This document is a set of 100% Final Construction Documents for the "Install New Park Facility Access and Monitoring System" project at Lowell National Historical Park, developed under Contract #140P2021D003 and Task Order #140P8223F0021.

The project encompasses installation of a comprehensive security and access control system across four distinct facilities: Boott Mill (multiple floors), Mogan Cultural Center (multiple floors), Kirk Street Agent's House (multiple floors), and Facilities Maintenance building. The scope includes implementation of video surveillance cameras (fixed, wide-angle, panoramic, and fish-eye types mounted on walls, ceilings, and parapets), access control readers and panels, door monitoring systems, electrified locking hardware, intercom stations, emergency communication devices, and fiber optic backbone infrastructure. The system architecture utilizes dedicated network switches with 20% future capacity reserves, security workstations, network video recorders, and access control management systems. All cabling must be routed through existing telecommunications rooms, with CAT 6A data connections required for camera installations. The documents detail architectural demolition requirements (removal of existing storefront systems, hollow metal frames, doors, and hardware), construction specifications for fastening to historic timber beams and masonry walls with compliance controls, and coordination requirements with the Park's 106 compliance coordinator for any latent conditions discovered during work. Design firms include VHB (Prime/Architecture, Williamsburg, VA), GWWO (Architecture, Hartford, CT), and AEI (Mechanical/Electrical, Madison, WI). The documents comprise 47 sheets of architectural, electrical, and construction detail drawings with schedules for all cameras, card readers, and door hardware installations.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTALL NEW PARK FACILITY ACCESS

AND MONITORING SYSTEM

LOWELL NATIONAL HISTORICAL PARK

314055

VARIOUS LOCATIONS

INSTALL NEW PARK FACILITY ACCESS

AND MONITORING PLAN

1 47

100% FINAL CONSTRUCTION

DOCUMENTS

100% FINAL CONSTRUCTION DOCUMENTS

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

STRUCTURAL:

N/A

CIVIL:

N/A

PRIME/ARCH:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO WEST

HARTFORD, CT

Sheet # Sub Sheet Number Sheet Name Contract Line Item Number (CLIN) Refer to Spec Section 01 27 00

GENERAL SHEETS

1 G0.00 COVER SHEET

2 G0.01 SHEET INDEX

ARCHITECTURAL

3 A1.00 ABBREVIATIONS, SYMBOLS, AND MATERIALS ALL

4 AD1.01 BOOTT MILL - FIRST FLOOR PLAN AREA 2 DEMO CLIN #1 - BASE BID #1

5 AD1.02 BOOTT MILL - THIRD FLOOR PLAN AREA 1 DEMO CLIN #1 - BASE BID #1

6 AD1.03 BOOTT MILL - FOURTH FLOOR PLAN AREA 2 DEMO CLIN #1 - BASE BID #1

7 AD1.04 BOOTT MILL - FIFTH FLOOR PLAN AREA 2 DEMO CLIN #1 - BASE BID #1

8 AD1.05 MAINTENANCE FACILITY FIRST FLOOR DEMO PLAN CLIN #4 - OPTION #3

9 A1.01 BOOTT MILL - FIRST FLOOR PLAN AREA 1 CLIN #1 - BASE BID #1

10 A1.02 BOOTT MILL - FIRST FLOOR PLAN AREA 2 CLIN #1 - BASE BID #1

11 A1.03 BOOTT MILL - SECOND FLOOR PLAN AREA 2 CLIN #1 - BASE BID #1

12 A1.04 BOOTT MILL - THIRD FLOOR PLAN AREA 1 CLIN #1 - BASE BID #1

13 A1.05 BOOTT MILL - THIRD FLOOR PLAN AREA 2 CLIN #1 - BASE BID #1

14 A1.06 BOOTT MILL - FOURTH FLOOR PLAN AREA 1 CLIN #1 - BASE BID #1

15 A1.07 BOOTT MILL - FOURTH FLOOR PLAN AREA 2 CLIN #1 - BASE BID #1

16 A2.01 MOGAN CC FIRST FLOOR PLAN CLIN #3 - OPTION #2

17 A2.02 MOGAN CC MEZZANINE FLOOR PLAN CLIN #3 - OPTION #2

18 A2.03 MOGAN CC SECOND FLOOR PLAN CLIN #3 - OPTION #2

19 A3.01 KIRK STREET FIRST FLOOR PLAN CLIN #2 - OPTION #1

20 A4.01 MAINTENANCE FACILITY FIRST FLOOR CLIN #4 - OPTION #3

21 A5.01 STOREFRONT ELEVATION & DOOR SCHEDULE ALL

22 A5.02 STOREFRONT ELEVATION & DETAILS CLIN #1 - BASE BID #1

ELECTRICAL

23 E0.00 ELECTRICAL SYMBOLS AND ABBREVIATIONS ALL

24 E1.01 BOOTT MILL - ELECTRICAL FIRST FLOOR PLAN - AREA 1 CLIN #1 - BASE BID #1

25 E1.02 BOOTT MILL - ELECTRICAL FIRST FLOOR PLAN - AREA 2 CLIN #1 - BASE BID #1

26 E1.03 BOOTT MILL - ELECTRICAL SECOND FLOOR PLAN - AREA 1 CLIN #1 - BASE BID #1

27 E1.04 BOOTT MILL - ELECTRICAL SECOND FLOOR PLAN - AREA 2 CLIN #1 - BASE BID #1

28 E1.05 BOOTT MILL - ELECTRICAL THIRD FLOOR PLAN - AREA 1 CLIN #1 - BASE BID #1

29 E1.06 BOOTT MILL - ELECTRICAL THIRD FLOOR PLAN - AREA 2 CLIN #1 - BASE BID #1

30 E1.07 BOOTT MILL - ELECTRICAL FOURTH FLOOR PLAN - AREA 1 CLIN #1 - BASE BID #1

31 E1.08 BOOTT MILL - ELECTRICAL FOURTH FLOOR PLAN - AREA 2 CLIN #1 - BASE BID #1

32 E1.09 BOOTT MILL - ELECTRICAL FIFTH FLOOR PLAN - AREA 1 CLIN #1 - BASE BID #1

33 E1.10 BOOTT MILL - ELECTRICAL FIFTH FLOOR PLAN - AREA 2 CLIN #1 - BASE BID #1

34 E2.01 MOGAN CC - ELECTRICAL FIRST FLOOR PLAN CLIN #3 - OPTION #2

35 E2.02 MOGAN CC - ELECTRICAL MEZZANINE FLOOR PLAN CLIN #3 - OPTION #2

36 E2.03 MOGAN CC - ELECTRICAL THIRD FLOOR PLAN CLIN #3 - OPTION #2

37 E3.01 KIRK STREET - ELECTRICAL BASEMENT FLOOR PLAN CLIN #2 - OPTION #1

38 E3.02 KIRK STREET - FIRST FLOOR PLAN CLIN #2 - OPTION #1

39 E3.03 KIRK STREET - SECOND FLOOR PLAN CLIN #2 - OPTION #1

40 E3.04 KIRK STREET - THIRD FLOOR PLAN CLIN #2 - OPTION #1

41 E4.01 MAINTENANCE FACILITY - FIRST FLOOR PLAN - AREA 1 CLIN #4 - OPTION #3

42 E4.02 MAINTENANCE FACILITY - ELECTRICAL FIRST FLOOR PLAN - AREA 2 CLIN #4 - OPTION #3

43 E7.00 FIBER OPTIC BACKBONE RISER DIAGRAM CLIN #5 - OPTION #4

44 E8.00 SECURITY DETAILS ALL

45 E8.01 SECURITY DETAILS ALL

46 E8.02 SECURITY DETAILS ALL

47 E9.00 DETAILS AND SCHEDULES ALL

SHEET INDEX

WALL TYPE

WINDOW TYPE

DOOR NUMBER

ROOM IDENTIFICATION

DEMOLITION NOTE

CONSTRUCTION NOTE

DETAIL/ PARTIAL

SECTION

REFERENCE

NEW WORK

KEY TO SYMBOLS

SEE MECHANICAL, ELECTRICAL, AND PLUMBING

DRAWINGS AS APPLICABLE FOR SYMBOLS RELATING TO M.E.P. WORK

(ARCHITECTURAL DRAWINGS ONLY)

EXISTING

WORK

8.1

8.1

X

X

X

NAME

XXX

A A1

A A1

SIM

A1

SIM

X

ELEVATION

REFERENCE

SECTION

REFERENCE

A/E ARCHITECTURE/ENGINEERING

ABA ARCHITECTURAL BARRIERS ACT

ABAAS ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS

ADA AMERICANS WITH DISABILITIES ACT

ADD ADDITION

ADMIN ADMINISTRATION

AFF ABOVE FINISHED FLOOR

AL ALUMINUM

APPROX APPROXIMATELY

AW AWNING

BLDG BUILDING

BLTS BOLTS

BO BOTTOM OF

CL CENTERLINE

CLO CLOSET

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CO CONTRACTING OFFICER

DH DOUBLE-HUNG

DIA/ø DIAMETER

DWGS DRAWINGS

EL/ELEV ELEVATION

EQ EQUAL

ETR EXISTING TO REMAIN

EX/EXT EXISTING

FCU FAN COIL UNIT

F FIXED

FF FINISHED FLOOR

GL GLASS, GLAZING

GWB GYPSUM WALL BOARD

HABS HISTORIC AMERICAN BUILDING SURVEY

HM HOLLOW METAL

HSR HISTORIC STRUCTURE REPORT

IBC INTERNATIONAL BUILDING CODE

IEBC INTERNATIONAL EXISTING BUILDING CODE

INT INTERIOR

LARPM LIQUID-APPLIED REINFORCED POLYMER MEMBRANE

LG LARGE

MAL MATERIAL

MIN MINIMUM

MAX MAXIMUM

MEP MECHANICAL/ELECTRICAL/PLUMBING

N/A NOT APPLICABLE

NIC NOT IN CONTRACT

NO NUMBER

NPS NATIONAL PARK SERVICE

OC ON CENTER

OH OPPOSITE HAND

OZ OUNCE

PART PARTIAL

PT PRESSURE-TREATED

REF REFRIGERATOR

REQ'D REQUIRED

RM ROOM

SF SQUARE FEET

SH SINGLE-HUNG

SI SQUARE INCH

SIM SIMILAR

SM SMALL

SS STAINLESS STEEL

TECH TECHNICAL

TYP TYPICAL

USPP UNITED STATES PARK POLICE

VENT VENTILATION

VIF VERIFY IN FIELD

W/ WITH

WD WOOD

KEY TO ABBREVIATIONS

ARCHITECTURAL DRAWINGS ONLY DEMOLITION SYMBOLS & NOTES

SEE MECHANICAL, ELECTRICAL, AND PLUMBING

DRAWINGS AS APPLICABLE FOR SYMBOLS RELATING TO M.E.P. WORK

SCOPE OF WORK

APPLIES TO THE

ITEM SHOWN

WITH DASHED

LINES. SEE

DEMOLITION

DRAWINGS AND

NOTES FOR

EXTENT.

