICALLY.
551 552550549
EL. 77.03'
WOMEN
MEN
GEN/BOILER
STACKS
583A583
556555
MECH'L
FOLK FEST
SUPPLIES
JAN CLO
I.T. CHASE
WOMEN'S
LOCKERS
SUPPLIES
ELECT'L
I.T. STORAGE
I.T. SERVER
CONNIE
BOSOLD
MEN'S
LOCKERS
ELLEN
FROST
EMILY
LEVINE
MARY
PRICE
LOCKERS
COPIER
MECH'L
UNIFORMS
INTERP.
STORAGE
INTERP.
STORAGE
COSTUME CLOSET
PARK
RANGER
DAVID
BYERS
JONATHAN
PARKER
SEASONAL
FAX/PRINTER
INTERP
RANGER
INTERP
RANGER
RADIOS
MAIL/KEYS
I & E
ADMIN.KITCHEN
EAST STAIR
TOWER
STORAGE
LOBBYCONFERENCE ROOM B
I.T. WORK ROOM
CATHY
NEVEUX
GREG
JONES
KERRY
OLSON
(8) SEASONAL
INTERP. PARK
RANGERS
CONFERENCE ROOM A
ENVIRONMENT
LABS
(5 DOUBLE-BACK
WORK STATIONS)
EXHIBITS
AMY
GLOWACKI
CHANGE IN THE MAKING CLASSROOM
OPEN
MAP
CLASSROOM
CLOSED
MAP
CLASSROOM
CHANGE IN THE MAKING CLASSROOM
CLOSET
EL. 77.03'
8.3
A/E FIRM - XXXXXXXXXX
8 0 8 16
SCALE OF FEET
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
SEAL:
100% FINAL CONSTRUCTION DOCUMENTS
PRIME:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO, INC.
BALTIMORE, MD
CIVIL:
N/A
STRUCTURAL:
N/A
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
:3 :2
A M
A u to d e sk
D o c s:
N P S
LO
W E In s ta ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B N P S
LO
W E In st a ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B rv t
BOOTT MILL - FIFTH FLOOR
PLAN AREA 2 DEMO
LOWELL NATIONAL HISTORICAL PARK
187676
LOWE 314055
7 47
AD1.04
MJG
MJG
MJG
SEPTEMBER 2024
INSTALL NEW PARK FACILITY ACCESS &
MONITORING SYSTEM
SCALE AAD1.04
BOOTT MILL - FIFTH FLOOR PLAN AREA 2
DEMO
DEMO NOTES
8.3 CONTRACTOR SHALL CAREFULLY REMOVE PAIR OF DOORS & ASSOCIATED HARDWARE IN
ACCORDANCE WITH SPEC. SECTION 02 41 00, SELECTIVE DEMOLITION. EXISTING HOLLOW METAL
FRAME TO REMAIN. IF ANY UNKNOWN OR LATENT CONDITIONS WHERE SYSTEMS MEET EXISTING
FRAME OR THRESHOLD CONDITIONS ARE DISCOVERED NOTIFY THE PARK'S 106 COMPLIANCE
COORDINATOR AND DOCUMENT PHOTOGRAPHICALLY.
REF.
VEND.
V E N D
COPY
CARPENTRY
SHOP
F A A P
LUNCHROOM
LINE OF WALL
BELOW
OFFICE
DN
WOMEN'S
SHOWER
FIRE
SUPPRESSION
EQUIPMENT
STANDPIPE
FIRE
HYDRANT
MEN'S
TOILET
110a
DW
KITCHEN
OFFICE
OFFICE
103 CONF.
ROOM
HALL
OFFICE
OFFICE
VEHICLE
MAINTENANCE
8.4
8.4
A/E FIRM - XXXXXXXXXX
8 0 8 16
SCALE OF FEET
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
SEAL:
100% FINAL CONSTRUCTION DOCUMENTS
PRIME:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO, INC.
BALTIMORE, MD
CIVIL:
N/A
STRUCTURAL:
N/A
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
:3 :2
A M
A u to d e sk
D o c s:
N P S
LO
W E In s ta ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B N P S
LO
W E In st a ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B rv t
MAINTENANCE FACILITY FIRST
FLOOR DEMO PLAN
LOWELL NATIONAL HISTORICAL PARK
187676
LOWE 314055
8 47
AD1.05
MJG
MJG
MJG
SEPTEMBER 2024
INSTALL NEW PARK FACILITY ACCESS &
MONITORING SYSTEM
SCALE AAD1.05
MAINTENANCE FACILITY FIRST FLOOR DEMO
PLAN
DEMO NOTES
8.4 CONTRACTOR SHALL CAREFULLY
REMOVE EXTERIOR DOORS IN
ACCORDANCE WITH SPEC. SECTION
02 41 00, SELECTIVE DEMOLITION. IF
ANY UNKNOWN OR LATENT
CONDITIONS WHERE SYSTEM MEETS
EXISTING CEILING, WALLS, JAMBS,
AND SILL CONDITIONS ARE
DISCOVERED NOTIFY THE PARK'S 106
COMPLIANCE COORDINATOR AND
DOCUMENT PHOTOGRAPHICALLY.
EXISTING FRAME TO REMAIN.
UPUP
ORIENTATION
RECEPTION/
VESTIBULE
ELEC
OBSERVATION
WEAVE
ROOM
UP
LOBBY
ENTRANCE
MECH
125123 128
STORE
ROOM MECH.
LOBBY
STAIR
NO. 3
STAIR
NO. 2
KITCHEN
MEN'S
ROOM
WOMEN'S
ROOM
B O O
TT
M
IL
L
A/E FIRM - XXXXXXXXXX
8 0 8 16
SCALE OF FEET
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
SEAL:
100% FINAL CONSTRUCTION DOCUMENTS
PRIME:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO, INC.
BALTIMORE, MD
CIVIL:
N/A
STRUCTURAL:
N/A
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
:3 :3
A M
A u to d e sk
D o c s:
N P S
LO
W E In s ta ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B N P S
LO
W E In st a ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B rv t
BOOTT MILL - FIRST FLOOR
PLAN AREA 1
LOWELL NATIONAL HISTORICAL PARK
187676
LOWE 314055
9 47
A1.01
MJG
MJG
MJG
SEPTEMBER 2024
INSTALL NEW PARK FACILITY ACCESS &
MONITORING SYSTEM
SCALE AA1.01
1 BOOTT MILL - FIRST FLOOR PLAN AREA 1
ELEC.
MAINTENANCE
FACILITY
TELE. STORAGE
GALLERY
ELEV.
MACHINE
ROOM
CATERING
KITCHEN
WOMEN
MEN
FIRE
PUMP
ELEC.