SCOPE OF

WORK APPLIES

TO THE ENTIRE

ROOM FOR THE

ITEM OF WORK

IDENTIFIED

EITHER IN THE

NOTE OR AT

THE SYMBOL.

THE FOLLOWING NOTES APPLY TO ALL DEMOLITION WORK WHETHER INDICATED ON THE

DEMOLITION DRAWINGS OR REQUIRED ELSEWHERE IN THE CONTRACT DOCUMENTS.

1.1 GENERAL REQUIREMENTS: THE FOLLOWING GENERAL REQUIREMENTS NOTES APPLY TO ALL

DEMOLITION WORK. THE NOTES ARE NOT SYMBOLICALLY REFERENCED ELSEWHERE IN THE

DRAWINGS.

1.2 THE SCOPE OF THE ARCHITECTURAL DEMOLITION FOR THIS PROJECT, APART FROM

SPECIFIED UNDER SECTION "SELECTIVE DEMOLITION," IS SHOWN IN SHEETS NUMBERED AD1.01

THROUGH AD1.05.

1.3 THE DEMOLITION AS INDICATED ON THE DRAWINGS APPLIES TO THE DEFINED SCOPE OF

WORK. THE DRAWINGS, IN GENERAL, DO NO SPECIFICALLY ADDRESS DEMOLITION THAT IS

DEPENDENT ON THE CONTRACTOR'S INDIVIDUAL "MEANS AND METHODS" OF EXECUTING THE

WORK. THE REQUIREMENT FOR THIS DEMOLITION IS UNDER SPECIFICATION SECTION

"SELECTIVE DEMOLITION."

1.4 THE EXTENT OF DEMOLITION SHALL BE COORDINATED WITH THE NEW AND REBUILT WORK.

1.5 "EXTENT OF WORK" SYMBOLS ARE DEFINED AS FOLLOWS:

1.6 THE TERM "REMOVE" IS DEFINED IN THE SPECIFICATION SECTION "SELECTIVE DEMOLITION."

1.7 DURING DEMOLITION, PROVIDE TEMPORARY SUPPORT TO ADJACENT EXISTING

CONSTRUCTION AND STRUCTURE TO HOLD IN PLACE WITHOUT ANY MOVEMENT UNTIL NEW

SUPPORTING WORK IS IN PLACE.

1.8 TEMPORARY DUST PARTITIONS AND HEPA DUST COLLECTION TO BE PROVIDED IN PARK

OFFICE AREAS AND VISITOR SERVICE AREAS.

8.1

8.1 8.1

SCOPE OF

WORK

APPLIES TO

THE ENTIRE

OPENING FOR

THE ITEM OF

WORK

IDENTIFIED

A/E FIRM - XXXXXXXXXX

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SEAL:

100% FINAL CONSTRUCTION DOCUMENTS

PRIME:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO, INC.

BALTIMORE, MD

CIVIL:

N/A

STRUCTURAL:

N/A

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

:3 :0

A M

A u to d e sk

D o c s:

N P S

LO

W E In s ta ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B N P S

LO

W E In st a ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B rv t

ABBREVIATIONS, SYMBOLS, AND

MATERIALS

LOWELL NATIONAL HISTORICAL PARK

187676

LOWE 314055

3 47

A0.01

MJG

MJG

MJG

SEPTEMBER 2024

INSTALL NEW PARK FACILITY ACCESS &

MONITORING SYSTEM

DEMOLITION NOTES

Demo Note # Description

8.1 CONTRACTOR SHALL CAREFULLY REMOVE STOREFRONT SYSTEM - INCLUDING FRAME, DOORS, AND ASSOCIATED HARDWARE - IN ACCORDANCE WITH SPEC. SECTION 02 41 00, SELECTIVE DEMOLITION. IF ANY UNKNOWN OR LATENT CONDITIONS WHERE SYSTEM MEETS EXISTING CEILING, WALLS, JAMBS, AND SILL CONDITIONS ARE DISCOVERED NOTIFY THE PARK'S 106 COMPLIANCE COORDINATOR AND DOCUMENT PHOTOGRAPHICALLY. PROTECT AND STORE EXISTING AUTO OPERATOR FOR FUTURE USE AND INSTALLATION IN

NEW STOREFRONT SYSTEM.

8.2 CONTRACTOR SHALL CAREFULLY REMOVE HOLLOW METAL FRAMES, SILLS THAT ARE ANCHORED TO EXISTING WOOD FLOOR, PAIR OF WOOD DOORS, AND ASSOCIATED HARDWARE IN ACCORDANCE WITH SPEC. SECTION 02 41 00, SELECTIVE DEMOLITION. IF ANY UNKNOWN OR LATENT CONDITIONS WHERE SYSTEMS MEET EXISTING SILL OR THRESHOLD CONDITIONS ARE DISCOVERED NOTIFY THE PARK'S 106 COMPLIANCE

COORDINATOR AND DOCUMENT PHOTOGRAPHICALLY.

8.3 CONTRACTOR SHALL CAREFULLY REMOVE PAIR OF DOORS & ASSOCIATED HARDWARE IN ACCORDANCE WITH SPEC. SECTION 02 41 00, SELECTIVE DEMOLITION. EXISTING HOLLOW METAL FRAME TO REMAIN. IF ANY UNKNOWN OR LATENT CONDITIONS WHERE SYSTEMS MEET EXISTING FRAME OR THRESHOLD CONDITIONS ARE DISCOVERED NOTIFY THE PARK'S 106 COMPLIANCE COORDINATOR AND DOCUMENT PHOTOGRAPHICALLY.

8.4 CONTRACTOR SHALL CAREFULLY REMOVE EXTERIOR DOORS IN ACCORDANCE WITH SPEC. SECTION 02 41 00, SELECTIVE DEMOLITION. IF ANY UNKNOWN OR LATENT CONDITIONS WHERE SYSTEM MEETS EXISTING CEILING, WALLS, JAMBS, AND SILL CONDITIONS ARE DISCOVERED NOTIFY THE PARK'S 106 COMPLIANCE

COORDINATOR AND DOCUMENT PHOTOGRAPHICALLY. EXISTING FRAME TO REMAIN.

8.5 EXISTING SECURITY ALARM CONTACTS AND WIRING TO BE TEMPORARILY DISCONNECTED AND ALARM

DE-ARMED DURING CONSTRUCTION.

8.6 PROVIDE SECURE, TEMPORARY DUST PARTITION WITH TEMPORARY DOOR TO SECURE CURATORIAL SPACE

DURING CONSTRUCTION. COORDINATE TEMPORARY CONSTRUCTION WITH COR/PARK LE.

CONSTRUCTION NOTES.

Construction Note # Description

8.1 ANCHORING INTO EXISTING BRICK MASONRY BEARING WALLS - WHERE ANCHORING INTO EXISTING

MASONRY BEARING WALLS MAY BE NECESSARY FOR THE INSTALLATION OF HM OR ALUMINUM

STOREFRONT FRAME SYSTEMS, FASTENING IS ALLOWED WITHIN THE FOLLOWING 106 COMPLIANCE

CONTROLS:

A. FASTENERS MAY BE INSTALLED ONLY IN EXISTING MORTAR JOINTS. PRE-DRILLING IS

RECOMMENDED. IF FASTENERS LARGER THAN 3/8� MORTAR JOINT THICKNESS ARE REQUIRED REVIEW WITH PARK 106 COMPLIANCE COORDINATOR / HISTORICAL ARCHITECT IN ADVANCE OF SCHEDULED

ACTIVITY TO INSPECT AND EVALUATE EXISTING CONDITIONS.

B. POWDER ACTUATED FASTENERS ARE PROHIBITED FROM USE INTO EXISTING MASONRY WALLS.

C. USE THE SHORTEST STRUCTURALLY SOUND FASTENERS ABLE TO HOLD NEW DOOR FRAMES.

8.2 FASTENING TO EXISTING VIRGIN HEART TIMBER BEAMS AND PLANK CEILING - FASTENING TO THE UNDERSIDE OF EXISTING 6" X 12" STRUCTURAL TIMBER BEAMS (VIRGIN HEART PINE TIMBER/SOUTHERN YELLOW PINE TIMBER) AND/OR THE UNDERSIDE OF EXPOSED PINE PLANK CEILING BOARDS, (9/16" THICK X 2" PLANKS OVER 2 3/4" THICK PLANKS 8-12" WIDTH) IS ALLOWED WITHIN THE FOLLOWING

106 COMPLIANCE CONTROLS:

A. POWDER ACTUATED FASTENERS ARE PROHIBITED FROM USE INTO THE EXISTING VIRGIN HEART

TIMBER BEAMS AND PLANK CEILING.

B. USE THE SHORTEST STRUCTURALLY SOUND FASTENERS ABLE TO HOLD NEW CONSTRUCTION

(RECOMMEND 3/4" - 1 1/4" DEPTH WOOD SCREWS).

8.3 FASTENING TO EXISTING WOOD PLANK FLOORING - THE EXISTING HISTORICAL FLOOR/CEILING CONSTRUCTION CONSISTS OF 9/16" THICK X 2" WIDTH VIRGIN HEART PINE PLANKS OF VARIOUS

LENGTHS, OVER 2 3/4" THICK PLANKS 8-12" WIDTH OF VARIOUS LENGTHS.

A. POWDER ACTUATED FASTENERS ARE PROHIBITED FROM USE INTO THE EXISTING WOOD

FLOORS.

B. USE THE SHORTEST STRUCTURALLY SOUND FASTENERS ABLE TO SECURE NEW

CONSTRUCTION (RECOMMEND 3/4" - 1 1/4", MAX. 2" DEPTH WOOD SCREWS).

C. WHEREVER POSSIBLE, AVOID FASTENING TO HISTORICAL FLOORS AND FASTEN/ANCHOR TO

EXISTING OR NEW WALL CONSTRUCTION.

8.4 CONTRACTOR SHALL REMOVE EXISTING CAMERAS AND INFRASTRUCTURE AS REQUIRED AT KIRK STREET

AGENT'S HOUSE FIRST FLOOR, AND TURN OVER TO THE PARK FOR RE-USE.

8.5 IN ACCORDANCE WITH SPEC. SECTION 01 27 00, PLEASE TURN OVER ALL REMOVED EXISTING DOOR

HARDWARE IN THE BASE AND OPTIONS TO THE PARK FOR RE-USE.

8.6 PROVIDE SECURE, TEMPORARY DUST PARTITION WITH TEMPORARY DOOR TO SECURE CURATORIAL SPACE

DURING CONSTRUCTION. COORDINATE TEMPORARY CONSTRUCTION WITH COR/PARK LE.

8.7 EXISTING SECURITY ALARM CONTACTS AND WIRING TO BE TEMPORARILY DISCONNECTED AND ALARM

DE-ARMED DURING CONSTRUCTION.

GENERAL NOTES

1. THE EXISTING CONDITIONS ARE DRAWN TO OUR BEST

KNOWLEDGE. CONTRACTOR TO VERIFY EXISTING DIMENSIONS IN

THE FIELD.

ELEC.

TROLLEY

MAINTENANCE

FACILITY

TELE. STORAGE

GALLERY

ELEV.

MACHINE

ROOM

CATERING

KITCHEN

WOMEN

MEN

FIRE

PUMP

ELEC.

CLOSET

MAIN

LOBBY

ENTRANCE

LOBBY

JAN.

8.1

A/E FIRM - XXXXXXXXXX

8 0 8 16

SCALE OF FEET

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SCALE A

SEAL:

100% FINAL CONSTRUCTION DOCUMENTS

PRIME:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO, INC.

BALTIMORE, MD

CIVIL:

N/A

STRUCTURAL:

N/A

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

:3 :1

A M

A u to d e sk

D o c s:

N P S

LO

W E In s ta ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B N P S

LO

W E In st a ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B rv t

BOOTT MILL - FIRST FLOOR

PLAN AREA 2 DEMO

LOWELL NATIONAL HISTORICAL PARK

187676

LOWE 314055

4 47

AD1.01

MJG

MJG

MJG

SEPTEMBER 2024

INSTALL NEW PARK FACILITY ACCESS &

MONITORING SYSTEM

SCALE AAD1.01

BOOTT MILL - FIRST FLOOR PLAN AREA 2

DEMO

DEMO NOTES

8.1 CONTRACTOR SHALL CAREFULLY REMOVE STOREFRONT SYSTEM - INCLUDING FRAME, DOORS, AND

ASSOCIATED HARDWARE - IN ACCORDANCE WITH SPEC. SECTION 02 41 00, SELECTIVE

DEMOLITION. IF ANY UNKNOWN OR LATENT CONDITIONS WHERE SYSTEM MEETS EXISTING CEILING, WALLS, JAMBS, AND SILL CONDITIONS ARE DISCOVERED NOTIFY THE PARK'S 106 COMPLIANCE

COORDINATOR AND DOCUMENT PHOTOGRAPHICALLY. PROTECT AND STORE EXISTING AUTO

OPERATOR FOR FUTURE USE AND INSTALLATION IN NEW STOREFRONT SYSTEM.

EL. 50.30'

OFFICES

324A

BECKY

WARREN

PARK

RANGER

MICHELE

TUROCY

MARY BETH

CLARK

WILLIAM

MORTON

STAFF

WORK

TABLES

I.T. CLOSET

CORRIDOR

CORRIDORWEST STAIR

TOWER

JACK

HERLIHY

CHRISTINE

WIRTH

DAVID

BLACKBURN

ELIZABETH

HOERMANN

CURATORIAL

ARTIFACTS

(LARGE RACKS)

CURATORIAL ARTIFACTS (FLAT FILES)

UTILITY:

BOILER, ACID

TANK,

WATER

HEATER

8.28.2

8.2

8.5 8.5

8.5

8.68.6

8.6

A/E FIRM - XXXXXXXXXX

8 0 8 16

SCALE OF FEET

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SCALE A

SEAL:

100% FINAL CONSTRUCTION DOCUMENTS

PRIME:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO, INC.

BALTIMORE, MD

CIVIL:

N/A

STRUCTURAL:

N/A

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

:3 :1

A M

A u to d e sk

D o c s:

N P S

LO

W E In s ta ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B N P S

LO

W E In st a ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B rv t

BOOTT MILL - THIRD FLOOR

PLAN AREA 1 DEMO

LOWELL NATIONAL HISTORICAL PARK

187676

LOWE 314055

5 47

AD1.02

MJG

MJG

MJG

SEPTEMBER 2024

INSTALL NEW PARK FACILITY ACCESS &

MONITORING SYSTEM

SCALE AAD1.02

BOOTT MILL - THIRD FLOOR PLAN AREA 1

DEMO

DEMO NOTES

8.2 CONTRACTOR SHALL CAREFULLY REMOVE HOLLOW METAL FRAMES, SILLS THAT ARE ANCHORED TO

EXISTING WOOD FLOOR, PAIR OF WOOD DOORS, AND ASSOCIATED HARDWARE IN ACCORDANCE

WITH SPEC. SECTION 02 41 00, SELECTIVE DEMOLITION. IF ANY UNKNOWN OR LATENT

CONDITIONS WHERE SYSTEMS MEET EXISTING SILL OR THRESHOLD CONDITIONS ARE DISCOVERED

NOTIFY THE PARK'S 106 COMPLIANCE COORDINATOR AND DOCUMENT PHOTOGRAPHICALLY.

8.5 EXISTING SECURITY ALARM CONTACTS AND WIRING TO BE TEMPORARILY DISCONNECTED AND ALARM

DE-ARMED DURING CONSTRUCTION.

8.6 PROVIDE SECURE, TEMPORARY DUST PARTITION WITH TEMPORARY DOOR TO SECURE CURATORIAL

SPACE DURING CONSTRUCTION. COORDINATE TEMPORARY CONSTRUCTION WITH COR/PARK LE.

CORRIDOR

STAIR

TSONGAS HIST CTR

STORAGE

MECHANICAL

GEN/BOILER

STACKS

LUNCHROOM

LUNCH AREA

CRC RECORDS

481 482

ELEC. JAN.

479WOMEN

MEN

LOWELL HISTORICAL

DIRECTORCONFERENCE ROOMLIBRARIANLIBRARIAN

436 437 438

KITCHEN

TSONGAS HIST

CTR STORAGE

SOCIETY

CORRIDOR

SUPPLIES

LOBBY

CONFERENCE

EAST STAIR

TOWER

LOWELL HISTORIC SOCIETY

LOUVER

LOUVER

ELECT'L

EL. 63.74'

8.3

A/E FIRM - XXXXXXXXXX

8 0 8 16

SCALE OF FEET

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SCALE A

SEAL:

100% FINAL CONSTRUCTION DOCUMENTS

PRIME:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO, INC.

BALTIMORE, MD

CIVIL:

N/A

STRUCTURAL:

N/A

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

:3 :1

A M

A u to d e sk

D o c s:

N P S

LO

W E In s ta ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B N P S

LO

W E In st a ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B rv t

BOOTT MILL - FOURTH FLOOR

PLAN AREA 2 DEMO

LOWELL NATIONAL HISTORICAL PARK

187676

LOWE 314055

6 47

AD1.03

MJG

MJG

MJG

SEPTEMBER 2024

INSTALL NEW PARK FACILITY ACCESS &

MONITORING SYSTEM

SCALE AAD1.03

BOOTT MILL - FOURTH FLOOR PLAN AREA 2

- DEMO

DEMO NOTES

8.3 CONTRACTOR SHALL CAREFULLY REMOVE PAIR OF DOORS & ASSOCIATED HARDWARE IN

ACCORDANCE WITH SPEC. SECTION 02 41 00, SELECTIVE DEMOLITION. EXISTING HOLLOW METAL

FRAME TO REMAIN. IF ANY UNKNOWN OR LATENT CONDITIONS WHERE SYSTEMS MEET EXISTING

FRAME OR THRESHOLD CONDITIONS ARE DISCOVERED NOTIFY THE PARK'S 106 COMPLIANCE

COORDINATOR AND DOCUMENT PHOTOGRAPHICALLY.

551 552550549

EL. 77.03'

WOMEN

MEN

GEN/BOILER

STACKS

583A583

556555

MECH'L

FOLK FEST

SUPPLIES

JAN CLO

I.T. CHASE

WOMEN'S

LOCKERS

SUPPLIES

ELECT'L

I.T. STORAGE

I.T. SERVER

CONNIE

BOSOLD

MEN'S

LOCKERS

ELLEN

FROST

EMILY

LEVINE

MARY

PRICE

LOCKERS

COPIER

MECH'L

UNIFORMS

INTERP.

STORAGE

INTERP.

STORAGE

COSTUME CLOSET

PARK

RANGER

DAVID

BYERS

JONATHAN

PARKER

SEASONAL

FAX/PRINTER

INTERP

RANGER

INTERP

RANGER

RADIOS

MAIL/KEYS

I & E

ADMIN.KITCHEN

EAST STAIR

TOWER

STORAGE

LOBBYCONFERENCE ROOM B

I.T. WORK ROOM

CATHY

NEVEUX

GREG

JONES

KERRY

OLSON

(8) SEASONAL

INTERP. PARK

RANGERS

CONFERENCE ROOM A

ENVIRONMENT

LABS

(5 DOUBLE-BACK

WORK STATIONS)

EXHIBITS

AMY

GLOWACKI

CHANGE IN THE MAKING CLASSROOM

OPEN

MAP

CLASSROOM

CLOSED

MAP

CLASSROOM

CHANGE IN THE MAKING CLASSROOM

CLOSET

EL. 77.03'

8.3

A/E FIRM - XXXXXXXXXX

8 0 8 16

SCALE OF FEET

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SCALE A

SEAL:

100% FINAL CONSTRUCTION DOCUMENTS

PRIME:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO, INC.