CLOSET
MAIN
LOBBY
ENTRANCE
LOBBY
JAN.
S1
100A
100B
8.1 8.2 8.3 8.5
A/E FIRM - XXXXXXXXXX
8 0 8 16
SCALE OF FEET
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
SEAL:
100% FINAL CONSTRUCTION DOCUMENTS
PRIME:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO, INC.
BALTIMORE, MD
CIVIL:
N/A
STRUCTURAL:
N/A
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
:3 :3
A M
A u to d e sk
D o c s:
N P S
LO
W E In s ta ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B N P S
LO
W E In st a ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B rv t
BOOTT MILL - FIRST FLOOR
PLAN AREA 2
LOWELL NATIONAL HISTORICAL PARK
187676
LOWE 314055
10 47
A1.02
MJG
MJG
MJG
SEPTEMBER 2024
INSTALL NEW PARK FACILITY ACCESS &
MONITORING SYSTEM
SCALE AA1.02
1 BOOTT MILL - FIRST FLOOR PLAN AREA 2
CONSTRUCTION NOTES
8.1 ANCHORING INTO EXISTING BRICK MASONRY BEARING WALLS - WHERE ANCHORING INTO EXISTING
MASONRY BEARING WALLS MAY BE NECESSARY FOR THE INSTALLATION OF HM OR ALUMINUM
STOREFRONT FRAME SYSTEMS, FASTENING IS ALLOWED WITHIN THE FOLLOWING 106 COMPLIANCE
CONTROLS:
A. FASTENERS MAY BE INSTALLED ONLY IN EXISTING MORTAR JOINTS. PRE-DRILLING IS
RECOMMENDED. IF FASTENERS LARGER THAN 3/8� MORTAR JOINT THICKNESS ARE REQUIRED REVIEW WITH PARK 106 COMPLIANCE COORDINATOR / HISTORICAL ARCHITECT IN ADVANCE OF SCHEDULED
ACTIVITY TO INSPECT AND EVALUATE EXISTING CONDITIONS.
B. POWDER ACTUATED FASTENERS ARE PROHIBITED FROM USE INTO EXISTING MASONRY WALLS.
C. USE THE SHORTEST STRUCTURALLY SOUND FASTENERS ABLE TO HOLD NEW DOOR FRAMES.
8.2 FASTENING TO EXISTING VIRGIN HEART TIMBER BEAMS AND PLANK CEILING - FASTENING TO THE
UNDERSIDE OF EXISTING 6" X 12" STRUCTURAL TIMBER BEAMS (VIRGIN HEART PINE
TIMBER/SOUTHERN YELLOW PINE TIMBER) AND/OR THE UNDERSIDE OF EXPOSED PINE PLANK CEILING BOARDS, (9/16" THICK X 2" PLANKS OVER 2 3/4" THICK PLANKS 8-12" WIDTH) IS ALLOWED WITHIN
THE FOLLOWING 106 COMPLIANCE CONTROLS:
A. POWDER ACTUATED FASTENERS ARE PROHIBITED FROM USE INTO THE EXISTING VIRGIN HEART
TIMBER BEAMS AND PLANK CEILING.
B. USE THE SHORTEST STRUCTURALLY SOUND FASTENERS ABLE TO HOLD NEW CONSTRUCTION
(RECOMMEND 3/4" - 1 1/4" DEPTH WOOD SCREWS).
8.3 FASTENING TO EXISTING WOOD PLANK FLOORING - THE EXISTING HISTORICAL FLOOR/CEILING CONSTRUCTION CONSISTS OF 9/16" THICK X 2" WIDTH VIRGIN HEART PINE PLANKS OF VARIOUS
LENGTHS, OVER 2 3/4" THICK PLANKS 8-12" WIDTH OF VARIOUS LENGTHS.
A. POWDER ACTUATED FASTENERS ARE PROHIBITED FROM USE INTO THE EXISTING WOOD
FLOORS.
B. USE THE SHORTEST STRUCTURALLY SOUND FASTENERS ABLE TO SECURE NEW
CONSTRUCTION (RECOMMEND 3/4" - 1 1/4", MAX. 2" DEPTH WOOD SCREWS).
C. WHEREVER POSSIBLE, AVOID FASTENING TO HISTORICAL FLOORS AND FASTEN/ANCHOR TO
EXISTING OR NEW WALL CONSTRUCTION.
8.5 IN ACCORDANCE WITH SPEC. SECTION 01 27 00, PLEASE TURN OVER ALL REMOVED EXISTING DOOR
HARDWARE IN THE BASE AND OPTIONS TO THE PARK FOR RE-USE.
EAST STAIR
TOWER
EVENTS
CENTER
STORAGE
EVENTS CENTER
MECHANICAL
ROOM
AUDIO VISUAL
ROOM
T R O L L E Y
B A R N
(O L D
C O A L
P O C K E T o p e n to
EL. 36.76' FIN. FLOOR
FIN. FLOOR
W.C.
DRESSING
ROOM
TELE.
MAIN ELECTRICAL ROOM
ELEC. JAN.
THEATER
EXHIBIT SPACE
245 246
226 240A
235A
STORAGE
WOMEN
MENLOBBY
EXHIBIT SPACE
226 OPEN
TO 1ST
FL.
8.5
A/E FIRM - XXXXXXXXXX
8 0 8 16
SCALE OF FEET
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
SEAL:
100% FINAL CONSTRUCTION DOCUMENTS
PRIME:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO, INC.
BALTIMORE, MD
CIVIL:
N/A
STRUCTURAL:
N/A
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
:3 :3
A M
A u to d e sk
D o c s:
N P S
LO
W E In s ta ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B N P S
LO
W E In st a ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B rv t
BOOTT MILL - SECOND FLOOR
PLAN AREA 2
LOWELL NATIONAL HISTORICAL PARK
187676
LOWE 314055
11 47
A1.03
MJG
MJG
MJG
SEPTEMBER 2024
INSTALL NEW PARK FACILITY ACCESS &
MONITORING SYSTEM
SCALE AA1.03
1 BOOTT MILL - SECOND FLOOR PLAN AREA 2
CONSTRUCTION NOTES
8.5 IN ACCORDANCE WITH SPEC. SECTION 01 27 00, PLEASE TURN OVER ALL REMOVED EXISTING DOOR
HARDWARE IN THE BASE AND OPTIONS TO THE PARK FOR RE-USE.