BALTIMORE, MD

CIVIL:

N/A

STRUCTURAL:

N/A

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

:3 :2

A M

A u to d e sk

D o c s:

N P S

LO

W E In s ta ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B N P S

LO

W E In st a ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B rv t

BOOTT MILL - FIFTH FLOOR

PLAN AREA 2 DEMO

LOWELL NATIONAL HISTORICAL PARK

187676

LOWE 314055

7 47

AD1.04

MJG

MJG

MJG

SEPTEMBER 2024

INSTALL NEW PARK FACILITY ACCESS &

MONITORING SYSTEM

SCALE AAD1.04

BOOTT MILL - FIFTH FLOOR PLAN AREA 2

DEMO

DEMO NOTES

8.3 CONTRACTOR SHALL CAREFULLY REMOVE PAIR OF DOORS & ASSOCIATED HARDWARE IN

ACCORDANCE WITH SPEC. SECTION 02 41 00, SELECTIVE DEMOLITION. EXISTING HOLLOW METAL

FRAME TO REMAIN. IF ANY UNKNOWN OR LATENT CONDITIONS WHERE SYSTEMS MEET EXISTING

FRAME OR THRESHOLD CONDITIONS ARE DISCOVERED NOTIFY THE PARK'S 106 COMPLIANCE

COORDINATOR AND DOCUMENT PHOTOGRAPHICALLY.

REF.

VEND.

V E N D

COPY

CARPENTRY

SHOP

F A A P

LUNCHROOM

LINE OF WALL

BELOW

OFFICE

DN

WOMEN'S

SHOWER

FIRE

SUPPRESSION

EQUIPMENT

STANDPIPE

FIRE

HYDRANT

MEN'S

TOILET

110a

DW

KITCHEN

OFFICE

OFFICE

103 CONF.

ROOM

HALL

OFFICE

OFFICE

VEHICLE

MAINTENANCE

8.4

8.4

A/E FIRM - XXXXXXXXXX

8 0 8 16

SCALE OF FEET

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SCALE A

SEAL:

100% FINAL CONSTRUCTION DOCUMENTS

PRIME:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO, INC.

BALTIMORE, MD

CIVIL:

N/A

STRUCTURAL:

N/A

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

:3 :2

A M

A u to d e sk

D o c s:

N P S

LO

W E In s ta ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B N P S

LO

W E In st a ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B rv t

MAINTENANCE FACILITY FIRST

FLOOR DEMO PLAN

LOWELL NATIONAL HISTORICAL PARK

187676

LOWE 314055

8 47

AD1.05

MJG

MJG

MJG

SEPTEMBER 2024

INSTALL NEW PARK FACILITY ACCESS &

MONITORING SYSTEM

SCALE AAD1.05

MAINTENANCE FACILITY FIRST FLOOR DEMO

PLAN

DEMO NOTES

8.4 CONTRACTOR SHALL CAREFULLY

REMOVE EXTERIOR DOORS IN

ACCORDANCE WITH SPEC. SECTION

02 41 00, SELECTIVE DEMOLITION. IF

ANY UNKNOWN OR LATENT

CONDITIONS WHERE SYSTEM MEETS

EXISTING CEILING, WALLS, JAMBS,

AND SILL CONDITIONS ARE

DISCOVERED NOTIFY THE PARK'S 106

COMPLIANCE COORDINATOR AND

DOCUMENT PHOTOGRAPHICALLY.

EXISTING FRAME TO REMAIN.

UPUP

ORIENTATION

RECEPTION/

VESTIBULE

ELEC

OBSERVATION

WEAVE

ROOM

UP

LOBBY

ENTRANCE

MECH

125123 128

STORE

ROOM MECH.

LOBBY

STAIR

NO. 3

STAIR

NO. 2

KITCHEN

MEN'S

ROOM

WOMEN'S

ROOM

B O O

TT

M

IL

L

A/E FIRM - XXXXXXXXXX

8 0 8 16

SCALE OF FEET

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SCALE A

SEAL:

100% FINAL CONSTRUCTION DOCUMENTS

PRIME:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO, INC.

BALTIMORE, MD

CIVIL:

N/A

STRUCTURAL:

N/A

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

:3 :3

A M

A u to d e sk

D o c s:

N P S

LO

W E In s ta ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B N P S

LO

W E In st a ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B rv t

BOOTT MILL - FIRST FLOOR

PLAN AREA 1

LOWELL NATIONAL HISTORICAL PARK

187676

LOWE 314055

9 47

A1.01

MJG

MJG

MJG

SEPTEMBER 2024

INSTALL NEW PARK FACILITY ACCESS &

MONITORING SYSTEM

SCALE AA1.01

1 BOOTT MILL - FIRST FLOOR PLAN AREA 1

ELEC.

MAINTENANCE

FACILITY

TELE. STORAGE

GALLERY

ELEV.

MACHINE

ROOM

CATERING

KITCHEN

WOMEN

MEN

FIRE

PUMP

ELEC.

CLOSET

MAIN

LOBBY

ENTRANCE

LOBBY

JAN.

S1

100A

100B

8.1 8.2 8.3 8.5

A/E FIRM - XXXXXXXXXX

8 0 8 16

SCALE OF FEET

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SCALE A

SEAL:

100% FINAL CONSTRUCTION DOCUMENTS

PRIME:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO, INC.

BALTIMORE, MD

CIVIL:

N/A

STRUCTURAL:

N/A

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

:3 :3

A M

A u to d e sk

D o c s:

N P S

LO

W E In s ta ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B N P S

LO

W E In st a ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B rv t

BOOTT MILL - FIRST FLOOR

PLAN AREA 2

LOWELL NATIONAL HISTORICAL PARK

187676

LOWE 314055

10 47

A1.02

MJG

MJG

MJG

SEPTEMBER 2024

INSTALL NEW PARK FACILITY ACCESS &

MONITORING SYSTEM

SCALE AA1.02

1 BOOTT MILL - FIRST FLOOR PLAN AREA 2

CONSTRUCTION NOTES

8.1 ANCHORING INTO EXISTING BRICK MASONRY BEARING WALLS - WHERE ANCHORING INTO EXISTING

MASONRY BEARING WALLS MAY BE NECESSARY FOR THE INSTALLATION OF HM OR ALUMINUM

STOREFRONT FRAME SYSTEMS, FASTENING IS ALLOWED WITHIN THE FOLLOWING 106 COMPLIANCE

CONTROLS:

A. FASTENERS MAY BE INSTALLED ONLY IN EXISTING MORTAR JOINTS. PRE-DRILLING IS

RECOMMENDED. IF FASTENERS LARGER THAN 3/8� MORTAR JOINT THICKNESS ARE REQUIRED REVIEW WITH PARK 106 COMPLIANCE COORDINATOR / HISTORICAL ARCHITECT IN ADVANCE OF SCHEDULED

ACTIVITY TO INSPECT AND EVALUATE EXISTING CONDITIONS.

B. POWDER ACTUATED FASTENERS ARE PROHIBITED FROM USE INTO EXISTING MASONRY WALLS.

C. USE THE SHORTEST STRUCTURALLY SOUND FASTENERS ABLE TO HOLD NEW DOOR FRAMES.

8.2 FASTENING TO EXISTING VIRGIN HEART TIMBER BEAMS AND PLANK CEILING - FASTENING TO THE

UNDERSIDE OF EXISTING 6" X 12" STRUCTURAL TIMBER BEAMS (VIRGIN HEART PINE

TIMBER/SOUTHERN YELLOW PINE TIMBER) AND/OR THE UNDERSIDE OF EXPOSED PINE PLANK CEILING BOARDS, (9/16" THICK X 2" PLANKS OVER 2 3/4" THICK PLANKS 8-12" WIDTH) IS ALLOWED WITHIN

THE FOLLOWING 106 COMPLIANCE CONTROLS:

A. POWDER ACTUATED FASTENERS ARE PROHIBITED FROM USE INTO THE EXISTING VIRGIN HEART

TIMBER BEAMS AND PLANK CEILING.

B. USE THE SHORTEST STRUCTURALLY SOUND FASTENERS ABLE TO HOLD NEW CONSTRUCTION

(RECOMMEND 3/4" - 1 1/4" DEPTH WOOD SCREWS).

8.3 FASTENING TO EXISTING WOOD PLANK FLOORING - THE EXISTING HISTORICAL FLOOR/CEILING CONSTRUCTION CONSISTS OF 9/16" THICK X 2" WIDTH VIRGIN HEART PINE PLANKS OF VARIOUS

LENGTHS, OVER 2 3/4" THICK PLANKS 8-12" WIDTH OF VARIOUS LENGTHS.

A. POWDER ACTUATED FASTENERS ARE PROHIBITED FROM USE INTO THE EXISTING WOOD

FLOORS.

B. USE THE SHORTEST STRUCTURALLY SOUND FASTENERS ABLE TO SECURE NEW

CONSTRUCTION (RECOMMEND 3/4" - 1 1/4", MAX. 2" DEPTH WOOD SCREWS).

C. WHEREVER POSSIBLE, AVOID FASTENING TO HISTORICAL FLOORS AND FASTEN/ANCHOR TO

EXISTING OR NEW WALL CONSTRUCTION.

8.5 IN ACCORDANCE WITH SPEC. SECTION 01 27 00, PLEASE TURN OVER ALL REMOVED EXISTING DOOR

HARDWARE IN THE BASE AND OPTIONS TO THE PARK FOR RE-USE.

EAST STAIR

TOWER

EVENTS

CENTER

STORAGE

EVENTS CENTER

MECHANICAL

ROOM

AUDIO VISUAL

ROOM

T R O L L E Y

B A R N

(O L D

C O A L

P O C K E T o p e n to

EL. 36.76' FIN. FLOOR

FIN. FLOOR

W.C.

DRESSING

ROOM

TELE.

MAIN ELECTRICAL ROOM

ELEC. JAN.

THEATER

EXHIBIT SPACE

245 246

226 240A

235A

STORAGE

WOMEN

MENLOBBY

EXHIBIT SPACE

226 OPEN

TO 1ST

FL.

8.5

A/E FIRM - XXXXXXXXXX

8 0 8 16

SCALE OF FEET

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SCALE A

SEAL:

100% FINAL CONSTRUCTION DOCUMENTS

PRIME:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO, INC.

BALTIMORE, MD

CIVIL:

N/A

STRUCTURAL:

N/A

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

:3 :3

A M

A u to d e sk

D o c s:

N P S

LO

W E In s ta ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B N P S

LO

W E In st a ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B rv t

BOOTT MILL - SECOND FLOOR

PLAN AREA 2

LOWELL NATIONAL HISTORICAL PARK

187676

LOWE 314055

11 47

A1.03

MJG

MJG

MJG

SEPTEMBER 2024

INSTALL NEW PARK FACILITY ACCESS &

MONITORING SYSTEM

SCALE AA1.03

1 BOOTT MILL - SECOND FLOOR PLAN AREA 2

CONSTRUCTION NOTES

8.5 IN ACCORDANCE WITH SPEC. SECTION 01 27 00, PLEASE TURN OVER ALL REMOVED EXISTING DOOR

HARDWARE IN THE BASE AND OPTIONS TO THE PARK FOR RE-USE.

EL. 50.30'

OFFICES

324A

BECKY

WARREN

PARK

RANGER

MICHELE

TUROCY

MARY BETH

CLARK

WILLIAM

MORTON

STAFF

WORK

TABLES

I.T. CLOSET

CORRIDOR

CORRIDORWEST STAIR

TOWER

JACK

HERLIHY

CHRISTINE

WIRTH

DAVID

BLACKBURN

ELIZABETH

HOERMANN

CURATORIAL

ARTIFACTS

(LARGE RACKS)

CURATORIAL ARTIFACTS (FLAT FILES)

UTILITY:

BOILER, ACID

TANK,

WATER

HEATER

323322

8.68.6

8.6

8.78.7

8.7

A/E FIRM - XXXXXXXXXX

8 0 8 16

SCALE OF FEET

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SCALE A

SEAL:

100% FINAL CONSTRUCTION DOCUMENTS

PRIME:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO, INC.

BALTIMORE, MD

CIVIL:

N/A

STRUCTURAL:

N/A

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

:3 :4

A M

A u to d e sk

D o c s:

N P S

LO

W E In s ta ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B N P S

LO

W E In st a ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B rv t

BOOTT MILL - THIRD FLOOR

PLAN AREA 1

LOWELL NATIONAL HISTORICAL PARK

187676

LOWE 314055

12 47

A1.04

MJG

MJG

MJG

SEPTEMBER 2024

INSTALL NEW PARK FACILITY ACCESS &

MONITORING SYSTEM

SCALE AA1.04

1 BOOTT MILL - THIRD FLOOR PLAN AREA 1

CONSTRUCTION NOTES

8.6 PROVIDE SECURE, TEMPORARY DUST PARTITION WITH TEMPORARY DOOR TO SECURE CURATORIAL

SPACE DURING CONSTRUCTION. COORDINATE TEMPORARY CONSTRUCTION WITH COR/PARK LE.

8.7 EXISTING SECURITY ALARM CONTACTS AND WIRING TO BE TEMPORARILY DISCONNECTED AND ALARM

DE-ARMED DURING CONSTRUCTION.

UTILITY

SINK

347348

363362

330329

361360

MEN

WOMEN

OFFICES

CORRIDOR

LOUVER LOUVER

MECHANICAL ROOM

MECHANICAL

GENERATORSUPPLIES

JAN CLO

I.T. CHASE

SUMMER CAMP CLOSET

HISTORY STUDIO WORKSHOP

WORKERS ON

THE LINE

WORKSHOP

STUDIO

SUPPLIES

EXHIBIT

WEAVE ROOM

WORKSHOP

WORK SINK

WORKSHOP SUPPLY CLOSET

LARGE LOOM

CREELS

TEACHERS

LOCKER

ROOM

EDUC. CENTER

DIRECTOR'S

OFFICEPARK

RANGER

SUPERVISOR

SHEILA

KIRSCHBAUM

ELLEN

ANSTEY

COPY

MAIL

ROOM

CAROL

LIASSON

CAROL

MEEHAN

SETH

COOPER

MIKE

CURRAN

FRANK

CLARK

REBECCA

LOFGREN

PARK

RANGER

UML

CONTRACTOR

STAFF

WORK

TABLES

EAST STAIR

TOWER

LOBBY

EXHIBIT/ORIENTATION

MAINTENANCE SHOP

POWER TO

PRODUCTION

WORKSHOP

RESOURCE ROOM

INVENTORS'

CORNER

WORKSHOP

EL. 50.30'

A/E FIRM - XXXXXXXXXX

8 0 8 16

SCALE OF FEET

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SCALE A

SEAL:

100% FINAL CONSTRUCTION DOCUMENTS

PRIME:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO, INC.

BALTIMORE, MD

CIVIL:

N/A

STRUCTURAL:

N/A

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

:3 :4

A M

A u to d e sk

D o c s:

N P S

LO

W E In s ta ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B N P S

LO

W E In st a ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B rv t

BOOTT MILL - THIRD FLOOR

PLAN AREA 2

LOWELL NATIONAL HISTORICAL PARK

187676

LOWE 314055

13 47

A1.05

MJG

MJG

MJG

SEPTEMBER 2024

INSTALL NEW PARK FACILITY ACCESS &

MONITORING SYSTEM

NO SCALEA1.05

1 BOOTT MILL - THIRD FLOOR PLAN AREA 2

STAIR

TSONGAS HIST CTR

STORAGE

MECHANICAL

GEN/BOILER

STACKS

LUNCHROOM

LUNCH AREA

CRC RECORDS

481 482

ELEC. JAN.

479WOMEN

MEN

LOWELL HISTORICAL

DIRECTORCONFERENCE ROOMLIBRARIANLIBRARIAN

436 437 438

KITCHEN

TSONGAS HIST

CTR STORAGE

SOCIETY

CORRIDOR

SUPPLIES

LOBBY

CONFERENCE

EAST STAIR

TOWER

LOWELL HISTORIC SOCIETY

LOUVER

LOUVER

ELECT'L

EL. 63.74'

A/E FIRM - XXXXXXXXXX

8 0 8 16

SCALE OF FEET

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SCALE A

SEAL:

100% FINAL CONSTRUCTION DOCUMENTS

PRIME:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO, INC.

BALTIMORE, MD

CIVIL:

N/A

STRUCTURAL:

N/A

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

:3 :4

A M

A u to d e sk

D o c s:

N P S

LO

W E In s ta ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B N P S

LO

W E In st a ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B rv t

BOOTT MILL - FOURTH FLOOR

PLAN AREA 2

LOWELL NATIONAL HISTORICAL PARK

187676

LOWE 314055

14 47

A1.06

MJG

MJG

MJG

SEPTEMBER 2024

INSTALL NEW PARK FACILITY ACCESS &

MONITORING SYSTEM

SCALE AA1.06

1 BOOTT MILL - FOURTH FLOOR PLAN AREA 2

551 552550549

EL. 77.03'

WOMEN

MEN

GEN/BOILER

STACKS

583A583

556555

MECH'L

FOLK FEST

SUPPLIES

JAN CLO

I.T. CHASE

WOMEN'S

LOCKERS

SUPPLIES

ELECT'L

I.T. STORAGE

I.T. SERVER

CONNIE

BOSOLD

MEN'S

LOCKERS

ELLEN

FROST

EMILY

LEVINE

MARY

PRICE

LOCKERS

COPIER

MECH'L

UNIFORMS

INTERP.

STORAGE

INTERP.

STORAGE

COSTUME CLOSET

PARK

RANGER

DAVID

BYERS

JONATHAN

PARKER

SEASONAL

FAX/PRINTER

INTERP

RANGER

INTERP

RANGER

RADIOS

MAIL/KEYS

I & E

ADMIN.KITCHEN

EAST STAIR

TOWER

STORAGE

LOBBYCONFERENCE ROOM B

I.T. WORK ROOM

CATHY

NEVEUX

GREG

JONES

KERRY

OLSON

(8) SEASONAL

INTERP. PARK

RANGERS

CONFERENCE ROOM A

ENVIRONMENT

LABS

(5 DOUBLE-BACK

WORK STATIONS)

EXHIBITS

AMY

GLOWACKI

CHANGE IN THE MAKING CLASSROOM

OPEN

MAP

CLASSROOM

CLOSED

MAP

CLASSROOM

CHANGE IN THE MAKING CLASSROOM

CLOSET

EL. 77.03'

A/E FIRM - XXXXXXXXXX

8 0 8 16

SCALE OF FEET

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SCALE A

SEAL:

100% FINAL CONSTRUCTION DOCUMENTS

PRIME:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO, INC.

BALTIMORE, MD

CIVIL:

N/A

STRUCTURAL:

N/A

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

:3 :5

A M

A u to d e sk

D o c s:

N P S

LO

W E In s ta ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B N P S

LO

W E In st a ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B rv t

BOOTT MILL - FIFTH FLOOR

PLAN AREA 2

LOWELL NATIONAL HISTORICAL PARK

187676

LOWE 314055

15 47

A1.07

MJG

MJG

MJG

SEPTEMBER 2024

INSTALL NEW PARK FACILITY ACCESS &

MONITORING SYSTEM

SCALE AA1.07

1 BOOTT MILL - FIFTH FLOOR PLAN AREA 2

IMMIGRANT

EXPERIENCE

EXHIBIT

VESTIBULE

READING ROOM

MICROFILM

STACKS

READING ROOM

CORRIDOR

KITCHEN EXHIBIT

PARLOR EXHIBIT

STAIRHALL

RECEPTION

EXHIBIT

ELEV MACH RM

STAIR

WOMENS

TOILET

MENS

TOILET

CORRIDOR

SERVICE

AREA

CONF

RM

OFFICE

MEETING ROOM

MECH

ELEC

JANITOR

EXITWAY

CORRIDOR

CORRIDOR

KITCHEN

131AKEEPER EXHIBIT

PASSAGEWAY

121B UP

UP

RAMP DN

DN

DN

UP

UP

UP

UP

UP

UP

UP

UP

UP

DN

UP

RAMP DN

101A 101B

A/E FIRM - XXXXXXXXXX

8 0 8 16

SCALE OF FEET

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SCALE A

SEAL:

100% FINAL CONSTRUCTION DOCUMENTS

PRIME:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO, INC.