EL. 50.30'
OFFICES
324A
BECKY
WARREN
PARK
RANGER
MICHELE
TUROCY
MARY BETH
CLARK
WILLIAM
MORTON
STAFF
WORK
TABLES
I.T. CLOSET
CORRIDOR
CORRIDORWEST STAIR
TOWER
JACK
HERLIHY
CHRISTINE
WIRTH
DAVID
BLACKBURN
ELIZABETH
HOERMANN
CURATORIAL
ARTIFACTS
(LARGE RACKS)
CURATORIAL ARTIFACTS (FLAT FILES)
UTILITY:
BOILER, ACID
TANK,
WATER
HEATER
323322
8.68.6
8.6
8.78.7
8.7
A/E FIRM - XXXXXXXXXX
8 0 8 16
SCALE OF FEET
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
SEAL:
100% FINAL CONSTRUCTION DOCUMENTS
PRIME:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO, INC.
BALTIMORE, MD
CIVIL:
N/A
STRUCTURAL:
N/A
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
:3 :4
A M
A u to d e sk
D o c s:
N P S
LO
W E In s ta ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B N P S
LO
W E In st a ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B rv t
BOOTT MILL - THIRD FLOOR
PLAN AREA 1
LOWELL NATIONAL HISTORICAL PARK
187676
LOWE 314055
12 47
A1.04
MJG
MJG
MJG
SEPTEMBER 2024
INSTALL NEW PARK FACILITY ACCESS &
MONITORING SYSTEM
SCALE AA1.04
1 BOOTT MILL - THIRD FLOOR PLAN AREA 1
CONSTRUCTION NOTES
8.6 PROVIDE SECURE, TEMPORARY DUST PARTITION WITH TEMPORARY DOOR TO SECURE CURATORIAL
SPACE DURING CONSTRUCTION. COORDINATE TEMPORARY CONSTRUCTION WITH COR/PARK LE.
8.7 EXISTING SECURITY ALARM CONTACTS AND WIRING TO BE TEMPORARILY DISCONNECTED AND ALARM
DE-ARMED DURING CONSTRUCTION.
UTILITY
SINK
347348
363362
330329
361360
MEN
WOMEN
OFFICES
CORRIDOR
LOUVER LOUVER
MECHANICAL ROOM
MECHANICAL
GENERATORSUPPLIES
JAN CLO
I.T. CHASE
SUMMER CAMP CLOSET
HISTORY STUDIO WORKSHOP
WORKERS ON
THE LINE
WORKSHOP
STUDIO
SUPPLIES
EXHIBIT
WEAVE ROOM
WORKSHOP
WORK SINK
WORKSHOP SUPPLY CLOSET
LARGE LOOM
CREELS
TEACHERS
LOCKER
ROOM
EDUC. CENTER
DIRECTOR'S
OFFICEPARK
RANGER
SUPERVISOR
SHEILA
KIRSCHBAUM
ELLEN
ANSTEY
COPY
ROOM
CAROL
LIASSON
CAROL
MEEHAN
SETH
COOPER
MIKE
CURRAN
FRANK
CLARK
REBECCA
LOFGREN
PARK
RANGER
UML
CONTRACTOR
STAFF
WORK
TABLES
EAST STAIR
TOWER
LOBBY
EXHIBIT/ORIENTATION
MAINTENANCE SHOP
POWER TO
PRODUCTION
WORKSHOP
RESOURCE ROOM
INVENTORS'
CORNER
WORKSHOP
EL. 50.30'
A/E FIRM - XXXXXXXXXX
8 0 8 16
SCALE OF FEET
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
SEAL:
100% FINAL CONSTRUCTION DOCUMENTS
PRIME:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO, INC.
BALTIMORE, MD
CIVIL:
N/A
STRUCTURAL:
N/A
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
:3 :4
A M
A u to d e sk
D o c s:
N P S
LO
W E In s ta ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B N P S
LO
W E In st a ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B rv t
BOOTT MILL - THIRD FLOOR
PLAN AREA 2
LOWELL NATIONAL HISTORICAL PARK
187676
LOWE 314055
13 47
A1.05
MJG
MJG
MJG
SEPTEMBER 2024
INSTALL NEW PARK FACILITY ACCESS &
MONITORING SYSTEM
NO SCALEA1.05
1 BOOTT MILL - THIRD FLOOR PLAN AREA 2
STAIR
TSONGAS HIST CTR
STORAGE
MECHANICAL
GEN/BOILER
STACKS
LUNCHROOM
LUNCH AREA
CRC RECORDS
481 482
ELEC. JAN.
479WOMEN
MEN
LOWELL HISTORICAL
DIRECTORCONFERENCE ROOMLIBRARIANLIBRARIAN
436 437 438
KITCHEN
TSONGAS HIST
CTR STORAGE
SOCIETY
CORRIDOR
SUPPLIES
LOBBY
CONFERENCE
EAST STAIR
TOWER
LOWELL HISTORIC SOCIETY
LOUVER
LOUVER
ELECT'L
EL. 63.74'
A/E FIRM - XXXXXXXXXX
8 0 8 16
SCALE OF FEET
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
SEAL:
100% FINAL CONSTRUCTION DOCUMENTS
PRIME:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO, INC.
BALTIMORE, MD
CIVIL:
N/A
STRUCTURAL:
N/A
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
:3 :4
A M
A u to d e sk
D o c s:
N P S
LO
W E In s ta ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B N P S
LO
W E In st a ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B rv t
BOOTT MILL - FOURTH FLOOR
PLAN AREA 2
LOWELL NATIONAL HISTORICAL PARK
187676
LOWE 314055
14 47
A1.06
MJG
MJG
MJG
SEPTEMBER 2024
INSTALL NEW PARK FACILITY ACCESS &
MONITORING SYSTEM
SCALE AA1.06
1 BOOTT MILL - FOURTH FLOOR PLAN AREA 2
551 552550549
EL. 77.03'
WOMEN
MEN
GEN/BOILER
STACKS
583A583
556555
MECH'L
FOLK FEST
SUPPLIES
JAN CLO
I.T. CHASE
WOMEN'S
LOCKERS
SUPPLIES
ELECT'L
I.T. STORAGE
I.T. SERVER
CONNIE
BOSOLD
MEN'S
LOCKERS
ELLEN
FROST
EMILY
LEVINE
MARY
PRICE
LOCKERS
COPIER
MECH'L
UNIFORMS
INTERP.
STORAGE
INTERP.