BALTIMORE, MD

CIVIL:

N/A

STRUCTURAL:

N/A

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

:3 :5

A M

A u to d e sk

D o c s:

N P S

LO

W E In s ta ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B N P S

LO

W E In st a ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B rv t

MOGAN CC FIRST FLOOR PLAN

LOWELL NATIONAL HISTORICAL PARK

187676

LOWE 314055

16 47

A2.01

MJG

MJG

MJG

SEPTEMBER 2024

INSTALL NEW PARK FACILITY ACCESS &

MONITORING SYSTEM

SCALE AA2.01

1 MOGAN CC FIRST FLOOR PLAN

EXHIBITION

M07

EXHIBITION

M04

BEDROOM

EXHIBIT

M05

CORRIDOR

M03

OFFICE

M09

OFFICE

M10

OFFICE

M11

OFFICE

M12

STAIR

M16

STORAGE

M15

STAIRHALL

M02

ELECTRICAL

M07A MEETING

M13

SOUTH

STACKS

LIBRARY

SERVICE

NORTH

STACKS

TECHNICAL

SERVICES

DN

UP

DN

DN

DN

DN

UP

UP

UP

DN

UP 03

A/E FIRM - XXXXXXXXXX

8 0 8 16

SCALE OF FEET

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SCALE A

SEAL:

100% FINAL CONSTRUCTION DOCUMENTS

PRIME:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO, INC.

BALTIMORE, MD

CIVIL:

N/A

STRUCTURAL:

N/A

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

:3 :5

A M

A u to d e sk

D o c s:

N P S

LO

W E In s ta ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B N P S

LO

W E In st a ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B rv t

MOGAN CC MEZZANINE FLOOR

PLAN

LOWELL NATIONAL HISTORICAL PARK

187676

LOWE 314055

17 47

A2.02

MJG

MJG

MJG

SEPTEMBER 2024

INSTALL NEW PARK FACILITY ACCESS &

MONITORING SYSTEM

SCALE AA2.02

1 MOGAN CC MEZZANINE FLOOR

CLASSROOM

685sf

CLASSROOM

CLASSROOM

DARKROOM

CORRIDOR

CORRIDOR

MENS

TOILET

WOMENS

TOILET

JANITOR

CLASSROOM

673sf

STAIR

KITCHEN

CORRIDOR

STAIR

OFFICE

LOUNGE

ROOF

UP

DN

DNUP

RAMP DN

DN

UP

A/E FIRM - XXXXXXXXXX

8 0 8 16

SCALE OF FEET

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SCALE A

SEAL:

100% FINAL CONSTRUCTION DOCUMENTS

PRIME:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO, INC.

BALTIMORE, MD

CIVIL:

N/A

STRUCTURAL:

N/A

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

:3 :5

A M

A u to d e sk

D o c s:

N P S

LO

W E In s ta ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B N P S

LO

W E In st a ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B rv t

MOGAN CC SECOND FLOOR

PLAN

LOWELL NATIONAL HISTORICAL PARK

187676

LOWE 314055

18 47

A2.03

MJG

MJG

MJG

SEPTEMBER 2024

INSTALL NEW PARK FACILITY ACCESS &

MONITORING SYSTEM

SCALE AA2.03

1 MOGAN CC SECOND FLOOR

TOILETTOILET

CLOSET

N101E

N101W N103W

N102

N105

N103E

MAIL/COPY

ROOM

S101E

S101W S103W

S102

S103E

N107

S105

E101

E103

BUDGET

OFFICER

ADMINISTRATION

ELEV.

PERSONNEL

MANAGEMENT ADMINISTRATION

FINANCE

OFFICER

ADMINISTRATION

ELEVATOR

LOBBY

8.4

8.4

A/E FIRM - XXXXXXXXXX

8 0 8 16

SCALE OF FEET

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SCALE A

SEAL:

100% FINAL CONSTRUCTION DOCUMENTS

PRIME:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO, INC.

BALTIMORE, MD

CIVIL:

N/A

STRUCTURAL:

N/A

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

:3 :0

A M

A u to d e sk

D o c s:

N P S

LO

W E In s ta ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B N P S

LO

W E In st a ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B rv t

KIRK STREET FIRST FLOOR

PLAN

LOWELL NATIONAL HISTORICAL PARK

187676

LOWE 314055

19 47

A3.01

MJG

MJG

MJG

SEPTEMBER 2024

INSTALL NEW PARK FACILITY ACCESS &

MONITORING SYSTEM

SCALE AA3.01

1 KIRK STREET FIRST FLOOR PLAN

CONSTRUCTION NOTES

8.4 CONTRACTOR SHALL REMOVE EXISTING CAMERAS AND INFRASTRUCTURE AS REQUIRED AT KIRK STREET

AGENT'S HOUSE FIRST FLOOR, AND TURN OVER TO THE PARK FOR RE-USE.

VEND.

V E N D

COPY

CARPENTRY

SHOP

F A A P

LUNCHROOM

LINE OF WALL

BELOW

OFFICE

DN

WOMEN'S

SHOWER

FIRE

SUPPRESSION

EQUIPMENT

STANDPIPE

FIRE

HYDRANT

MEN'S

TOILET

110a

DW

KITCHEN

OFFICE

OFFICE

103 CONF.

ROOM

HALL

OFFICE

OFFICE

VEHICLE

MAINTENANCE

NEW WALL & DOOR WILL BE

INSTALLED AS PART OF A

FUTURE NPS PROJECT

8.5

8.5

A/E FIRM - XXXXXXXXXX

8 0 8 16

SCALE OF FEET

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SCALE A

SEAL:

100% FINAL CONSTRUCTION DOCUMENTS

PRIME:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO, INC.

BALTIMORE, MD

CIVIL:

N/A

STRUCTURAL:

N/A

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

:3 :0

A M

A u to d e sk

D o c s:

N P S

LO

W E In s ta ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B N P S

LO

W E In st a ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B rv t

MAINTENANCE FACILITY FIRST

FLOOR

LOWELL NATIONAL HISTORICAL PARK

187676

LOWE 314055

20 47

A4.01

MJG

MJG

MJG

SEPTEMBER 2024

INSTALL NEW PARK FACILITY ACCESS &

MONITORING SYSTEM

SCALE AA4.01

1 MAINTENANCE FACILITY FIRST FLOOR PLAN

CONSTRUCTION NOTES

8.5 IN ACCORDANCE WITH SPEC. SECTION

01 27 00, PLEASE TURN OVER ALL

REMOVED EXISTING DOOR HARDWARE

IN THE BASE AND OPTIONS TO THE

PARK FOR RE-USE.

F FF FG2FG2 NN

S C H E D

S E E

D O O R

SCHED

SEE DOOR

SCHED

SEE DOOR

S C H E D

S E E

D O O R

4" 4"

S C H E D

S E E

D O O R

SCHED

SEE DOOR

SCHED

SEE DOOR

S C H E D

S E E

D O O R

6" 6"

GL-1 GL-14"

S C H E D

S E E

D O O R

FG2

SCHED

SEE DOOR

F1

2"

DOOR

WIDTH

2"

D O O R

H E

IG

H T

EXISTING

H5.01

EXISTING WALL

HEAD

VARIES

EXISTING

WALL

WALL

+ 1 1/8"

EXISTING

J5.01

WALL TYPE

JAMB

VARIES

EXISTING

WALL

WALL

+ 1 1/8"

A/E FIRM - XXXXXXXXXX

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SEAL:

100% FINAL CONSTRUCTION DOCUMENTS

PRIME:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO, INC.

BALTIMORE, MD

CIVIL:

N/A

STRUCTURAL:

N/A

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

:3 :0

A M

A u to d e sk

D o c s:

N P S

LO

W E In s ta ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B N P S

LO

W E In st a ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B rv t

DOOR SCHEDULE & DETAILS

LOWELL NATIONAL HISTORICAL PARK

187676

LOWE 314055

21 47

A5.01

MJG

MJG

MJG

SEPTEMBER 2024

INSTALL NEW PARK FACILITY ACCESS &

MONITORING SYSTEM

NO SCALE

DOOR TYPES

DOOR SCHEDULE - BOOTT MILL

OPENING

NO.

LOCATION DOOR FRAME DETAIL REF. FIRE

RATING

HARDWARE

SET

CARD

READER

POSITION

SWITCH

AUTO

OPERATOR

RX

FUNCTION

THRESHOLD

NO.

GLAZING

TYPE COMMENTSFROM TO TYPE WIDTH HEIGHT MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB

1 - FIRST FLOOR

100A FF 6' - 0" 7' - 0" EX EX EX EX EX EX EX HW-05 Yes Yes No Yes N/A RETROFIT EXISTING PANIC

HARDWARE

100B FG2 3' - 4" 7' - 0" EX EX EX EX EX EX EX HW-05 Yes Yes Yes No N/A RETROFIT EXISTING PANIC

HARDWARE

101 FG2FG2 6' - 0" 7' - 10" AL PTD MFG MFG MFG MFG MFG HW-01 Yes Yes Yes Yes GL-1 102 F 3' - 0" 7' - 0" EX EX EX EX EX EX EX HW-02 Yes Yes No No N/A 122 F 3' - 0" 7' - 0" EX EX EX EX EX EX EX EX Yes Yes No No N/A

2 - SECOND FLOOR

231 NN 6' - 0" 7' - 0" EX EX EX EX EX EX EX HW-02 Yes Yes No Yes N/A

3 - THIRD FLOOR

322 FF 6' - 0" 7' - 0" WD CL F1 HM PTD H5.01 J5.01 HW-03 Yes Yes No Yes N/A UNEVEN LEAFS -

4'-0"/2'-0"(INACTIVE)

323 FF 6' - 0" 7' - 0" WD CL F1 HM PTD H5.01 J5.01 HW-03 Yes Yes No Yes N/A UNEVEN LEAFS -

4'-0"/2'-0"(INACTIVE)

327 FF 6' - 0" 7' - 0" WD CL F1 HM PTD H5.01 J5.01 HW-03 Yes Yes No Yes N/A UNEVEN LEAFS -

4'-0"/2'-0"(INACTIVE)

338 FG2FG2 6' - 0" 7' - 0" EX EX EX EX EX EX EX EX Yes Yes No Yes N/A DELAYED EGRESS LEFT

LEAF, REFER TO LOWE

335201 PROJECT

DRAWINGS AND SPECS FOR

COORDINATION

4 - FOURTH FLOOR

433 F 3' - 0" 7' - 0" EX EX EX EX EX EX EX HW-02 Yes Yes No No N/A 443 FG2FG2 6' - 0" 7' - 0" HM F1 HM PTD H5.01 J5.01 HW-04 Yes Yes Yes Yes GL-1

5 - FIFTH FLOOR

545 FG2FG2 7' - 0" 7' - 0" EX EX EX EX EX EX EX EX Yes Yes No Yes GL-1 553 FG2FG2 6' - 0" 7' - 0" WD CL F1 HM PTD H5.01 J5.01 HW-04 Yes Yes No Yes GL-1

NO SCALE

TYPICAL DOOR FRAMES

NO SCALE

TYPICAL INTERIOR DOOR HEAD DETAILS

NO SCALE

TYPICAL INTERIOR DOOR JAMB DETAILS

DOOR SCHEDULE - KIRK STREET

OPENING

NO.

LOCATION DOOR FRAME DETAIL REF. FIRE

RATING

HARDWARE

SET

CARD

READER

POSITION

SWITCH

AUTO

OPERATOR

RX

FUNCTION

THRESHOLD

NO.

GLAZING

TYPE COMMENTSFROM TO TYPE WIDTH HEIGHT MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB

1 - FIRST FLOOR

103 FG2FG2 5' - 4" 7' - 0" EX EX EX EX EX EX EX EX Yes Yes No Yes EX EX 105 F 3' - 0" 7' - 0" EX EX EX EX EX EX EX EX Yes Yes No No EX EX

DOOR SCHEDULE - MOGAN CC

OPENING

NO.

LOCATION DOOR FRAME DETAIL REF. FIRE

RATING

HARDWARE

SET

CARD

READER

POSITION

SWITCH

AUTO

OPERATOR

RX

FUNCTION

THRESHOLD

NO.

GLAZING

TYPE COMMENTSFROM TO TYPE WIDTH HEIGHT MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB

1 - FIRST FLOOR

101A FG2FG2 6' - 0" 7' - 0" EX EX EX EX EX EX EX EX Yes Yes Yes Yes EX EX 101B FG2FG2 6' - 0" 7' - 0" EX EX EX EX EX EX EX EX Yes Yes Yes Yes EX EX 117 FG2FG2 6' - 0" 7' - 0" EX EX EX EX EX EX EX HW-05 Yes Yes No Yes EX N/A RETROFIT EXISTING PANIC

HARDWARE

2 - SECOND FLOOR

03 FG2 3' - 0" 7' - 0" EX EX EX EX EX EX EX EX Yes Yes No No EX EX

3 - THIRD FLOOR

214 FG2 3' - 0" 7' - 0" EX EX EX EX EX EX EX EX Yes Yes No No EX EX

DOOR SCHEDULE - MAINTENANCE FACILITY

OPENING

NO.

LOCATION DOOR FRAME DETAIL REF. FIRE

RATING

HARDWARE

SET

CARD

READER

POSITION

SWITCH

AUTO

OPERATOR

RX

FUNCTION

THRESHOLD

NO.

GLAZING

TYPE COMMENTSFROM TO TYPE WIDTH HEIGHT MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB

1 - FIRST FLOOR

100 FG 3' - 0" 7' - 0" EX EX EX EX EX EX EX EX Yes No No No EX N/A 117 F 3' - 0" 7' - 0" HM PTD EX EX EX EX EX HW-02 Yes Yes No Yes EX N/A 126 F 3' - 0" 7' - 0" HM PTD EX EX EX EX EX HW-02 Yes Yes No Yes EX N/A

S1

EQ.

GL-1

GL-1

GL-1

GL-1

DOOR WIDTH

D O O R

H E

IG

H T

V.I.F.

12'-0"

EQ.

A5.02

TYP.

A5.02

TYP.

A5.02

TYP.

A5.02

TYP.

A5.02

TYP.

V .I .F

EXT. WALL

GLASS

BACKER ROD AND

SEALANT

LINE OF MULLION

BEYOND

STOREFRONT JAMB

GASKET

SHIM AS REQUIREDEXT. STEEL FRAMING

EXT. WALL

GLASS

BACKER ROD AND

SEALANT

LINE OF

MULLION

BEYOND

STOREFRONT HEAD

GASKET

GLASS STOP

SHIM AS REQUIRED

GLASS

LINE OF MULLION

BEYOND

STOREFRONT SILL MULLION

GASKET

EXT. CONCRETE

SLAB

GLASS

BACKER ROD AND

SEALANT

LINE OF MULLION

BEYOND

STOREFRONT SILL

GASKET

SHIM AS REQUIRED

GLASS

LINE OF MULLION

BEYOND

HORIZONTAL MULLION

GASKET

GLASS STOP

SCALE AA5.02

1 S1

A/E FIRM - XXXXXXXXXX

8 0 8 16

SCALE OF FEET

TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

OF

SUB SHEET NO.DESIGNED:

CADD:

TECH. REVIEW:

DATE:

SCALE A

SEAL:

100% FINAL CONSTRUCTION DOCUMENTS

PRIME:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO, INC.

BALTIMORE, MD

CIVIL:

N/A

STRUCTURAL:

N/A

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

:3 :1

A M

A u to d e sk

D o c s:

N P S

LO

W E In s ta ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B N P S

LO

W E In st a ll N e w

P a rk

F a c ili ty

A c c e ss a n d

M o n it o ri n g

S ys te m

(s u b to

V H B rv t

STOREFRONT ELEVATION &

DETAILS

LOWELL NATIONAL HISTORICAL PARK

187676

LOWE 314055

22 47

A5.02

MJG

MJG

MJG

SEPTEMBER 2024

INSTALL NEW PARK FACILITY ACCESS &

MONITORING SYSTEM

SCALE BA5.02

2 STOREFRONT JAMB DETAIL

SCALE BA5.02

3 STOREFRONT HEAD DETAIL

SCALE BA5.02

5 STOREFRONT VERT. MULLION DETAIL

SCALE BA5.02

4 STOREFRONT SILL DETAIL

SCALE BA5.02

6 STOREFRONT HORIZ. MULLION DETAIL

ACP

NVR

PS

DM

K

L

P

WS

D

E

M

L

D

P

E

M

S

I

I

M

V

DR

R

P

ABBREVIATIONS

REFERENCE SYMBOLS

KEYNOTE NUMBER REVISION NUMBER

CONSTRUCTION BULLETIN NUMBER

ETHERNET/FAST ETHERNET

GIGABIT ETHERNET (SHORT WAVELENGTH)

GIGABIT ETHERNET (LONG WAVELENGTH)