STORAGE
COSTUME CLOSET
PARK
RANGER
DAVID
BYERS
JONATHAN
PARKER
SEASONAL
FAX/PRINTER
INTERP
RANGER
INTERP
RANGER
RADIOS
MAIL/KEYS
I & E
ADMIN.KITCHEN
EAST STAIR
TOWER
STORAGE
LOBBYCONFERENCE ROOM B
I.T. WORK ROOM
CATHY
NEVEUX
GREG
JONES
KERRY
OLSON
(8) SEASONAL
INTERP. PARK
RANGERS
CONFERENCE ROOM A
ENVIRONMENT
LABS
(5 DOUBLE-BACK
WORK STATIONS)
EXHIBITS
AMY
GLOWACKI
CHANGE IN THE MAKING CLASSROOM
OPEN
MAP
CLASSROOM
CLOSED
MAP
CLASSROOM
CHANGE IN THE MAKING CLASSROOM
CLOSET
EL. 77.03'
A/E FIRM - XXXXXXXXXX
8 0 8 16
SCALE OF FEET
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
SEAL:
100% FINAL CONSTRUCTION DOCUMENTS
PRIME:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO, INC.
BALTIMORE, MD
CIVIL:
N/A
STRUCTURAL:
N/A
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
:3 :5
A M
A u to d e sk
D o c s:
N P S
LO
W E In s ta ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B N P S
LO
W E In st a ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B rv t
BOOTT MILL - FIFTH FLOOR
PLAN AREA 2
LOWELL NATIONAL HISTORICAL PARK
187676
LOWE 314055
15 47
A1.07
MJG
MJG
MJG
SEPTEMBER 2024
INSTALL NEW PARK FACILITY ACCESS &
MONITORING SYSTEM
SCALE AA1.07
1 BOOTT MILL - FIFTH FLOOR PLAN AREA 2
IMMIGRANT
EXPERIENCE
EXHIBIT
VESTIBULE
READING ROOM
MICROFILM
STACKS
READING ROOM
CORRIDOR
KITCHEN EXHIBIT
PARLOR EXHIBIT
STAIRHALL
RECEPTION
EXHIBIT
ELEV MACH RM
STAIR
WOMENS
TOILET
MENS
TOILET
CORRIDOR
SERVICE
AREA
CONF
RM
OFFICE
MEETING ROOM
MECH
ELEC
JANITOR
EXITWAY
CORRIDOR
CORRIDOR
KITCHEN
131AKEEPER EXHIBIT
PASSAGEWAY
121B UP
UP
RAMP DN
DN
DN
UP
UP
UP
UP
UP
UP
UP
UP
UP
DN
UP
RAMP DN
101A 101B
A/E FIRM - XXXXXXXXXX
8 0 8 16
SCALE OF FEET
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
SEAL:
100% FINAL CONSTRUCTION DOCUMENTS
PRIME:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO, INC.
BALTIMORE, MD
CIVIL:
N/A
STRUCTURAL:
N/A
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
:3 :5
A M
A u to d e sk
D o c s:
N P S
LO
W E In s ta ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B N P S
LO
W E In st a ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B rv t
MOGAN CC FIRST FLOOR PLAN
LOWELL NATIONAL HISTORICAL PARK
187676
LOWE 314055
16 47
A2.01
MJG
MJG
MJG
SEPTEMBER 2024
INSTALL NEW PARK FACILITY ACCESS &
MONITORING SYSTEM
SCALE AA2.01
1 MOGAN CC FIRST FLOOR PLAN
EXHIBITION
M07
EXHIBITION
M04
BEDROOM
EXHIBIT
M05
CORRIDOR
M03
OFFICE
M09
OFFICE
M10
OFFICE
M11
OFFICE
M12
STAIR
M16
STORAGE
M15
STAIRHALL
M02
ELECTRICAL
M07A MEETING
M13
SOUTH
STACKS
LIBRARY
SERVICE
NORTH
STACKS
TECHNICAL
SERVICES
DN
UP
DN
DN
DN
DN
UP
UP
UP
DN
UP 03
A/E FIRM - XXXXXXXXXX
8 0 8 16
SCALE OF FEET
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
SEAL:
100% FINAL CONSTRUCTION DOCUMENTS
PRIME:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO, INC.
BALTIMORE, MD
CIVIL:
N/A
STRUCTURAL:
N/A
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
:3 :5
A M
A u to d e sk
D o c s:
N P S
LO
W E In s ta ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B N P S
LO
W E In st a ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B rv t
MOGAN CC MEZZANINE FLOOR
PLAN
LOWELL NATIONAL HISTORICAL PARK
187676
LOWE 314055
17 47
A2.02
MJG
MJG
MJG
SEPTEMBER 2024
INSTALL NEW PARK FACILITY ACCESS &
MONITORING SYSTEM
SCALE AA2.02
1 MOGAN CC MEZZANINE FLOOR
CLASSROOM
685sf
CLASSROOM
CLASSROOM
DARKROOM
CORRIDOR
CORRIDOR
MENS
TOILET
WOMENS
TOILET
JANITOR
CLASSROOM
673sf
STAIR
KITCHEN
CORRIDOR
STAIR
OFFICE
LOUNGE
ROOF
UP
DN
DNUP
RAMP DN
DN
UP
A/E FIRM - XXXXXXXXXX
8 0 8 16
SCALE OF FEET
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
SEAL:
100% FINAL CONSTRUCTION DOCUMENTS
PRIME:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO, INC.
BALTIMORE, MD
CIVIL:
N/A
STRUCTURAL:
N/A
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
:3 :5
A M
A u to d e sk
D o c s:
N P S
LO
W E In s ta ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B N P S
LO
W E In st a ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B rv t
MOGAN CC SECOND FLOOR
PLAN
LOWELL NATIONAL HISTORICAL PARK
187676
LOWE 314055
18 47
A2.03
MJG
MJG
MJG
SEPTEMBER 2024
INSTALL NEW PARK FACILITY ACCESS &
MONITORING SYSTEM
SCALE AA2.03
1 MOGAN CC SECOND FLOOR
TOILETTOILET
CLOSET
N101E
N101W N103W
N102
N105
N103E
MAIL/COPY
ROOM
S101E
S101W S103W
S102
S103E
N107
S105
E101
E103
BUDGET
OFFICER
ADMINISTRATION
ELEV.
PERSONNEL
MANAGEMENT ADMINISTRATION
FINANCE
OFFICER
ADMINISTRATION
ELEVATOR
LOBBY
8.4
8.4
A/E FIRM - XXXXXXXXXX
8 0 8 16
SCALE OF FEET
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
SEAL:
100% FINAL CONSTRUCTION DOCUMENTS
PRIME:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO, INC.
BALTIMORE, MD
CIVIL:
N/A
STRUCTURAL:
N/A
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
:3 :0
A M
A u to d e sk
D o c s:
N P S
LO
W E In s ta ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B N P S
LO
W E In st a ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B rv t
KIRK STREET FIRST FLOOR
PLAN
LOWELL NATIONAL HISTORICAL PARK
187676
LOWE 314055
19 47
A3.01
MJG
MJG
MJG
SEPTEMBER 2024
INSTALL NEW PARK FACILITY ACCESS &
MONITORING SYSTEM
SCALE AA3.01
1 KIRK STREET FIRST FLOOR PLAN
CONSTRUCTION NOTES
8.4 CONTRACTOR SHALL REMOVE EXISTING CAMERAS AND INFRASTRUCTURE AS REQUIRED AT KIRK STREET
AGENT'S HOUSE FIRST FLOOR, AND TURN OVER TO THE PARK FOR RE-USE.
VEND.
V E N D
COPY
CARPENTRY
SHOP
F A A P
LUNCHROOM
LINE OF WALL
BELOW
OFFICE
DN
WOMEN'S
SHOWER
FIRE
SUPPRESSION
EQUIPMENT
STANDPIPE
FIRE
HYDRANT
MEN'S
TOILET
110a
DW
KITCHEN
OFFICE
OFFICE
103 CONF.
ROOM
HALL
OFFICE
OFFICE
VEHICLE
MAINTENANCE
NEW WALL & DOOR WILL BE
INSTALLED AS PART OF A
FUTURE NPS PROJECT
8.5
8.5
A/E FIRM - XXXXXXXXXX
8 0 8 16
SCALE OF FEET
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
SEAL:
100% FINAL CONSTRUCTION DOCUMENTS
PRIME:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO, INC.
BALTIMORE, MD
CIVIL:
N/A
STRUCTURAL:
N/A
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
:3 :0
A M
A u to d e sk
D o c s:
N P S
LO
W E In s ta ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B N P S
LO
W E In st a ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B rv t
MAINTENANCE FACILITY FIRST
FLOOR
LOWELL NATIONAL HISTORICAL PARK
187676
LOWE 314055
20 47
A4.01
MJG
MJG
MJG
SEPTEMBER 2024
INSTALL NEW PARK FACILITY ACCESS &
MONITORING SYSTEM
SCALE AA4.01
1 MAINTENANCE FACILITY FIRST FLOOR PLAN
CONSTRUCTION NOTES
8.5 IN ACCORDANCE WITH SPEC. SECTION
01 27 00, PLEASE TURN OVER ALL
REMOVED EXISTING DOOR HARDWARE
IN THE BASE AND OPTIONS TO THE
PARK FOR RE-USE.
F FF FG2FG2 NN
S C H E D
S E E
D O O R
SCHED
SEE DOOR
SCHED
SEE DOOR
S C H E D
S E E
D O O R
4" 4"
S C H E D
S E E
D O O R
SCHED
SEE DOOR
SCHED
SEE DOOR
S C H E D
S E E
D O O R
6" 6"
GL-1 GL-14"
S C H E D
S E E
D O O R
FG2
SCHED
SEE DOOR
F1
2"
DOOR
WIDTH
2"
D O O R
H E
IG
H T
EXISTING
H5.01
EXISTING WALL
HEAD
VARIES
EXISTING
WALL
WALL
+ 1 1/8"
EXISTING
J5.01
WALL TYPE
JAMB
VARIES
EXISTING
WALL
WALL
+ 1 1/8"
A/E FIRM - XXXXXXXXXX
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SEAL:
100% FINAL CONSTRUCTION DOCUMENTS
PRIME:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO, INC.
BALTIMORE, MD
CIVIL:
N/A
STRUCTURAL:
N/A
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
:3 :0
A M
A u to d e sk
D o c s:
N P S
LO
W E In s ta ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B N P S
LO
W E In st a ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B rv t
DOOR SCHEDULE & DETAILS
LOWELL NATIONAL HISTORICAL PARK
187676
LOWE 314055
21 47
A5.01
MJG
MJG
MJG
SEPTEMBER 2024
INSTALL NEW PARK FACILITY ACCESS &
MONITORING SYSTEM
NO SCALE
DOOR TYPES
DOOR SCHEDULE - BOOTT MILL
OPENING
NO.
LOCATION DOOR FRAME DETAIL REF. FIRE
RATING
HARDWARE
SET
CARD
READER
POSITION
SWITCH
AUTO
OPERATOR
RX
FUNCTION
THRESHOLD
NO.
GLAZING
TYPE COMMENTSFROM TO TYPE WIDTH HEIGHT MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB
1 - FIRST FLOOR
100A FF 6' - 0" 7' - 0" EX EX EX EX EX EX EX HW-05 Yes Yes No Yes N/A RETROFIT EXISTING PANIC
HARDWARE
100B FG2 3' - 4" 7' - 0" EX EX EX EX EX EX EX HW-05 Yes Yes Yes No N/A RETROFIT EXISTING PANIC
HARDWARE
101 FG2FG2 6' - 0" 7' - 10" AL PTD MFG MFG MFG MFG MFG HW-01 Yes Yes Yes Yes GL-1 102 F 3' - 0" 7' - 0" EX EX EX EX EX EX EX HW-02 Yes Yes No No N/A 122 F 3' - 0" 7' - 0" EX EX EX EX EX EX EX EX Yes Yes No No N/A
2 - SECOND FLOOR
231 NN 6' - 0" 7' - 0" EX EX EX EX EX EX EX HW-02 Yes Yes No Yes N/A
3 - THIRD FLOOR
322 FF 6' - 0" 7' - 0" WD CL F1 HM PTD H5.01 J5.01 HW-03 Yes Yes No Yes N/A UNEVEN LEAFS -
4'-0"/2'-0"(INACTIVE)
323 FF 6' - 0" 7' - 0" WD CL F1 HM PTD H5.01 J5.01 HW-03 Yes Yes No Yes N/A UNEVEN LEAFS -
4'-0"/2'-0"(INACTIVE)
327 FF 6' - 0" 7' - 0" WD CL F1 HM PTD H5.01 J5.01 HW-03 Yes Yes No Yes N/A UNEVEN LEAFS -
4'-0"/2'-0"(INACTIVE)
338 FG2FG2 6' - 0" 7' - 0" EX EX EX EX EX EX EX EX Yes Yes No Yes N/A DELAYED EGRESS LEFT
LEAF, REFER TO LOWE
335201 PROJECT
DRAWINGS AND SPECS FOR
COORDINATION
4 - FOURTH FLOOR
433 F 3' - 0" 7' - 0" EX EX EX EX EX EX EX HW-02 Yes Yes No No N/A 443 FG2FG2 6' - 0" 7' - 0" HM F1 HM PTD H5.01 J5.01 HW-04 Yes Yes Yes Yes GL-1
5 - FIFTH FLOOR
545 FG2FG2 7' - 0" 7' - 0" EX EX EX EX EX EX EX EX Yes Yes No Yes GL-1 553 FG2FG2 6' - 0" 7' - 0" WD CL F1 HM PTD H5.01 J5.01 HW-04 Yes Yes No Yes GL-1
NO SCALE
TYPICAL DOOR FRAMES
NO SCALE
TYPICAL INTERIOR DOOR HEAD DETAILS
NO SCALE
TYPICAL INTERIOR DOOR JAMB DETAILS
DOOR SCHEDULE - KIRK STREET
OPENING
NO.
LOCATION DOOR FRAME DETAIL REF. FIRE
RATING
HARDWARE
SET
CARD
READER
POSITION
SWITCH
AUTO
OPERATOR
RX
FUNCTION
THRESHOLD
NO.
GLAZING
TYPE COMMENTSFROM TO TYPE WIDTH HEIGHT MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB
1 - FIRST FLOOR
103 FG2FG2 5' - 4" 7' - 0" EX EX EX EX EX EX EX EX Yes Yes No Yes EX EX 105 F 3' - 0" 7' - 0" EX EX EX EX EX EX EX EX Yes Yes No No EX EX
DOOR SCHEDULE - MOGAN CC
OPENING
NO.
LOCATION DOOR FRAME DETAIL REF. FIRE
RATING
HARDWARE
SET
CARD
READER
POSITION
SWITCH
AUTO
OPERATOR
RX
FUNCTION
THRESHOLD
NO.
GLAZING
TYPE COMMENTSFROM TO TYPE WIDTH HEIGHT MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB
1 - FIRST FLOOR
101A FG2FG2 6' - 0" 7' - 0" EX EX EX EX EX EX EX EX Yes Yes Yes Yes EX EX 101B FG2FG2 6' - 0" 7' - 0" EX EX EX EX EX EX EX EX Yes Yes Yes Yes EX EX 117 FG2FG2 6' - 0" 7' - 0" EX EX EX EX EX EX EX HW-05 Yes Yes No Yes EX N/A RETROFIT EXISTING PANIC
HARDWARE
2 - SECOND FLOOR
03 FG2 3' - 0" 7' - 0" EX EX EX EX EX EX EX EX Yes Yes No No EX EX
3 - THIRD FLOOR
214 FG2 3' - 0" 7' - 0" EX EX EX EX EX EX EX EX Yes Yes No No EX EX
DOOR SCHEDULE - MAINTENANCE FACILITY
OPENING
NO.
LOCATION DOOR FRAME DETAIL REF. FIRE
RATING
HARDWARE
SET
CARD
READER
POSITION
SWITCH
AUTO
OPERATOR
RX
FUNCTION
THRESHOLD
NO.
GLAZING
TYPE COMMENTSFROM TO TYPE WIDTH HEIGHT MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB
1 - FIRST FLOOR
100 FG 3' - 0" 7' - 0" EX EX EX EX EX EX EX EX Yes No No No EX N/A 117 F 3' - 0" 7' - 0" HM PTD EX EX EX EX EX HW-02 Yes Yes No Yes EX N/A 126 F 3' - 0" 7' - 0" HM PTD EX EX EX EX EX HW-02 Yes Yes No Yes EX N/A
S1
EQ.
GL-1
GL-1
GL-1
GL-1
DOOR WIDTH
D O O R
H E
IG
H T
V.I.F.
12'-0"
EQ.
A5.02
TYP.
A5.02
TYP.
A5.02
TYP.
A5.02
TYP.
A5.02
TYP.
V .I .F
EXT. WALL
GLASS
BACKER ROD AND
SEALANT
LINE OF MULLION
BEYOND
STOREFRONT JAMB
GASKET
SHIM AS REQUIREDEXT. STEEL FRAMING
EXT. WALL
GLASS
BACKER ROD AND
SEALANT
LINE OF
MULLION
BEYOND
STOREFRONT HEAD
GASKET
GLASS STOP
SHIM AS REQUIRED
GLASS
LINE OF MULLION
BEYOND
STOREFRONT SILL MULLION
GASKET
EXT. CONCRETE
SLAB
GLASS
BACKER ROD AND
SEALANT
LINE OF MULLION
BEYOND
STOREFRONT SILL
GASKET
SHIM AS REQUIRED
GLASS
LINE OF MULLION
BEYOND
HORIZONTAL MULLION
GASKET
GLASS STOP
SCALE AA5.02
1 S1
A/E FIRM - XXXXXXXXXX
8 0 8 16
SCALE OF FEET
TITLE OF SHEET DRAWING NO.
PMIS/PKG NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
SCALE A
SEAL:
100% FINAL CONSTRUCTION DOCUMENTS
PRIME:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO, INC.
BALTIMORE, MD
CIVIL:
N/A
STRUCTURAL:
N/A
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
:3 :1
A M
A u to d e sk
D o c s:
N P S
LO
W E In s ta ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B N P S
LO
W E In st a ll N e w
P a rk
F a c ili ty
A c c e ss a n d
M o n it o ri n g
S ys te m
(s u b to
V H B rv t
STOREFRONT ELEVATION &
DETAILS
LOWELL NATIONAL HISTORICAL PARK
187676
LOWE 314055
22 47
A5.02
MJG
MJG
MJG
SEPTEMBER 2024
INSTALL NEW PARK FACILITY ACCESS &
MONITORING SYSTEM
SCALE BA5.02
2 STOREFRONT JAMB DETAIL
SCALE BA5.02
3 STOREFRONT HEAD DETAIL
SCALE BA5.02
5 STOREFRONT VERT. MULLION DETAIL
SCALE BA5.02
4 STOREFRONT SILL DETAIL
SCALE BA5.02
6 STOREFRONT HORIZ. MULLION DETAIL
ACP
NVR
PS
DM
K
L
P
WS
D
E
M
L
D
P
E
M
S
I
I
M
V
DR
R
P
ABBREVIATIONS
REFERENCE SYMBOLS
KEYNOTE NUMBER REVISION NUMBER
CONSTRUCTION BULLETIN NUMBER
ETHERNET/FAST ETHERNET
GIGABIT ETHERNET (SHORT WAVELENGTH)
GIGABIT ETHERNET (LONG WAVELENGTH)
ABOVE CEILING/ALTERNATING CURRENT
ACCESS CONTROL PANEL
ACOUSTICAL CEILING TILE
AUTOMATIC DOOR OPENER
ABOVE FINISHED FLOOR
AUTHORITY HAVING JURISDICTION
ALTERNATE
ALARM PANEL
APPLICATION PROGRAMMING INTERFACE
ARCHITECTURAL
ABOVE SUSPENDED CEILING
ACCESS CONTROL MANAGEMENT SYSTEM
AUTOMATIC
AMERICAN WIRE GAUGE
BUILDING AUTOMATION SYSTEM
BUILDING CONTROL SYSTEM
BUILDING ENTRANCE FACILITY
BELOW FINISH CEILING
BELOW FLOOR LEVEL
BUILDING
BUILDING MANAGEMENT SYSTEM
BREAKER
CONDUIT
CIRCUIT
CIRCUIT BREAKER
CEILING
CONTRACTOR
CORRIDOR
CONSOLIDATION POINT
CABLE TRAY
DIRECT BURIAL
DIRECT CURRENT
DEDICATED
DETAIL
DIAMETER
DOWN
DISCONNECT SWITCH
DIGITAL VIDEO RECORDER
EMPTY CONDUIT/ELECTRICAL CONTRACTOR
ELECTRIC DUCT BANK
ENTRANCE FACILITY
EQUIPMENT GROUND
ENGINE GENERATOR SET
EQUIPMENT INTERMEDIATE DISTRIBUTION FACILITY
EXPANSION JOINT
ELECTRIC/ELECTRICAL
EMERGENCY
ELECTROMAGNETIC INTERFERENCE
ELECTRICAL METALLIC TUBING
END-OF-LINE RESISTOR
EQUIPMENT
EQUIPMENT ROOM
EXISTING TO REMAIN
FLUSH WITH FINISHED CEILING
FLUSH WITH FINISHED FLOOR
FLUSH WITH FINISHED WALL
FIRE ALARM
FIRE ALARM CONTROL PANEL
AT FLOOR LINE
FLEXIBLE
FLOOR
FLOW SWITCH
FUSED SAFETY SWITCH
FLAME SAFEGUARD CONTROL PANEL
FULL VOLTAGE NON-REVERSING
FOREIGN EXCHANGE OFFICE
GLOBAL AREA NETWORK
GIGABIT INTERFACE CONVERTER
GENERAL CONTRACTOR
GROUND FAULT CIRCUIT INTERRUPTER
GROUND
GENERATOR
GALVANIZED RIGID CONDUIT
GRAPHICAL USER INTERFACE
HANDHOLE
HEIGHT/HEAT TRACE
HIGH VOLTAGE
INTERMEDIATE DISTRIBUTION FACILITY
INTERMEDIATE METAL CONDUIT
INTERNET PROTOCOL
JUNCTION BOX
KNOCK-OUT
KILOVOLT
10/100BaseTX 1000BaseSX 1000BaseLX
AC
ACP
ACT
ADO
AFF
AHJ
ALT
AP
API
ARCH
ASC
ACMS
AUTO
AWG
BAS
BCS
BEF
BFC
BFL
BLDG
BMS
BRKR
C
CCT
CCT BKR
CLG
CONTR
CORR
CP
CT
DB
DC
DED
DET
DIA
DN
DS
DVR
EC
EDB
EF
EG
EGS
EIDF
EJ
ELEC
EMER
EMI
EMT
EOL
EQUIP
ER
ETR
F/FC
F/FF
F/FW
FA
FACP
FL
FLEX
FLR
FS
FSS
FSCP
FVNR
FXO
GAN
GBIC
GC
GFCI
GND
GEN
GRC
GUI
HH
HT
HV
IDF
IMC
IP
JB
KO
KV
KILOVOLT-AMPERES
KILOWATTS
KILOWATT HOURS
LOCAL AREA NETWORK
LOW VOLTAGE
MASTER ANTENNA TELEVISION
MECHANICAL CONTRACTOR
MAIN DISTRIBUTION FACILITY
MAIN EQUIPMENT ROOM
MAINTENANCE HOLE
MULTIMODE
MEGA-PIXEL
MOUNTED
MOUNTING
MOUNTING HEIGHT
NOT APPLICABLE
NEW CONNECTION/NORMALLY CLOSED
NOT IN CONTRACT
NORMALLY OPEN
NOT TO SCALE
NETWORK VIDEO RECORDER
ON CENTER
OWNER FURNISHED CONTRACTOR INSTALLED
OWNER FURNISHED OWNER INSTALLED
OPERATING SYSTEM
PULL BOX/PUSH-BUTTON
PRIVATE BRANCH EXCHANGE
PLUMBING CONTRACTOR / PHOTOCELL /
PERSONAL COMPUTER
POWER DISTRIBUTION UNIT
POWER FACTOR
PHASE
PLUMBING
PANEL
POWER
REFLECTED CEILING PLAN
RECESSED
RECEPTACLE
RELOCATE
REQUIRED
RADIO FREQUENCY
ROUGH-IN: TO BE PROVIDED WITH CAP /
COVER AND PAINTED TO MATCH SURFACE
REMOTE MODULES
RACK UNIT
SOFTWARE DEVELOPMENT KIT
SHEET
SIGNAL
SIMILAR
STANDARD INFORMATION OUTLET
SESSION INITIATION PROTOCOL
SINGLEMODE
SECURITY MANAGEMENT SYSTEM
SPECIFICATION
SAFETY SWITCH
STATION
SWITCH
TERMINAL BOX
TRANSPORT CONTROL PROTOCOL
TELEPHONE
TO FLOOR ABOVE
TO FLOOR BELOW
TELECOMMUNICATIONS OUTLET
TELECOM ROOM
TAMPER SWITCH/TIME SWITCH
TELEVISION
TRANSIENT VOLTAGE SURGE SUPPRESSION
TYPICAL
UNDER COUNTER
UNDERGROUND
UNLESS OTHERWISE NOTED
UNINTERRUPTIBLE POWER SUPPLY
UNIVERSAL SERIAL BUS
VOLTAGE
VOICE COMMUNICATION SYSTEM
VIDEO MANAGEMENT SYSTEM
VOICE OVER INTERNET PROTOCOL
WIRE
WITH
WIDE AREA NETWORK
WIRELESS LOCAL AREA NETWORK
WEATHERPROOF
WALL SURFACE
WATER TIGHT
EXIST
TRANSFORMER
EXPLOSION PROOF
KVA
KW
KWH
LAN
LV
MATV
MC
MDF
MER
MH
MM
MP
MTD
MTG
MTG HGT
NA
NC
NIC
NO
NTS
NVR
OC
OFCI
OFOI
OS
PB
PBX
PC
PDU
PF
PH
PLBG
PNL
PWR
RCP
REC
RECEP
REL
REQD
RF
R/I
RM
RU
SDK
SHT
SIG
SIM
SIO
SIP
SM
SMS
SPEC
SS
STA
SW
TB
TCP
TEL
TFA
TFB
TO
TR
TS
TV
TVSS
TYP
UC
UG
UON
UPS
USB
V
VCS
VMS
VoIP
W W/
WAN
WLAN
WP
WS
WT
X
XFMR
XP
EMERGENCY REQUEST TO EXIT DEVICE (NIC)
MOUNTING LOCATION: WALL
MOUNTING HEIGHT: AS NOTED
PANIC/DURESS BUTTON
MOUNTING LOCATION: UNDER DESKTOP
MOUNTING HEIGHT: REFER TO DETAIL
KNOX BOX (NIC)
MOUNTING LOCATION: WALL
*PROVIDE TAMPER/DRY-CONTACT CLOSURES TO ALL
RAPID-ENTRY BOXES. RAPID ENTRY ALARMS SHALL BE UNIQUELY
IDENTIFIED ON THE ACMS.
ACCESS CONTROL PANEL
CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION
NETWORK VIDEO RECORDER (NVR)
CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION
POWER SUPPLY
DOOR TAGXXXX
ELECTRICAL SYMBOLS AND ABBREVIATIONS
POLE MOUNTED
#-## = FLOOR-SEQUENTIAL NUMBER
MULTI-IMAGER MEGA PIXEL CAMERA
TYPE:180 DEGREE
CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION.#-##
INTERCOM SUBSTATION
MOUNTING LOCATION: AS NOTED
MOUNTING HEIGHT: AS NOTED
CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION
ACCESS CONTROL READER
MOUNTING LOCATION: WALL
MOUNTING HEIGHT: REFER TO DETAILS
ELECTRIFIED LOCKING HARDWARE
ELECTRIFIED PANIC HARDWARE
DOOR POSITION SWITCH
MOUNTING LOCATION: REFER TO DRAWINGS/DETAIL
MOUNTING HEIGHT: REFER TO DETAIL SHEET
SECURITY WORKSTATION (PROVIDED BY CONTRACTOR)
MOUNTING LOCATION: DESK (UNLESS OTHERWISE NOTED)
MOUNTING HEIGHT: AS NOTED
CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION
LCD MONITOR
MOUNTING LOCATION: DESK (UNLESS OTHERWISE NOTED)
MOUNTING HEIGHT: AS NOTED
MULTI-IMAGER MEGA PIXEL CAMERA
TYPE:360 DEGREE
CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION.#-##
MOUNTING HEIGHT: REFER TO DETAIL SHEET
HIGH-SECURITY DOOR POSITION SWITCH
MOUNTING LOCATION: REFER TO DRAWINGS/DETAIL
MOUNTING HEIGHT: REFER TO DETAIL SHEET
ROLL-UP SHUTTER DOOR POSITION SWITCH
MOUNTING LOCATION: REFER TO DRAWINGS/DETAIL
MOUNTING HEIGHT: AS NOTED
CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION
MOUNTING LOCATION: REFER TO DRAWINGS/DETAIL
VIDEO INTERCOM SUBSTATION
LOCAL ALARM (NIC)
MOUNTING LOCATION: REFER TO DETAILS
MOUNTING HEIGHT: AS NOTED
DEVICE MOUNTS
DETAIL REFERENCE
TOP DESIGNATES DETAIL NUMBER
BOTTOM DESIGNATES SHEET NUMBER
DET #
SHT #
MOUNTING LOCATION: DESK
BADGE PRINTER
CAMERAS
PEDESTAL/GOOSENECK MOUNTED
MOUNTING HEIGHT: AS NOTED
CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION
MOUNTING LOCATION: CONTROLLED THROUGH ACMS
INTERCOM MASTER STATION
MOUNTING LOCATION: DESK
MOUNTING HEIGHT: REFER TO DETAIL SHEET
DOOR RELEASE BUTTON
REDIRECTOR/DEMARCATION PANEL
CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION
PARAPET MOUNTED (J-BOX)
SURFACE MOUNTED (J-BOX)
RECESS MOUNTED (J-BOX)
WIRELESS PANIC/DURESS BUTTON
MOUNTING LOCATION: UNDER DESKTOP
MOUNTING HEIGHT: REFER TO DETAIL
OTHER
HEAD-END EQUIPMENT
ACCESS CONTROL
INTRUSION SYSTEM
DOOR MONITORING
CALL INITIATION DEVICES
EMERGENCY BREAK GLASS (NIC)
MOUNTING LOCATION: WALL
MOUNTING HEIGHT: AS NOTED
ELECTRO-MAGNETIC LOCKING HARDWARE
SIZE: REFER TO DRAWINGS
FIXED IP CAMERA
MOUNTING LOCATION: WALL
CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION.
ELECTRIFIED STRIKE
DOOR HARDWARE
SERVER RACK (NIC)
MOUNTING LOCATION: REFER TO DETAILS
MOUNTING HEIGHT: AS NOTED
CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION
1. REFER TO DRAWINGS AND DETAIL SHEET(S) FOR MOUNTING LOCATION AND HEIGHT INFORMATION.
2. TYPICAL SYMBOLS INDICATED. ALL SYMBOLS MAY NOT BE REFLECTED ON PLAN DRAWINGS OR USED.
A
ACCESS CONTROL READER: FUTURE/TENANT DEVICE
MOUNTING: UNLESS OTHERWISE NOTED ON DRAWINGS
CONTRACTOR TO PROVIDE ONLY ROUGH-IN AND CABLING PULL
STRING TO THE LOCATION INDICATED ON SECURITY DRAWING(S)
A F
VISITOR BADGE PRINTER
MOUNTING LOCATION: DESK
D DELAYED EGRESS
ENCLOSED CAMERA INDICATES
CEILING/RECESSED MOUNT TYPE
MOUNTING LOCATION: REFER TO DRAWINGS
DRY CONTACT RELAY CLOSURE
ACCESS CONTROL READER: MULLION MOUNT
MOUNTING LOCATION: DOOR FRAME
A M
MOUNTING HEIGHT: REFER TO DETAIL
T TEMPERATURE, HUMIDITY, AND WATER LEAK ENVIRONMENTAL
CONTROLLER
REQUEST-TO-EXIT PASSIVE INFRARED (PIR) MOTION SENSOR.
MOUNTING LOCATION: CEILING
360-DEGREE PANORAMIC CAMERA
TYPE: FISH-EYE
CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION.
*DOOR HARDWARE PROVIDED BY DIVISION 08. DOOR HARDWARE SYMBOLS
SHOWN FOR COORDINATION AND INFORMATION PURPOSES ONLY.
100% FINAL CONSTRUCTION DOCUMENTS
CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021
MECHANICAL:
AEI
MADISON, WI
ELECTRICAL:
AEI
MADISON, WI
STRUCTURAL:
N/A
CIVIL:
N/A
PRIME/ARCH:
VHB
WILLIAMSBURG, VA
ARCHITECT:
GWWO…