ABOVE CEILING/ALTERNATING CURRENT

ACCESS CONTROL PANEL

ACOUSTICAL CEILING TILE

AUTOMATIC DOOR OPENER

ABOVE FINISHED FLOOR

AUTHORITY HAVING JURISDICTION

ALTERNATE

ALARM PANEL

APPLICATION PROGRAMMING INTERFACE

ARCHITECTURAL

ABOVE SUSPENDED CEILING

ACCESS CONTROL MANAGEMENT SYSTEM

AUTOMATIC

AMERICAN WIRE GAUGE

BUILDING AUTOMATION SYSTEM

BUILDING CONTROL SYSTEM

BUILDING ENTRANCE FACILITY

BELOW FINISH CEILING

BELOW FLOOR LEVEL

BUILDING

BUILDING MANAGEMENT SYSTEM

BREAKER

CONDUIT

CIRCUIT

CIRCUIT BREAKER

CEILING

CONTRACTOR

CORRIDOR

CONSOLIDATION POINT

CABLE TRAY

DIRECT BURIAL

DIRECT CURRENT

DEDICATED

DETAIL

DIAMETER

DOWN

DISCONNECT SWITCH

DIGITAL VIDEO RECORDER

EMPTY CONDUIT/ELECTRICAL CONTRACTOR

ELECTRIC DUCT BANK

ENTRANCE FACILITY

EQUIPMENT GROUND

ENGINE GENERATOR SET

EQUIPMENT INTERMEDIATE DISTRIBUTION FACILITY

EXPANSION JOINT

ELECTRIC/ELECTRICAL

EMERGENCY

ELECTROMAGNETIC INTERFERENCE

ELECTRICAL METALLIC TUBING

END-OF-LINE RESISTOR

EQUIPMENT

EQUIPMENT ROOM

EXISTING TO REMAIN

FLUSH WITH FINISHED CEILING

FLUSH WITH FINISHED FLOOR

FLUSH WITH FINISHED WALL

FIRE ALARM

FIRE ALARM CONTROL PANEL

AT FLOOR LINE

FLEXIBLE

FLOOR

FLOW SWITCH

FUSED SAFETY SWITCH

FLAME SAFEGUARD CONTROL PANEL

FULL VOLTAGE NON-REVERSING

FOREIGN EXCHANGE OFFICE

GLOBAL AREA NETWORK

GIGABIT INTERFACE CONVERTER

GENERAL CONTRACTOR

GROUND FAULT CIRCUIT INTERRUPTER

GROUND

GENERATOR

GALVANIZED RIGID CONDUIT

GRAPHICAL USER INTERFACE

HANDHOLE

HEIGHT/HEAT TRACE

HIGH VOLTAGE

INTERMEDIATE DISTRIBUTION FACILITY

INTERMEDIATE METAL CONDUIT

INTERNET PROTOCOL

JUNCTION BOX

KNOCK-OUT

KILOVOLT

10/100BaseTX 1000BaseSX 1000BaseLX

AC

ACP

ACT

ADO

AFF

AHJ

ALT

AP

API

ARCH

ASC

ACMS

AUTO

AWG

BAS

BCS

BEF

BFC

BFL

BLDG

BMS

BRKR

C

CCT

CCT BKR

CLG

CONTR

CORR

CP

CT

DB

DC

DED

DET

DIA

DN

DS

DVR

EC

EDB

EF

EG

EGS

EIDF

EJ

ELEC

EMER

EMI

EMT

EOL

EQUIP

ER

ETR

F/FC

F/FF

F/FW

FA

FACP

FL

FLEX

FLR

FS

FSS

FSCP

FVNR

FXO

GAN

GBIC

GC

GFCI

GND

GEN

GRC

GUI

HH

HT

HV

IDF

IMC

IP

JB

KO

KV

KILOVOLT-AMPERES

KILOWATTS

KILOWATT HOURS

LOCAL AREA NETWORK

LOW VOLTAGE

MASTER ANTENNA TELEVISION

MECHANICAL CONTRACTOR

MAIN DISTRIBUTION FACILITY

MAIN EQUIPMENT ROOM

MAINTENANCE HOLE

MULTIMODE

MEGA-PIXEL

MOUNTED

MOUNTING

MOUNTING HEIGHT

NOT APPLICABLE

NEW CONNECTION/NORMALLY CLOSED

NOT IN CONTRACT

NORMALLY OPEN

NOT TO SCALE

NETWORK VIDEO RECORDER

ON CENTER

OWNER FURNISHED CONTRACTOR INSTALLED

OWNER FURNISHED OWNER INSTALLED

OPERATING SYSTEM

PULL BOX/PUSH-BUTTON

PRIVATE BRANCH EXCHANGE

PLUMBING CONTRACTOR / PHOTOCELL /

PERSONAL COMPUTER

POWER DISTRIBUTION UNIT

POWER FACTOR

PHASE

PLUMBING

PANEL

POWER

REFLECTED CEILING PLAN

RECESSED

RECEPTACLE

RELOCATE

REQUIRED

RADIO FREQUENCY

ROUGH-IN: TO BE PROVIDED WITH CAP /

COVER AND PAINTED TO MATCH SURFACE

REMOTE MODULES

RACK UNIT

SOFTWARE DEVELOPMENT KIT

SHEET

SIGNAL

SIMILAR

STANDARD INFORMATION OUTLET

SESSION INITIATION PROTOCOL

SINGLEMODE

SECURITY MANAGEMENT SYSTEM

SPECIFICATION

SAFETY SWITCH

STATION

SWITCH

TERMINAL BOX

TRANSPORT CONTROL PROTOCOL

TELEPHONE

TO FLOOR ABOVE

TO FLOOR BELOW

TELECOMMUNICATIONS OUTLET

TELECOM ROOM

TAMPER SWITCH/TIME SWITCH

TELEVISION

TRANSIENT VOLTAGE SURGE SUPPRESSION

TYPICAL

UNDER COUNTER

UNDERGROUND

UNLESS OTHERWISE NOTED

UNINTERRUPTIBLE POWER SUPPLY

UNIVERSAL SERIAL BUS

VOLTAGE

VOICE COMMUNICATION SYSTEM

VIDEO MANAGEMENT SYSTEM

VOICE OVER INTERNET PROTOCOL

WIRE

WITH

WIDE AREA NETWORK

WIRELESS LOCAL AREA NETWORK

WEATHERPROOF

WALL SURFACE

WATER TIGHT

EXIST

TRANSFORMER

EXPLOSION PROOF

KVA

KW

KWH

LAN

LV

MATV

MC

MDF

MER

MH

MM

MP

MTD

MTG

MTG HGT

NA

NC

NIC

NO

NTS

NVR

OC

OFCI

OFOI

OS

PB

PBX

PC

PDU

PF

PH

PLBG

PNL

PWR

RCP

REC

RECEP

REL

REQD

RF

R/I

RM

RU

SDK

SHT

SIG

SIM

SIO

SIP

SM

SMS

SPEC

SS

STA

SW

TB

TCP

TEL

TFA

TFB

TO

TR

TS

TV

TVSS

TYP

UC

UG

UON

UPS

USB

V

VCS

VMS

VoIP

W W/

WAN

WLAN

WP

WS

WT

X

XFMR

XP

EMERGENCY REQUEST TO EXIT DEVICE (NIC)

MOUNTING LOCATION: WALL

MOUNTING HEIGHT: AS NOTED

PANIC/DURESS BUTTON

MOUNTING LOCATION: UNDER DESKTOP

MOUNTING HEIGHT: REFER TO DETAIL

KNOX BOX (NIC)

MOUNTING LOCATION: WALL

*PROVIDE TAMPER/DRY-CONTACT CLOSURES TO ALL

RAPID-ENTRY BOXES. RAPID ENTRY ALARMS SHALL BE UNIQUELY

IDENTIFIED ON THE ACMS.

ACCESS CONTROL PANEL

CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION

NETWORK VIDEO RECORDER (NVR)

CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION

POWER SUPPLY

DOOR TAGXXXX

ELECTRICAL SYMBOLS AND ABBREVIATIONS

POLE MOUNTED

#-## = FLOOR-SEQUENTIAL NUMBER

MULTI-IMAGER MEGA PIXEL CAMERA

TYPE:180 DEGREE

CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION.#-##

INTERCOM SUBSTATION

MOUNTING LOCATION: AS NOTED

MOUNTING HEIGHT: AS NOTED

CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION

ACCESS CONTROL READER

MOUNTING LOCATION: WALL

MOUNTING HEIGHT: REFER TO DETAILS

ELECTRIFIED LOCKING HARDWARE

ELECTRIFIED PANIC HARDWARE

DOOR POSITION SWITCH

MOUNTING LOCATION: REFER TO DRAWINGS/DETAIL

MOUNTING HEIGHT: REFER TO DETAIL SHEET

SECURITY WORKSTATION (PROVIDED BY CONTRACTOR)

MOUNTING LOCATION: DESK (UNLESS OTHERWISE NOTED)

MOUNTING HEIGHT: AS NOTED

CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION

LCD MONITOR

MOUNTING LOCATION: DESK (UNLESS OTHERWISE NOTED)

MOUNTING HEIGHT: AS NOTED

MULTI-IMAGER MEGA PIXEL CAMERA

TYPE:360 DEGREE

CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION.#-##

MOUNTING HEIGHT: REFER TO DETAIL SHEET

HIGH-SECURITY DOOR POSITION SWITCH

MOUNTING LOCATION: REFER TO DRAWINGS/DETAIL

MOUNTING HEIGHT: REFER TO DETAIL SHEET

ROLL-UP SHUTTER DOOR POSITION SWITCH

MOUNTING LOCATION: REFER TO DRAWINGS/DETAIL

MOUNTING HEIGHT: AS NOTED

CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION

MOUNTING LOCATION: REFER TO DRAWINGS/DETAIL

VIDEO INTERCOM SUBSTATION

LOCAL ALARM (NIC)

MOUNTING LOCATION: REFER TO DETAILS

MOUNTING HEIGHT: AS NOTED

DEVICE MOUNTS

DETAIL REFERENCE

TOP DESIGNATES DETAIL NUMBER

BOTTOM DESIGNATES SHEET NUMBER

DET #

SHT #

MOUNTING LOCATION: DESK

BADGE PRINTER

CAMERAS

PEDESTAL/GOOSENECK MOUNTED

MOUNTING HEIGHT: AS NOTED

CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION

MOUNTING LOCATION: CONTROLLED THROUGH ACMS

INTERCOM MASTER STATION

MOUNTING LOCATION: DESK

MOUNTING HEIGHT: REFER TO DETAIL SHEET

DOOR RELEASE BUTTON

REDIRECTOR/DEMARCATION PANEL

CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION

PARAPET MOUNTED (J-BOX)

SURFACE MOUNTED (J-BOX)

RECESS MOUNTED (J-BOX)

WIRELESS PANIC/DURESS BUTTON

MOUNTING LOCATION: UNDER DESKTOP

MOUNTING HEIGHT: REFER TO DETAIL

OTHER

HEAD-END EQUIPMENT

ACCESS CONTROL

INTRUSION SYSTEM

DOOR MONITORING

CALL INITIATION DEVICES

EMERGENCY BREAK GLASS (NIC)

MOUNTING LOCATION: WALL

MOUNTING HEIGHT: AS NOTED

ELECTRO-MAGNETIC LOCKING HARDWARE

SIZE: REFER TO DRAWINGS

FIXED IP CAMERA

MOUNTING LOCATION: WALL

CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION.

ELECTRIFIED STRIKE

DOOR HARDWARE

SERVER RACK (NIC)

MOUNTING LOCATION: REFER TO DETAILS

MOUNTING HEIGHT: AS NOTED

CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION

1. REFER TO DRAWINGS AND DETAIL SHEET(S) FOR MOUNTING LOCATION AND HEIGHT INFORMATION.

2. TYPICAL SYMBOLS INDICATED. ALL SYMBOLS MAY NOT BE REFLECTED ON PLAN DRAWINGS OR USED.

A

ACCESS CONTROL READER: FUTURE/TENANT DEVICE

MOUNTING: UNLESS OTHERWISE NOTED ON DRAWINGS

CONTRACTOR TO PROVIDE ONLY ROUGH-IN AND CABLING PULL

STRING TO THE LOCATION INDICATED ON SECURITY DRAWING(S)

A F

VISITOR BADGE PRINTER

MOUNTING LOCATION: DESK

D DELAYED EGRESS

ENCLOSED CAMERA INDICATES

CEILING/RECESSED MOUNT TYPE

MOUNTING LOCATION: REFER TO DRAWINGS

DRY CONTACT RELAY CLOSURE

ACCESS CONTROL READER: MULLION MOUNT

MOUNTING LOCATION: DOOR FRAME

A M

MOUNTING HEIGHT: REFER TO DETAIL

T TEMPERATURE, HUMIDITY, AND WATER LEAK ENVIRONMENTAL

CONTROLLER

REQUEST-TO-EXIT PASSIVE INFRARED (PIR) MOTION SENSOR.

MOUNTING LOCATION: CEILING

360-DEGREE PANORAMIC CAMERA

TYPE: FISH-EYE

CONTRACTOR TO PROVIDE CAT 6A DATA CONNECTION.

*DOOR HARDWARE PROVIDED BY DIVISION 08. DOOR HARDWARE SYMBOLS

SHOWN FOR COORDINATION AND INFORMATION PURPOSES ONLY.

100% FINAL CONSTRUCTION DOCUMENTS

CONTRACT #: 140P2021D003 | TASK ORDER #: 140P8223F0021

MECHANICAL:

AEI

MADISON, WI

ELECTRICAL:

AEI

MADISON, WI

STRUCTURAL:

N/A

CIVIL:

N/A

PRIME/ARCH:

VHB

WILLIAMSBURG, VA

ARCHITECT:

GWWO…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .